Loading...
HomeMy WebLinkAbout20240103_reclamation Mutrien- Feeding the Future- Certified Mail RECEIVED December 27, 2023 JAN 0 3 YII24 LAND QUALITY MINING PROGRAM Mr. Adam Parr, P.E. State Mining Engineer Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699-1612 Dear Mr. Parr: As required by our Mining Permit No. 07-01, enclosed are the descriptions of reclamation activities for the last half of 2023, and the reclamation plans for the first half of 2024. Also enclosed with the description is a support map which visually depict the activities. If you have any questions, please do not hesitate to call me at (252) 322-8249, or email me at Jeff.Furness@nutrien.com. Sinceyt1/rely,n is Je frYel/y C. Furness Senior Scientist Attachment PC: Samir Dumpor— DEMLR, WaRO (w/attach) L. Moody (email attach) D. Jordan (email attach) T. Cvetan (email attach) M. Schuckenbrock (email attach) T. Peacock (email attach) 23-04-002-02 (w/attach) 1530 NC Hwy 306 South,Aurora,NC USA 27806 nutrien.com 1 Effective January 1,2018,PCs Phosphate Company,Inc.is an indirect subsidiary of Nutrien Ltd.PCs Phosphate Company,Inc. remains the legal operating entity and permittee. ;rlutrien Semi-Annual Reclamation Activity Report Feeding the Future December 2023 Aurora Mine Site Reclamation Aurora, NC Am 2=Wo R-15 Area Contents: • December 2023 Reclamation Activity Report • Activity during July 2023— December 2023 • Planned Activity for January 2024—June 2024 • Reclamation Development Drawing 1 Nutrien- Semi-Annual Reclamation Activity Report December 2023 Feeding the Future- Semi-Annual Reclamation Activity Report July 2023 — December 2023 Gypsum Stack Area Activity during Previous Six Months: Gypsum was actively removed from Gypsum Stack 6 and blended with clay for reclamation. Gypsum storage was directed to Gypsum Stack 4. Gypstack 5 underwent drying activities. Planned Activity for next Six Months: Gypsum storage will continue on Gypsum Stack 4 during the next six months. Drying activities will continue on Gypsum Stack 5. Gypsum will be actively removed from Gypsum Stack 6 during the next six months. Reclaim Area 1 Activity during Previous Six Months: Reclamation activities complete. Continued monitoring. Planned Activity for next Six Months: Reclamation activities complete. Continue monitoring. Reclaim Area 2 Activity during Previous Six Months: Reclamation activites complete. Continued monitoring. Planned Activity for next Six Months: Reclamation activities complete. Continue monitoring. Reclaim Area 3 Activity during Previous Six Months: Reclamation activities complete. Continued monitoring. Planned Activity for next Six Months: Reclamation activities complete. Continue monitoring. 2 Nutrien- Semi-Annual Reclamation Activity Report • December 2023 Feeding the Future- Reclaim Area 4 Activity during Previous Six Months: The Mine Refuse Disposal Area continued to receive material. Reclamation activities complete on the remainder of R4. Planned Activity for next Six Months: The Mine Refuse Disposal Area will continue to receive material. Reclamation activities complete on the remainder of R4. Reclaim Area 5 Activity during Previous Six Months: R5 East: Reclamation activites complete. Continued monitoring. R5 West: Reclamation activites complete. Continued monitoring. Planned Activity for next Six Months: R5 East: Reclamation activites complete. Continue monitoring. R5 West: Reclamation activities complete. Continue monitoring. Reclaim Area 6 Activity during Previous Six Months: Stormwater from this area was monitored, treated and discharged through permitted Outfalls according to our NPDES permit. Reclamation activities complete. Planned Activity for next Six Months: Stormwater from R-6 will continue to be monitored, treated and discharged through permitted Outfalls according to our NPDES permit. Reclaim Area 7 Activity during Previous Six Months: Water from this area was maintained as part of the internal water management system. Prestrip spoil was placed in the southern portion of R7. Planned Activity for next Six Months: Water from this area will continue to be maintained as part of the internal water management system. Prestrip spoil will continue to be placed in the southern portion of R7. 3 Nutrien- Semi-Annual Reclamation Activity Report December 2023 Feeding the Future- Reclaim Area 81 Dredge Lake Activity during Previous Six Months: Prestrip spoils were placed in the northern portion of R8 for blend capping. Water from this area was maintained as part of the internal water management system. Planned Activity for next Six Months: Water from this area will be maintained as part of the internal water management system. Reclaim Area 9 Activity during Previous Six Months: Water from this area is returned to the mine process water system. Sand tails were deposited in the area and capping activities continued. Planned Activity for next Six Months: Water will continue to be drained off of the blend surface. Sand tails will continue to be deposited in the area and capping activities will advance. Reclaim Area 10 Activity during Previous Six Months: Internal ditching was started to lower the water level in the area. Placing capping material over blend was completed. Planned Activity for next Six Months: Water from this area is directed to the internal water management system. The cap will be graded and vegetation will be established. Reclaim Area 11 Activity during Previous Six Months: Used as process water return system as it returns water to the Recycle Lake. Sand tails was placed in the area to prepare for capping activities. Planned Activity for next Six Months: Sand tails will continue be deposited in the area to prepare for capping activities. 4 Nutrien- Semi-Annual Reclamation Activity Report December 2023 Feeding the Future~ Reclaim Area 12: Activity during Previous Six Months: Groundwater sampling continued. Blend material was placed in the reclamation area. Planned Activity for the next Six Months: Groundwater monitoring will continue. Blend will continue to dry. Reclaim Area 13: Activity during Previous Six Months: This area was used as a water clarification and blend placement area. Monitoring continued on perimeter groundwater wells. Planned Activity for the next Six Months: Continue ground water monitoring. This area will be used to treat process water as it returns to the Recycle Lake. Blend material will be placed in this area. Reclaim Area 14: Activity during Previous Six Months: This area was used as a water clarification area. Planned Activity for the next Six Months: Continued use as water clarification area is planned. Reclaim Area 15: Activity during Previous Six Months: Stormwater from this area was monitored, treated and discharged through permitted Outfalls according to our NPDES permit. Planned Activity for the next Six Months: Reclamation activities and area monitoring will continue. Stormwater from this area will continue to be monitored, treated and discharged through permitted Outfalls according to our NPDES permit. 5 � llutrien Semi-Annual Reclamation Activity Report December 2023 Feeding the Future- Reclaim Area 16: Activity during Previous Six Months: This area was mined continuously over the previous six months. Planned Activity for the next Six Months: Mining in this area continues. Reclaim Area 17: Activity during Previous Six Months: Prestripping and mine development activities were completed in the area. Planned Activity for the next Six Months: Will continue installation of roads and water controls. Mining activities will begin. Knob Lake Activity during Previous Six Months: This area was used as a water clarification area. Planned Activity for next Six Months: Continued use as water clarification area is planned. Charles Tract Activity during Previous Six Months: Reclamation activities complete. Continued monitoring. Planned Activity for next Six Months: Reclamation activities complete. Continued monitoring. 6 1 . 11 .1 I 1 b _ M. WV 0 SITE LLS •`r i •. RIVER SH1 1• Ask WS Blend Storage i, • i _• •1_• with Overburden _ I • •- • •• •• Land Affected and Not Backfilled Recycle Lake Plant Site GypsumActive Mine Area �TESYSTFAA • .• Areas - i'PJi Topsoil Storage Areas ® 2022RECLAMATI 1