C.PROTECTION OF NATURAL RESOURCES
1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence
to the mine map(s). Attach additional sheets as needed.
1.OBTAIN PLAN APPROVAL&ALL OTHER APPLICABLE PERMITS, 15.PROVIDE GROUND STABILIZATION BY TEMPORARY SEEDING
2.FLAG CONSTRUCTION LIMITS. ALL CUT/FILL SLOPES WITHIN 7 DAYS OF COMPLETION OF GRADING.
3.INSTALL GRAVEL CONSTRUCTION ENTRANCE/EXIT&INSTALL 16.INSTALL DEWATERING PUMP TO DISCHARGE INTO DEWATERING BASIN.
GATE WITH LOCK AS INDICATED ON DRAWING. 17.AFTER COMPLETION OF MINING,KNOCK DOWN BERMS AND DRESS UP AREAS
4.INSTALL SEDIMENT FENCE AS INDICATED ON DRAWING. AROUND PIT.SLOPE BANKS OF PIT TO 3:1 MAX.SIDE SLOPES.STOCK POND WITH FISH,
5.CLEAR AND GRUB SITE STOCKPILE TOPSOIL&MATERIAL. 18.COMPLETE FINAL GRADING OF LANDS TO DRAIN INTO PIT,
5,CONSTRUCT BERMS FROM STOCKPILE OVERBURDEN. 19.PREPARE GROUND FOR SEEDING,LIME AND FERTILIZING,
7 PREPARE BERMS FOR SEEDING,LIME,.AND FERTILIZING. 20.COMLETE SEEDING,LIME,AND=ERTILIZING AS NECESSARY TO ENSURE
3.COMPLETE SEEING,LIME,AND FERTILIZING.RE-SEED AS REQUIRED ADEQUATE COVERAGE OF PERMAENT GROUND COVER ON ALL
9.EXCAVATE AND CONSTRUCT DEWATERING BASIN IN PHASE I. DISTURBED AREAS AND CUTIPILL SLOPES.
10.BEGIN EXCAVATING MINE PIT"PHASE 1". 20.RE-SEE AS REQUIRED.
11.PROVIDE GROUND STABILIZATION BY TEMPORARY SEEDING 21.REMOVE TEMPORARY SEDIMENT FENCE WHEN SITE IS STABILIZED AND PERMANENT
ALL CUT/FILL SLOPES WITHIN 7 DAYS OF COMPLETION OF GRADING. GROUND COVER IS APPROPRIATELY ESTABLISHED.
12,INSTALL DEWATERING PUMP TO DISCHARGE INTO DEWATERING BASIN.
13.EXCAVATE&CONSTRUCT DEWATERING BASIN IN PHASE
14.BEGIN EXCAVATING MINE PIT"PHASE 11".
2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to
prevent offsite sedimentation(include specific plans for sediment and erosion control for mine excavatioWnl, waste
piles, access/mine roads, and process areas), and give a detailed sequence of installation and schedule for
maintenance of the measures.Locate and label all sediment and erosion control measures on the mine maps)and
provide typical cross-sections/construction details of each measure.Engineering designs and calculations are required
to justify the adequacy of any proposed measures.
1. Install temporary sediment fence
2. Install gravel construction entrance/exit
3. Install pipe inlet protection & rip rap apron
4. Construct berm and provide seeding & mulching
5. Temporary seeding and mulching of any waste/stockpile remaining in place
for 21 days or more.
3. A)Will the operation involve washing the material mined, recycling process water,or other wastewater handling?
FIYES IN NO
If yes, briefly describe all such processes including any chemicals to be used.
B)Will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters
of the State?
YES NO
If yes, briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of
stabilization)on the mine map(s).
This site will have 2 de-watering basins installed independently as each phase of
the mine is started. They will be located on the south of the mine and will
discharge storm water/wastewater into an existing farm ditch that currently flows
into existing wetlands. The outlets will be stabilized with rip rap aprons. (See
calculations enclosed for the de-watering basins and rip rap aprons.)
6
Are you applying for a discharge permit in the same location as a previously permitted mine?
El Yes(please provide permit number and mine name)
✓❑No
If the stormwater discharges to a municipal separate storm sewer system (MS4), name the operator of the MS4:
❑N/A
3. Consultant(if applicable):
Name of consultant: Consulting firm:
LARRY W.ANDERSON,PE ANDERSON ENGINEERING&ASSOCIATES,P.A.
Street address: City: State and zip code:
305 N.CHIPPEWA STREET LUMBERTON NC 28358
Telephone number: Email address:
910-671-9530 andersonengineeringpa@gmail.com
4. Development Activities and Buffers
Mining operation will precede development activities at this site:
❑Yes
❑✓ No
Mine is located within one of the 20 Coastal Counties,and will it add more than 10,000 ft2 of impervious surface:
❑Yes(to both)
❑No, this mine is within one of the 20 Coastal Counties,but will not at more than 10,000 ft2 of impervious surface
✓❑No,this mine is not within one of the 20 Coastal Counties
Mine is in the Neuse,Tar-Pamlico,or Catawba River Basins,OR in the Randleman or Jordan Water supply Watersheds?
❑Yes(specify size of stream buffers)
❑✓ No
S. Mine Dewatering
Mine dewatering will occur at this site:
❑✓ Yes ❑No(mark N/A for the rest of this section)
Mine dewatering from this facility will be discharged to:
[]Surface Waters and/or Wetlands
❑Other(specify)
❑Mine will not discharge dewatering to Surface Waters and/or Wetlands;specify how dewatering will occur and where
water will be directed:
[-]N/A
Wetlands and/or Surface Waters are within 400'of the mine pit perimeter: 404/401 Certification permits required:
❑✓ Yes(specify distance) 144.40' []Yes(briefly describe)
❑No ❑✓ No
❑N/A ❑N/A
Have you been required to obtain a wetland delineation certified by the US Army Corps of Engineers?
[:]Yes(please attach to this application) ❑✓ No
6. Wastewater Treatment
Will this facility wash mined materials?
❑Yes ❑✓ No
Will discharges of process wastewater treatment systems occur(including possible recycle system overflows)
❑Yes(please describe)
❑✓ No
Page 2 of 8