Loading...
HomeMy WebLinkAbout20220301_Basin From: Parr,Adam To: Riddle,Shawna Cc: Miller,David Subject: RE: [External]New Basin at Grove Stone Date: Tuesday,March 1,2022 10:30:00 AM Shawna, To follow up on our conversation as well as discussions I had with David, this will not require a modification. However, the permittee must leave the smaller original basin in place as that was the approved ESC measure. We do not need to require a modification if the company is adding additional measures upstream from the permitted measure. Thanks, Adam Parr, PE Assistant State Mining Engineer Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Office: (919) 707-9207 Cell: (919)441-7157 FAX: (919) 715-8801 Email: adam.parr(@ncdenr.g_ov Physical Address: 512 N Salisbury Street Mailing Address: 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Mining Program Website: https://deq.nc.gov/mining-program D E vor+T 9 .,ru mom UOPMmme"GiUftfteww" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Riddle, Shawna <shawna.riddle@ncdenr.gov> Sent: Wednesday, February 23, 2022 4:23 PM To: Parr, Adam <adam.parr@ncdenr.gov> Subject: Fwd: [External] New Basin at Grove Stone Adam - Hey. This is the information you and I talked about the other day and trying to determine if a modification is needed. Please take a look and let me know. Thanks Shawna Shawna Riddle Environmental Senior Specialist Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality 828-296-4500 (office) 828-299-7043 (fax) Shawna.Riddle(@ncdenr.gov From:Jason Conner<iconner(@hedrickind.com> Sent:Tuesday, February 8, 2022 10:49:45 AM To: Riddle, Shawna <shawna.riddle(@ncdenr.gov> Subject: [External] New Basin at Grove Stone CAUTION: External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Report Spam. Shawna, Attached is the updated basin design at Grove Stone. The new basin will be a wastewater basin that has been designed to handle the 100-year storm plus wash water from our plant. The water will flow through 2 cells and then be pumped to our large slurry pump at the plant and become part of our closed loop recycle process. If for some reason the pump malfunctions or we have a 100-year plus storm event any discharge would flow out the 5'x5'x7' concrete riser into the existing GSQ#1 stormwater basin. Jason Jason Conner 828-712-9009 www.hedrickind.com HEDRICK INDUSTRIES