Loading...
HomeMy WebLinkAboutReclamation Calculation_78-54 E. DETERMINATION OF AFFECTED ACREAGE AND BOND 78-54 -Lonnie Locklear Jr. Hwy 72 Mine The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to $5,000 per affected acre) for each permitted mine site based upon the acreage approved by the Department to be affected during the life of the mining permit. Please insert the approximate acreage,for each aspect the mining operation, that you intend to a ect during the li e-fthis mining ep rmit in addition,Please insert the appropriate reclamation cost/acres each cate rX rom the Schedule _f Reclamation Costs provided with this application orm OR you can defer to the Department to calculate your bond for you based upon your maps and standard reclamation costs: AFFECTED CATEGORY ACREAGE RECLAMATION COST/ACRE RECLAMATION COST Tailings/Sediment Ponds 0.00 Ac. X $ 500 /Ac. _ $ - Stockpiles 2.70 Ac. X $ 1,800 /Ac. _ $ 4,860.00 Wastepiles 0.00 Ac. X $ 2,000 /Ac. _ $ - Processing Area/Haul Roads 1.19 Ac. X $ 1,800 /Ac. _ $ 2,142.00 Mine Excavation 32.12 Ac. X $ 500 /Ac. _ $ 16,060.00 Other(berm) X $ 1,800 /Ac. _ $ - TOTAL AFFECTED AC.: 36.01 Ac. TOTAL PERMITTED AC.: 44.66 Ac. Temporary&Permanent Sedimentation& Erosion Control Measures: Divide the TOTAL AFFECTED AC. above into the following two categories: a) affected acres that drain into proposed/existing excavation and/or b) affected acres that will be graded for positive drainage where measures will be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands. a)Internal Drainage 36.01 Ac. b)Positive Drainage 0.00 Ac. X $ 1,500.00 = $ - SUBTOTAL COST: $ 23,062.00 Inflation Factor 0.02 X SUBTOTAL COST: $ 461.24 X Permit Life Provided by Applicant (Life of the Mining Operation or Life of Lease from Public Entity(in Years)): 10 INFLATION COST: $ 4,612.40 SUBTOTAL COST+INFLATION COST: $ 27,674.40 Total Reclamation Bond Cost: $ 27,600.00 (round down to the nearest $100.00) (NOTE: The reclamation bond cannot exceed$1 million per GS 74-54)