Loading...
HomeMy WebLinkAbout20240617_Mine_Map �a 1 T)IVc&RS(0,0.1 ;a t t 60, 6"min f 2-3" �r `k coarse agSregate F1p t,t.`f A'N r4A �-rT Gravel Construction Entrance Detail BORROW PIT DEWATERING BASIN DETAILSOMERAL NOTES: [—CLASS A STONE i L4 v►��a1s�Ld28i DETERMINE BORROW PIT 04TU1TBRIFIO BABIM SI»YRINO pJ 1 W( •f S •, �VA -� Y=♦•ONES C• T. (MERE Y IS vOL461C (FF). 0 IS v PUMP FLOW RATE IBPMJ•AND T 1B nFOAT'ERIFRR TIME CHR). PWrw aw� �v /�, 1 ►! .(� Use SOBINUM FLOW RATE OF 1000 GPM AMD A OLNnRO �,f y�, t p OEIMITERIRB TIE OF 2 HOURS. _ Q,-0 �i�`fi ` /,,,✓/ RISEN OWL BE A MOM-PERFORATED SOUTHoR CORRUGATED MATERIAL WITH A FLABHBCARD OPTION. �* STB0NEPA saw 1:)rj v 6TD Q` RUc COMBTr THE COIR FIBER BAFFLE:SWIM A MATEFIAL t�. j P,9P THAT MEETS TM SPECIFICATIONS OF THE OOIP1 FIBER !) ' MAT BP&1LAL PROYIBIOR PROVIDED in'IFS CONTRACT. �6" �y�� �n RIOVfOE S STEEL POSTS#THE PELF-FABTPI�FA LrVi1'.1` V w�• f/ /s , .�f1 AFMILE STEEL TYPE. FNSSYLLL STEEL POlTB "11" 55�v :3" NITH NO MORE THAN a OF THE POST AFFEARINB MY\PA�y ABOVE THE MOM. ATTACH THE COIR FIBER NOT TO THE 6TEA. POSTS WM NIR6 ON OTHER ACCEPTABLE MEANS EdAND STAPLED INTO THE BOTTOM AM SIDE SLOPES p f+c+7 4i( a) OF THE RASIN WITH I9"STAPLER. lWtALL TYPE 2 FILTER FABRIC ON SIPULDPBB AND Q,Rj3�`J `I �N;;2PN C� C 'L0 OIEI Bar=OF BASIN AT INLET AB O IN THE DE N,TAIL. ` �'P' USE THE TYPICAL GBOTION SHME FOR THE S'CD1j� WORKS!PIr CRIM )INS BASIN AS A KQOM. THE BASIN MY NAPE ANY TYPE MOUATT�OM All LONG AS \ ' q\� ��j t ►. 7 M MADE I N AA NNONIPERFORATO RIME IBIIOMB EARiH Cn� �wv�� O` y �y w C t(_ANr.>s OIlEM REWIRED FOR NORCO PIT OENOTERINB MEIN. p��� tl° ® 1 ► ,,,` * �y `N �r.I h�� v `w„ 00 NOT EIU,'EED FT. IN FILER I"TM F.WM �- RIMER � G I 1 V ► ,`T � 4 1� �' THE BORROW PIT OCMNTERINB BASIN SIZE IB WARIABLE ` � 1 AS SELL NDEi�EAS"FRT ON DPflMM OUNSTT IO OF11SATIONSC SITE S. SUBMIT THE SIZE LOCATIUII AND RISER PIPE APP� ---) MATERIAL FOR ROYAL PRIG►TO CONBTRIA.rIOF. 'I�UNCLABGIM, I � . I � 1 ' / Q k .0 P%W OW EFFUMW INTO TTE B IRON PIT OE1WGFILNG _INIBIN BIRA MABINID DE"OF B IN. BELpf T01+OF ___ __ �r � fS{I�BEEP I/ OUTLETPROVIDEOf TM STONE ENERGY HOSE AND 028111PATOR PAD AOUR1Pi OF g' P�wTH MATLNLAL ODLLXR `t ( o THE ENDS L BI"N/B.U�WITH RR00 VA%.YTI. fog k OUR FIBER BAFFLE VARIABLESTEEL POSTSSTANDARD ' a r&j('AL SECTION VIE1M 1 / hlC}7 Tp SCALE 1�, IC,-j r t�a, 1�' pr,`jNQ�� 1`6�` jib D n/T ! 1 1� `1P.U.G �11rMtri�- tAar ►AVU rra�t. v T3g5rN DcczVIA �t_TZVU5 OE[2N1 !N T4l5 AFZeA_ . //gar /' t Un 402 1 ` IAA ie/,T- 79eVA 1MlrnEicrt �Ut? C3�." le 09, tNPR QTtwN p t av0. t3 citM ` Z B�!RJ t 1 C, ' �e>Q s 151 t %IATa WATErt!LEVEL VPON 1�C(t+`�e4~rtaN � �l Ottrna�� Core Creek �', lW Are C:r 'on a4sectl rN w (not to orate) r I K max stood d str " th fabric with wire jence r,i M b 1nax extra strength fabric without wire 10 Pot U r�- ._.- .. -.-,........ __.-.. __..:.. ram^ r Meet a ' host Plastic b. wire ties C'"J"f` 1 LOCATION MAP 18 24 Wire fence 6 " I f 3, Natural �.71 ground CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED 8"dawn A 4" ACREAGE AFFECTED ACREAGE ACREAGE f the trench Tailings/Sediment Ponds 0.00 0.00 Q.10 24" Filter fabric Stockpiles 0.00 0.00 0.00 Waste piles 0.00 0.00 1 0.00 Processing Areas/Haul Roads 0.00 1.50 Wire Mine Excavations 45.00 ence Other(Please explain) Cross-Section View Total Affected Acreage 46.60 Filter V iv�PSi`( Total Permitted Acreage 5tee:l fabric 8ackfill trench 13a 166.39 post f and compact ground! L�N(� t thoroughly �� p�13 Via` • ' ' • •• ups MINE PLAN AND DETAILS • • min ■ '. z " • min Reclamation Plan: The entire Mining Area will be left as a pond. All slopes will beQ-rL ,• „! i, MINE graded to a 3:1 slope or flatter. All disturbed areas above static water level will be -► CORE CREEK UT ' seeded according to approved Revegetation Plan. The haul road will remain in use for NSN INVESTMENTS LLC property access. z t r11 o 0CARTERET COUNTY U. n7 1'=200' February 16, 2024 S'; ut t=-c�rt c� a' coa too' qav" r N < —OP-4 AI ) ! I ! - �- ® PREPARED BY CAROLINA GEOLOGICAL SERVICES, INC