Loading...
HomeMy WebLinkAbout20230620_NOV_Ashton_Farm ROY COOPER Governor vs ELIZABETH S.BISER S�tratm� DOUGLAS R.ANSEL hitarim Dhvctor NORTH CAROLINA Emiromnautal Quality June 20,2023 Certified Mail Return Receipt Requested 7020 1290 0001 6718 2770 NOTICE OF VIOLATION OF THE MINING ACT OF 1971 Jimmy L. McLamb L. M. McLamb& Son Construction Company, Inc. 800 Calabash Rd. W Calabash,NC 28467 RE: Ashton Farm Sand Mine Mining Permit No. 10-A04 Brunswick County Lumber River Basin Dear Mr. McLamb: This is to inform you and/or your company of a violation of the above referenced mining permit. On 06/19/2023, personnel of this office inspected your mine, copy of inspection report attached, and determined that one or more of the conditions contained in your mining permit are being violated, The conditions being violated are as follows: I. Operating Condition No. IA: Any wastewater processing or mine dewatering shall be in accordance with the permitting requirements and rules promulgated by the N.C. Environmental Management Commission. 2. Operating Condition No. 4A: Adequate mechanical barriers including but not limited to diversions, earthen dikes, sediment check dams, sediment retarding structures, rip rap pits, or ditches shall be provided in the initial stages of any land disturbance and maintained to prevent sediment from discharging onto adjacent surface areas or into any take,wetland,or natural watercourse in proximity to the affected land. 3. Operating Condition No. 4C Mining activities, including dewatering activities and including the installation and maintenance of the approved sediment basins and associated diversion channels, shall occur as indicated in the application, on the Mine Maps sealed June 8, 2022, and the supplemental information received on March 29,2022,and June 10,2022. an��� Norih Cunbna Deparrmenr of Emtrmmentd Qualky f Dmsbn of Energy.mh=-l d land 4e wars 512 North Sa6sbw'y StrVM t 1612 Mail Servke Cerrler I L*Ac1gh North CaroT1zu 27699-1612 To correct the current violations and bring the site into compliance,you must take the following corrective actions within the time specified; 4. Submit mine modification with adequate mine discharge system that retains sediment onsite and is non erosive. Modification must be congruent with NPDES NCG020000 permit application. Modification must include the discharge channel as a part of the mine map. 5. Cease pumping operations until NCG020000 is obtained. If the above violation is not corrected *within sb (30) days following your receipt of this Notice, appropriate enforcement action will be taken and a civil penalty may be assessed against your company. If a civil penalty is assessed,the amount may be up to five hundred dollars($500.00)for each day of violation,beginning with the date of your receipt of this Notice of Violation(N.C.G.S. §74-64). Other enforcement actions may include seeking an injunction,criminal penalty,revoking your permit or bond forfeiture procedures. The responsibility for understanding and complying with the conditions of your mining permit rests with you. The responsibility also rests with you for notifying this office of your plans to correct the violations. Please do not hesitate to contact Daniel Sams,Regional Engineer,at(910)796-7215 or Mr.David Miller,PE,State Mining Engineer,at(919)707-9220 regarding any questions you might have about this matter. Sincerely, Daniel Sams Regional Engineer Wilmington Regional Office Attachment: Mine Inspection Report cc: Mr. David Miller, PE- State Mining Engineer