Loading...
HomeMy WebLinkAbout20240320_ADI ��n�51A1£q, ROY COOPER Governor ELIZABETH S.BISER Secretary �AM° * WILLIAM E. TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality March 20, 2024 Certified Mail Return Receipt Requested 7022 0410 0003 1066 5986 R. Gary Thompson TR Equipment Company, Inc PO Box 190 Harbinger,NC 27941 RE: The Sandlot Currituck County Pasquotank River Basin Dear Mr. Thompson: We have reviewed the application your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Please provide a pumping O&M plan to mitigate impact to the surrounding land. 2. There are several proposed features located within the "Undisturbed Area," including berms, the dirt path for office access, and the overflow discharge pipe with the accompanying riprap apron. Undisturbed buffers are not permitted to have any activity whatsoever. Please clarify if this buffer is intended to be unexcavated(no excavation, but roadways, berms, ad erosion& sedimentation control measures may be installed within) or undisturbed(no activity). Please clearly label the type of buffer on the mine map. 3. The acreage table provided proposes 0.40 acres of stockpile area. Please identify the stockpile area on the Mine Map. Please note, this office may request additional information, not included in this letter, as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. D EQl r-A- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA oanenmem of Envimomenmi Quality /� 919.707.9200 Certified Mail 7022 0410 0003 1066 5986 Page 2 In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy,Mineral, and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 513.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at(919)707-9228 if you have any questions. Sincerely, Co Clacton. Corey Clayton, Assistant State Mining Engineer cc: Samir Dumpor,PE