HomeMy WebLinkAbout20240607_Narrative Martin Jay Nivens
Marietta Regional Manager Environmental Services
East Division
June 6,2024 FedEx Delivery
Mr.Adam Parr, P.E.
State Mining Engineer
NC DEQ Division of Energy, Mining and Land Resources
512 North Salisbury Street
Raleigh, NC27699-1612
RE: Martin Marietta Kings Mountain Quarry—Mine Permit#23-02 Permit Modification
Dear Mr. Parr:
This letter is requesting the modification of the mining permit #60-02 for the Kings Mountain
Quarry located at 262 Holiday Inn Drive in Kings Mountain, NC. This proposed modification includes the
following modifications:
• Update the existing mining permit limits with more accurate property boundary information.
The overall mining permit limits have not changed. The acreage adjustments that have been
made are to depict the acreage more accurately within the existing mining permitted
boundary.
• Revise the location of the processing plant located within the pit expansion area.
• Update the Reclamation Plan to reflect the current conditions.
Should you have any questions or need any additional information, please contact me at 704-409-
1475 or via e-mail at iay.nivens@martinmarietta.com
Sincerely,
Carolina Regional Office
8701 Red Oak Blvd.Suite 540,Charlotte,NC 28217
t.(704)409-1475 m.(980)613-9009 e.jay.nivens@martinmarietta.com
www.martinmarietta.com
Martin
Marietta
Kings Mountain 2024 Mine Permit
Modification Submittal — June 6, 2024
• Modification Cover Letter
• Mine Permit Application & Modification Fee
• USGS Map, Roadway Map
Revised Mine Plan
• Revised Reclamation Map
Engineering Calculations
• Culvert #1 Design Calculations
Martin Marietta Materials, Inc.
8701 Red Oak Blvd. Suite 540
Charlotte, NC 28217
704-407-1475
c
Mine Permit Application