HomeMy WebLinkAbout20240516_ADI_55-01 „HESrnre�
ROY COOPER
Governor Ce _ >
ELIZABETH S.BISER
Secretary AM”
WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA
Interim Director Environmental Quality
May 16, 2024
Certified Mail
Return Receipt Requested
7022 0410 0003 1130 7960
Mr. Jason Conner
BV Hedrick Gravel and Sand Company
PO Box 425
Swannanoa,NC 28778
RE: Lake Norman Quarry
Mining Permit No. 55-01
Lincoln County
Catawba River Basin
Dear Mr. Conner:
We have reviewed the modification request your company submitted for the referenced mine site. In order for this
office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining
Act of 1971,please provide the additional or revised information in accordance with the following comments:
1. The permit boundary on the property owner map does not match the permit boundary on the mine map.
Please clarify the discrepancy and please add the property lines and owners of record to the mine map.
2. The permit boundary on the mine map does not extend to the public road. N.C.G.S. §74-49 defines
"affected land"as the surface are of land that is mined,the surface area of land associated with a mining
activity so that soil is exposed to accelerated erosion,the surface area of land on which overburden and
waste is deposited, and the surface area of land used for processing or treatment plant, stockpiles,
nonpublic roads, and settling ponds. Please clearly indicate and label on the mine map that the haul
road to the nearest public road is included in the Mine permit boundary.
3. Please clearly indicate and label on the mine map the stream buffers to the relocated Forney Creek on
the Mine map. The relocated stream and buffers should be labeled on the same map that shows the
related mining activities and permit boundary.
4. Please address the enclosed comments from the Mooresville Regional Office
Please note, this office may request additional information, not included in this letter, as the mining application
review progresses. Be advised that our review cannot be completed until all of the items listed above have been
fully addressed.
D E Q J� North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612
NORh1 CAROLINA _
oanemment of Environmental nu:nty 919.707.9200
Certified Mail
7022 0410 0003 1130 7960
Mr. Connor
Page 2
In order to complete the processing of your application,please forward two(2)copies of the requested information
to my attention at the following address:
Division of Energy,Mineral and Land Resources
Department of Environmental Quality
1612 Mail Service Center
Raleigh,NC 27699-1612
If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address:
Division of Energy,Mineral,and Land Resources
Department of Environmental Quality
512 N. Salisbury Street, 5th Floor
Raleigh,NC 27604
As required by 15A NCAC 5B.0113,you are hereby advised that you have 180 days from the date of your receipt
of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request
additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot
be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be
made to grant or deny the mining permit based upon the information currently in the Department's files at the end
of the 180-day period.
Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the
additional information requested by this letter as soon as possible. Your prompt response will help us to complete
processing your application sooner.
Please contact me at(919) 707-9220 if you have any questions.
Sincerely,
Adam Parr,PE
State Mining Engineer
Enclosures: Mooresville Regional Office Comments
cc: Mr. Jerry Eplin,PE