Loading...
HomeMy WebLinkAbout16-83 Thomas Borrow Pit New Mine Carteret Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM THIS SECTION TO BE OUT BY DEIVILR DEMLR PERMIT: 16-83 Project Acti!7t Modification Transfer Release Applicant Name: Ralph Thomas Jr. Applicant's Email: ralphthomasjr@hotmail.com County: Carteret Project Name: Thomas Borrow Pit YES NO Date Commencing Have land disturbing activities started?? X Latitude: 34.7753 Longitude: -76.6306 Please return comments to (at DEMLR CO): Jenna Spencer jenna,spencer@ncdenr,gov Comments due by: 05/27/2021 SECTION • TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? P Is the RO concerned that the operation, as proposed, would violate standards of water quality? F I I ✓ Comments: The applicant provided a JD from USACE and proper documentation.Existing haul roads within wetland boundaries will be utilized from when this was a DOT borrow pit,but the roads will not be widened per the application. DWR has no issues with this permit application. Does this mine (or previous owner) have DWR back fees to pay? I (If Yes, amount): Watershed/Stream Name & Classification: Thomas Creek Stream Index 21-35-1-5 From Source to North River Class SA;HQW DWR Compliance Status of Mine: N/A-New Application 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? Z (If Yes, Permit#): 2017-1234 Does DWR RO have enough information to determine if a 401 certification is required? Z I ❑ Is an O & M Plan needed? ✓ Are wetlands disturbed at this site? I ❑ Z Does DWR RO suspect or know of nearby wetlands to the site? I �✓ ❑ Is a wetland delineation required prior to DWR issuing the permit? I ✓ Already completed expires 03/17/2022 SAW-2017-01139 JD Consultant Onsite Offsite Stream Determination Needed? ❑ 1 Z Stream Determination Completed? ❑ Z Does DWR RO need a statement that no wetlands/streams are disturbed for this project ❑ from applicant? Buffer Determination Needed? ✓ Buffer Determination Completed? �✓ Recycle system permit existing? Ll IZ (If Yes, Permit#): New Recycle System permit required? ❑ ✓ Enough information to determine? 1�✓ El I Rev. December 2020-2020rl Return PDF of this form to DEMLR CO by email. cc DEMLR RO,DWR SPU. Send a copy to the permittee. Non-discharge permit existing? LI I ✓ (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? ✓ 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑ ❑✓ because DWR requires more information)? Has Violation O&M Requirements HQW/7Q10 Concerns LI Pay back fees or renew DWR permit Other ❑ Please describe the reason to hold the permit: RO contact: I Hold Until: Mine must wait to dewater until an O&M plan is approved? z__ Reviewed by Central Office Date Regional Office Date DWR RO Surface Water I Megan Faulkner&Holley Snider 05/21/2021 RO Aquifer Protection Section Rev. December 2020-2020r1