MINING PERMIT APPLICATION REVIEW FORM
THIS SECTION TO BE OUT BY DEIVILR
DEMLR PERMIT: 16-83 Project Acti!7t
Modification Transfer Release
Applicant Name: Ralph Thomas Jr.
Applicant's Email: ralphthomasjr@hotmail.com County: Carteret
Project Name: Thomas Borrow Pit YES NO Date Commencing
Have land disturbing activities started?? X
Latitude: 34.7753 Longitude: -76.6306
Please return comments to (at DEMLR CO): Jenna Spencer jenna,spencer@ncdenr,gov
Comments due by: 05/27/2021
SECTION • TO BE FILLED OUT BY DWR
YES NO
Is this mine an active permit in BIMS? P
Is the RO concerned that the operation, as proposed, would violate standards of water quality? F I I ✓
Comments: The applicant provided a JD from USACE and proper documentation.Existing haul roads within wetland boundaries will be utilized
from when this was a DOT borrow pit,but the roads will not be widened per the application. DWR has no issues with this permit application.
Does this mine (or previous owner) have DWR back fees to pay? I
(If Yes, amount):
Watershed/Stream Name & Classification: Thomas Creek Stream Index 21-35-1-5 From Source to North River Class SA;HQW
DWR Compliance Status of Mine: N/A-New Application
401 Wetland Cert. required? ✓
401 Wetland Cert. existing? Z
(If Yes, Permit#): 2017-1234
Does DWR RO have enough information to determine if a 401 certification is required? Z I ❑
Is an O & M Plan needed? ✓
Are wetlands disturbed at this site? I ❑ Z
Does DWR RO suspect or know of nearby wetlands to the site? I �✓ ❑
Is a wetland delineation required prior to DWR issuing the permit? I ✓
Already completed expires 03/17/2022 SAW-2017-01139 JD
Consultant
Onsite
Offsite
Stream Determination Needed? ❑ 1 Z
Stream Determination Completed? ❑ Z
Does DWR RO need a statement that no wetlands/streams are disturbed for this project ❑
from applicant?
Buffer Determination Needed? ✓
Buffer Determination Completed? �✓
Recycle system permit existing? Ll IZ
(If Yes, Permit#):
New Recycle System permit required? ❑ ✓
Enough information to determine? 1�✓ El I
Rev. December 2020-2020rl
Return PDF of this form to DEMLR CO by email. cc DEMLR RO,DWR SPU. Send a copy to the permittee.
Non-discharge permit existing? LI I ✓
(If Yes, Permit#):
Will wastewaters discharge to HQW waters with a 7Q10=0? ✓
7Q10 Flow:
Unknown Permittee must determine
Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑ ❑✓
because DWR requires more information)?
Has Violation
O&M Requirements
HQW/7Q10 Concerns LI
Pay back fees or renew DWR permit
Other ❑
Please describe the reason to hold the permit:
RO contact: I Hold Until:
Mine must wait to dewater until an O&M plan is approved? z__
Reviewed by
Central Office Date Regional Office Date
DWR RO Surface Water I Megan Faulkner&Holley Snider 05/21/2021
RO Aquifer Protection Section