Loading...
HomeMy WebLinkAbout20240830_Transfer_80-18_signed ROY COOPER Governor ELIZABETH S. BISER IV Secretary WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality August 30,2024 Certified Mail Return Receipt Requested 7022 0410 0003 1066 4088 J. David McKeown Meridian Brick LLC 5100 Brickyard Road Columbia,SC 29203 Re: Mining Permit No. 80-18 Thomas Mine Rowan County Yadkin-PeeDee River Basin Dear Mr. McKeown: Your request to have Mining Permit No.80-18 transferred in its entirety from your company to General Shale Brick, Inc.has been approved. As we have received General Shale Brick Inc.'s required surety in an amount sufficient to cover the present operation,your company is hereby released from further responsibility for this site with respect to The Mining Act of 1971. Your$1,000,000.00 blanket bond will remain on file to cover your remaining mine permits. Thank you for your cooperation in this matter. Sincerely, Adam Parr, PE State Mining Engineer AP/kbj cc: Jerry Eplin,PE Mr. Beau Thomas-DOL, Mine and Quarry Bureau D_EQ�� North Carolina Depamment of Environmental Quality I Division of Energy.Mineral and land Resources 512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 2 769 9-1612 919.707.9200 ROY COOPER Governor ELIZABETH S. BISER Secretary WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality August 30,2024 J. David McKeown General Shale Brick, Inc. 5100 Brickyard Road Columbia, SC 29203 RE: GSBI(Plant 51)Thomas Mine Mining Permit No. 80-18 Rowan County Yadkin-PeeDee River Basin Dear McKeown: Your request to have the above referenced mining permit,issued to Meridian Brick LLC,has been approved and is transferred in its entirety to your company. As we have received the required surety in an amount sufficient to cover the present operation, I am enclosing the transferred mining permit. The permit number and mine name shall remain the same as before the transfer. Please review the permit carefully and notify this office of any objections or questions you may have concerning the terms of the permit. It is your responsibility to fully understand and comply with the conditions of your mining permit. As a reminder,your permitted acreage at this site is 65.5 acres and the amount of land you are approved to disturb is 51.0 acres. Again,if you should have any questions on this matter please contact Kelly Jonas,Assistant State Mining Specialist, at(919)707-9220. Sincerely, Adam Parr, PE State Mining Engineer APlkbj Enclosures—Mine Permit 80-18 cc: Jerry Eplin, PE Mr. Beau Thomas-DOL, Mine and Quarry Bureau,w/o enclosures North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources 512 North Salisbury Street 11612 Mail Service Center I Raleigh.North Carolina 2 76 9 9-1612 919.707.9200 DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY,MINERAL,AND LAND RESOURCES LAND QUALITY SECTION PERMIT For the operation of a mining activity In accordance with the provisions of N.C.G.S. §74-46 through 68,"The Mining Act of 1971,"Mining Permit Rule 15A NCAC 05B,and other applicable laws,rules,and regulations Permission is hereby granted to: General Shale Brick,Inc. GSBI (Plant 51)Thomas Mine Rowan County-Permit No. 80-18 for the operation of a Clay and Shale Mine Which shall provide that the usefulness,productivity and scenic values of all lands and waters affected by this mining operation will receive the greatest practical degree of protection and restoration. Page 2 In accordance with the application for this mining permit, which is hereby approved by the Department of Environmental Quality,hereinafter referred to as the Department,and in conformity with the approved Reclamation Plan attached to and incorporated as part of this permit, provisions must be made for the protection of the surrounding environment and for reclamation of the land and water affected by the permitted mining operation. This permit is expressly conditioned upon compliance with all the requirements of the approved Reclamation Plan. However,completed performance of the approved Reclamation Plan is a separable obligation,secured by the bond or other security on file with the Department,and may survive the revocation or suspension of this permit. This permit is not transferable by the permittee with the following exception: If another operator succeeds to the interest of the permittee in the permitted mining operation,by virtue of a sale, lease,assignment or otherwise,the Department may release the permittee from the duties imposed upon