Loading...
HomeMy WebLinkAbout20240320_Narrative_23-01 i SWCA113 Edin6vrgh Sovlh Drive Suite y 120 Cary,North Coro€ina 27511 Tel 919.292.2200 ENVIRONMENTAL CONSULTANTS www.swca.com 1136 Sound Science.Creative Solutions' R�c�1\lED March 18, 2023 State of North Carolina SEC�10N Department of Environmental Quality LAND QUAttTY Division of Energy, Mineral, and Land Resources Mining Program Archdale Building, Fifth Floor 512 N Salisbury Street Raleigh, NC 27604 Attn: Corey Clayton RE: Mine Permit Modification Response to ADI_2024.03.06 Kings Mountain Mine- East Albemarle U.S., Inc.-Cleveland County, NC Mining Permit No. 23-01 We are in receipt of the ADI dated March 6, 2024 for the referenced permit application modification. The enclosed Attachment(Attachment 1) provides responses to your request for additional information. Two (2) copies of the revised Mine Map drawing set are also enclosed. Should you have any questions or require additional information, please contact me at 352.818.8995 or via email at steve.adams(@swca.com Sincerely SWCA 5 Awl . Steve Adams Project Manager Cc: John Kuhn-Albemarle U.S., Inc. Attachments Attachment 1 Response to ADI+2-eapies) Mine Map Set (2 copies) Attachment 1 Response to ADI_2024.03.06 1. After reviewing the drill pad locations, it is requested to change the sediment and erosion control measures,as proposed on the mine maps,at the following three drill pads: HAC-008 to Type A, DRA-BH-029 to Type A,and HAC-030 to Type B. Response:The erosion and sediment control measures have been revised as requested and provided on the revised Mine Map. 2. Southeast of"#1 Pond" is a Swale that the sewer demo runs through. Please confirm that appropriate sediment and erosion control measures will be taken to prevent impact to the surrounding wetlands. Response:A drainage feature (swale) routes water to the sand tailings pit. All drainage is internal to the site and does not run off-site or enter a stream or wetland. To provide a stronger measure of erosion and sediment control, additional measures (silt fence and silt fence outlet) have been incorporated and are shown on the revised Mine Map. 3. Please indicated all current and proposed outfalls or discharges on the mine map.This should include outfalls 004, 005A,and 005E as referenced in the Stormwater Pollution Protection Plan submitted with your application. Response: Outfall locations 004,005A, and 005B are now shown on the revised Mine Map. 4. Please provide a typical cross-section for any existing or perimeter channels on the mine maps. Response:They are no existing or perimeter channels on the East Mine site.There are however, swales that direct water to internal areas with no off-site runoff or runoff to existing streams and wetlands.A typical swale cross-section is provided on the revised Mine Map.