HomeMy WebLinkAbout10-91 MOD 2015 (1) North Carolina Department of Environmental Quality
Pat McCrory Donald R.van der Vaart
Governor Secretary
November 3, 2015
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
7013 2630 0001 8990 3477
Ms. Margaret Collins
Salisbury Partners, LLC
24 West Salisbury Street
Wrightsville Beach, North Carolina 28480
Re: Alligator Branch Sand Pit
Mining Permit No. 10-91
Brunswick County
Cape Fear River Basin
Dear Ms. Collins:
Your recent request to have the above referenced mining permit modified has been
approved. The modification is to increase the affected acreage at this site to 24.05 acres as
indicated on the mine maps last revised August 28, 2015. The modification includes the
addition of sediment basins for use in dewatering activities during mining operations. A copy
of the modified permit is enclosed.
The conditions in the modified permit were based primarily upon the initial application.
Modifications were made as indicated by the modification request and as required to insure
compliance with The Mining Act of 1971. The expiration date, mine name and permit number
shall remain the same as before the modification. I would like to draw your particular attention
to the following conditions where minor additions or changes were made: Operating Condition
Nos. 4D, 5, 9B and 13.
The issuance of a mining permit and/or any modification to it does not supersede local
zoning regulations. The responsibility of compliance with any applicable zoning regulations
lies with you.
As a reminder, your permitted acreage at this site is 31.5 acres and the amount of land
you are approved to disturb is 24.05 acres.
As we have received the $17,551.13 Assignment of Savings Account issued by First
Citizens Bank, I am returning the previously held $14,800.00 Assignment of Savings Account
issued by First Citizens Bank to you for your disposal.
1601 Mail Service Center,Raleigh,North Carolina 27699-1601
Phone:919-707-86001 Internet:www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer-Made in part by recycled paper
Certified Mail
Ms. Collins
Page Two
Please review the modified permit and contact Judy Wehner, Assistant Mining
Specialist, at (919) 707-9220 should you have any questions concerning this matter.
Sincerely, ;da
et S. 0yer, Et to Mining Splistnd Quality Seion
JSB/jw
Enclosures
cc: Mr. Dan Sams, PE
Mr. William Gerringer-Mine and Quarry Bureau, w/o enclosures
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
LAND QUALITY SECTION
PERMIT
for the operation of a mining activity
In accordance with the provisions of G.S. 74-46 through 68, "The Mining
Act of 1971," Mining Permit Rule 15A NCAC 5 B, and other applicable
laws, rules and regulations
Permission is hereby granted to:
Salisbury Partners, LLC
Alligator Branch Sand Pit
Brunswick County - Permit No. 10-91
for the operation of a
Sand Mine
which shall provide that the usefulness, productivity and scenic values of
all lands and waters affected by this mining operation will receive the
greatest practical degree of protection and restoration.
MINING PERMIT EXPIRATION DATE: July 7, 2025
Page 2
In accordance with the application for this mining permit, which is hereby approved by the
Department of Environmental Quality, hereinafter referred to as the Department, and in
conformity with the approved Reclamation Plan attached to and incorporated as part of this
permit, provisions must be made for the protection of the surrounding environment and for
reclamation of the land and water affected by the permitted mining operation. This permit is
expressly conditioned upon compliance with all the requirements of the approved Reclamation
Plan. However, completed performance of the approved Reclamation Plan is a separable
obligation, secured by the bond or other security on file with the Department, and may survive
the expiration, revocation or suspension of this permit.
This permit is not transferable by the permittee with the following exception: If another
operator succeeds to the interest of the permittee in the permitted mining operation, by virtue
of a sale, lease, assignment or otherwise, the Department may release the permittee from the
duties imposed upon him by the conditions of his permit and by the Mining Act with reference
to the permitted operation, and transfer the permit to the successor operator, provided that
both operators have complied with the requirements of the Mining Act and that the successor
operator agrees to assume the duties of the permittee with reference to reclamation of the
affected land and posts a suitable bond or other security.
In the event that the Department determines that the permittee or permittee's successor is not
complying with the Reclamation Plan or other terms and conditions of this permit, or is failing
to achieve the purposes and requirements of the Mining Act, the Department may give the
operator written notice of its intent to modify, revoke or suspend the permit, or its intent to
modify the Reclamation Plan as incorporated in the permit. The operator shall have right to a
hearing at a designated time and place on any proposed modification, revocation or
suspension by the Department. Alternatively and in addition to the above, the Department
may institute other enforcement procedures authorized by law.
Definitions
Wherever used or referred to in this permit, unless the context clearly indicates otherwise,
terms shall have the same meaning as supplied by the Mining Act, N.C.G.S. 74-49.