him by the conditions of his permit and by the Mining Act with reference to the permitted operation, and transfer the permit to the successor operator, provided that both operators have complied with the requirements of the Mining Act and that the successor operator agrees to assume the duties of the permittee with reference to reclamation of the affected land and posts a suitable bond or other security. In the event that the Department determines that the permittee or permittee's successor is not complying with the Reclamation Plan or other terms and conditions of this permit or is failing to achieve the purposes and requirements of the Mining Act,the Department may give the operator written notice of its intent to modify,revoke or suspend the permit,or its intent to modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a hearing at a designated time and place on any proposed modification, revocation, or suspension by the Department. Alternatively,and in addition to the above,the Department may institute other enforcement procedures authorized by law. I. Definitions. N.C.G.S. §74-49. Wherever used or referred to in this permit,unless the context clearly indicates otherwise,terms shall have the same meaning as supplied by the Mining Act,N.C.G.S. §74-49. H. Issuance and Modifications. N.C.G.S. §74-52. March 27, 1980: This permit has been transferred in its entirety from Hammil Construction Company to Isenhour Brick and Tile Company. August 29, 1997: This permit has been modified to change the corporate name from Isenhour Brick and Tile Company to Boral Bricks,Inc. November 10, 1999:This permit has been modified to increase the affected acreage to 49 acres as indicated on the Mine Map last revised August 1999. August 17,2009:This permit has been modified to increase the affected acreage at this site to 51.0 acres as indicated on the Mine Maps dated April 30, 2009. This modification includes the expansion of the mine excavation area, the removal of 7.94 acre reclamation area from the affected acreage, revision to the sediment and erosion control plan to construct a berm to direct run off to the sediment basin and reconstruct the principle spillway and dewatering devices of the sediment basin and revision to the reclamation plan to allow the 2.42 acre sediment basin to be left as a lake at the time of final reclamation. June 15, 2017: This permit has been modified to change the corporate name from Boral Bricks, Inc. to Meridian Brick LLC. December 1.2017: This permit has been issued for the life of site or the duration of the lease term. Page 3 August 30, 2024: This permit has been transferred in its entirety from Meridian Brick LLC to General Shale Brick, Inc. The permitted area is 65.5 acres and the area approved to disturb is 51.0 acres. This permit is valid for the life of the site or life of lease, if applicable, as defined by Session Law 2017- 209 and has no expiration date. However, all provisions of N.C.G.S. §74-51 and N.C.G.S. §74-52 still apply for new,transferred,and modified mining permits. III. Operating Conditions. N.C.G.S. V4-51. This Permit shall be subject to the provisions of the Mining Act, N.C.G.S. §74-46, et. seq., and to the following conditions and limitations: 1. Wastewater and Quarry Dewatering. A. Any wastewater processing or mine dewatering shall be in accordance with the permitting requirements and rules promulgated by the N.C.Environmental Management Commission. B. Any stormwater runoff from the affected areas at the site shall be in accordance with any applicable permit requirements and regulations promulgated by the Environmental Protection Agency and enforced by the N.C.Environmental Management Commission. It shall be the permittee's responsibility to contact the Stormwater Program to secure any necessary stormwater permits or other approval documents. 2. Air Quality and Dust Control. A*. Any mining process producing air contamination emissions shall be subject to the permitting requirements and rules promulgated by the N.C. Environmental Management Commission and enforced by the Division of Air Quality. B. During mining operations, water trucks or other means that may be necessary shall be utilized to mitigate dust leaving the permitted area. 3. Buffer Zones. A. Sufficient buffer(minimum 50 foot undisturbed)shall be maintained between any affected land and any adjoining waterway or wetland to prevent sedimentation of that waterway or wetland from erosion of the affected land and to preserve the integrity of the natural watercourse or wetland. B. Buffers shall be maintained as indicated on the mine maps dated April 30, 2009. No additional mining related disturbances shall be conducted within these buffers. C. Any mining activity affecting waters of the State,waters of the U. S.,or wetlands shall be in accordance with the requirements and regulations promulgated and enforced by the N. C. Environmental Management Commission. 