Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20240529_ESC_Plan
DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Erosion and Sedimentation Control Plan Stone LCID Landfill Chatham County, North Carolina Prepared for: ARBD, LLC Chapel Hill, NC STONE EXCAVATING February 2023 (Revised May2024) Prepared by: SMITH4GARONER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 O 2023 Smith Gardner,Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner,Inc. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Erosion and Sedimentation Control Plan Stone LCID Landfill Chatham County, North Carolina Prepared For: ARBD, LLC Chapel Hill, NC S+G Project No. ARBD-21-1 \``����suuurrry�r �`•a SEAL Docusigned by: = 054367 — 24/2024 CSECC95C937E4AC Ej .... ��j ✓ �•'•••...�N.•••'•'• ���� SE G Jesse C. Li, P.E. ��r'��rrrrnn►►`�`���� Project Engineer isu19,r01 11 #. 1W � ' DocuSigned by: SEAL 1 Esz7easzdFi�ao9a sit 023 5k4/2024 Stacey A.Smith, P.E. Senior Engineer `%off, ' A-�#.�V �+�IfJfiJ111i1�l# February 2023 (Revised May 2024) SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1919.828.0577 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Stone LCIB Landfill Chatham County Erosion and Sedimentation Control Plan Table of Contents Paqe 1.0 NARRATIVE.....................................................................................................................2 1.1 Project Description......................................................................................................2 1.2 Site Location.................................................................................................................2 1.3 Contact Information.....................................................................................................2 1.3.1 Engineer...........................................................................................................2 1.3.2 Owner...............................................................................................................3 1.4 Existing Site Conditions...............................................................................................4 1.5 Adjacent Areas.............................................................................................................4 1.6 Site Soils Information ..................................................................................................4 2.0 DESIGN GUIDELINES AND PROCEDURES.....................................................................4 3.0 RUNOFF CALCULATIONS...............................................................................................5 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES - INITIAL...............................5 4.1 Sediment Basins..........................................................................................................5 4.2 Drainage Channels......................................................................................................6 4.3 Drop Inlets....................................................................................................................6 4.4 Culverts ........................................................................................................................6 4.5 Silt Fence......................................................................................................................6 4.6 Vegetative Stabilization ...............................................................................................6 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES - FINAL.................................7 5.1 Side Slope Swales........................................................................................................7 5.2 Down Pipes...................................................................................................................7 6.0 SCHEDULE FOR IMPLEMENTATION ..............................................................................7 7.0 INSPECTION AND MAINTENANCE.................................................................................8 FIGURES Figure 1 USGS Map (Farrington Quadrangle) Figure 2 Post Development Drainage Areas APPENDICES Appendix A Current Deeds & Solid Waste Permit Appendix B Erosion and Sedimentation Control Calculations Appendix C Erosion and Sedimentation Control Technical Specifications Appendix D Erosion and Sedimentation Control Plans and Details DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 1.0 NARRATIVE 1.1 Project Description ARBD, LLC currently operates a Land Clearing and Inert Debris (LCID) landfill at their Landfill facility located off of Rock Hill Drive in Chatham County. The landfill property is proposing an expansion from a 38-acre site to a 60-acre site operating under NC DEQ Solid Waste Permit No. 19-9. A copy of the current NC Solid Waste Permit is shown in Appendix A. This plan discusses both the initial and long term (final) erosion and sedimentation control measures used on this project. 1.2 Site Location The attached USGS map (Farrington Quadrangle) shows the approximate location of the site and the location of stormwater outfalls for this project. Additional information is as follows: Address: 52 Rock Hill Drive Chapel Hill, NC 27517 Coordinates (Site Entrance): Latitude: 35.80 degrees Longitude: -79.03 degrees River Basin: Cape Fear Receiving Streams) Jordan Lake (Stream Classification): 1.3 Contact Information 1.3.1 En ineer For questions regarding this erosion and sedimentation control plan, please contact the following: Smith Gardner, Inc. Attn.: Stacey A. Smith, P.E. 14 N. Boylan Ave. Raleigh, NC 27603 Phone: (919) 828-0577 Email: stacey(dsmithgardnerinc.com. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 1.3.2 Owner The owner of the site and the person to contact should sediment control issues arise during the land-disturbing activity is as follows: ARBD LLC Attn: Alan Stone, President 5180-A Big Woods Road Chapel Hill, NC 27517 Phone: (919) 971-0918 The property includes multiple parcels as shown below. Copies of the deeds are shown in Appendix A. PIN Book Page Acreage Grantor Grantee 9794-00-06-6670 2.60 9791-00-06-5834 4.25 9794-00-07-7340 3.39 9794-00-06-2132 1.80 9794-00-01-6956 1828 0533 2.00 Alan H. Stone ARBD LLC 9794-00-06-8964 2.00 9794-00-16-1724 2.21 9794-00-96-9735 20.59 9794-00-06-3570 0.98 9794-00-05-3751 1.29 9794-00-06-7335 0.92 9794-00-16-1542 0.84 9794-00-06-8170 1.12 9794-00-05-7905 2.18 Mildred P. 9794-00-05-3876 3.10 Ramsey, Elbert 9794-00-05-6511 0289 0206 2.06 Ramsey, Lillian P. Alan Hugh Stone 9794-00-06-5204 1.91 Shaw&Joseph & Helen B. Stone 9794-00-06-9414 0.93 Shaw 9784-00-96-7064 0.97 9784-00-96-5097 0.86 9784-00-96-3282 1.28 9781-00-95-3963 1.18 9794-00-06-4069 0729 0038 1.17 Helen B. Stone Marlon K. Stone 9786-00-06-4069 0680 1073 1.01 A. Hugh Stone Helen B. Stone Total Site Acreage: 60.64 Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 1.4 Existing Site Conditions ARBD owns and operates a LCID landfill under NC Solid Waste Permit No. 19-09. The LCID landfill has been in operation since 2003. The facility entrance is located at 52 Rock Hill Drive. Rock Hill Drive is a gravel road off of Big Woods Road. The elevation varies from 390 ft in the southern portion of the existing landfill property to 250 ft in the eastern portion of the property. 1.5 Adjacent Areas The site lies between Dalton Drive to the North and Rock Hill Drive to the South. There is an unnamed creek running in the Northern portion of the site and Jordan Lake sites adjacent to the site on the East. 1.6 Site Soils Information According to the USDA Natural Resources Conservation Service soil survey (see Drawing S11, the native surficial soils at the site fall under the categories Nanford-Badin Complex, Goldston-Badin Complex, and Georgeville-Badin Complex. For purposes of runoff calculations, the soils at the site can be classified as being in hydrologic soil group (HSG) "B". 2.0 DESIGN GUIDELINES AND PROCEDURES The erosion and sediment control design for the landfill was conducted based on guidelines and procedures as set forth in the following references: A. HydroCAD Software Solutions, LLC (2006), HydroCAD Stormwater Modeling System Owner's Manual - Version 8, Chocorua, NH. B. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. C. North Carolina Division of Land Resources (2013 Update), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. D. Chatham County Chapter 164.16 Ordinance on Soil Erosion and Sedimentation Control Design and Performance Standards. E. North Carolina Stormwater BMP Manual (2018) Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 3.0 RUNOFF CALCULATIONS All stormwater flow volumes were calculated using the HydroCAD computer program (utilizing USDA-NRCS (SCS) methods) and/or the Rational Method based on a 25-year 24-hour storm event. Rainfall quantities and/or intensities used in the analyses were derived from an analysis of design storms for the site. Drainage areas were determined using a planimeter and/or AutoCAD on topographic sheets of the project area. For each drainage area, runoff curve numbers (SCS methods) and/or runoff coefficients (Rational Method) were selected based on ground cover conditions, where the Chatham County minimum design standard (c=0.60) was used. Times of concentration were calculated by HydroCAD using SCS methods. 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES- INITIAL The following erosion and sedimentation control measures are to be constructed as part of the proposed construction. Appendices B, C, and D to this plan include calculations, technical specifications, and plans and details (project drawings) for each of these measures, respectively. In most cases, the following erosion and sedimentation control measures were designed using the final drainage areas which were found to represent a worst case for design. Each calculation indicates what condition was used in the analysis. 4.1 Sediment Basins There are four (4) permanent (Sediment Basins A, B, D, and E) sediment basins which will serve the site. Sediment Basin A is existing and is located on the west side of the existing landfill. Sediment Basin B is also existing and is located to the north side of the Landfill. Sediment Basin D is to be located to the east side of the existing landfill. Finally, Sediment Basin E will be located south of the proposed expansion area. These basins were designed in accordance with E&SCP&DM Section 6.61 and the Chatham County Stormwater Ordinance Section 164.16. Sediment basins are subject to several design requirements. Each sediment basin must have a basin volume of 3,600 ft3/acre of disturbed area and should have a surface area (measured at crest of principal spillway (riser)) of 400 ft2/cfs (based on the peak flow from the 10-year storm). Each basin must include a riser/barrel principal spillway and must have an emergency spillway (preferably a weir type spillway). The crest of the emergency spillway is set one foot above the invert of the riser and the spillway must pass the peak run off from the design storm event with one foot (min.) of freeboard to the crest of berm. Each riser/barrel assembly must be provided with an anchor displacing a buoyant weight of at least 1.1 times the weight of water displaced by the riser. Each riser must also be provided with a method of dewatering the basin. In addition to E&SCP&DM requirements, each sediment basin was designed to have an adequate surface area to achieve an 80% settling efficiency of a 40-micron (silt size) Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 particle at the peak discharge from the design storm. Each sediment basin was modeled with the HydroCAD computer program and a spreadsheet was used to verify the design requirements. 4.2 Drainage Channels Drainage channel calculations were conducted using a reformulation of Manning's Equation in a spreadsheet format. The calculations determine the normal depth of flow based on the peak discharge from the design storm (from HydroCAD) and assumed channel dimensions/slope(s). Both temporary and/or permanent channel linings were chosen, as appropriate, based on the calculated velocity and/or shear stress. Steeper channels (if specified) were analyzed as riprap channels in accordance with NRCS procedures. Temporary channel linings (if specified) were designed based on the peak discharge from a 2-year and 25-year design storm. 4.3 Drop Inlets Four (4) Weir-type drop inlets will be used in the perimeter drainage channel to route flows into Sediment Basin E. These drop inlets were designed either using HydroCAD or a spreadsheet based on an analysis of the flow capacity of the open sides (weirs) of the drop inlet compared to the maximum flow from the design storm. Prior to vegetative stabilization of the perimeter channel, each drop inlet will be protected from sedimentation by a placing a wire mesh and coarse aggregate filter around all sides of the drop inlet. 