Modifications
November 3, 2015: This permit has been modified to increase the affected acreage at this
site to 24.05 acres as indicated on the mine maps last revised August 28, 2015. The
modification includes the addition of sediment basins for use in dewatering activities during
mining operations.
Expiration Date
This permit shall be effective from the date of its issuance until July 7, 2025.
Page 3
Conditions
This permit shall be subject to the provisions of the Mining Act, N.C.G.S. 74-46, et. seq., and
to the following conditions and limitations:
OPERATING CONDITIONS:
1. A. Any wastewater processing or mine dewatering shall be in accordance with the
permitting requirements and rules promulgated by the N.C. Environmental
Management Commission.
B. Any stormwater runoff from the affected areas at the site shall be in accordance
with any applicable permit requirements and regulations promulgated by the
Environmental Protection Agency and enforced by the N.C. Environmental
Management Commission. It shall be the permittee's responsibility to contact
the Stormwater Program to secure any necessary stormwater permits or other
approval documents.
2. A. Any mining process producing air contamination emissions shall be subject to
the permitting requirements and rules promulgated by the N.C. Environmental
Management Commission and enforced by the Division of Air Quality.
B. During mining operations, water trucks or other means that may be necessary
shall be utilized to prevent dust from leaving the permitted area.
3. A. Sufficient buffer (minimum 50 foot undisturbed) shall be maintained between any
affected land and any adjoining waterway or wetland to prevent sedimentation of
that waterway or wetland from erosion of the affected land and to preserve the
integrity of the natural watercourse or wetland.
B. Any mining activity affecting waters of the State, waters of the U. S., or wetlands
shall be in accordance with the requirements and regulations promulgated and
enforced by the N. C. Environmental Management Commission.
4. A. Adequate mechanical barriers including but not limited to diversions, earthen
dikes, sediment check dams, sediment retarding structures, rip rap pits, or
ditches shall be provided in the initial stages of any land disturbance and
maintained to prevent sediment from discharging onto adjacent surface areas or
into any lake, wetland or natural watercourse in proximity to the affected land.
B. All drainage from the affected areas around the mine excavations shall be
diverted internal to said excavations.
C. Mining activities shall occur as indicated on the mine maps last revised May 5,
2015 and the supplemental information received by the Land Quality Section on
September 30, 2014, November 24, 2014, and May 12, 2015.
Page 4
D. Mining activities associated with dewatering activities shall be conducted as
indicated on the mine maps last revised August 28, 2015 and the supplemental
information received by the Land Quality Section on September 9, 2015.
5. All affected area boundaries (24.05 acres) shall be permanently marked at the site on
100-foot intervals unless the line of sight allows for larger spacing intervals.
6. The angle for graded slopes and fills shall be no greater than the angle, which can be
retained by vegetative cover or other adequate erosion control measure, structure, or
device. In any event, exposed slopes or any excavated channels, the erosion of which
may cause off-site damage because of sedimentation, shall be planted or otherwise
provided with ground cover, devices or structures sufficient to restrain such erosion.
7. The affected land shall be graded so as to prevent collection of pools of water that are,
or likely to become, noxious or foul. Necessary structures such as drainage ditches or
conduits shall be constructed or installed when required to prevent such conditions.
8. Existing vegetation or vegetated earthen berms shall be maintained between the mine
and public thoroughfares whenever practical to screen the operation from the public.
9. A. Sufficient buffer shall be maintained between any excavation and any mining
permit boundary to protect adjacent property.
B. Buffers shall be maintained as indicated on the mine maps last revised August
28, 2015.
10. A. No on-site disposal of refuse or other solid waste that is generated outside of the
mining permit area shall be allowed within the boundaries of the mining permit
area unless authorization to conduct said disposal has first been obtained from
both the Division of Waste Management and the Land Quality Section,
Department of Environmental Quality. The method of disposal shall be
consistent with the approved reclamation plan.
B. Mining refuse as defined by G.S. 74-49 (14) of The Mining Act of 1971
generated on-site and directly associated with the mining activity may be
disposed of in a designated refuse area. All other waste products must be
disposed of in a disposal facility approved by the Division of Waste
Management. No petroleum products, acids, solvents or their storage containers
or any other material that may be considered hazardous shall be disposed of
within the permitted area.
C. For the purposes of this permit, the Division of Energy, Mineral and Land
Resources considers the following materials to be "mining refuse" (in addition to
those specifically listed under G.S. 74-49 (14) of the N.C. Mining Act of 1971):
1. on-site generated land clearing debris
2. conveyor belts
Page 5
3. wire cables
4. v-belts
5. steel reinforced air hoses
6. drill steel
D. If mining refuse is to be permanently disposed within the mining permit
boundary, the following information must be provided to and approved by the
Division of Energy, Mineral and Land Resources prior to commencement of such
disposal:
1. the approximate boundaries and size of the refuse disposal area;
2. a list of refuse items to be disposed;
3. verification that a minimum of 4 feet of cover will be provided over the
refuse;
4. verification that the refuse will be disposed at least 4 feet above the
seasonally high water table; and,
5. verification that a permanent vegetative groundcover will be established.