4. Erosion and Sediment Control. A. Adequate mechanical barriers including but not limited to diversions, earthen dikes, sediment check dams, sediment retarding structures, rip rap pits, or ditches shall be provided in the initial stages of any land disturbance and maintained to prevent sediment from discharging onto adjacent surface areas or into any lake, wetland, or natural watercourse in proximity to the affected land. Page 4 B. Mining activities, including the installation and maintenance of the approved sediment basins and associated diversion channels,shall be conducted as indicated on the Mine Maps dated April 30, 2009, and the supplemental information received by the Land Quality Section on May 29,2009. 5. Permanently Marked Boundaries. A. All mining permit boundaries(65.5 acres)shall be permanently marked at the site on 100- foot intervals unless the line of sight allows for larger spacing intervals. B. Before and during site development, limits of disturbance, for any active disturbed areas, as indicated on the Mine Maps dated April 30, 2009, shall be marked at the site on 100- foot intervals unless the line of sight allows for larger spacing intervals. 6. Graded Slopes and Fills. The angle for graded slopes and fills shall be no greater than the angle, which can be retained by vegetative cover or other adequate erosion control measure, structure, or device. In any event, exposed slopes or any excavated channels,the erosion of which may cause off-site damage because of sedimentation,shall be planted,or otherwise provided with ground cover,devices,or structures sufficient to restrain such erosion. 7. Surface Drainage. The affected land shall be graded so as to prevent collection of pools of water that are,or likely to become, noxious or foul. Necessary structures such as drainage ditches or conduits shall be constructed or installed when required to prevent such conditions. 8. Blastiniz No blasting activities shall occur at this site. 9. Visual Screening. Existing vegetation or vegetated earthen berms shall be maintained between the mine and public thoroughfares whenever practical to screen the operation from the public. 10. Buffer Between Mining Permit Boundaries and/or Right-of-ways. A. Sufficient buffer (minimum 25 foot undisturbed) shall be maintained between any excavation and any mining permit boundary to protect adjacent property. B. Buffers shall be maintained as indicated on the mine maps dated April 30, 2009. No additional mining related disturbances shall be conducted within these buffers. 11. Highwall barrier A. A physical barrier consisting of a fence or earthen berm, etc.,shall be maintained around the perimeter of any highwall. Page 5 12. Refuse Disposal. A. No on-site disposal of refuse or other solid waste that is generated outside of the mining permit area shall be allowed within the boundaries of the mining permit area unless authorization to conduct said disposal has first been obtained from both the Division of Waste Management and the Division of Energy,Mineral and Land Resources,Department of Environmental Quality. The method of disposal shall be consistent with the approved reclamation plan. B. Mining refuse as defined by N.C.G.S. §74-49 (14)of The Mining Act of 1971 generated on-site and directly associated with the mining activity may be disposed of in a designated refuse area. All other waste products must be disposed of in a disposal facility approved by the Division of Waste Management. No petroleum products, acids, solvents or their storage containers or any other material that may be considered hazardous shall be disposed of within the permitted area. C. For the purposes of this permit, the Division of Energy, Mineral and Land Resources considers the following materials to be "mining refuse" (in addition to those specifically listed under N.C.G.S. §74-49(14)of the N.C. Mining Act of 1971): i. on-site generated land clearing debris. ii. conveyor belts. iii. wire cables. iv. v-belts. V. steel reinforced air hoses. vi. drill steel. D. If mining