4.4 Culverts There are four (4) culverts which will be used at the site to convey flow beneath roadways and embankments. These culverts will be directed to Sediment Basin E. Culverts were designed either using HydroCAD or a spreadsheet based on an analysis of inlet and outlet control under the influence of the design storm to determine the maximum headwater elevation. Where required, culvert outlets were designed for outlet stabilization based on criteria set forth in E&SCP&DM, Section 6.41. 4.5 Silt Fence Silt fencing design was based on criteria set forth in E&SCP&DM, Section 6.62 including the limitation of 100 feet of fencing for each acre of drainage area. 4.6 Ve etative Stabilization Vegetative stabilization will be in accordance with the seeding schedule on the project drawings and/or in the project specifications. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 6 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES- FINAL The following erosion and sedimentation control measures are to be constructed as art of final cover construction. The design and permitting of these controls are under jurisdiction of NC DEQ Solid Waste Section, the measures listed below are proposed and subject to change during a subsequent permit modification. 5.1 Side Slope Swales Side slope swales (diversion berms) are to be placed along final cover side slopes at 20 to 30 foot vertical increments. Flow from the side slope swales is directed to the down pipes or perimeter channels. The capacity and need for lining of the swales was checked using the same procedures as described above for drainage channels. 5.2 Down Pipes Down pipes will be used to carry flows from side slope swales to the bottom of final cover slopes. Down pipes were designed based on an analysis of inlet and outlet control under the influence of the design storm to determine the governing headwater condition. Down pipes will be adequately anchored to the landfill side slopes by use of a soil cover and each will be discharged either directly to perimeter channels or sediment traps (with rip rap outlet protection). 6.0 SCHEDULE FOR IMPLEMENTATION Erosion and sedimentation control measures will be established prior to, or as soon as practical thereafter, any land disturbance or construction activities may begin in that portion of the site which drains to the erosion control measures. The following general schedule will be followed for this project: A. Flag the clearing limits and identify any tree protection areas. B. Install temporary gravel construction entrance/exit. C. Clear the vegetated portion of the site and install silt and stone filter fencing prior to stripping/grubbing. D. Site shall be inspected and approved by Chatham County. E. Only strip/grub areas required for installation of structures, berms, and drainage channels. Other areas will be stripped/grubbed once the skimmer basins are completed. F. Install sediment basin outlet structure; outlet protection and/or channel, berm, and emergency spillway. G. Perform earthwork as required for construction. H. Perform fine grading and establish permanent vegetation on completed areas. I. After stabilization, remove silt and stone filter fencing and other temporary measures and install permanent vegetation on the disturbed areas. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page? DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Soil stabilization will be achieved on any area of the site where land disturbing activities have temporarily or permanently ceased according to the following schedule: A. All perimeter dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3 horizontal to 1 vertical (3H:1V) will be provided temporary or permanent stabilization with ground cover and erosion control blanket as soon as practicable but in any event within 7 calendar days from the last land disturbing activity. B. All other disturbed areas will be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 15 calendar days from the Last land disturbing activity. C. Basins, traps, channels, and diversions will be lined with anchored rolled erosion control products or rip rap and/or vegetated upon construction. D. Permanent ground cover for all disturbed areas will be established within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. 7.0 INSPECTION AND MAINTENANCE All erosion and sedimentation control measures will be inspected at least once every 7 calendar days and within 24 hours after any storm event of greater than 1-inch of rain per 24-hour period and appropriate maintenance conducted. A rain gauge will be maintained on the site and a record of the rainfall amounts and dates will be kept. During inspections, any stormwater discharges from the site will be observed for stormwater discharge characteristics to evaluate the effectiveness of the erosion and sedimentation control measures incorporating Best Management Practices (BMPs). If visible sedimentation is leaving the disturbed limits of the site, corrective action will be taken immediately to control the discharge of sediments. Maintenance activities will include, but not be limited to the following: A. The removal and satisfactory disposal of trapped or deposited sediments from basins, traps, barriers, filters, and/or drainage features/devices; B. Replacement of filter fabrics used for silt fences upon loss of efficiency; and C. Replacement of any other components which are damage or cannot serve the intended use. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Page 8 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page left intentionally blank. 1p OF 0011 DR 1130.1 Il) �IA� r o e • O 10 M •oo e .o Y a •-o • 1 111 111 111 111 • '�" "' • SMITHAARDNER SCALE DATE PROJECT N Q ASSHOWN Dec. 1 • ARBD 19-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ` PERMIT ISSUE FA51MG R'2AA0—f,� j \ - - ARP RAP CHAWa INLET Ae�Acts(srA4JiEy a' �' "� +. � � dRDA,LLC STONE WIFE■1H[LASS A �.'.'.,,. "... fas.�_~ ..' 1 .-.. V-SIOrf RAFFIf W11i MASS B STONE LCID LANDFILL EROSON 4WRR STCNE 4'XILH _ .:.... _-. 4` ' E 4 NOT FOR CONSTRUCTION 52 RDCI[HILL DA1UE e 4 �"•"""�j —BfRGEKY�'LWA+'26 WTM CHdPELHILE,NC ENF14mLcr�ALxur-- / �.�� t so WIDTHr— ErcNn —Y �-e � �3`'.:::_:'..%.' �\ _ ,. 1; •'_:. tr-cops�r mlmme:�.�r Ll PUW✓1fAMV5,WpACZ " FIGURE 2. POST �.. -____ / �--�_ ��� .. , i. �• _ {StF A17LF P] - mrvc x•a+rn rsu arm..a•V CONSTRUCTION ❑A-N3 _= D � SMITH + DRAINAGE AREAS A-N4 .I GRPRAP MET — — — - - HAUL RW y' r:•' / - /� " �-��___,:: a 1 a „ 1 � n [jam_ n>:�.,A�r� � BAFilE I11P.] . % f�/� •••/%'' .-�� �-i f ,a�, ��a \ f y ©IRI-cliNsmucSloN o[enu.amx mr:rn LYexrRRANaiIttR-] - Aiarnuamrs¢n7texr� STp[avnE» ................ - 1. CWIR0.SLpLE 4'HKN _-� %: .;.... :�f .r.. 1`I i. 1 'I i 1 .41 I �+�•• I 1»aYnn rniG 1,wirmxu[r ExavGGaCrSFELwAr 20'wMi ��I I 1 riI 1 ' -- •:�� -SI I.%�,� - .::.' "''<'7' ;j�11 Ir! 1 ! 1 ,�. l Mnar AvannR G 71/'�/ IIT.�� I7/ I +1 i I `_• 'y1 erww.�axr¢ i ,`I . I+� .;'�;,�� / °' DA-S1 /r. �'y �.;?, r ', �. o� . s , _ LND"VAh1 �mw sO'Y Orin AW I DA-SWZ ,.•�I, J. 1•I ,v:• ,;: %� BUFFER omx rts WJTH DRAINAGE rErr_Oxn vFA ttro[:wu. CHANNEL _«« Nomrmwn AArswlur,.rnmuY l:IXO nvxn wn 'rl.{j �_- ___:=-: �.:."H— _ 7 �Il '. T. /.1 �•� am�nav+aaranraxa�rrn a[iuwibcm� ormr acps Atll 'I� _ I ,r' �vwr xx u xnl N sea�tus-cl . ,IL �I i1 =__-____� - - y I /�, / .PR[Pp$p E%PANOED IA75 OF BED r.sR,cim,uvµ uEwxc wy,p.wrrn '/ 9lbrIEA RB>tIWY 2!P] I . ! FINALS _ '� . rmn�s Ywa+err r»I mE rruxrruwn uc tar.aw PIFf{T1P9 e[r a mi3 p er uw•.0 ruwueui. -- .... . SLOPE SXMIE[T1F.] :i< `'t _;� SYY 1 1 A!A ' � -' � �_— _ i �j� win.xr4 azu asam uraMv.�nc mrunwnn '.: -..�'--a V .;:�1. — — ��$� —- � L-', j i I•.� I�,.; `�PRLpl o am FACILITY �irwinsa oci:oin . —_ � � - _ �'- �'�- _ �! �i�i1� . % �•� BpNLTARY >,nn,inpiypnx l[r�,,9�F RM Na uIH x;,x sap[ .. STONE LANBFILLANG MINE I] I PROP09D 100'SAID PASTE 81NFEB 3 IwmriY,Fn.FW ND SnFHr Ar5'RT Rla lcarw up e[rxs�x epK�s oo s,nl ar r x.A.�xars aIkF CJ4WI[L�,�„ PERMIT GA GR0.WING5 �:J (�E H6iE 5] nc w:Aml.w.0 vsurm�im�w�.�eu:� '�= tl T[N M nnE AAL FtLr l6Ym Br A[u5 NOfr[Gpd 6 T YnFID rorauxr rT srnn id v FdKf WILEE IhP.� `mnmw oxim w.,rerar y PoPRAP CWWNEL�"� �n1 f• - — _ ._��J 5�Y -''/ r►---— '1 SAP NIET ' WE IX:AVA13ON iAAIE '�y ?;'.;i•, —"-- — .� -' _ s ..! -- xRT "``�` , .aAs MIN€RECLIMAIIRNFLAX ... _ �.. '•. --� .:�.,. -- "�=� _ _, F-x . rrwasn.n:tans - 's, ". 9 •�'• ` 1� -,��y�y t i-- [RP AAP OUTLET PINiECSICII] o»Fx(c8Lw0 re r ss�s rcnn�nuoroS _—— nnnus<1, F1P:hP!TI.HINEi`� _ _ cJ� 1)L[/{YLI®AOIEYE AS4 an w 5xCW1 •,th,s FAlkl2iCT SPILNNT BASH E LULiWmm ApEfI[ B1A atop.'HI'a smNE asFnE eRi aAS$B ®7o7fi Sm.n Garorrr.s=. EROSIONLUNIROL SWNE A'FNGH 4 S3 s DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 AppendixA Current Deeds & Solid Waste Permit Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0533 FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Nov 16, 2015 AT 04:13:21 pm BOOK 01828 START PAGE 0533 END PAGE 0535 INSTRUMENT# 11214 EXCISE TAX (None) Excise Tax: $ 6 Mail after recording to: Grantee This instrument was prepared by: Paul S. Messick,Jr.,Attorney at Law, Pittsboro,NC If checked,the property includes the primary residence of at least one of the Grantors.(NCGS §105-317.2) NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED, made this day of November 2015 between ALAN H. STONE, unmarried, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTOR; and ARBD, LLC, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTEE. The designation Grantor and Grantee as used herein shall include parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH The Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Chatham County,North Carolina and more particularly described as follows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. The property hereinabove described are properties acquired by Grantor by instrument recorded in Book ,Page of the Chatham County Registry. Title to the property hereinabove described is subject to the following exceptions: Easements and restrictions of record. IN WITNESS WHEREOF, the Grantor has hereunto set his hand an a the da and year first above written. (SEAL) ALAN H. STONE, unmarried STATE OF NORTH CAROLINA COUNTY OF OA I, a Notary Public of i4v County and State aforesaid, certify that ALAN ,W!° TOW,, harried, personally appeared before me this day and acknowledged the execution of the foregoing instrumeqk.` F l Witness my hand and official stamp or seal,this day of 20�I Ste`yr M"y Commission Expires: 1 u—( 3 "aU I-7 _ J ALJ'Printed Name:_ Notary Public 90°�+tu+s1110`� DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0534 EXHIBIT A TRACT I: (Tax Parcel No. 77630) ALL of Lot 8 according to a plat entitled "Property of A. Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RLS, dated August 29, 1983 and recorded in Plat Book 37, Page 19, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT II: (Tax Parcel Nos. 87481, 87482, & 76383) ALL that certain tract or parcel of land containing 26.191 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT III: (Tax Parcel No. 68340) ALL that certain tract or parcel of land containing 4.944 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry,reference to which is hereby made for a more particular description. TRACT IV: (Tax Parcel No. 65049) ALL of Lot A containing 3.001 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT V: (Tax Parcel No. 87344) ALL of Lot B containing 3.856 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT VI: (Tax Parcel No. 79314) ALL of Lot 1 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 11 and V above) TRACT VII: (Tax Parcel No. 73915) ALL of Lot 2 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated September 11, 2001 and recorded in Plat Slide 2001-448, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 1I, III, IV, and V above.) SAVE AND EXCEPT: BEGINNING at a point in the northern right of way line of Rock Hill Drive, and running thence North 28 degrees 50 minutes 41 seconds West 154.88 feet from an existing iron pipe, a common corner between Stone lots described by deed recorded in Book 595, Page 291 and Book 524, Page 747, Chatham County Registry; thence North 62 degrees 59 minutes 02 seconds East 302.63 feet to a point in the western right of way line of an existing 60 foot private road; thence along the right of way of said road South 56 degrees 34 minutes 34 seconds East 66.37 feet to a point; thence South 27 degrees 00 minutes 58 seconds East 55.41 feet to a point in the northern right of way line of Rock Hill Drive; thence along said drive South 73 degrees 09 minutes 15 seconds West 35.20 feet to an existing iron pipe; thence further South 62 degrees 59 minutes 02 seconds West 268.91 feet to the point or place of BEGINNING, containing 0.800 acre and denominated as "Well Lots" on the plat entitled "Well Lot Map Alan Hugh Stone" prepared by Smith and Smith Surveyors dated March 26, 2015, a copy of which is attached hereto as Exhibit B and incorporated herein by reference. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0535 EXHIBIT B Mar&U#Kff 9If THIS MAP IS NOT A CER77RED SURVEY AND HAS NOT BEEN RENEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPUCABLE 84 $ 64 LAND DEVELOPMENT REGULA77ONS. VAMVJff YAP AD,DNNXS'DEED OW 594 PACE 201 PLAT aw 2001-298 PRICY 7P>Y AALrPfSZ �0"NG 27517 ALL QtSTAMD=S 9AOMN/L7pEOV A�U.S £Y fEET Atl04GWTAL GPOI.AO IL£ASfA�DV7S AWA BY 7W AWL AI W= r � ' ALAN H. STONE 1 ` DA 524 Pa 747 PLAT SLIDE 2WI-296 ALAN H. STONE I ' Ip up RA SLIDE 200-2W � b 2 b 1,0 o MP s �"a ox VP It Ati EI ALAN H. STONE AF �. 00% 6 G. as 594 Pa 291 s oosTWD T suuE 4r\� PUT SiIQE 2001-296 (-SM ,s ue `s- P/N 979-1-06-6670 \\ AKPAR/65049 W Op .01 E ac0ir[ounov) �S 25541 g i wcu HOWE �S 3pi�0 gg 41 �: DP i d NELL LOT � � 1/ i MP a8OO AQW 91 W OR I unury 9�10 ME ZIP W/Pms S cd EP / 1 AR 37, Pa 19 Z N 2239Y•W AP •Wig u'" .00 � I .So TLUTr Q S� � /1\ kio J tlU%j \ P.a 37, Pa 19 1 A. HUGH S70NE, ET UX _ PRAT BK. 37, Pa 19 1/ / THIS IS A PRELIMINARY DRAWING AND NOT TO USED AS A SURVEY OR TO TRANSFER ANY PROPERTY SHOWN HEREON. !DO D 50 100 7/7/L7I/QL//L�D�J/7/I/U�7/P/ /���/}/7/�/ LB rim � Ru1.YJL 1L SM vE it- -Edrthp#w,Pot 1N FEMP "S-O-km Poo set 1 inch = 100 ft RRs-o-fi km Stake LWLLUAIS 701M/9/° La'"p"L O&MY,ACRIN CARO MA R�- - TR�r L1r Smith and Smithu LwawMs DLiILQV sr �- -umv Pais r 1Q0 Cc& - surveyors AP-O-NoMrrroUcd Pohl ary L�a1 u'>et Al.t-mat a�-06-6?M EALP-•-D*thy Rakoad P.a AW Nf -m ��• PJKMKT roy J" Arm DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 NORTH CAROLINA CHATHAM COUNTY THIS DEED:, made this 31st day of May, 1963, by MILDRED P. RAMSEY and husband, ELBERT RAMSEY, and LILLIAN P. SHAW and husband, JOSEPH. SHAW, parties of the first part, to A. HUGH STONE and wife, HELEN B. STONE, of Chatham County, North Carolina, parties of the second part, WITNE SSETH° That said parties of the first part in consideration of TEN DOLLARS ($10.0-0) and other valuable- considerations to them paid by said parties of the second part, the receipt or which is hereby acknowledged, have bargained and sold, and by these presents do grant, bargain, sell and convey unto said parties of the second part and their heirs and assigns, a certain lot or parcel of land in Williams Township, Chatham. County, North Carolina, bounded and described as follows: BEGINNING at a,brock and pointers in the southeastern corner of Lot No. 1 of the division of the Calvin W. Powell home tract, common corner of Hugh Stone and Curtis V. Dowdy and H. N. Butler, and running thence along and with Dowdy and Butler- line South 68 deg. 52 min. East 560.75 feet to an iron pipe corner, known as the "Old Shotgun Barrell Corner" in an old roadbed; thence with the line of Dowdy and Butler North 59 deg. 22 min. East 669 feet to an iron pipe; thence with the line of Dowdy and Butler North 48 deg. 5.1 min. East 255.90 feet to an iron pipe; thence with the line of Dowdy and Butler South 79 deg• 35 min. East 796.66 feet to an iron pipe on the West bank of Big Bush Creek; thence South 79 deg. 35 min. East 30 feet to a point in the center of said creek; thence down the course- of said Bush Creek as the same meanders in a southeastern direction the following courses and distances: South 37 deg. 04 min.. East 205 feet, South 21 deg. 04 min. East 168 feet, South 39 deg. 41 min. 78 feet; South 28 deg. 19 min. East 238 feet, South .24 deg. 41 min. East 153 feet, South 12 deg. 06 min.. West 63 feet, South 47 deg. 54 min. East 377..50 feet, North 71 deg. 46 min. East 118 feet., South 26 deg 46 min. West 97 feet and South 12 deg:. 12 min. East 193.11 feet to a railroad spike in a bridge in the center of the intersection of said Big- Bush Creek with N. C. Secondary Road No. 1715; thence along and with the center line- of said N. C. Secondary Road No. 1715 South 6o deg. 13 min. 30 seconds West 914.38 feet to an. iron pipe; thence North 0 deg. 23 min.. West 113 feet to an iron pipe, stone and ash pointer, Hugh Stone's corner; thence- along and with said Hugh Stone's line North 0 deg. 03 min. West 925.36 feet to an iron pipe;- thence with the line of Hugh Stone North 87 deg. 42 min. West• 2,000.40 feet to an iron pipe, known as "The Old Dogwood Corner"; thence with the line of Hugh Stone North 1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 SEP L2 2I l -1 197 07337 BooK 729 PAGE 38 Mccise Tax� Recording 71me, Hook and Page Tax Lot No. ........... .... .................. .. .............. .. ......... . .. . ... ............ Parcel Identifier No ... , ..,........... , Verified by ......... ...................... .... . ... ...I... .-.. ......,: . .,,. County on the .. ............ day of ..... , ............ ,,. ....... , . .......... .� 19. by ................. .................. .. .. ................. . . ....I........ ,., . . .,............ ,. ...,..... ,. .. .. ,...... , ... .. . ............ ,. . ............ , ....... �.,... .. .... , ........:... .. Mail after recording to _. G1r.antee This instrument was prepared by .... a }... M 1 si k� Jri �...Attorney.•a•t•-•Lawi...Pittsborcri-.NC.......... ........................ Brief description for the Index NORTH CAROLINA NON-WARRANTY DEED THIS DEED made this ... ......., day of .August...-...................... , y9.9.7........ by and between GRANTOR GRANTEE HELEN B. STONE, free trader MARLON K. STONE 3405 Lazy bay Lane Charlotte , NC 28269 Enter in appropriate block for each party: name, address, and, it Appropriate, character of entity, e.q, corporation or partnenhlp. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that A City o .................. s .... Township, certain of or parcel of [and situated in the ty f -.-.-.-.-.Williams .................Chatliam, County, North Carolina and more particularly described as follows; ALL of Lot 12 containing 50,762 square feet, more or less, according to a plat entitled "Property of A. Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RL , dated August 299 1983, recorded in Plat Book 37, Page 20 of the Chatham County Registry, reference to which is hereby made for a more particular description. N.C. Bar Assoc. Fenn No. 7 0 1977 —Jan+M Widkwm A co,•Inc-Solt 17I.wadkiwAlIC N,c,2700 hinted by Avemienl with the W C.Bar Ame,—1981 k a .i r DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 9 ' i BOOK 7 PAGE 39 The property hereinabove described was acquired by Grantor by instrument recorded in . A map showing the above described property is recorded in Plat Boot: . 37 Page ., 20 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging Grantee in fee simple. Sing to the The Grantor makes no warranty, express or implied, .as to title to the property hereitlabove described. IN corporate name byyItsEdu yPauthorl authorized Officers ande Grantor has o set his itsto be h reuilto And and ffixrdrby auth rii o Abov wrlt.t4n. rate, has caused this instrument to be siiened In itf y f Its lluurd� Of IfJr c t a, the dqy and year first a (corporate Name) - ----------(SEAL) 13rCX ' By; »---- ---- ------- ---- ------- - ---- ------------ __ Z ------- -- -------------- ----president ------------------------ ----- -- ---- -- ----------- (SEAL) ) ATTEST: i V a ---- ------ ------- -------------- - - ,. �_m------ ------ --- 4 __----- ------ --»-----_-_. --- ------ ---- isl:at.) ------- ---Secretary (Corporate Seal) r - - - -- --------- --- -------------- --------- _(SEAL) SE4�L1tt �ll� f',, J NoRTH CAROLIN'4 '- --- ---------- --- County. Ili Z * 4�IP,•.,r4a 1, a Notary Public of the County and State aforesaid, certify that __Helen $. , tol2e ��� - � -- -- -------z-�-----__free trader X -- --- - - ,� ----------------- -------- �- ------- ----------- - -------- ------------ ---------- Grantor, o y ` s * „ personally aPPeared before me this day and acknowledged the execution of the foregoing instrument. Witness my R f `a hand �/f a 1 * and official stamp ur seal, this .. day of , ___A l , .___-- 7 ••..,�$ ` ; A M+ MY commission exPires: _ _4/2-5/20 l0------ i �. - - -r -- 4 Public xpIZTH eArtOI,INA, _.-----__,LL ------ ------ --------County, I, a Notary Public of the C4utety and state aforesaid, certify that _ a personally came before me this day and acknowledged that at he Is Secretary of -- - __ "----- ---- _ __ a North Carolina corporation, and that by authority duly given and as the act of the Corporation, the foregoing instrument was signed In its name by its ;i� President, sealed with its corporate seal and attested by ........... as its Witness my hand and official stamp -......................... -_- ____________ ___ _Secretary. ti P or Beal, thin _____ day of ________ --- ---- ---- --, 19------ y My commission expires., - --------------------------------------Notary public The _- NORTH CAROLINA, CHATHAM COUNTY -----I- -- ThO foregoing Certificate(s) of GINA F. WEBSTER ---_--_. -� Pt�bllc is (are) certified to be Correct. This Instrument Was r - p wanted for re 2 : 2I Notary(ies) f; ., on Se tember --------- • �997 registration at o chock #. hown on the REBA a.THOIWAS, and r corde In Book 729 _ _ REGISTER OF DEEDS FOR CHATHAM COUNW By -�� Page 38 By ....... .............. Assistant-Rapist of Deeds -, COUNTY N.C.Bar Assoc. Form No.7 C) 1977-Jw wiaiom.ei co.,inc„box,27.vrdklrn,;or,N.C.27055 Fringe br, V*WrMM VAlh ehs N.C.S&Amm,—1081 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 DEC 680 PAGE 1073 EXciae Tax Recording Time, Book and page TaxLot No. ... .... . .............................. ..... ........... . .. „ .. .. .. ............ parcel Identifier No. ......... .. .. . ............... « ,........ ., . ,.. ..,................ Verified by ... ,, .. .« ....................... , ... , ................. County on the ................ day of ........................................................ 19.... . by ......... .. ... . ......... ............. .., .................... ; .............-....................................... «.,......:.......... «, , ......,..... .,..,........ , . .................. , .,... ir Mail after recording to ....Grantee.... . .�,.,��°� '4 ? .,.,........... ..... .+ .. �...... .. . .....« ................ .. . .........,... ........... .. ...........«.................. , ....,....... ., .. ,«., ,.. . ......,.......... ...1....... ,........ , ...... .. .................. , ............... ,..,..............,,.. This instrument was prepared by ....Nau1 ,S. „Messick._.jr. , At.tnrney. at Lawn... .itteboro IBC „27 12 Brief description for the Index .. .... , . .. .. , . . ...' '.. . . .. .... . . . . ., .. ... ..............�... NORTH AROLINA NOWWARR AN TY" DIRED THIS DEED made this .,NT"N.— day of ..... ...December.............. .. . .......... by and between GRANTOR GRANTEE A. HUGH STONE HELEN B. STONE Enter in appropriate block for each party: name, address, and, if appropriate, character of entity, e.q. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shalt include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable conaideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of .................. Williams _. Township, Chatham ........... ......... .............. ...�.... . ....... , « p, .« . ............. .... County, North Carolina and more articular) described particularly e cribed as follows: IrgA One; ALL of Lot No. 2 containing 2.46 acres, more or less according to a plat recorded in Plat Bonk 26, Page 62 of the Chatham County Registry, reference to which is hereby made for a more Particular description. act Tw • ALL of Lots 12 and 18 containing 50,762 square fee and 43,961 square feet, respectively, according to a plat entitled "Property of A. Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RLS, dated August 29, 1983, recorded in Flat Book 37, Page 20 of the Chatham County Registry, reference to which is hereby made for a more particular description. It is the purpose and intent of this conveyance to effectuate a partial settlement of marital property between the parties pursuant to an agreement between them &ted November 30, 1995 and G.S. ¢ 150- 29(d). From and after the execution and delivery hereof, the Grantor shall have no further rig) k title or interest herein by virtue of the marital relationship and Grantee sill have the right, without the Joinder or consent of the 15rantor, to mortgap or convey the pity conveyed herein, DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 4 r 680 PA6E I 74 The property hereinabove described was acquired b q y Grantor by instrument recorded in . ........ ...... ..... ..... . .. . ....... ,........ .......... ...... I.......................,,... .......,,... .,........... ....... . . ,........... ... .. „--- ...... ......... .. ..... ... . ,.,..... ,............ ...... . : A map showing the above described property is recorded in Plat Book ........................ pale ..,..........,........... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. The Grantor makes no warranty, express or implied, as to title to the property hereinabave described. i or WITNESS WHISR6DR. the Grantor has !Hereunto set his hand and seal. or co�otate. h /t*used this in rHsalelHt to be nod In its eoeporate patine by its duly Authorized officers and Its seal to be hereunto affix Above written. a its Board fir to the day and year arst ---------------------------------- (Corporgte Name) a A �- --- ----- - -�- - .............(SEAL) z A. HUGH #STON ----------•------•-----•--------------�--- _President -'----,...-,...__(dRAAL) ATTEST: ------------------------------------- ...................(SEAL) ---�...-a.. ,, ............... ._—_......-..,..------------- --_-_- �.secretar - f� ►1 0�# iz - --- r(Corporate seal) 00 t / ---...-------•____•----------------------r__.._...._.....(SWAL) py NORT#1 CAROLINA. _ ..__ Count i. ■ Notary► Pnblie of the County and State aforesaid, certify that At__Ut _ t-gmi--------------- 4 +� ------------------------------------•--------------------*------ ------- ---I---- •----------_.+___ Grantor, i a M personally appeared before me this day and Aftn*W dried the execution of %isle foregoing instrument. Witness my :0!' pq Band sari official stamp or seat, this day a[ ___ -_-- ......i y r. _ S-- �E���r�t:rr�►t�� � ,�.�1f a my commission expires: --- - -_-__- ,. --- ----- ........ public SEAL•5TAMP NORTH CAROLINA County, r. a Notary Public of the County and State aforesaid, tertlfy that personally tame before me this day and acknowledged that mo... he Is .,._ ------------------ Secretary at ----------------`-----•-------------------------_.---- a North Carolina corporation, and that by atttbority duly given and as the act of the corporation, the foregoing Instrument was signed In Its flame by its .__---__ President, sealed with Its corporate seal and attested by ........... as Its ._-..............._.........Secretary. Witness MY band and official stamp or seal, this _ — day of -------------------------,,,to...... my commission expires. __ ------------------,.__-_- - ._-_____----_...___.,____- .__ .___Notary► Pubtk NORTH CAROU A, CHA,TH" COUNTY The foregoing Caliticata(s) of GINA F. WEBSTER Notafy(ias) Public, Wan) certified to be oonWA. This instrument W&S preaeted for regisoration at 9; 5 o'clock .. a,m. an December 15 ,t 995, and recorded in Book , Page Reba G. 'Thom, REGISTER OF DEEDS FOR CHATHAM COUNTY BY Aidtaot - Register of Doodi« N.C.Bar Assoc. Form No.7 0 1977-r�wau.�r�ra co..ice..soy lr�.v rk�n,nrw.a.�#ross PFAqd by AV*wnNM w+wh 1100 M.C.Ow Ann-1=1 �y DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP sT4iE Issuance:February 9,2021 », �y ROY COOPER File ID: 1516661 Page 1 of 9 Governor MICHAEL S.REGAN u o Secretary L2 rftL v� MICHAEL SCOTT `a`Q� Director NORTH CAROLINA Environmental Quality STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION SOLID WASTE MANAGEMENT FACILITY Permit No. 1909-LCID-2010 ARBD LLC d/b/a STONE COMPANY LLP and ALAN HUGH STONE is hereby issued a Permit to Construct and Operate Stone Landfill LCID Phases 1, 2, 3, & 4 Located north of the intersection of Rock Hill Drive and Big Woods Road, Chapel Hill, Williams Township, North Carolina in Chatham County, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deeds recorded for this property listed in Attachment No. 1 of this permit. Sherri C. Stanley, Supervisor Permitting Branch Solid Waste Section Division of Waste Management 1646 Mail Service Center,Raleigh,North Carolina 27699-1646 Phone:919-707-8200 Internet: hfps:Hdeq.ne.gov/abouVdivisions/waste-management An Equal Opportunity 1 Affirmative Action Employer DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 2 of 9 ATTACHMENT 1 GENERAL PERMIT CONDITIONS AND INFORMATION Permit to Operate Data Table Permit Status Issuance EExpiration 1909-LCID-2010 Active February 9, 2021 February 9, 2026 PART I: GENERAL PERMIT CONDITIONS 1. This permit is issued by the North Carolina Department of Environmental Quality,Division of Waste Management, Solid Waste Section(Section). In accordance with North Carolina Solid Waste Management Rules(Rule) 15A NCAC 13B .0201 (e),a land clearing and inert debris (LCID) solid waste management facility permit may be combined in two parts: a Permit to Construct and a Permit to Operate. The Permit to Construct conditions are contained in Attachment 2 of this permit and the Permit to Operate conditions are contained in Attachment 3 of this permit. 2. The persons to whom this permit is issued ("permittee") are the owners and operators of the solid waste management facility. 3. The permit to operate for this facility issued August 7, 2015 was recorded in the Chatham County Register of Deeds on August 17, 2015 in Deed Book 01813, Page 0070 to Page 0080. 4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other instrument of transfer must contain in the deed description section, in no smaller type than that used in the body of the deed or instrument, a statement that the property has been used as a land clearing and inert debris landfill and a reference by book and page to the recordation of the permit. 5. By beginning construction or receiving waste at this facility, the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Construction and operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit, and the approved plan identified in Attachment 1, "List of Documents for the Approved Plan". Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. 7. The permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, "List of Documents for Approved Plan," and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 3 of 9 8. The owner or operator shall notify the Department within 30 days of a significant change in accordance with G.S. 130A-295.2(g). The owner or operator shall submit an application to amend the permit for any change in ownership or corporate structure. 9. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for sedimentation and erosion control, and a General or Individual National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does not remove the permittee's responsibilities for compliance with any other local, state or federal rule, regulation or statute. Pro erties Approved for the Solid Waste Facility Chatham County, N.C.,Register of Deeds Book Page Grantor Grantee Acres 0595 0291 A. Hugh Stone and 6.60 Helen B. Stone Alan Hugh Stone 1411 0517 Cynthia W. Stone Alan Hugh Stone 2.21 0524 0747 A. Hugh Stone and Alan Hugh Stone 4.25 Helen B. Stone 0826 0314 A. Hugh Stone and Alan Hugh Stone 3.39 Helen B. Stone 1554 0319 A. Hugh Stone and Alan Hugh Stone 20.59 Helen B. Stone 826 0314 A. Hugh Stone and Alan Hugh Stone 0.98 Helen B. Stone Total Site Acrea e: 38.02 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 4 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) Permitting History Doc/File Permit Action Date ID 1909-LCID-2010 Original Issuance Permit to Construct/Operate May 28, 2010 10409 Permit Amendment, Expansion August 7, 2015 24484 Permit Amendment, Renewal February 9, 2021 151661 List of Documents for Approved Plan Note—Documents referenced in this permit (e.g., DIN/FID 1234567) can be viewed online at the NC Solid Waste Section website in the Documents database 1. Application for LCID Landfill Permit. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 10383. September 2009. 2. Application for LCID Expansion. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 24250. March 2015. 3. 2020 Permit Renewal Application Stone LCID Landfill. Prepared by: Smith+Gardner Engineers. Prepared for: ARBD, LLC. FID 1390647. February 2020. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 5 of 9 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT PART I: GENERAL PERMIT CONDITIONS 1. Construction of all solid waste management units within this facility must be in accordance with the pertinent approved plans included in Attachment 1, "List of Documents for the Approved Plan". 2. Modification or revision of any approved plan or changes during construction require approval by the Section and may constitute a permit modification and be subject to a permitting fee. 3. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act NCGS 113A-50, et seq., and rules promulgated under 15A NCAC 4. The facility must furnish a copy of the approved Sedimentation and Erosion Control Plan from the NC Division of Energy, Mineral and Land Resources, Land Quality Section, to the Solid Waste Section. 4. Modifications to the approved sedimentation and erosion control activities require approval by the NC Division of Energy, Mineral and Land Resources, Land Quality Section. The Solid Waste Section must be notified of any modifications. 5. Facility construction must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirement under Sections 401 and 404 of the Clean Water Act, as amended. EROSION AND SEDIMENTATION CONTROL REQUIREMENTS 6. All earth disturbing activities must be conducted in accordance with the Sedimentation Pollution Control Act of 1973 (15 NCAC 4) and consistent with any other local, state or federal requirements. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Modifications to the approved sedimentation and erosion control activities require approval by the North Carolina Land Quality Section. The permittee must notify the Section of any sedimentation and erosion control plan modifications. PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 6 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 9. The landfill is permitted for a total gross capacity of 920,721 cubic yards (CY) including 106,149 cubic yards in the existing 4.87-acre landfill. Gross capacity is the measured volume between the bottom of waste and the top of final cover. Development of the landfill is approved as shown in the approved operation plans and drawings listed in Attachment 1 List of Approved Documents (FID 1390647) and summarized below. Phase Development Acreage Capacity (CY) Status Phase 1 2.43 54,305 Existing Phase 2 2.44 51,844 Existing Phase 3 8.14 352,836 Existing Phase 4 5.58 243,936 Existing Phase 5 1 5 217,800 Proposed TOTAL 1 23.6 920,721 10. The facility capacity will be completed when fill reaches the final grades as shown in the approved facility drawings (FID 1390647). Any additional capacity at the facility will require the permittee to complete the application process as required under NC Solid Waste Management Rule 15A NCAC 13B .0563 et seq. 11. The following is required prior to receiving solid waste in the new phase. a. Written certification from a registered professional engineer must be submitted to the Section certifying that the waste disposal unit(s) has been constructed in accordance with the approved plan. b. The disposal unit boundary must be accurately delineated with permanent markers in accordance with 15A NCAC 13B .0201(g). c. A site inspection and pre-operative meeting must be conducted by a representative of the Section. The permittee must notify the Section and make arrangements for the site inspection and pre-operative meeting. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 7 of 9 ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: GENERAL PERMIT CONDITIONS 1. The facility must be adequately secured by means of gates, chains,berms, fences, or other security measures approved by the Section to prevent unauthorized access. 2. Signs must be posted at the site entrance that state that no hazardous waste or liquid waste can be received at the facility; that provide information on dumping procedures and hours of operation; and that show the permit number, site contact's name and phone number, emergency contact information and the waste types accepted for disposal at the facility. Traffic signs or markers must be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. 3. Access roads shall be of all-weather construction and shall be maintained to allow access by vehicles transporting waste, Department staff, and fire-fighting vehicles. 4. The permanent markers that delineate the waste disposal boundary must be maintained at all times. 5. Copies of this permit, the approved plans, and all records required to be maintained by the permittee must be maintained at the facility and made available to the Section upon request during normal business hours. 6. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act, N.C.G.S. 113A-50 et seq., and rules promulgated under 15A NCAC 4. The Section must be notified of any approved modifications to the sedimentation and erosion control plan. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Fire lanes must be established and maintained at all times. The dimensions of the fire lanes must be coordinated with the Fire Marshall having jurisdiction over the site. 9. Open burning of solid waste is prohibited unless approval has been obtained from the Division, the local government, and the Division of Air Quality in accordance with 15A NCAC 02D .1900 prior to any burning activity. 10. The owner or operator shall provide equipment on-site to control fires and make arrangements with the local fire protection agency to provide fire-fighting services. Fires must be reported to the regional waste management specialist with 24 hours or the occurrence, followed by a written notification within 15 calendar days of the occurrence. 11. Financial assurance as required by state rules and statutes must be continuously maintained for the duration of the facility and updated and submitted annually to the Section by the anniversary date of the issuance of this permit. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 8 of 9 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 12. This Permit to Operate expires February 9, 2026 or when the facility capacity reaches the final grades as shown in the approved facility drawings (FID 1390647). Pursuant to 15A NCAC 13B .201(c), the permittee must submit a permit renewal application prepared in accordance with 15A NCAC 13B .0565 and .0566 to the Section no later than August 9, 2025. 13. This Permit to Operate authorizes the continued operation of Phase 1, Phase 2, Phase 3, and Phase 4 of the LCID Landfill as shown in the approved plans and drawings indicated in Attachment 1, List of Documents for Approved Plan 14. This facility is permitted to receive land clearing waste;yard trash;untreated and unpainted wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-294(m). 15. Revisions to the design or operation of the facility require written approval of the Section and may be subject to a permitting fee. 16. Solid waste in the landfill shall be compacted. Slopes shall not exceed a ratio of three horizontal to one vertical (3:1) at any time. 17. An operator must be on duty at all times while the site is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. COVER MATERIAL REQUIREMENTS 18. All waste shall be covered with no less than six inches of soil monthly or when the active area reaches one (1) acre in size, whichever occurs first. More frequent cover may be required when necessary to prevent the site from becoming a nuisance, or to mitigate conditions associated with fire, windblown materials, vectors, or excessive water infiltration. Any soils used for cover at the site shall meet unrestricted use standards for soils as defined in G.S. 130A-310.65. 19. The facility must maintain a supply of cover material adequate to cover the working face in case of an emergency or fire at all times. 20. Areas that will not have additional wastes placed on them for three months or more, but where final termination of disposal operations has not occurred, shall be covered with no DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 9 of 9 less than one foot of soil cover sloped to direct the flow of surface water from the landfill, and stabilized with vegetative ground cover or other stabilizing material. The Division may require further action to correct any condition that the Division determines may be injurious to the public health, or a nuisance to the community. 21. The owner or operator shall meet the closure and post-closure requirements of 15A NCAC 13B .0567(b) and(c). DRAINAGE CONTROL AND WATER PROTECTION REQUIREMENTS 22. All required sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility. 23. Ground water quality at this facility is subject to the classification and remedial action provisions of 15 NCAC 2L. 24. Solid waste must be placed a minimum of four feet above the seasonal high water table in accordance with Rule 15A NCAC 13B .0564(9). 25. Solid waste shall not be disposed in standing water. Surface water shall be diverted away from the operational area and shall not be impounded over waste. 26. Leachate shall be maintained and managed on-site. RECORDKEEPING AND REPORTING 27. The permittee must maintain a record of the amount of solid waste received at the facility. On or before August 1 annually, the permittee must submit an annual facility report to the Solid Waste Section, on forms prescribed by the Section PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 RDY COOPER = r Governor s ELIZABETH S.BISER ` Secretary � + MICHAEL SCOTT NORTH CAROLINA Director Environmental Quality May 19, 2022 Sent Via Email - ray.maxwell@gaston ov.com Alan Stone Owner ARBD, LLC 5180-A Big Woods Road Chapel Hill, NC 27517 Subject: Phase 5 - Approval to Operate Stone Landfill LCID Chatham County, Permit# 1909-LCID-2010, File ID 1677023 Dear Alan, The Division of Waste Management, Solid Waste Section (Section) has completed review of the Phase 5 Construction Certification submittal (file ID number 1676421) for the above referenced facility. The document was submitted on your behalf by Smith+Gardner, Inc., and received by the Section on May 11, 2022. The certification document contained the information that was required to be submitted to the Section, by the conditions of the permit to construct and operate, prior to beginning operations in Phase 5 of the landfill. No issues of concern were noted with any of the information provided in the report. Based on the Engineer's Certification, and the review of the report, the Section approves operation of Phase 5. If you should have any questions regarding this matter, please contact me at (919) 707-8229, or by email at jordan.russ@ncdenr.gov . Sincerely, Jordan Russ Permitting Engineer CC: Stacey Smtih - Smith+Gardner Jesse Li - Smith+Gardner Chuck Kirchner - NC DEQ ,.- North Carolina Department of Environmental Quality I Division of Waste Management 217 West Jones Street 1 164b Mail Service Center I Raleigh,North Carolina 27699-1646 NCi31 I I':RI ICll.11: u.u.m.m ar,�n nnMl a n� r 919,707.8200 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 191a♦7 FILED CHATHAM COUNTY REBA G.THOMAS Chatham County,North Carolina REGISTER OF DEEDS REBA G.THOMAS Register of Deeds The foregoing certificate(s)of FILED Jun 20, 2003 TERESA LOY FARRELL AT 03:47:31 pm BOOK 01030 BOCK t3 15A 0 notary/notaries public START PAGE 0150 is/are certified to be correct. END PAGE 0153 I a INSTRUMENT# 09852 Assistant-Register of Deeds North Carolina Department of Environment and Natural Resources f •r Division of Waste Management Michael F.Easley,Governor NCDENR William G.Ross Jr.,Secretary Dexter R.Mattbe-,vs,Director LAND CLEARING AND INERT DEBRIS LANDFILL NOTIFICATION Pursuant to 15A NCAC 13B .0563(2)(a),the land owner(s) and operator(s) of any Land Clearing and Inert Debris Landfill under two (2) acres in size shall submit this notification form to the Division prior to constructing or operating the landfill. This form must be filed for recordation in the Register of Deeds' Office. The Register of Deeds shall index the notification under the name of the owner(s) of the land in the county or counties in which the land is located. The Register's seal and the date, book, and page number of recording must be included on this form when submitted to the Division.This notification is not valid to authorize operation of a landfill unless complete,accurate,recorded,and submitted to the Division as required by 15A NCAC 13B .0563(2)(b). f 1. Facility Name: 2, Facility location (street address): J� c�k/ City: 0- W 01 A/e- County: N( A- zip: ZVI 3. Directions to Site: 'ru j 4 S 5 M ley 1) eoLlL .lei/ �/• / �firtr..�y 4. The land on which this landfill is located is described in the deed recorded in; deed book: page: �iI county: C A 5. Name of land owner: M) TO1\C- 6. Mailing address of land owner: ,31+8' Awsk CY'edi 40-m City: F tQ Wit State: A(�. zip: M-7 — 7. Telephone number of land owner:) 9l9 ) /���Gg54 (0yj� ) _If^D6i IC qfq_ �)_o9tr If the land is owned by more than one person, attach additional sheets with the name, address, and phone number of all additional land owners. 8. Name of operator: kt-An r`(- 9. Trade or business name of operator. LA) 54bNL iFvl.AV irl Ale. 10. Mailing address of_operator: 34f( B,,LS k er-tok Atf- [ City:a t'}fT�t^ 14t(' , _ State: /v� Zip: A ZVI 11. Telephone number of operator: lq If the landfill is operated by more than one person, attach additional sheets with the name, address, and phone number of all additional operators. A 12. Projected use of land after completion of landfill operations: �flRiS —S�{4��� �"r��� 1646 Mail Service Center,Raleigh,North Carolina 27699-1646 Phone: 919-733-0692 \ FAX: 919-733-4810 \ Internet: www.enr.state,nc.us AN EQUAL OPPORTUhIITY\AFFMMATIVE ACTION EMPLOYER-50%RECYCLED/I0%POST CONSUMER PAPER DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 17131 r BOOK 10 t 0 PAUGE 151 The following are the applicability, siting, and operating criteria for Land Clearing and Inert Debris Landfills operating under notification. From: North Carolina Solid Waste Management Rules 15A NCAC 1313: .0101 DEFINITIONS (63) "Land clearing waste"means solid waste which is generated solely from land clearing activities such as stumps,trees,limbs,brush,grass, and other naturally occurring vegetative material. (54) "Land clearing and inert debris landfill" means a facility for the land disposal of land clearing waste,concrete,brick, concrete block, uncontaminated soil,gravel and rock,untreated and unpainted wood,and yard trash. (55) "Yard trash"means solid waste resulting from landscaping and yard maintenance such as brush,grass,tree limbs,and similar vegetative materials. .0563 APPLICABILITY REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS Management of land clearing and inert debris shall be in accordance with the State hierarchy for managing solid waste as provided for under N.C.G.S. §130A-309.04(a).Disposal in a landfill is considered to be the least desirable method of managing land clearing and inert debris.Where landfilling is necessary,the requirements of this Rule apply. (1) An individual permit from the Division of Solid Waste Management is not required for Land Clearing and inert Debris(LCID)landfills that meet all of the following conditions: (a) The facility is to be operated for the disposal of land clearing waste,inert debris,untreated wood,and yard trash.Operations must be consistent and in compliance with the local government solid waste management plan as approved by the Division of Solid Waste Management. (b) The total disposal area is under two acres in size. (c) The facility and practices comply with the siting criteria under Rule.0564,and operational requirements under Rule.0566. (d) The fill activity is not exempt from,and must comply with all other Federal,State,or Local laws,ordinances,Rules,regulations, or orders,including but not limited to zoning restrictions,flood plain restrictions,wetland restrictions,sedimentation and erosion control requirements,and mining regulations. (2) Where an individual permit is not required,the following applies: (a) The owner of the land where the landfill is located must notify the Division on a prescribed form,duly signed,notarized,and recorded as per Rule.0563(2)lb).The operator of the landfill,if different from the(and owner,shall also sign the notification form. (b) The owner must file the prescribed notification form for recordation in the Register of Deeds'Office.The Register of Deeds shall index the notification in the grantor index under the name of the owner of the land in the county or counties in which the land is located-A Copy of the recorded notification,affixed with the Register's seal and the date,book and page number of recording shall be sent to the Division of Solid Waste Management. (c) When the land on which the Land Clearing and Inert Debris Landfill is sold,leased,conveyed,or transferred in any manner,the deed or other instrument of transfer shall contain in the description section in no smaller type than that used in the body of the deed or instrument a statement that the property has been used as a Land Clearing and Inert Debris Landfill and a reference by book and page to the recordation of the notification. .0564 SITING CRITERIA FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS - The following siting criteria shall apply for Land Clearing and Inert Debris(LCID)landfills: (1) Facilities or practices,shall not be located in the 100-year floodplain. - (2) Facilities or practices shall not cause or contribute to the taking of any endangered or threatened species of plants,fish,or wildlife. (3) Facilities or practices shall not result in the destruction or adverse modification of the critical habitat of endangered or threatened species as identified in 50 CFR Part 17 which is hereby incorporated by reference including any subsequent amendments and editions.This material is available for inspection at the Department of Environment,Health,and Natural Resources,Division of Solid Waste Management,401 Oberlin Road,Raleigh,North Carolina 27605 where copies can be obtained at no cost. 14) Facilities or practices shall not damage or destroy an archaeological or historical site. 15) Facilities or practices shall not cause an adverse impact on a state park,recreation or scenic area,or any other lands included in the state nature and historic preserve. 