Loading...
HomeMy WebLinkAboutNT21113 03-25-24 Mine App. Page 1 Revised NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE: It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE- APPLICATION MEETING to discuss your intentions and address any questions. 1. Name of Mine Coastal Land and Sand Company, LLC Mine County Brunswick River Basin Lumber Latitude(decimal degrees to four places) 34.0605 Longitude(decimal degrees to four places) -78.2607 2. Name of Applicant Coastal Land and Sand Company, LLC Applicant Contact Dave Tripp Consultant Contact J. Phillip Norris, P.E. Applicant Email trippsconstruction@atmc.net Consultant Email pnorris@ntengineers.com Telephone 910-287-3234 Telephone 910-287-5900 Cell Phone 910-540-6296 Cell Phone 910-471-9638 3 Permanent Address for Receipt of Official Mail** 3540 Ash-Little Road, Ash NC 28420 4. Mine Office Address P.O. Box 126 Ash, NC 28420 5. Mine Manager Dave Tripp Mine Manager Email trippsconstruction@atmc.net Telephone 910-287-3234 Cell Phone 910-540-6296 1 certify that all details contained in this permit application are true and correct to the best of our knowledge.We fully understand that any willful misrepresentation of facts will be cause for permit revocation. Signature*** ��� -� .� °� ,., Date A.'As lar{ Print Name Dave Tripp Title Mine Manager *This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond(security)that corresponds to this site. **The Division of Energy,Mineral,and Land Resources must be notified of any changes in the permanent address or telephone number. ***Signature of company officer required. G.S.74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or, if a public hearing is held,within 30 days following the hearing and the filing of any supplemental information required by the Department.All questions must be addressed,and all required maps provided before this application can be considered complete.Attach additional sheets as needed. Revised September 21, 2021 P a g e 11