HomeMy WebLinkAboutFigure 28_Interim Operations - LOM Ph 2 °°o O ldd� aF\tea Pod Shelby Project Location
Gastonia
Rd
* to ,Charlotte
North Carolina
South Carolina
Perimeter
Pond M71
O `0r
h4rSf t� Ge� Dewatering - - -
O Q aC9te Storage Y C,,=Permit Boundary
Heavy Electric r� - "+ -
p NC Jurisdictional Waters 50 Foot Buffer
Charging Station } Property
Setback
Laydow>� I h , ` O No Buffer
c l Q [3Proposed Walking Path
Pe r imeter
. Open Pit o \CC ®Undisturbed Enhanced Evergreen Buffer
Truck Maintenance Shop Pond M72 / "_ / ®Undisturbed Naturally Vegetated Property Buffer
Lube Storage Temp.Perimeter
UtilityAreaRool Room Pond M73
216 - Q Undisturbed Planted Vegetated Buffer
W&F Shop Layd�o�rea
® o Q Vegetated Berm
Mine Change Housel jnt�ri" i Mine Design Feature
Mine Offices r (�
Warehouse 4 Growth / \\�\' �Open Pit Contour
0 StorageOde\ /> �Overburden Storage Facility Contour
4 GS Rock Storage Facility Contour
North Gate 1 Open Pit
�d P� Security Offices Ready Line Wash Bay& � ❑Overburden Storage Facility
e Water Recir.Area / 1
G Fire Water Tanks ) - Q Rock Storage Facility
to &Pumps y Truck �el Station boo �, ♦ 1
t� /�, Tech Center Gate l� I Mine Stockpile Area
Dominion Gast Collection Weighing yap \ \ Securily' Offic'e �4
G Metering Station Pond M61 4if
P,te 6 m °a`y 1 South Gate -�Y —Run-of-Mine Pad
d7 Tire Yard "�, ♦n Dewatering Storage
4 Run-of=Mine Security Office `
Oa O �^ � , „_ ♦ � o �Growth Media Storage
goo ��--♦ , <\ Pad /
Water Truck Laydown Area
Tailin sLoadout Fill Area Note$ -
Q�w s St i Overburden Primary Infrastructure
1�mm Building. Crusher;
0 � Misc.Waste Storage !� � , � � ter- Fence Line
— Storage Faduty-2 1 �� ♦ ,t —Pipe Line
�000 Sed Pond 1 , ♦ Processing Features and Infrastructure
0 010 .� Colleylion 85 PIan4Feed j
Overburden_ 9i �� e / �.'
d ` �100o f eno O S,�e Pond M12 StockpileArea �� � 161 —Proposed 44kV Route
_ Storage sio y
d Existing Building e
Facilit :1 g40 062 ®Conveyors mac/ La down
Y South Creek � % Secondary
+Proposed Building
c Sed Pond:62 Arch Culvert Rail'Car,Fuelin'g Station R f Crusher C011ection o
063%7 / i. Pond CO3 / Proposed Dam —
�-—-- r 067'�r - &Infra St6rage� \/ Tertiary
o / ���llC ° Transportation
x YSed Pond 63 Crusher Tooling� 0 ♦ Crusher
// Area&Uo or Flotation m
p ♦ Existing Road i
p 1�\ Sorting Building .1
ConcentratorrTruek\ , Building Reage\ Riprap Diffuser Railroad
Load-Outbuilding �+'�Storage f ♦ ockfill E
Haul Road
Concentrator- y Electrical Electrical Building Y
y Rock Storage e t 9 Site Road
Load�-IO,ut Bins Natural Gas Building x
Facility X /A V_X i MeteringStation Concentrator Gate/Security Office Hydrology m
Collection Pond M11 'F g
r Future DMS Building
Collection • Outfall Location o
o , Pond'C01 DMS Building —Conduits and Culverts a
Warehouse
0� a ho n Filtration Building 2-Drainage
Rock Storage c+ / p Raw Comp g 2,Named Flowline
'1 Compressor
S° FaCllltyA f\ i o03 Water Pump qo Pond
Concentrator Of lice/
hO0/ �� f� Lay'ownl Q ♦ CanteenlChange House Water Storage Basin 1
Sr ,, Water Storage
�i' WRC Pond 51 m� Concentrator Water Notes:
7 Collection PondCO2 \� Basin 1 Treatment Plant
I 5Q -Note 1:Permit Boundary updated by ERM on September 3 2024. x
Note 2:Mine phases were provided by SRK on April 19 2024.
°d o64 ♦ y 005 E Note 3:Area excluded from the permit boundary,existing
d/ �Embankment
� I facilities are not related to mining activity in North Carolina.
—WRC Pond 61 Seond64 �
N
a Overburden
Sto�agey }� 0 0.2 0.4
_0 Facility 3 ��� �� rJ+ Miles
`�C� , 1 inch = 0.2 mile when printed at 11"x17"
,�� Gaffe Rd a z
T cd9� Figure 28
Sequence Map: Interim Operations g
(End of Mining Year 5) LOM Ph 2
Kings Mountain Lithium Mine
Albemarle
Kings Mountain ��` Q
o ea City Cleveland County, 1
o a0e Lake o North Carolina g