11. An Annual Reclamation Report shall be submitted on a form supplied by the
Department by February 1 of each year until reclamation is completed and approved.
12. The operator shall notify the Department in writing of the desire to delete, modify or
otherwise change any part of the mining, reclamation, or erosion/sediment control plan
contained in the approved application for a mining permit or any approved revision to it.
Approval to implement such changes must be obtained from the Department prior to
on-site implementation of the revisions.
13. The security, which was posted pursuant to N.C.G.S. 74-54 in the form of a $17,551.13
Assignment of Savings Account (of which $17,300.00 is required for this site
), is sufficient to cover the operation as indicated in the approved application. This
security must remain in force for this permit to be valid. The total affected land shall not
exceed the bonded acreage.
14. A. Authorized representatives of the Division of Archives and History shall be
granted access to the site to determine the presence of significant
archaeological resources.
B. Pursuant to N. C. G. S. 70 Article 3, "The Unmarked Human Burial and Human
Skeletal Remains Protection Act," should the operator or any person in his
employ encounter human skeletal remains, immediate notification shall be
provided to the county medical examiner and the chief archaeologist, North
Carolina Division of Archives and History.
Page 6
APPROVED RECLAMATION PLAN
The Mining Permit incorporates this Reclamation Plan, the performance of which is a condition
on the continuing validity of that Mining Permit. Additionally, the Reclamation Plan is a
separable obligation of the permittee, which continues beyond the terms of the Mining Permit.
The approved plan provides:
Minimum Standards As Provided By G.S. 74-53
1. The final slopes in all excavations in soil, sand, gravel and other unconsolidated
materials shall be at such an angle as to minimize the possibility of slides and be
consistent with the future use of the land.
2. Provisions for safety to persons and to adjoining property must be provided in all
excavations in rock.
3. All overburden and spoil shall be left in a configuration which is in accordance with
accepted conservation practices and which is suitable for the proposed subsequent use
of the land.
4. No small pools of water shall be allowed to collect or remain on the mined area that are,
or are likely to become noxious, odious or foul.
5. The revegetation plan shall conform to accepted and recommended agronomic and
reforestation practices as established by the North Carolina Agricultural Experiment
Station and the North Carolina Forest Service.
6. Permittee shall conduct reclamation activities pursuant to the Reclamation Plan herein
incorporated. These activities shall be conducted according to the time schedule
included in the plan, which shall to the extent feasible provide reclamation simultaneous
with mining operations and in any event, provide reclamation at the earliest practicable
time after completion or termination of mining on any segment of the permit area and
shall be completed within two years after completion or termination of mining.
RECLAMATION CONDITIONS:
1. Provided further, and subject to the Reclamation schedule, the planned reclamation
shall be to restore the mine excavation to a lake area and to grade and revegetate the
adjacent disturbed areas.
2. The specifications for surface gradient restoration to a surface suitable for the planned
future use are as follows:
A. The lake area shall be excavated to maintain a minimum water depth of four feet
measured from the low water table elevation.
Page 7
B. The side slopes to the lake excavation shall be graded to a 3 horizontal to 1
vertical or flatter to the water line and 2 horizontal to 1 vertical or flatter below the
water line.
C. Any areas used for wastepiles, screening, stockpiling or other processing shall
be leveled and smoothed.
D. No contaminants shall be permanently disposed of at the mine site. On-site
disposal of waste shall be in accordance with Operating Condition Nos. 10A
through D.
E. The affected land shall be graded to prevent the collection of noxious or foul
water.
3. Revegetation Plan:
After site preparation, all disturbed land areas shall be revegetated as per the Grassing
Details on the mine map, Sheet M2 of 2, last revised May 5, 2015.
Whenever possible, disturbed areas should be vegetated with native warm season
grasses such as switch grass, Indian grass, bluestem and gamma grass.
In addition, the permittee shall consult with a professional wildlife biologist with the N.C.
Wildlife Resources Commission to enhance post-project wildlife habitat at the site.
4. Reclamation Plan:
Reclamation shall be conducted simultaneously with mining to the extent feasible. In
any event, reclamation shall be initiated as soon as feasible after completion or
termination of mining of any mine segment under permit. Final reclamation, including
revegetation, shall be completed within two years of completion or termination of
mining.
This permit, issued July 7, 2015, is hereby modified this 3rd day of November, 2015
pursuant to GS 74-52.
By.46�L
racy E. Davis, Director
Division oCEEnergy, Mineral, and Land Resources
Authority of the Secretary
Of the Department of Environmental Quality