Loading...
HomeMy WebLinkAboutC402 Site Details_20190718 1 t ra+e. ^oaa:-s+:-ra-�+:,:;u:-+� _=s-na—�r�-srzn-rs-.F:.^s ..-rasrscr_*^sm.. - -�..•. _ LaBe' Ra Powered by pa6ership. 615 St. George Square Suite 300 Winston-Salem, NC 27103I 336-842-4065 C#0430 i Channel Side Slope Bottom Width Discharge Bottom Stabilization Side Stabilization I a b e l l a 0.0 O m Description Max. Bed Slope P Number (H:V) (ft) (cfs) Method Method i 1 FES 2 to STA. 6+50 2.90% 3:1 2 7.05 Curlex I Curlex 1 I 2 FES 1to Sta. 6+50 2.96% 3:1 2 12.66 Curlex I Curlex I 3 West Side Access Road Sta. 7+00to 14+00 4.10% 3:1 2 3.5 Curlex I Curlex I I ��``�tt t CArtrI-It T 4 East Side Access Road Sta. 8+50to 14+00 3.63% 3:1 2 5.12 Curlex I Curlex I •••^RQ( .. 5 Access Road (West Side) Sta. 18+50to SK 6 11.25% 3:1 2 4.55 Curlex III Curlex 111 0R A 6 SK 8to Stream Buffer 6.93% 2:1 3 13.64 Curlex III Curlex III C _ 7 Exist. 18" RCP to FES 2 1.00% 2:1 1 20.59 Curlex I Curlex I 22 52 8 5K Ito Sta. 20+00 3.25% 2:1 2 4.55 Curlex I Curlex I F Cj 9 SK 7 to Sta. 20+00 3.50% 2:1 2 5.81 CurlexI Curlex ) ��A7'.TGINBEIto .• _ TRENCH WIDTH �= TRENCH l I I GRADE WIDTH�'�--� I II EllII I =1 ICI 11 I -I 11=I I =I I r s —I I— T T s z h Ill—I l I I I I I I I I —III W 111= i I I 1 B,• III—III_ III F -III -I I El I ill —III- �� CHANNEL STABILIZATION SCHEDULE C 402 NTS O Q _A —III 6" _ 12" ICI °. ° - ..UTINE <.' aE I�. 6.. —..I °4 (DIAMETER — I ( — II VARIES) d ANT—SEEP COLLAR _ d d 1' ©2019 LaBeta Associates - III I' a t . d ° I� _ ° III Z ° A IIIII I1111 II— III F I— ANTI—SEEP COLLAR. tTI I—I,I I(-I _III CLASS B CONCRETE 12" _ 1.= ALAMANCE i Iil Lip, AGGREGATES, L SECTION A—A PLAN VIEW Mr. Chad Threatt, VP I s ANTI-SEEP COLLAR C 402 NTS Snow Camp Mine I RIPRAP APRON I i A A A A t — 'A 3 TIMES INNER I T DIAMETER (LDJ — —PIPE — FES PIPE FES - - - - 1 L — NOTES: ---' -- -- ( -- RIPRAP APRON ) t = LENGTH OF THE RIPRAP APRON. NO, DATE: DESCRIPTION: 2) L2 = RIPRAP TO BE INSTALLED UNDERNEATH 1/3 THE LENGTH REVISIONS PLAN VIEW OF FLARED END SECTION (FES). PROJECT NUMBER: PLAN VIEW 3) d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT 2190335 NOTES. LESS THAN 6 INCHES. DRAWN BY: 4) IN A WELL—DEFINED CHANNEL EXTEND THE APRON UP THE KCG/ATC 1) L1 = LENGTH OF THE RIPRAP APRON. CHANNEL BANKS TO AN ELEVATION OF 18 INCHES ABOVE THE REVIEWED BY: 2) L2 = RIPRAP TO BE INSTALLED UNDERNEATH 1/3 THE LENGTH MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, PAS OF FLARED END SECTION (FES). SEE NOTE 4 Lt WHICHEVER IS LESS. Lt 3) d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS ISSUED FOR: THAN 18 INCHES. _ — — __ 5) A FILTER BIANKET OR FILTER FABRIC MUST BE INSTALLED CONSTRUCTION — 4) A FILTER BLANKET OR FILTER FABRIC MUST BE INSTALLED ` BETWEEN THE RIPRAP AND SOIL FOUNDATION (NCDOT TYPE 2). PIPE BETWEEN THE RIPRAP AND SOIL FOUNDATION (NCDOT TYPE 2). PIPE FES ` DATE: _ -- - - - -- — - - 7/18/19 ull _ — � DRAWING NAME: l (j _II —IL , d I , T I II 1-, _ IA FILTER FILTER L2 FABRIC L2 SECTION 'A-A' SECTION 'A-A' FABRIC SITE DETAILS 0 a c c> Y U i c'a 0 2 PIPE OUTLET TO FLAT AREA NOWELL-DEFINED CHANNEL i� PIPE OUTLET TO WELL-DEFINED CHANNEL C 402 NTS C 402 NTS DRAWING NUMBER: d E v ,d cV U rn g 0 0 N c W 4J M r M I .. O EC402 O H m N O d