HomeMy WebLinkAboutNOD 01-10 20211112 ROY COOPER "L`i „A.S{'.4TF TP 'So`
Governor
ELIZABETH BISER
Secretary
BRIAN YY 1EN
Director NORTH CARO!INA
Environmental Quality
November 12, 2021
NOTICE OF DEFICIENCY
CERTIFIED MAIL
RETURN RECEIPT REQUESTED 7020 1810 0001 2075 0259
Alamance Aggregates, LLC
Attention: Chad Threatt
PO Box 552
Snow Camp,NC 27349
RE: Mine Name: Alamance Quarry and Construction Materials Quarry
Mine Permit Number: 01-10
County: Alamance
Address: 342 Snow Camp Road
River Basin: Cape Fear
Dear Mr. Threatt:
On October 28, 2021, an inspection of the subject mine was performed by Kimberly Turney and myself of
this office. A detailed review of the current site conditions against your mine application documents has
revealed the following deficiency that requires your attention:
• An existing former farm road with an existing creek culvert has been used to access both sides of the
creek for site development. Rip-rap stabilization has been placed on the road, as shown in the picture
below,taken October 28, 2021.
North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road,Suite 3001 Winston-Salem,North Carolina 27105
336-776-9800
Notice of Deficiency
Alamance Quarry and Construction Materials Quarry
November 12, 2021
Page 2 of 2
You clarified on-site that use of this existing road is only for site development. The use of this existing
road and culvert is expected only until the installation of the arch culvert, and the arch culvert will be
operational prior to production of material for sale.
Once the arch culvert is installed, it is expected that the rip-rap will be removed from the existing road and
the area reclaimed to a stabilized condition.
Your cooperation is appreciated. If you should have any questions, please contact me at
tamera.eplinCcc�,ncdenr.gov or(336) 776-9654.
Sincerely,
l"
V �
7Tamera Epli , PE
Regional Engineer
Land Quality Section
c: Brad Cole, PE, Section Chief, Regional Operations (email)
Toby Vinson, PE, CPESC, CPM, Section Chief, Program Operations (email)
David Miller, PE, State Mining Engineer (email)
Adam Parr, Assistant State Mining Engineer(email)
Sue Homewood, Water Quality Regional Operations Section(email)
Lon Snider, Water Quality Regional Operations Section(email)
North Carolina Department of Environmental Quality
Division of Energy, Mineral and Land Resources
Land Quality Section
MINE INSPECTION REPORT
® PERMITTED MINE SITE ❑ UNPERMITTED MINE SITE
1. MINE NAME: Alamance Quarry&Construction Materials 2.MINE LOCATION: 342 Clark Road,Snow Camp
3. COUNTY: Alamance 4. RIVER BASIN: Cape Fear
5. CASE: 6. OPERATOR: Alamance Aggregates,LLC
7. ADDRESS: PO Box 552, Snow Camp,NC 27349 8. MINING PERMIT#: 01-10
9. PERMIT EXPIRATION DATE:
10. PERSON(S) CONTACTED AT SITE: Chad Threatt,Alamance Aggregates,LLC
11. PICTURES? ® Yes ❑ KE No TAN BY: Kimberly Turney&Tamera Eplin,DEQ DEMLR WSRO
12. TYPE OF INSPECTION:
❑ A. Initial Inspection(Unpermitted Mine Sites)
1. Size of affected land: ac. (attach sketch map)
2. How was this area measured? Measured by:
B. Follow-up Inspection
1. Date of last inspection: 08-18-2021
13. Any mining since that date? ® Yes ® No If yes, cite evidence of such mining activity: Initial blasts in the
location of the mine have occurred. The operator is still constructing the scale house and grading for Phase I areas.
14. Was mine operating at time of inspection? ❑ Yes ® No If yes,explain:
15. Is the mine in compliance with the Operating Conditions of the Permit? LJ Yes El No M N/A If no,
explain: The mine is not yet operational.
16. Is the mine in compliance with the Reclamation Conditions of the Permit? ❑ Yes ❑ No ® N/A If no,
explain:
17. Is there any off-site damage? A. ❑ Yes B. ❑ No C. ® None observed
If A,describe the type and severity of the damage:
If B or C,is there potential for offsite damage?�] Yes ® No Explain:
18. Corrective measures needed and/or taken: N/A
19. Other recommendations and comments: Temporary vegetation throughout the site is well established, including all
stockpiles,and all temporary perimeter silt fence and erosion control measures for Phase I have been installed.Portions of the permanent
fence have been installed at the entrance on Clark Road; the gate is scheduled to be installed within the next few weeks. Grading for
Phase I areas and the scale house have begun.
An existing former farm road with an existing creek culvert has been used to access both sides of the creek for site development.
20. Is the Annual Reclamation Report+/-map accurate? [:1 Yes [:1 No(Explain) [:1 Not Reviewed ® N/A
21. Follow-up inspection needed? ❑ Yes No Proposed date
22. No. of additional pages of Inspection Report 23. Copy of Report sent to operator: With NOD.
INSPECTED BY: Tamera Eplin,Kimberly Turney DATE: October 28, 2021 Telephone No: 336-776-9800
Copy to file Copy to operator Copy to Mining Engineer