refuse is to be permanently disposed within the mining permit boundary, the following information must be provided to and approved by the Division of Energy, Mineral and Land Resources prior to commencement of such disposal: i. the approximate boundaries and size of the refuse disposal area. ii. a list of refuse items to be disposed. iii. verification that a minimum of 4 feet of cover will be provided over the refuse. iv. verification that the refuse will be disposed at least 4 feet above the seasonally high-water table;and, V. verification that a permanent vegetative groundcover will be established. IV. Annual Reclamation Report and Annual Operating Fee. N.C.G.S. An Annual Reclamation Report and Annual Operating Fee of$400.00 shall be submitted to the Department by September 1 of each year until reclamation is completed and approved for release by the Department. V. Prior Approval Required for Plan Modification. N.C.G.S. §74-52. The operator shall notify the Department in writing of the desire to delete,modify or otherwise change any part of the mining,reclamation,or erosion/sediment control plan contained in the approved application for a mining permit or any approved revision to it. Approval to implement such changes must be obtained from the Department prior to on-site implementation of the revisions. Page 6 VI. Bonding. N.C.G.S. §74-54. The security, which was posted pursuant to N.C.G.S. §74-54 in the form of a$1,000,000 blanket surety bond,is sufficient to cover the operation as indicated in the approved application. This security must remain in force for this permit to be valid. The total affected land shall not exceed the bonded acreage. VII. Archaeolojaical Resources. N.C.G.S. §70. 1. Minimum Requirements. A. Authorized representatives of the Division of Archives and History shall be granted access to the site to determine the presence of significant archaeological resources. B. Pursuant to N.C.G.S. §70, Article 3, "The Unmarked Human Burial and Human Skeletal Remains Protection Act,"should the operator or any person in his employ encounter human skeletal remains,immediate notification shall be provided to the county medical examiner and the chief archaeologist,North Carolina Division of Archives and History. VIII. Approved Reclamation Plan. N.C.G.S. §74-53. The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition on the continuing validity of that Mining Permit. Additionally,the Reclamation Plan is a separable obligation of the permittee,which continues beyond the terms of the Mining Permit. To comply with N.C.G.S. §74-53 the approved plan will provide: 1. Minimum Standards. A. The final slopes in all excavations in soil,sand,gravel,and other unconsolidated materials shall be at such an angle as to minimize the possibility of slides and be consistent with the future use of the land. B. Provisions for safety to persons and to adjoining property must be provided in all excavations in rock. C. All overburden and spoil shall be left in a configuration which is in accordance with accepted conservation practices,and which is suitable for the proposed subsequent use of the land. D. No small pools of water shall be allowed to collect or remain on the mined area that are,or are likely to become noxious,odious,or foul. E. The revegetation plan shall conform to accepted and recommended agronomic and reforestation practices as established by the North Carolina Agricultural Experiment Station and the North Carolina Forest Service. F. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein incorporated. These activities shall be conducted according to the time schedule included in the plan,which shall to the extent feasible provide reclamation simultaneous with mining operations and in any event, provide reclamation at the earliest practicable time after completion or termination of mining on any segment of the permit area and shall be completed within two years after completion or termination of mining. Page 7 2. Reclamation Conditions. A. Provided further, and subject to the Reclamation schedule, the planned reclamation shall be to allow the sediment basin and part of the mine excavation area to be left as a lake and regrade and satisfactorily revegetate any other disturbed areas. B. The specifications for surface gradient restoration to a surface suitable for the planned future use are as follows: i. All final perimeter side slopes shall be graded to a 3 horizontal to 1 vertical or flatter slope. ii. The processing, stockpile, and other disturbed areas neighboring the mine excavation shall be leveled and smoothed. iii. Compacted surfaces shall be disced, subsoiled or otherwise prepared before revegetation. iv. No contaminants shall be permanently disposed of at the mine site. On-site disposal of waste shall be in accordance with Operating Condition Nos. III.12.A through III.12.13. V. The affected land shall be graded to prevent the collection of noxious or foul water. 