16) Facilities shall not be located in any wetland as defined in the Clean Water Act,Section 404(b). 17) It must be shown that adequate suitable soils are available for cover,either from on or off site. (8) Land Clearing and Inert Debris landfills shall meet the following surface and ground water requirements: la) Facilities or practices shall not cause a discharge of pollutants into waters of the state that is in violation of the requirements of the National Pollutant Discharge Elimination System(NPDES),under Section 402 of the Clean Water Act,as amended. (b) Facilities or practices shall not cause a discharge of dredged materials or fill material into waters of the state that is in violation of the requirements under Section 404 of the Clean Water Act,as amended. (e) Facilities or practices shall not cause non-point source pollution of waters of the state that violates assigned water quality standards. (d) Waste in landfills with a disposal area greater than two acres shall be placed a minimum of four feet above the seasonal high water table,except where an alternative separation is approved by the Division. (a) Waste in landfills with a disposal area less than two acres shall be placed above the seasonal high water table. (9) The facility shall meet the following minimum buffer requirements: (a) 50 feet from the waste boundary to all surface waters of the state as defined in G.S.143.21 2. (b) 100 feet from the disposal area to property lines,residential dwellings,commercial or public buildings,and wells. (c) Buffer requirements may be adjusted as necessary to insure adequate protection of public health and the environment. (10) The facility shall meet all requirements of any applicable zoning ordinance. .0566 OPERATIONAL REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS Land Clearing and Inert Debris(LCID)landfills shall meet the following operational requirements: (1) Operational plans shall be approved and followed as specified for the facility. (2) The facility shall only accept those solid wastes which it is permitted to receive- (3) Solid waste shall be restricted to the smallest area feasible and compacted as densely as practical into cells. (4) Adequate soil cover shall be applied monthly,or when the active area reaches one acre in size,whichever occurs first. 2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 171aL _ BOOK 10 v i PAGE 15 2 15) 120 calendar days after completion of any phase of disposal operations,or upon revocation of a permit,the disposal area shall be covered with a minimum of one foot of suitable soil cover sloped to allow surface water runoff in a controlled manner.The Division may require further action in order to correct any condition which is or may become injurious to the public health,or a nuisance to the community. 16) Adequate erosion control measures,structures,or devices shall be utilized to prevent silt from leaving the site and to prevent excessive on site erosion.visions(7) Pro for a ground cover sufficient to restrain erosion must be accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill development. (8) The facility shall be adequately secured by means of gates,chains,berms,fences,etc.to prevent unauthorized access except when an operator is on duty.An attendant shall be on duty at all times while the landfill is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. 19) Access roads shall be of all-weather construction and properly maintained. {to) Surface water shall be diverted from the working face and shall not be impounded over waste. (t 11 Solid waste shall no be disposed of in water. 1121 Open burning of solid waste is prohibited. (13) The concentration of explosive gases generated by the facility shall not exceed: fal Twenty-five percent of the lower explosive limit for the gases in facility structures. fb) The lower explosive limit for the gases at the property boundary. (141 Leachate shall be properly managed on site through the use of current best management practices. (151 Should the Division deem it necessary,ground water or surface water monitoring,or both,may be required as provided for under Rules.0501 and.0602 of this Subchapter. (16) A sign shall be posted at the facility entrance showing the contact name and number in case of an emergency and the permit number.The permit number requirement is not applicable for facilities not requiring an individual permit. Certification by Land Owner: I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this Land Clearing & Inert Debris landfill will comply with the requirements of Sections .0563, .0564 and .0566 of 15A NCAC 13B, North Carolina Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. Where the operator is different from the land owner, I, the land owner, have knowledge of the operator's plans to dispose of solid waste on the land and I specifically grant permission for the operation of the landfill. I understand that both the land owner and operator are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five thousand dollars($5,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may r vised or amended in the future and that the facility siting af�d operations of this landfill will be re r d to ply with all such revisions o am ndments. & Print Name (Owner) Signature (Owner) Date North Carolina CI 1CT17 F�M County I, f``!! a 1—0 Fr_VY_? a Notary Public for said County and State, do hereby certify that ! ) personally appeared before me this day and acknowledged the due ext cltitlon,gf the foregoing instrument. J' tne4s rOj�hQ�fcl and offices ial seal, this the eday f 20 0 wf©ffial Sprall } Notary Public ":J�hy bomlpissf l�g-kplr#s 20 My Commission Expires Feb.13,2007. 3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 U-LDJ r ~ Certification by Landfill Operator (if different from Owner): I certify that the information provided by me in this notification is true,accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this Land Clearing & Inert Debris landfill will comply with the requirements of Sections .0563, .0564 and .0566 of 15A NCAC 1313, North Carolina Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. I have informed the land owner of my plans to dispose of solid waste on the land and the land owner has specifically granted permission for the operation of the landfill. I understand that both the operator and land owner are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five thousand dollars ($5,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that t facility siting and operations of this landfill will be required to comply witt all such revisions or an, n ments Print Name (Operator) Signature (Operator) Date North Carolina County I, =z 4_o laae t a Notary Public for said County and State, do hereby certify t4, personally appeared before me this day and acknowledged the due exgptrtion„qf the foreping instrument. GY r�' 1 �Y�1li 6ess.rriy d aid official seal,this the ao- day taf 2003 _. (b'fficiitloSaa1) r = '� - c 1 Notary Public �•• � � n �� '.,'My'e4Dmm4 -expires 0 ' r c o�` My Commission Expires 0 For additional land owners and landfill operators, attach separate notarized certifications for each additional land owner and landfill operator. For Corporate land owners and/or operators, use the Corporate Certifications, pages 5 and 6. Contact the Division of Solid Waste Management for proper applicable certifications. INSTRUCTIONS Purpose: Notification of Land Clearing and Inert Debris Landfills under two(2)acres in size is required under 15 NCAC 13B.0563(2)(a). Contact the Solid Waste Section at the address below for further information. Distribution: Mail completed recorded original notification to the following address: Division of Solid Waste Management Solid Waste Section 1 646 Mail Service Center Raleigh,North Carolina 27699.1646 (919)733-0692 Disposition: This form will be transferred to the State Records Center when reference value ends.Records will be held for agency in the State Records Center five(5)additional years and then transferred to the custody of the Archives. 4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0533 FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Nov 16, 2015 AT 04:13:21 pm BOOK 01828 START PAGE 0533 END PAGE 0535 INSTRUMENT# 11214 EXCISE TAX (None) Excise Tax: $ 6 Mail after recording to: Grantee This instrument was prepared by: Paul S. Messick,Jr.,Attorney at Law, Pittsboro,NC If checked,the property includes the primary residence of at least one of the Grantors.(NCGS §105-317.2) NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED, made this day of November 2015 between ALAN H. STONE, unmarried, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTOR; and ARBD, LLC, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTEE. The designation Grantor and Grantee as used herein shall include parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH The Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Chatham County,North Carolina and more particularly described as follows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. The property hereinabove described are properties acquired by Grantor by instrument recorded in Book ,Page of the Chatham County Registry. Title to the property hereinabove described is subject to the following exceptions: Easements and restrictions of record. IN WITNESS WHEREOF, the Grantor has hereunto set his hand an a the da and year first above written. (SEAL) ALAN H. STONE, unmarried STATE OF NORTH CAROLINA COUNTY OF OA I, a Notary Public of i4v County and State aforesaid, certify that ALAN ,W!° TOW,, harried, personally appeared before me this day and acknowledged the execution of the foregoing instrumeqk.` F l Witness my hand and official stamp or seal,this day of 20�I Ste`yr M"y Commission Expires: 1 u—( 3 "aU I-7 _ J ALJ'Printed Name:_ Notary Public 90°�+tu+s1110`� DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0534 EXHIBIT A TRACT I: (Tax Parcel No. 77630) ALL of Lot 8 according to a plat entitled "Property of A. Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RLS, dated August 29, 1983 and recorded in Plat Book 37, Page 19, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT II: (Tax Parcel Nos. 87481, 87482, & 76383) ALL that certain tract or parcel of land containing 26.191 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT III: (Tax Parcel No. 68340) ALL that certain tract or parcel of land containing 4.944 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry,reference to which is hereby made for a more particular description. TRACT IV: (Tax Parcel No. 65049) ALL of Lot A containing 3.001 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT V: (Tax Parcel No. 87344) ALL of Lot B containing 3.856 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT VI: (Tax Parcel No. 79314) ALL of Lot 1 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 11 and V above) TRACT VII: (Tax Parcel No. 73915) ALL of Lot 2 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated September 11, 2001 and recorded in Plat Slide 2001-448, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 1I, III, IV, and V above.) SAVE AND EXCEPT: BEGINNING at a point in the northern right of way line of Rock Hill Drive, and running thence North 28 degrees 50 minutes 41 seconds West 154.88 feet from an existing iron pipe, a common corner between Stone lots described by deed recorded in Book 595, Page 291 and Book 524, Page 747, Chatham County Registry; thence North 62 degrees 59 minutes 02 seconds East 302.63 feet to a point in the western right of way line of an existing 60 foot private road; thence along the right of way of said road South 56 degrees 34 minutes 34 seconds East 66.37 feet to a point; thence South 27 degrees 00 minutes 58 seconds East 55.41 feet to a point in the northern right of way line of Rock Hill Drive; thence along said drive South 73 degrees 09 minutes 15 seconds West 35.20 feet to an existing iron pipe; thence further South 62 degrees 59 minutes 02 seconds West 268.91 feet to the point or place of BEGINNING, containing 0.800 acre and denominated as "Well Lots" on the plat entitled "Well Lot Map Alan Hugh Stone" prepared by Smith and Smith Surveyors dated March 26, 2015, a copy of which is attached hereto as Exhibit B and incorporated herein by reference. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BK 1828 PG 0535 EXHIBIT B Mar&U#Kff 9If THIS MAP IS NOT A CER77RED SURVEY AND HAS NOT BEEN RENEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPUCABLE 84 $ 64 LAND DEVELOPMENT REGULA77ONS. VAMVJff YAP AD,DNNXS'DEED OW 594 PACE 201 PLAT aw 2001-298 PRICY 7P>Y AALrPfSZ �0"NG 27517 ALL QtSTAMD=S 9AOMN/L7pEOV A�U.S £Y fEET Atl04GWTAL GPOI.AO IL£ASfA�DV7S AWA BY 7W AWL AI W= r � ' ALAN H. STONE 1 ` DA 524 Pa 747 PLAT SLIDE 2WI-296 ALAN H. STONE I ' Ip up RA SLIDE 200-2W � b 2 b 1,0 o MP s �"a ox VP It Ati EI ALAN H. STONE AF �. 00% 6 G. as 594 Pa 291 s oosTWD T suuE 4r\� PUT SiIQE 2001-296 (-SM ,s ue `s- P/N 979-1-06-6670 \\ AKPAR/65049 W Op .01 E ac0ir[ounov) �S 25541 g i wcu HOWE �S 3pi�0 gg 41 �: DP i d NELL LOT � � 1/ i MP a8OO AQW 91 W OR I unury 9�10 ME ZIP W/Pms S cd EP / 1 AR 37, Pa 19 Z N 2239Y•W AP •Wig u'" .00 � I .So TLUTr Q S� � /1\ kio J tlU%j \ P.a 37, Pa 19 1 A. HUGH S70NE, ET UX _ PRAT BK. 37, Pa 19 1/ / THIS IS A PRELIMINARY DRAWING AND NOT TO USED AS A SURVEY OR TO TRANSFER ANY PROPERTY SHOWN HEREON. !DO D 50 100 7/7/L7I/QL//L�D�J/7/I/U�7/P/ /���/}/7/�/ LB rim � Ru1.YJL 1L SM vE it- -Edrthp#w,Pot 1N FEMP "S-O-km Poo set 1 inch = 100 ft RRs-o-fi km Stake LWLLUAIS 701M/9/° La'"p"L O&MY,ACRIN CARO MA R�- - TR�r L1r Smith and Smithu LwawMs DLiILQV sr �- -umv Pais r 1Q0 Cc& - surveyors AP-O-NoMrrroUcd Pohl ary L�a1 u'>et Al.t-mat a�-06-6?M EALP-•-D*thy Rakoad P.a AW Nf -m ��• PJKMKT roy J" Arm DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5D6B1 �.,k-.,_L--V/V 1 ! I UI c. J 1.-.rA 1 I v�STATE State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Raleigh, North Carolina 27604 Division of Solid Waste Management James B. Hunt, Jr., Governor Solid Waste Section Jonathan B. Howes, Secretary Telephone(919) 733-4996 January 27, 1993 Alan Stone Route 9, Box 474 Chapel Hill, North Carolina 27514 Ref: Land Clearing & Inert Debris Notification Mr. Stone: On January 27, 1993, the Solid Waste Section received your Land Clearing and Inert Debris landfill notification. As long as your disposal activities remain under 2 acres, you may operate under the provisions of this approval. If your landfill disposal activities grow in size to more than 2 acres, please contact the Solid Waste Section for assistance in obtaining an individual permit. If this property is sold, leased, conveyed or transferred, the deed or other instrument of transfer shall contain in the description section, in no smaller type than used in the body of the deed or instrument, a statement that the property has been used as a Land Clearing and Inert Debris landfill. Amendments or revisions to the Solid Waste Management Rules or violation of groundwater standards may necessitate modification of the construction and operation of this facility or closure of this facility. This approval is not transferrable. The Land Clearing and Inert Debris landfill is permitted to receive: a. Land Clearing Waste as provided for in 15A NCAC 13B .0101(72); stumps, trees, limbs, brush, grass, and other naturally occurring vegetative material. b. Inert Debris and untreated wood as provided for in 15A NCAC 13B .0101(73); concrete, brick, concrete block, uncontaminated soil, gravel and rock, untreated and unpainted wood. C. Used asphalt as provided for under North Carolina General Statute §130A- 309.09B(a)(1); used asphalt or used asphalt mixed with dirt, sand, gravel, rock, and concrete; effective till July 1, 1993. Site preparation and construction shall be in accordance with 15A NCAC 13B .0564, Siting Criteria For Land Clearing and Inert Debris (LCID) Landfills. P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-4984 Fax N 919-733-0513 An Equal Opportunity Affirmative Action Employer DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 The facility must be operated in accordance with 15A NCAC 13B .0566, Operational Requirements for Land Clearing and Inert Debris (LCID) Landfills. All sedimentation and erosion control activities shall be conducted in accordance with 15A NCAC 4, Sedimentation Control. Construction and operations involving sedimentation and erosion control activities greater than 1 acre typically require approval from the Land Quality Section. Contact the Land Quality Section to determine if your activities require approval. Ground water quality at this facility is subject to the classification and remedial action provisions of 15A NCAC 2L, Classifications and Water Quality Standards. If you have any questions or if we can be of any other assistance, please do not hesitate to contact the Regional Waste Management Specialist, Mr. Mark Fry at (919) 486-1 191, the Eastern Area Engineer, Mr. Jim Barber at (919) 786-1191, or this office. Thank you, William D. Sessoms, PE Approved: Ja es C. Coffey, Sup rvi or P mitting Branch Solid Waste Section copy: Mark Fry Jim Barber A. Hugh Stone & Helen B. Stone C ASE SSOM SILCIMNOTIMSTO NE DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 SfArfo } FILED 'S3 JAN 21 Ail 1133 State of North Carolina Department of Environment, Health, and Natural Resobr6es', '� S -r EEDS Division of Solid Waste Management E P.O. Box 27687-Raleigh,North Carolina 27611-768 Q. '� 00 N.C` James G. Martin, Governor illiam L. e er William W. Cobey, Jr., Secretary BOOK O P Q G E 71993 D it -Ud f. LAND CLEARING AND INERT DEBRIS LANDFILL NOTIFICATIO Pursuant to 15A NCAC 13B .0563(2)(a), the land owner(s) and operator(s) of any Lan d !nert Debris Landfill under two (2) acres in size shall submit this notification form to the Division prior- to constructing or operating the landfill. This form must be filed for recordation in the Register of Deeds' Office. The Register of Deeds shall record the notification under the name of the owner(s) of the land in the county or counties in which the land is located. The Register's seal and the date, book, and page number of recording must be included on this form when submitted to the Division. This notification is not valid to authorize operation of a landfill unless complete. accurate, and recorded as required by 15A NCAC 13B .056312)(b). 1. Facility Name: 2. Facility location (street address): /M�/�. t l�ao/ City: R l i�� County: C,04 0�,. Zip: 2 751Z 3. The land on which this landfill is located is described in the deed r eprded ig: deed book: page: �! county: 4. Name of land owner: /I 7�6� A 4 Ae/G4 e, Soh-e 5. Mailing address f land owner: 14 S 4eyY / City: State: tic . ® Zip: 2 6. Telephone number of land owner:( �//� 1 / 7-1/.7" If the land is owned by more than one person, attach additional sheets with the name, address, and phone number of all additional laird owners. 7. Name of operator: Z;� 5*q r 8. Trade or business name of operator: �1� n 9. Mailing address of operator: _.__1er-2 City: 1" �� State: AA Zip: a7s/l�- 10. Telephone number of operator:( M ) If the landfill is operated by more than one person, attach additional sheets with the name, address, and phone number of all additional operators. 11. Projected use of land after completion of landfill operations: AJ 91eS'S An EgLW Opportunity Afiimutive Acdon Employer DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BOOK 609PAGE S 3b The following are the applicability, siting, and operating criteria for Land Clearing and Inert Debris Landfills operating under notification. .0563 APPLICABILITY REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS iLCID)LANDFILLS Management of land clearing and Inert debris shall be In accordance with the State hierarchy for managing solid waste as provided for under N.C.G.S. 5 130A-309.04(a).Disposal in a landfill is considered to be the least desirable method of managing land clearing and inert debris.Where landfilling is necessary,the requirements of this Rule apply. (1) An individual permit from the Division of Solid Waste Management Is not required for Land Clearing and Inert Debris(LCID)landfills that most all of the following conditions:. (a) The facility Is to be operated forthe disposal of land clearing waste,inert debris,untreated wood,and yard trash.Operations must be consistent and in compliance with the local government solid waste management plan as approved by the Division of Solid Waste Management. (b) The total disposal area is under two acres in size. (c) The facility and practices comply with the siting criteria under Rule.0564,and operational requirements under Rule.0566. (d) The fill activity is not exempt from, and must comply with all other Federal, State, or Local laws, ordinances,Rules, regulations, or orders, including but not limited to zoning restrictions, flood plain restrictions, wetland restrictions. sedimentation and erosion control requirements,and mining regulations. (2) Where an individual permit is not required,the following applies: (a) The owner of the land where the landfill is located must notify the Division on s prescribed form,duly signed,notarized,and recorded as per Rule.0663(2)(b).The operator of the landfill,if different from the land owner,shall also sign the notification form. (b) The owner must file the prescribed notification form for recordation In the Register of Deeds'Office.The Register of Deeds shall index the notification in the grantor Index undarthe name of the owner of the land in the county or counties in which the land is located.A copy of the recorded notification,affixed with the Registers seal and the date,book and page number of recording shall be sent to the Division of Solid Waste Management. (c► When the land on which the Land Clearing and Inert Debris Landfill is sold,leased,conveyed,or transferred in any manner, the dead or other instrument of transfer shall contain in the description section in no smaller type than that used in the body of the deed or instrument a statement that the property has been used as a Land Clearing and Inert Debris Landfill and a reference by book and page to the recordation of the notification. .0564 SITING CRITERIA FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS The following siting criteria shall apply for Land Clearing and Inert Debris(LCID)landfills: (1) Facilities or practices,shall not be located in the 100-year floodplain. (2) Facilities or practices shall not cause or contribute to the taking of any endangered or threatened species of plants,fish,or wildlife. (3) Facilities or practices shall not result in the destructionor adverse modification of the critical habitat of endangered orthreatened species as identified in 60 CFR Part 17 which is hereby incorporated by reference including any subsequent amendments and editions.This material is available for inspection at the Department of Environment, Heakh, and Natural Resources, Division of Solid Waste Management,401 Obedin Road,Raleigh,North Carolina 27605 where copies can be obtained at no cost. (4) Facilities or practices shall not damage or destroy an archaeological or historical site. (6) Facilities or practices shall not cause an adverse Impact on a state park,recreation or scenic area,or any other lands included in the state nature and historic preserve. (6) Facilities shall not be located in any wetland as defined In the Clean Water Act,Section 404(b). (71 It must be shown that adequate suitable soils are available for cover,either from on or off slte. (8) Land Clearing and Inert Debris landfills shall meet the following surface and ground water requirements: (a) Facilities or practices shall not cause a discharge of pollutants into waters of the state that is in violation of the requirements of the National Pollutant Discharge Elimination System(NPDES),under Section 402 of the Clean Water Act,as amended. (b) Facilities or practices shall not cause a discharge of dredged materials or fill material into waters of the state that is in vioiation cf the requirements under Section 404 of the Clean Water Act,as amended, (c► Facilities or practices shall not cause non-point source pollution of waters of the state that violates assigned water quality standards. (d) Waste in landfills with a disposal area greaterthan two acres shall be placed a minimum of four feet above the seasonal high water table,except where an alternative separation is approved by the Division. (el Waste in landfills with a disposal area less than two acres shall be placed above the seasonal high water table. (9) The facility shall meet the following minimum buffer requirements: (a1 60 feet from the waste boundary to all surface waters of the state as defined In G,S. 143-212, (bl 100 feet from the disposal area to property lines,residential dwellings,commercial or public buildings,and wells. (c) Buffer requirements may be adjusted as necessary to insure adequate protection of public heafth and the environment. (10) The facility shall meet all requirements of any applicable zoning ordinance. .0666 OPERATIONAL REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID►LANDFILLS Land Clearing and Inert Debris(LCID)landfills shall meet the following operational requirements: (1) Operational plans shall be approved and followed as specified for the facility. (21 The facility shall only accept those solid wastes which it is permitted to receive. (3) Solid waste shall be restricted to the smallest area feasible and compacted as densely as practical into calls. (41 Adequate soil cover shall be applied monthly,or when the active area reaches one acre in size,whichever occurs first, 2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 (5) 120 calendar days after completion of any phase$I 46al op[l a ar-Ar revoc�ioTrof a permit,the disposal area shall be covered with a minimum of ono foot of suitable soil,coffer eloped to allow surface water runoff in a controlled manner.The Division may require further action in order to correct any condition which is or may become injurious to the public health,or a nuisance to the community, (6) Adequate erosion control measures,structures,or devices shall be utilized to prevent silt from leaving the site and to prevent excessive an site erosion. (7) Provisions for a ground cover sufficient to restrain erosion must be accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill development. (6) The facility shall be adequately secured by means of gates,chains,berms,fences,etc,to prevent unauthorized access except when an operator is on duty.An attendant shall be on duty at all times while the landfill is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. (9) Access roads shall be of all-weather construction and properly maintained. (10) Surface water shall be diverted from the working face and shall not be impounded over waste. 