Loading...
HomeMy WebLinkAbout20210818_Inspection North Carolina Department of Environment and Natural Resources, Division of Land Resources, Land Quality Section MINE INSPECTION REPORT ® PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE 1. MINE NAME: Alamance Quarry&Construction Materials 2.MINE LOCATION: 342 Clark Road, Snow Camp 3. COUNTY: Alamance 4. RIVER BASIN: Cape Fear 5. CASE: 6. OPERATOR: Alamance Aggregates,LLC 7. ADDRESS: PO Box 552, Snow Camp,NC 27349 8. MINING PERMIT#: 01-10 9. PERMIT EXPIRATION DATE: 10. PERSON(S) CONTACTED AT SITE: -Chad Threatt,Alamance Aggregates,LLC;Luke Turner,Alamance Aggregates 11. PICTURES? ® Yes ❑ No TAKEN BY: Kimberly Turney,DEQ DEMLR WSRO 12. TYPE OF INSPECTION: ❑ A. Initial Inspection(Unpermitted Mine Sites) 1. Size of affected land: ac. (attach sketch map) 2. How was this area measured? Measured by: B. Follow-up Inspection 1. Date of last ins ection: 07-07-2021 13. Any mining since that date? �] Yes ® No If yes,cite evidence of such mining activity: Theoperator is presently in the process of constructing the scale house and grading for Phase I areas. 14. Was mine operating at time of inspection? ❑ Yes Z No If yes,explain: The operator is presently in the process of constructing the scale house and grading for Phase I areas. 15. Is the mine in compliance with the Operating Conditions of the Permit? ❑ Yes ❑ No ® N/A If no, explain: The mine is not,operational. 16. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑ Yes ❑ No ® N/A If no, explain: 17. Is there any off-site damage? A. ❑ Yes B. ❑ No C. ® None observed If A, describe the type and severity of the damage. If B or C,is there potential for offsite damage? ❑ Yes ® No Explain: 18. Corrective measures needed and/or taken: N/A 19. Other recommendations and comments: Temporary vegetation throughout the site is well established, and all temporary perimeter silt fence and erosion control measures for Phase I have been installed.Portions of the permanent fence have been installed at the entrance on Clark Road; the gate is scheduled to be installed within the next few weeks. Grading_ for Phase I areas and the scale house have begun.The associated dirt stockpiles have temporary silt fence installed around them. 20. Is the Annual Reclamation Report+/-ma accurate? ❑Yes ❑No(Explain) ❑ Not Reviewed ® N/A 21. Follow-up inspection needed? El Yes M No Proposed date 22. No.of additional pages of Inspection Report 23. Copy of Report sent to operator: 08/22/2021 INSPECTED BY: Kimberly Turney DATE: 08/18/2021 Telephone No: 336-776-9657 Copy to file Copy to operator Copy to Mining Specialist