Loading...
HomeMy WebLinkAbout20240426_ADI_ext_approval From: Vinson,Tobv To: Parr,Adam Subject: Re: [External]time extension request-Toisnot Pit and Dunnie Hole Mine Date: Friday,April 26,2024 2:15:55 PM Those reasons appear appropriate for an extension. Approved. Tv Toby Vinson, Interim Director, Dept of Environmental Quality Div of Energy, Mineral, and Land Resources/Land Quality Section DEQ NCORR Liaison Toby.vinson@ncdenr.gov 919-707-9201 On Apr 26, 2024, at 10:09 AM, Parr, Adam<adam.parr@deq.nc.gov>wrote: To by, Please see the two extension of time requests to respond to our ADI letters. The time requested for both applications is July 29, 2024. Please let me know if you approve and I'll draft the extension letter. Thanks, Adam Parr, PE State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919)707-9207 1 Cell: (919)441-7157 adam.parrCc-0deq.nc.9ov Physical Address: 512 N Salisbury Street Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deq.nc.gov/mining-program <image001,jpg> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: e2s@bellsouth.net<e2s@bellsouth.net> Sent: Friday, April 26, 2024 9:09 AM To: Parr, Adam <adam.parr@deq.nc.gov> Cc: Vinson, Toby<toby.vinson@deq.nc.gov> Subject: Re: [External] time extension request-Toisnot Pit and Dunnie Hole Mine CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Adam, Could the due date for both sites be extended to July 29, 2024. Thanks T. Patrick Shillington, P.E. Engineering &Environmental Science Company, Inc. 3008 Anderson Drive, Suite 102 Raleigh, NC 27609 919-781-7798 O 919-781-7796 F 919-539-8582 C e2s&bellsouth.net On Thursday, April 25, 2024 at 05:46:30 PM EDT, Parr, Adam <adam.parrQdeq.nc.gov> wrote: Pat, What is the length of time you are requesting for an extension on both of these sites? Adam Parr, PE State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9207 1 Cell: (919) 441-7157 adam.parr e_deq.nc.gov Physical Address: 512 N Salisbury Street Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deq.nc.gov/mining-program <image001.jpg> Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: e2s o bellsouth.net <e2s&bellsouth.net> Sent: Tuesday, April 23, 2024 5:13 PM To: Vinson, Toby <toby.vinson&deq.nc.gov>; Parr, Adam <adam.parr a deq.nc.gov> Subject: [External] time extension request-Toisnot Pit and Dunnie Hole Mine CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Toby, Please see attached time extension requests. T.Patrick Shillington,P.E. Engineering&Environmental Science Company,Inc. 3008 Anderson Drive,Suite 102 Raleigh,NC 27609 919-781-7798 O 919-781-7796 F 919-539-8582 C e2s a&bellsouth.net Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. <time extension request-Dunnie Hole Mine.pdf5 <time extension request-toisnot pit.pdf>