Loading...
HomeMy WebLinkAbout2023.11.16 Riverlake RPT Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: Brunswick Project: Riverlake River basin: Lumber Person financially responsible:Oak Harbour,LLC-David Vannoy,Manager Project#: BRUNS-2022-083 Address: 2919 Breezewood Avenue,Suite 100,Fayetteville,NC 1. Project Location: Stone Chimney Road,Supply Pictures: Yes-Digital 2. Weather and soil conditions: 60s,clear,workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): none Title: Inspection report: Sent Report Date given/sent: November 16,2023 9. Corrective action needed: 10. Comments: 1.Continue to follow the plan as work progresses,specifically,"clearing and grading operations shall begin at low points of outfall release or other locations where sediment control measures are shown on the plan and the sediment control devices(sediment traps,silt fences,etc.)shall be installed before or simultaneously with the disturbance of any area draining to the device." 2.Be sure to maintain a rain gauge throughout all phases of construction,conduct inspections and complete reports as required by the approved plan. austin.turbitt@deq.nc.gov Reported by: Austin Turbitt Others present: Date of inspection: November 14,2023 Time arriving on site: 10:15 AM Time leaving site: 11:15 AM cc: