Loading...
HomeMy WebLinkAbout20240729_PCN_Submittal 27/07/2024, 14:29 AT&T Yahoo Mail-404 PCN Application Submittal-Dunnie Hole Pit 404 PCN Application Submittal - Dunnie Hole Pit From: laserfiche@ncdenr.gov To: robin.maycock@gmail.com;e2s@bellsouth.net;hunter@gatorwoodinc.com Date: Friday,July 12,2024 at 12:41 PM EDT Your pre-construction notification application has been submitted to the Wilmington District US Army of Corp of Engineers. The time clock for the review process will begin on the first business day of the submittal or the next business day if submitted on a weekend or holiday. If this pre- construction notification was not submitted to the correct field office, the time clock will not start until the correct field office receives the application. If the application is incomplete a project manager will be contacting you to request more information. If you have any questions, or are experiencing any issues with the PCN online form, please contact Kristi Lynn Carpenter at KdstiLynn.Carpenter@ncdenr.gov. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. 27/07/2024,14:26 AT&T Yahoo Mail-Project Notification for ID 20240958 Ver 1 for COURTESY COPY Dunnie Hole Pit Project Notification for ID 20240958 Ver 1 for COURTESY COPY Dunnie Hole Pit From: laserfiche.ncdenr.gov@ mccicloud.io To: e2s@bellsouth.net Date: Wednesday,July 17,2024 at 12:38 PM EDT The North Carolina Division of Water Resources has received application or request that you submitted on 7/12/2024 12:40 PM for COURTESY COPY Dunnie Hole Pit.The ID number for that project is 20240958,Version 1. Reviewer Contact Information:Joseph Myers-joseph.myers If you have questions,please contact Sheri Montalvo at shed.montalvo@@deq.nc.gov Project file link: https://edocs.deq.nc.govMaterResources/Browse.aspx?dbid=O&startid=3385627 If this permit application was submitted outside of standard business hours, it will be considered to have been received on the next business day. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. MDWR 11410on or twin,R-n-tc, Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 4,2023 Ver 4.3 Please theta:fields marked with a red asterisk s below ere required. You will not be able to submit the form until all mandatory questions am answered. Also,if at any point you wish to print a copy of the E-PCN,all you need to do Is fight-chick on the document and you can print a copy of the foml. Below is a link to the online help file. https:l/edor .deq.ne,gov/WaterRwoumesMocVim.aspx?dbid=Ogid=2196924 A. Processing Information If this is a counesy copy,please fill in this with the submission dale. Does this project Involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and Aquatic Weed Fund or Involve the distribution or transmission of energy or fuel.Including natural gas,diesel,petroleum,or electricity?' Yes No Is this project connected with ARPA funding?` Yes No County(or Counties)where the project is located:s Wayne Wilson Is this a NCDMS Project' Yes No LM1w Yes.one,Hi NCOMs is the aogManl or coaepiernt DO NOT CHECK YES.UNLESS YOU ARE DMS OR CO-APPLICANT. Is this project a public transportation project?' Yes No TNf is any exacN IUMM br munle"r rule on rah I faros ses..1....v.recohnm waecl. 1a.Typil of approval sought from the Corps:s Section 404 Permit(wellands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,fidal waters,Rivers and Harbors AG) Has this PCN previously been submitted?' Yes No tb.What type(s)of permit(s)do you wish to seek authorization?' Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) to.Has the NWP or GP number been verified by the Corps?' Yes No Nationwide Permit(NWP)Number: 44-Mining NWP Numbers(far multiple N WPS): List all"numbers you are applying Ip not on the Crop ou on Hsi. to.Type(s)of approval sought from the DWR:e co.a.lim.legpy 401 Water Quality Certification-Regular 401 Water Quality Cortificatlon-Express Nor,404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification 1e.Is this notification solely for the record because written approval Is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 111.Is this an aher4he fact permit application?" Yes No t g.Is payment into a mitigation bank or in-lieu lee program proposed for mitigation of Impacts? IIm,aearh tee aw0lame Mrter IT.miligatim MO m,n4-lm pmgnm. Yes No Acceptance latter Attachment C IM BrW IMlo,a d,M aM aw files Mee w wadh Qro .,t FILE TYPE MUST BE PUF 1h.Is the project located In any of NC`s twenty coastal counties?" Yes No 1j.is the project located in a designated trout watershed?" Yes - No Link to trout information:hUp:lhx ..saw.usaw.anny.miUMissionslRegulatory-Permit- mgmmlAgency-Caordination/Goulaspx B. Applicant Information Ia.Who Is the Primary Contact?" Robin Maycock Perez Is.Primary Contact Phone:' 1b.Primary Contact Email:" IaaDaa-nx. rcbin.maywck@gmmI.wm (9191,118-76,t5 Id.Who Is applying for the permit?" Owner Applicant(other Nan owner) (Che all NaiappN) Ia.Is there an Agent/Consultant for this project?" Yes No 2. Owner Information 2a.Name(s)on recorded deed:" H 8 S Land LLC 2b.Deed book and page no.: 3402123 ]a Contact Person: (Ia Ca%raecnal Anthony Hunter Stone 2d.Address" Snee kdW 3204 Nash St N "mnv wa 2 Suite C CITY sun/Pra /Re Wilson NC Pmtel/IipCWe Cwnpy 27896-3002 USA 2e.Telephone Number:" (n.Im-m (2521243-0014 2f.Fax Number. M.) . 2g.Email Address:" Hunter@gatomoodincwin 3.Applicant Information(if different from owner) 3a.Name:" T.Patrick Shillington 3b.Business Name: (uayPt®de) Engineering and Envronmental Sciences Co,Inc.(E2S) 3c.Address` sven Mdmn 3008 Anderson Drive Mdmn line 2 Suite 102 Clry sxxf .IR'. Raleigh NC N,ua l Zip CWe cosy 27609 USA 3d.Telephone Number.` (919)781-7798 3e.Fax Number. I:ral:o-nn I>nia..>m 3f.Email Address:` e2s@bellsouth.net 4.Agent/Consultant(if applicable) 4a.Name:` Robin Maycock Perez 4b.Business Name: (aePMCacNI Maycatic Environmental 4o.Address` sxnl Md . 2415 Adams Farm Court Mdmnune2 cxY Suu I FT—I R1. Snow Camp NC PosaII7io C,N. C rvy 27349 USA 4d.Telephone Number:' 1919p1&7645 4e.Fax Number: 0.Email Address:` roun.maycack@gmall cam C. Project Information and Prior Project History 1.Project Information 7a.Name of project:` Dunnie Hole Pit Its.Subdivision name: lc.Nearest municipality I town:` Stanlonsburg 2.Project Identification 2a.Properly Identification Number: 2b.Property size: dm PIN d Pamel Im (In—) 3646882787 164.4 2c.Project Address S.Mdeu E NC 222 HWY Md.Un.2 Dunnie Hole Road Gry sun.I Pre—I Reran Stantonsburg NC Pnwlzocae. v„n:,y 27883 USA 2d. Site coordinates in decimal degrees Please collect site coordinates In decimal degrees.Use between 4d digits(unless you are using a survey-grade GPS device)aver the decimal place as appropriate,based on how the location was constrained. (For example,most mobile phones wim GPS provide locations]precision in decimal degrees to map coordinates to 5 or fi digits after the decimal place.) Latitude:" Longitude:' 35.58555514 -77825278W ex sx 201 .n 7aran 3.Surface Waters 3a.Name of the nearest body of water to proposed project:' Contaminant Creek Its.Water Resources Classification of nearest receiving water.' C.SW.NSW Surface Water Lookup 3c. What river basins)Is your project located in?' Nauss 3d.Please provide the 12digit HUC In which the project is located.' 03020203405 River Basin Lookup 4. Project Description and History 4a.Describe the existing conditions on the site and fine general land use In the vicinity of the project at the time of this application:` Existing sand/stone mine applying for expansion with NCDLMR/USACE/NCDW R. Currently partially logged with existing logging roads. Wetland,streams and riparian buffers are wooded and undisturbed by past logging and pasulempoeed mining. Land Use Cover-upland mixed pine/hardwood and wetlandMinarian areas with clearcut areas and active mining area/roads. (USFS NWI:PFOI C,PFOI A.PSS1 C.PF01/2F,PUBHx) 4b.Have Coma permits or DWR certifications been obtained for this project(including all prior phases)In the past?' Yes No Unknown at.List the total estimated acreage of all existing wetlands on the property: 29.74 ac 404/noni jurisdictional wetlands(within mine permit limits) 4g.List the total estimated linear feet of all existing streams on the property: trn...m.,dixuarri 24421f Intermittent/perennlal streams(within mine permit limits) 4h.Explain the purpose of the proposed project:' Expand existing mining permit footptlnl in order to mine sail sand and gravel for local construaian projects associated with 587 projects.Improve existing logging access road for mine expansion. 41.Describe the overall project in detail,including Indirect Impacts and the type of equipment to be used:' Existing mine permit area to be expanded and existing road to be improvedbwdened with hydraulically sized calved to provide mining truck access.Standard construction equipment to be used(excavator dump trucks,bull dozer)to improve road.Riparian and welland areas to be avoided with the exception of one crossing. 5.Jurisdictional Determinations to Have the wetlands or streams been delineated on the properly or Proposed impact areas?' Yes No Unknown Comments: See attached data forms and maps. Sib.If the Coma made a jurisdictional determination,what type of determination was made?` Preliminary Approved Not Veered Unknown N/A Corps AID Number: E.ani snW.2011-eseea Sc.If Sa is yes,who delineated the jurisdictional areas? Name(if known): Robin Mai Perez,LSS Agency/Consultant Company: Maycock Environmental Other: 6. Future Project Plans 6a.is this a phased project?* Yes No Are any other NWP(s),regional general pemlt(s),or Individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?This includes other separate and distant creasing for linear projects that require Department of the Army authorization but don't require pre-eonstructlon notification. Second phase-expansion of existing mining peril f000mnl,presently used as a hunt club property,to be forested/open water habitat after mining. D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Sireams-tn'butariea Buffers Open Waters Pond Construction 2.Wetland Impacts If there are wetland impacts proposed on the site,then complete this question for each Weiland area Impacted. "W."will be used In the table below to represent the word"wetland". b.3ltede lvt 2ad Reason et'i b.lmpacttiff.", 2c.Type ofWe 2tl.W.namee 2e.Forestede Type of Jurisdicftion e�areampact Raetl crossing �Botlomland Hardwood Forest �No Both O018 29.Total Temporary Wetland Impact 0.000 2g.Total Permanent Weiland Impact 0.018 2g.Total Wetland Impact 0 018 21.Comments: Existing logging road crossing M be improved for mining truck traffic. E. Impact Justification and Mitigation _ 1. Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed Impacts In designing the project:e Expansion of mining area smaly avoids all wetland areas except where nail crossing is necessary. tb.Specifically describe measures taken to avoid or minimize the proposed Impacts through construction techniques:e Minimal impacts to widen and reinforce proposed road crossing.Cofferdams to protect water quality when placing culvert.MEC measures during earth moving. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: NC Stream Temperature Classification Maps can be found under the Mitigation Concepts lab on the Wilmington Distdd's RIBITS websile. F. Stormwater Management and Diffuse Flow Plan (required by DWR) Recent changes to the storms ter rules have required updates to this section 1. Diffuse Flow Plan 1a.Does the project Include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No lb.All buffer impacts and high ground Impacts require diffuse flow or other fom of stomwater treatment. If the project is subject to a state implemented riparian buffer protection program, ' include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures(SCM)s must be designed in accordance with the NC Stomwater Design Manual. Associated supplement forms and other documentation shall be provided. What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SH Wn Wetland Swale(higher SHWr) Other SCM that removes minimum 30%nitrogen proposed project will not create concentrated slotmwater flow through the buffer (MxY ell Nat.") For a list of options to meet the diffuse flow requirements,click here. 2. Stormwater Management Plan 2a.Is Nis a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NC5000250?' Yes No 2b.Does this project meat the requirements for low density projects as deflued In 15A NCAC 02H.1003(2)?