HomeMy WebLinkAbout10-99_20201007_ADI RA a
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN NORTH CAROLINA
Director Environmental Quality
October 7, 2020
Certified Mail
Return Receipt Requested
7019 1120 0000 5072 4076
Mr. Randy Hardee
131 Houghton Place SW
Sunset Beach, North Carolina 28468
RE: Permit No. 10-99
Lennon Sand Mine#3
Brunswick County
Lumber River Basin
Dear Mr. Hardee:
To date,this office has not received all of the information requested in the July 10, 2020 letter regarding
your modification for the Lennon Sand Mine#3 Mine in Brunswick County. As required by 15A NCAC 513.0013,
you are advised that you have 180 days from the date of your receipt of that letter to submit all of the requested
information. The above referenced letter was replied to on July 16, 2020. Therefore,your deadline to submit all
of the requested information is January 12, 2021.
In order for this office to complete its review of the referenced project in accordance with GS 74-50 and 51
of the Mining Act of 1971, please provide the additional or revised information in accordance with the following
comments:
Please provide a Jurisdictional Determination (JD) or Preliminary
Jurisdictional Determination (PJD)from the US Army Corps of Engineers for
the delineated wetlands onsite.
Please note,this office may request additional information, not included in this letter, as the mining
application review progresses. Be advised that our review cannot be completed until all of the items listed
above have been fully addressed.
D E Q�� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612
NORTH CAROLINA -�
o*a�mofEnvl mmww,iity /`� 919.707.9200
Certified Mail
Mr. Hardee
Page 2
In order to complete the processing of your application, please forward two (2) copies of the requested
information to my attention at the following address:
Division of Energy, Mineral and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
If you are unable to meet this deadline and wish to request additional time,you must submit
information, in writing,to the Director clearly indicating why the deadline cannot be met and request that an
extension of time be granted. If an extension of time is not granted or you do not respond to our request by the
January 12, 2021 deadline, a decision will be made to grant or deny the mining permit based upon the
information currently in the Department's files at the end of the 180-day period.
Though the preceding statement cites the maximum time limit for your response, we encourage you to
provide the additional information requested by this letter as soon as possible. Your prompt response will help
us to complete processing your application sooner.
Please contact me at (919)707-9220 if you have any questions.
Sincerely,
Adam R. Parr
Assistant State Mining Engineer
cc: Dan Sams, PE