Loading...
HomeMy WebLinkAbout2024-08-09 Speight Pit App ADI letter Adam MKE Environmental 3620 Cattail Lane Greenville, N.C. 27858 August 9, 2024 Mr. Adam Parr Division of Energy, Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh, North Carolina 27699-1612 RE: Smith Brewer Farms, LLC Proposed Speight Pit Lenoir County Dear Mr. Parr, The following addresses the comments in your letter dated May 6, 2024. 1. The O&M plan is stated on the revised mine map. Impacts to the adjacent wetlands are not expected. The adjacent wetlands will be routinely inspected for any impacts. Any impact(s) will be addressed immediately. Water withdrawals and water levels at the excavation area will be reported per the CCPCUA permit. 2. Mr. Ely Perry has confirmed there are no private drinking wells within 500' of the mine excavation. 3. The map has been revised to show the 75' area between the excavation areas. This 75' area will be the last area excavated. Pumping will cease at this stage. Excavation will start on one end of the 75' area and work out towards the opposite end. Excavation will go down to just above the water table, then the excavator will reach down from there below the water table. This part of the operation will be wet-mined. Two copies of the revised map and additional information are enclosed. If you have any questions or need additional information, do not hesitate to contact me at (252) 258-4037. Sincerely, H44C K. F..r. WA404 Marc K. Edwards Cc: Ely Perry III Enclosures: Mine maps (#2)