Loading...
HomeMy WebLinkAboutFigure 28_Interim Operations - LOM Ph 2 °°o O ldd� aF\tea Pod Shelby Project Location Gastonia Rd * to ,Charlotte North Carolina South Carolina Perimeter Pond M71 O `0r h4rSf t� Ge� Dewatering - - - O Q aC9te Storage Y C,,=Permit Boundary Heavy Electric r� - "+ - p NC Jurisdictional Waters 50 Foot Buffer Charging Station } Property Setback Laydow>� I h , ` O No Buffer c l Q [3Proposed Walking Path Pe r imeter . Open Pit o \CC ®Undisturbed Enhanced Evergreen Buffer Truck Maintenance Shop Pond M72 / "_ / ®Undisturbed Naturally Vegetated Property Buffer Lube Storage Temp.Perimeter UtilityAreaRool Room Pond M73 216 - Q Undisturbed Planted Vegetated Buffer W&F Shop Layd�o�rea ® o Q Vegetated Berm Mine Change Housel jnt�ri" i Mine Design Feature Mine Offices r (� Warehouse 4 Growth / \\�\' �Open Pit Contour 0 StorageOde\ /> �Overburden Storage Facility Contour 4 GS Rock Storage Facility Contour North Gate 1 Open Pit �d P� Security Offices Ready Line Wash Bay& � ❑Overburden Storage Facility e Water Recir.Area / 1 G Fire Water Tanks ) - Q Rock Storage Facility to &Pumps y Truck �el Station boo �, ♦ 1 t� /�, Tech Center Gate l� I Mine Stockpile Area Dominion Gast Collection Weighing yap \ \ Securily' Offic'e �4 G Metering Station Pond M61 4if P,te 6 m °a`y 1 South Gate -�Y —Run-of-Mine Pad d7 Tire Yard "�, ♦n Dewatering Storage 4 Run-of=Mine Security Office ` Oa O �^ � , „_ ♦ � o �Growth Media Storage goo ��--♦ , <\ Pad / Water Truck Laydown Area Tailin sLoadout Fill Area Note$ - Q�w s St i Overburden Primary Infrastructure 1�mm Building. Crusher; 0 � Misc.Waste Storage !� � , � � ter- Fence Line — Storage Faduty-2 1 �� ♦ ,t —Pipe Line �000 Sed Pond 1 , ♦ Processing Features and Infrastructure 0 010 .� Colleylion 85 PIan4Feed j Overburden_ 9i �� e / �.' d ` �100o f eno O S,�e Pond M12 StockpileArea �� � 161 —Proposed 44kV Route _ Storage sio y d Existing Building e Facilit :1 g40 062 ®Conveyors mac/ La down Y South Creek � % Secondary +Proposed Building c Sed Pond:62 Arch Culvert Rail'Car,Fuelin'g Station R f Crusher C011ection o 063%7 / i. Pond CO3 / Proposed Dam — �-—-- r 067'�r - &Infra St6rage� \/ Tertiary o / ���llC ° Transportation x YSed Pond 63 Crusher Tooling� 0 ♦ Crusher // Area&Uo or Flotation m p ♦ Existing Road i p 1�\ Sorting Building .1 ConcentratorrTruek\ , Building Reage\ Riprap Diffuser Railroad Load-Outbuilding �+'�Storage f ♦ ockfill E Haul Road Concentrator- y Electrical Electrical Building Y y Rock Storage e t 9 Site Road Load�-IO,ut Bins Natural Gas Building x Facility X /A V_X i MeteringStation Concentrator Gate/Security Office Hydrology m Collection Pond M11 'F g r Future DMS Building Collection • Outfall Location o o , Pond'C01 DMS Building —Conduits and Culverts a Warehouse 0� a ho n Filtration Building 2-Drainage Rock Storage c+ / p Raw Comp g 2,Named Flowline '1 Compressor S° FaCllltyA f\ i o03 Water Pump qo Pond Concentrator Of lice/ hO0/ �� f� Lay'ownl Q ♦ CanteenlChange House Water Storage Basin 1 Sr ,, Water Storage �i' WRC Pond 51 m� Concentrator Water Notes: 7 Collection PondCO2 \� Basin 1 Treatment Plant I 5Q -Note 1:Permit Boundary updated by ERM on September 3 2024. x Note 2:Mine phases were provided by SRK on April 19 2024. °d o64 ♦ y 005 E Note 3:Area excluded from the permit boundary,existing d/ �Embankment � I facilities are not related to mining activity in North Carolina. —WRC Pond 61 Seond64 � N a Overburden Sto�agey }� 0 0.2 0.4 _0 Facility 3 ��� �� rJ+ Miles `�C� , 1 inch = 0.2 mile when printed at 11"x17" ,�� Gaffe Rd a z T cd9� Figure 28 Sequence Map: Interim Operations g (End of Mining Year 5) LOM Ph 2 Kings Mountain Lithium Mine Albemarle Kings Mountain ��` Q o ea City Cleveland County, 1 o a0e Lake o North Carolina g