3. Revegetation Plan. After site preparation,all disturbed land areas shall be revegetated as per the following: Permanent Seeding Specifications Dates Species Rate,Lbs./Acre February 15-April 1 Kobe Lespedeza 10 Bahiagrass 50 Redtop 1 Winter rye(grain) 15 April 1-July 31 Common Bermuda 50 August 1-October 25 Lespedeza(unscarified) 30 German millet 40 October 25-February 15 Rye(grain-temporary) 120 Soil Amendments Lime 2000 lbs./acre or follow recommendations from a soil test. Fertilizer 1000 lbs./acre 8-8-8 or 10-10-10 or follow recommendations from a soil test. Mulch All seeded areas shall be mulched using small grain straw at a rate of 2000 lbs./acre and anchored appropriately. Whenever possible, disturbed areas should be vegetated with native warm season grasses such as switch grass, Indian grass,bluestem,and gamma grass. In addition,the permittee shall consult with a professional wildlife biologist with the N.C.Wildlife Resources Commission to enhance post-project wildlife habitat at the site. Page 8 4. Reclamation Plan. Reclamation shall be conducted simultaneously with mining to the extent feasible. In any event, reclamation shall be initiated as soon as feasible after completion or termination of mining of any mine segment under permit. Final reclamation, including revegetation, shall be completed within two years of completion or termination of mining. IX. Issuance and Modification Summary. N.C.G.S. 474-51 and 474-52. This permit, issued to Hammil Construction Company Inc.on June 20, 1978,transferred to Isenhour Brick and Tile Company Inc.on March 27, 1980,renewed May 25, 1989,modified to change the corporate name to Boral Bricks Inc. on August 29, 1997,renewed and modified November 10, 1999,and modified August 17,2009,June 15,2017,and December 1,2017,is hereby transferred in its entirety this 30th day of August 2024 pursuant to N.C.G.S. §74-51. Adam Parr, PE, State Mining Engineer Division of Energy,Mineral, and Land Resources By Authority of the Secretary Of the Department of Environmental Quality NOTICE REGARDING THE RIGHT TO CONTEST A MINING PERMIT DECISION Right of Persons Aggrieved to File a Contested Case for the Issuance of,or Modification to,a Mining Permit: Pursuant to NCGS 74-61 and NCGS 150B,Article 3,a party or person aggrieved may file a contested case by filing a petition under NCGS 150B-23 in the Office of Administrative Hearings within 30 days after the Division makes the decision and posts the decision on a publicly available website. General Filing Instructions: A petition for contested case hearing must be in the form of a written petition, conforming to NCGS 150B-23, and filed with the Office of Administrative Hearings, 1711 New Hope Church Road, Raleigh NC, 27609, along with a fee in an amount provided in NCGS 15013-23.2. A petition for contested case hearing form may be obtained upon request from the Office of Administrative Hearings or on its website at https://www.oah.nc.govlhearings-division/filing/hearing-forms. Additional specific instructions for filing a petition are set forth at 26 NCAC Chapter 03. Service Instructions: A party filing a contested case is required to serve a copy of the petition, by any means authorized under 26 NCAC 03 .0102,on the process agent for the Department of Environmental Quality: William F. Lane, General Counsel North Carolina Department of Environmental Quality 1601 Mail Service Center Raleigh,North Carolina 27699-1601 If the party filing the petition is a person aggrieved other than the permittee or permit applicant,the party must also serve the permittee in accordance with NCGS 150B-23(a). s s s Be aware that other rules or laws may apply to the filing of a petition for a contested case. Additional information is available at httr)s://www.oah.nc.uovihearings-division/heariniz-process/filiniz-contested-case. Please contact the Office of Administrative Hearings at(984) 236-1850 or oah.postmaster n oah.nc. og_v with all questions regarding the filing fee and/or the details of the filing process.