HomeMy WebLinkAbout20240426_ADI_ext_approval From: Vinson,Tobv
To: Parr,Adam
Subject: Re: [External]time extension request-Toisnot Pit and Dunnie Hole Mine
Date: Friday,April 26,2024 2:15:55 PM
Those reasons appear appropriate for an extension. Approved.
Tv
Toby Vinson, Interim Director,
Dept of Environmental Quality
Div of Energy, Mineral, and Land Resources/Land Quality Section
DEQ NCORR Liaison
Toby.vinson@ncdenr.gov
919-707-9201
On Apr 26, 2024, at 10:09 AM, Parr, Adam<adam.parr@deq.nc.gov>wrote:
To by,
Please see the two extension of time requests to respond to our ADI letters. The
time requested for both applications is July 29, 2024. Please let me know if you
approve and I'll draft the extension letter.
Thanks,
Adam Parr, PE
State Mining Engineer
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Office: (919)707-9207 1 Cell: (919)441-7157
adam.parrCc-0deq.nc.9ov
Physical Address: 512 N Salisbury Street
Raleigh, NC 27604
Mailing Address: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Mining Program Website:
https://deq.nc.gov/mining-program
<image001,jpg>
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: e2s@bellsouth.net<e2s@bellsouth.net>
Sent: Friday, April 26, 2024 9:09 AM
To: Parr, Adam <adam.parr@deq.nc.gov>
Cc: Vinson, Toby<toby.vinson@deq.nc.gov>
Subject: Re: [External] time extension request-Toisnot Pit and Dunnie Hole Mine
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious
emails with the Report Message button located on your Outlook menu bar on the Home tab.
Adam,
Could the due date for both sites be extended to July 29, 2024.
Thanks
T. Patrick Shillington, P.E.
Engineering &Environmental Science Company, Inc.
3008 Anderson Drive, Suite 102
Raleigh, NC 27609
919-781-7798 O
919-781-7796 F
919-539-8582 C
e2s&bellsouth.net
On Thursday, April 25, 2024 at 05:46:30 PM EDT, Parr, Adam <adam.parrQdeq.nc.gov>
wrote:
Pat,
What is the length of time you are requesting for an extension on both of these
sites?
Adam Parr, PE
State Mining Engineer
Division of Energy, Mineral and Land Resources
North Carolina Department of Environmental Quality
Office: (919) 707-9207 1 Cell: (919) 441-7157
adam.parr e_deq.nc.gov
Physical Address: 512 N Salisbury Street
Raleigh, NC 27604
Mailing Address: 1612 Mail Service Center
Raleigh, North Carolina 27699-1612
Mining Program Website:
https://deq.nc.gov/mining-program
<image001.jpg>
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: e2s o bellsouth.net <e2s&bellsouth.net>
Sent: Tuesday, April 23, 2024 5:13 PM
To: Vinson, Toby <toby.vinson&deq.nc.gov>; Parr, Adam
<adam.parr a deq.nc.gov>
Subject: [External] time extension request-Toisnot Pit and Dunnie Hole Mine
CAUTION: External email. Do not click links or open attachments unless verified. Report
suspicious emails with the Report Message button located on your Outlook menu bar on
the Home tab.
Toby,
Please see attached time extension requests.
T.Patrick Shillington,P.E.
Engineering&Environmental Science Company,Inc.
3008 Anderson Drive,Suite 102
Raleigh,NC 27609
919-781-7798 O
919-781-7796 F
919-539-8582 C
e2s a&bellsouth.net
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties by an authorized state official.
<time extension request-Dunnie Hole Mine.pdf5
<time extension request-toisnot pit.pdf>