` Yes No To look up low density requirement click here 15A NCAC 02H.1003(2). comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(frederallstatellowl)funds or the use of public(federallstale)land?' Yes No 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0600),Isolated Wetland Rules(15A NCAC 2H.1300j,or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(I5A NCAC 2B.0200)?' Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project(based on past and reasonably ardid"lad future impacts)result in additional development,which could impact nearby downstream water quality?` Yes No 31.If you answered"no."provide a short narrative description. SBEC and Sloonwaler measures will be installed in compliance with mining regulations. 4. Sewage Disposal (DWR Requirement) aa.Is sewage disposal required by DWR for this project?' Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur In or near an area with federally protected species or habitat?' Yes No 5b.Have you checked with the USFWS concerning Endangered Species Ad impacts?` Yes No Sit.Is another Federal agency involved?' Yes No Unknown Se.Is this a DOT project located within Division's iS?' Yes No SE Will you cut any trees In order to conduct the work in waters of the U.S.?` Yes No Sg.Does this project Involve bridge maintenance or removal?' Yes No Link to me NILES SLOPES document hnp:lleawweg.usacoaodymillNLEBII-30-17signed_NLE8SLOPE58apps.pdf 5h.Does this project Involve the constructlon0nstallatlon of a wind turbine(s)?•` Yes No 5i.Does this project Involve(1)blasting,andlor(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.?' Yes No 5j.What data sources did you use to determine whether your site would Impact Endangered Species or Designated Critical Habitat?' NCNHP,USFWS ECOS 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?` Yes No 6b.What data sources did you use to determine whether your site would Impact an Essential Fish Habitat?` NOM EFH mapper 7. Historic or Prehistoric Cultural Resources(Corps Requirement) Link to the Slate Historic Preservation Office Histanc Properties Map(does not include archaeological data: OggLllg3.O rgoas ow 7a.WIII this project occur In or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status(e.g.,National Historic Trust designation or properties slgni6unt In North Carolina history and archaeology)?' Yes No 7b.What data sources did you use to determine whether your site would Impact historic or archeological resources?' NCSHP.NCDNR 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floociplain Maps: hhpsJlmsc.fema.govlportal/search Be.Will this project occur in a FEMAdesignated 100-yearfloodplain?' Yes No Sc.What source(s)did you use to make the floodplain determination?' National Flood Hazard Layer FIRMette Miscellaneous Comments Please use the space below to attach all required documentation or any additional Information you feel is helpful for application review.Documents should be combined into one rile when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. cad ea ePloaf suoan wore,ern aoP nes 1.is..aso1an1 figure 1-vicinity mapdunnie hole mmopdf 980,83KB figure 2-USDA Sail Surveydunnie hole mine(1).pdf 1.31MB figure Vera mapdunnies.pdf 4.99MB Dunne Hole-Wayne Cc(1)(1).pdf 512.01 FIRMETTE_Ob874116-OW447e-868c-8e5f4b7975f0.pdf 732.96KB wetland Impactdunnie hole.pdf 326.75KB Agent AuNonzationdunnie Hole Mine-signed(1).pdf 26.91KB Ounme Hole Cave,Letter pi f 372.52KB F.te-9.POF or IW 2 Signature _. k By checking the box and signing below,I certify that: • The project proponent hereby ceNfies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and lake action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information an this tarn; • I agree that submission of this PCN form is a-transaction'subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act-): • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Arl 40 of the NC General Statutes(the-Uniloim Electronic Transactions Acr): • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a writer,signature:AND • I inland to electronically sign and submit the PCN form. Full Name:` T Patrick Shillington,PE Signature` f1A-1vr a.•.SArnasnw..R5