Loading...
HomeMy WebLinkAbout20240813_Narrative_Table_of_Contents 4250 Congress Street Suite 900 Charlotte, North Carolina 28209 980-299-5700 ,.s\\ Albemarle August 2, 2024 Adam Parr North Carolina Department of Environmental Quality Division of Energy, Mineral, and Land Resources 1612 Mail Service Center Raleigh, North Carolina 27699 Subject: Kings Mountain Lithium Mine Project—Tailings Storage Facility, North Carolina Mining Permit Application Dear Mr. Parr: Please find one original signed North Carolina Mining Permit Application enclosed for the proposed Archdale Tailings Storage Facility (the "Project" or"TSF Project") associated with the Kings Mountain Lithium Mine. The TSF Project is located approximately 3 miles southwest of the Kings Mountain Lithium Mine in Cleveland County. The Project will consist of the development of a dry stack tailings storage facility for permanent storage of filtered tailings generated by the Kings Mountain concentrator plant. Albemarle U.S., Inc. ("Applicant") owns the land at the proposed tailings storage facility and the Kings Mountain Lithium Mine. Imerys currently holds the mining permit for the Archdale TSF under permit number 23-03, and stormwater and wastewater permit number NCG020089. At the direction of the North Carolina Department of Environmental Quality, and in conjunction with this permit application, Imerys has submitted a modification to their mine permit to remove the Archdale site from a portion of their permit. Upon review and approval and based upon coordination with the North Carolina Department of Environmental Quality, a simultaneous regulatory action would occur to approve Imerys' modification and approve the Albemarle new mine permit application. Following these actions, Imerys will receive release from the Archdale portion of their mine permit, giving the Applicant full operational control and responsibility for the site. The Project will include the construction of a tailings storage facility, infrastructure and service facilities, related impervious areas located at the north and south site entrances, access and haul roads, and associated stormwater management systems on 143.8 acres of previously disturbed and undisturbed land. The North Carolina Mining Permit Application form for the TSF Project is associated with a supplementary report document and a full list of appendices, both of which are attached to this letter. Per discussions with the North Carolina Division of Energy, https://www.albemarle.com August 2,2024 Page 2 Mineral, and Land Resources on July 25, 2023, the proposed Project can be authorized through the issuance of a New Permit Application. A check for the new mine application fee of$5,000 is attached. An additional five copies of the signed application have also been attached to this submittal. An electronic PDF version of the permit application package will also be provided for further distribution and review. Please do not hesitate to contact me directly if you have any questions or need additional information. On behalf of Albemarle U.S., Inc., our team is looking forward to working with you during the permitting process. Sincerely, John Kuhn Mine Environmental Permitting Lead Enclosure: Permit Application North Carolina Mine Permit Supplemental Report: Kings Mountain Lithium Mine Project— Tailings Storage Facility Appendix A Mine and Reclamation Maps Appendix B Permit Site and Tailings Storage Facility Design Sheets (Preliminary) Appendix C Archdale Stormwater Management Report Kings Mountain Mining Project North Carolina Appendix D Hydrogeological Assessment Study for Archdale Tailings Facility Kings Mountain Mining Project Prefeasibility Study Appendix E Monitoring Well Development and Q4 2023 Groundwater Monitoring Report— Archdale Site Appendix F 2023 Prefeasibility Study Kings Mountain Mining Project Baseline Geochemistry Characterization Study for the Archdale Tailings Storage Facility August 2, 2024 Page 3 Appendix G Prefeasibility Engineering Design Report for Archdale Tailings Storage Facility Appendix H Technical Report 2023 Prefeasibility Study Surface Water: Water Balance Development Report Archdale TSF Kings Mountain Project Appendix I Technical Report 2023 Prefeasibility Study, Kings Mountain Mining Project Archdale Tailings Storage Facility Water Quality Predictions Appendix J TSF Mobile Equipment List Appendix K Conceptual Closure Plan Kings Mountain Mining Project Archdale Tailings Storage Facility Appendix L Landowner Notifications