01) Solid waste shall not be disposed of In water, (12) Open burning of solid waste Is prohibited. (13) The concentration of explosive gases generated by the facility shall not exceed: (a) Twenty-five percent of the lower explosive limit for the gases in facility structures. (b) The lower explosive limit for the gases at the property boundary. 114) Leachate shall be properly managed on site through the use of current best management practices. (16) Should the Division deem it necessary,ground water or surface water monitoring,or both,may be required as provided for under Rules .0601 and,0602 of this Subchapter. (16) A sign shall be posted at the facility entrance showing the contact name and number in case of an emergency and the permit number. The permit number requirement is not applicable for facilities not requiring an individual permit. Certification by Land Owner: I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this landfill will comply with the requirements of sections .0564 and .0566 of the Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. Where the operator is different from the land owner, I, the land owner, have knowledge of the operator's plans to dispose of solid waste on the land and I specifically grant permission for the operation of the landfill. I understand that both the land owner and operator are jointly:and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A=22,p,roVides for administrative penalties of up to five hundred dollars ($500.00) per day per each violation 61 the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may'b0,revised or amended in the future and that the facility siting and operations of this landfill will a to ired to comply with all such rev- ion o are Print Name'(Owner) Signature (Ow er) Date No h arolina C County 1, 4 Z7 (�c ec_- , a Notary Public for said County and State, do hereby certify that CA S personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the day of !IYG;,9,C , 19 g L (Official Seal) f Notary Putlic My commission expires 5 /� , 19 � 3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 BOOK G d �PAGE 838 Certification by Landfill Operator (if different from Owner): I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this landfill will comply with the requirements of sections .0564 and .0566 of the Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. I have informed the land owner of my plans to dispose of solid waste on the land and the land owner has specifically granted permission for the operation of the landfill. I understand that both the operator and land owner are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A- 309.27. 1 further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five hundred dollars ($500.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that the facility siti nd operations of this landfill will b required to comply with all such revisions or amendment Print Name (Operator) Signature (Operator) Date/ North Carolina a County I, a Notary Public for said County and State, do hereby certify that 49L&� personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the a y day of , 19� (Official Seal) N66ry Public My commission expires led 19 _. For additional land owners and landfill operators, attach separate notarized certifications for each additional land owner and landfill operator. INSTRUCTIONS Purpose: Notification of Land Clearing and Inert Debris Landfills under two (2) acres in size is required under 15 NCAC 13B .0563(2)(a). Contact the Solid Waste Section at the address below for further information. Distribution: Mail completed recorded original notification to the following address: Division of Solid Waste Management Solid Waste Section PO Box 27687 Raleigh,North Carolina 27611-7687 (919) 733-0692 Disposition: This forth will be transferred to the State Records Center when reference value ends.Records will be held for agency in the State Records Center five(6)additional years and then transferred to the custody of the Archives. 4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 NC 'DEPARTMENT, OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of Sotid:Yaste Management Sotid Waste Section SOLID HASTE R4NAGBENT FACILITY EVAMTION REPORT Type of Faci t i ty Lc! D Permit it BY NOT W County CC�� / t Ca� 1, �-7 Now of Facility STbNt= 5 LAwni~9t.,t_ Locstiangoc4< HILL 1rL1, ©m /f Date of Last Evaluation CO G j I. Permit-Condition FOUVAled yes No. K 1Vk A.. Specific canditiorKs) Violated l-G�NI RCornS-�vne,�sLan��'i� _ Non II. Operational Requirements Followed /yes No 15A N.c. Admin."Cade 13B"Section • 057(o k. Specific Violation(s) 'by'rraber and letter. - II,I ,R)tfier lhotatiara of Rule or Law IV. Evatuator's can■ents siTa in th! c.(• o sHArE ,; 1^/C W tu- BE r..Lm ma mgg7- W att You t o D I3 cyns Ompookrknon (j,LHng ith c- I aAft5 'TO SHi4PE" �s LoPEJ FDR UOT)URE- FEEL FR 'E Th CALL . V. Continuation Page Required) Yes X-1/00 Receiving Signature C mkiLix To /°kt At4 -,=sna t>_ Evaluation Date I eks 19 Solid Waste Section *Alt .[.1117 DEW 3793 Visit I Write: Facility Part II Canary: Centrat Office Part III Pink: Regional Office) Solid Waste Section (Review 7/94) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Purpose: G.S. 130A-294 reg res that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Managemment Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. IYLstnictions: Solid Waste Section personnel shall cculplete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. Part I White: facility copy Part II Canary: Raleigh central office file copy Part III Plink: Regional office file cclpy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Enviramient, Health and Natural Resources. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 � '. ..P„ NO DLPA R!.Jrt ..: OF ffi�iVIRONMEN'1', ,.HEALTH AND. NATURAL RESOURCES' - �: Division of"solid Vesta ManOgesellt Solid Waste Section l� fO0 , 4� M1 SOLID WZrE MA1BEi W•FACILITY EV OATIOY RPPORT ' v Facility L�.+I Permit SI.hIQTIF 0olrity ATN&( Ras of Facility � .Laeat'ifln77 : Date+of.Last Evaluation ' : : ;. I.. Re11•lt'Cpllditlerl�.Followed .,•^^�Tas .. �'. `•.:llo �^Il/Ik. .. . A- Specific ColdiOugs) Violated ; - a : Sr r IIi, 1anal lresents.Foltaso. `: '. "; . Yea �: Ro': 16 r6i Wit_. . S44i� �„�,_ .T38 : .. A ifio`Yiokat�ian(s�` .�tiulber�and'lette�^.=' - : .AtA� 'irl�. 1(0 ..tAgen ;sig.M zHowtmr.. '..caNThgT QEitioM 9*69 :A-4 tJuHaER INI ct►-� �tF f�^rt>`'1��'Nc�l III. Ot1r.Violatiane of:nuke or.Law: IV. Evaluator's Comments no NaT EYTC-tJO FfU- /FNy . feikR11i R .'ris �bii'1'f-� Ar' 409R I..tt7Htip, 100� gum ro (DuTautLnttzc t4goygay wl t.t , Td JKNN40r& SLorls' �tf B Ta AC44 � -a i St orc mug= Sy . .65Yy 5 c3)(j) . • BTh i _ Y. CarltinletiptPeae•Requlred? Yes V MO kke ,d:.. Smnature / WO "Eb ng 60, x Evaluation Deft 4A Solid Waste Section RAIL DEHNR 3793 tPart.I White: Facility Part II Canary: Central.office Part III Pink: ReRiana, fine) Solid Waste Section (Review 7/9) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 o Pu3Tcme: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management hales codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instructions: Solid Waste Section personnel shall ccaTplete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. i]i ctrit»t-i can: Part I Mite: facility ccPY Part II Canary: Raleigh ventral office file ccIpy Part III Fink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of IIzvironment, Health and Natural Resources. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 " - NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of Solid Waste Managament Solid Waste Section SOLID PASTE MVIIGM MT FACILITY EVALUATION REPORT Yype:of Facitity LCAQ, Lkt4oF1tsL Pemit Y NdT'IJ, Y F f4TNF►h� Name of Fae�t tl►: TONCBL&NOrtLL Location O.W. Mi of sk 171 t Data df:East Osluatian, t!' % I. Pr�it Conditi6m'FoUc W Yes No . V N/A A: Specific Cadition(s) Violated r II OperationaL Requirements Fdttowed Yes y so 15A N_C. Ad in. Code 130 Section . C9 70 fO A_ :Specific Vidtat on(s) by nuk6r and letter. ; (B) FAQ1L.Ia. 54ALL: IRE At)F6tLJik"['I 9EG6 966 ACPAI NTr UMAUTRoM13CM Cta� wArem 7a 15 niveRTE0 FRok woml-. w_ M-kC-115- (tom) sl a<ni .1m 't.L B E' Fb!3f E;7LD ShtcsW frtfs easn*e . WAML- �tt.lt] cut i ^.i�t ty�i c sE' of �'M�Rct�Ne:�l III. 00w VidLations of Rute or Law 15 M .C.-A . C. . b d 1.�z OM NI I l ec IR Q21*4, Co M'f F�3 t t N FOR ,4�rt t Tt cotr�e its�• ci,.� ®R N©ram k 1e„rrS iv.' �valuatar■s Coo ents S�fiF IhL c, d `3�tAA� 0jVfeAU_ P UeAnE �oj-r- 9E N k►�t . DiyeFer .; uRFAaC FLmA RtR4" ipjAsiur rOM 1MFQftHAtT'10K C*4 05h*5 CpntTrkoL P LPsN.. P`e" CA JOHN H©6LCJ A-r A 19) E71 � y 70 V. Continuatian Page Required? Yes V Mo Receiving Sigreture M 1f IUD TO ,r�i"F„� Evatuation Date gq Solid Waste fectiQn h✓vim -cI OEM 3793 Pak I into: Facitity Pert II Canary: Centrat Office Part III Pink: RMianaL Office) Solid Waste'Section (Review 7/9 ) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Purpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instructiicns: Solid Waste Section personnel shall coarplete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. Distributicn: Part I Mute: facility copy Part II (,mazy: Raleigh cmt al office file copy Part III Pink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 NQ. 10EPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOUR 1 Division of Solid haste Management A TE s Solid Waste Section FJ, SOLID WASTE MANAGEMENT FACILITY EVALUATION REPORT 2 6y Type of Facility L.Gl b 1.AMbEll.L Permit N NoTEFI Tk tonty CHAT 1 Name of Facility 5--TONE 5 L..AtNDFI.LL Location©. t F 5• , 17 iij Date of Last Evaluation N fA -� I. Permit COiditiom FoLLoued Yes No V N/A A. Specific Condition(s) Violated II. Operational Requirements Followed Yes ��Mo 15A N.C. Admin. Code 13B Section . (!>5 lute A_ Specific Violations) by amber and etter. $) P A C I L.i-r x tad"f" Ab nsi 1J\'T'E`1•.'y `3 CCU r.-JE.( 5IGN SHCw1MC- CCWTh-C' PE51k5oMJ NAHK AWQ CHOKE ►JO. L° F®eT'F-'b AM eNTRANC15 III_ Other Violations of Rule or Law IV. Evaluator's Comments. J 1 T"E it l t� C-001) CA D tT1 copy of V. Continuation Page Required? Yes L//No Receiving Signature C Kd\1l.Ep MJ�. �t'a►1E�� Evaluation Date i i f ) Solid Waste Section�p7 Ak DEHNR 3793 (Part I White: Facility Part II Canary: CentraL Office Part III Pink: Regional Office) solid Waste Section (Review 7/94) I�� DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Purpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid. Waste Management Act and Solid Waste Management Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instruction: Solid Waste Section personnel shall Clete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. nist-rib ticn: Part I mite: facility copy Part II Canary: Ralei�ft central office file copy Part III Pink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 CASE BLUEPRINT d SUPPLY CO, N32486 o o 2 Z ^ c 4 o a a m 0 ; a s 2 C : c ; < a �S ` a o • s D D �. • `� m< o o 4 ° • o n J 0 D r L` ar-< a a a o a a m rn ,Is- . a D � p C m 1700 Q `� a �. c i N o e ° N ° ° 4 m W N N N r m 0 rn y C g y ^ ° •v o p 2 W W CO W ^ a QL c �- 2 ° > c a (0 (0 (D W �I ® a = • �fN 3 Ir 2 — a j ` ��ilN1 Iy4,', N ` n' ����a�MMr �� ° o n t < W O O O a it, 4 ^ •', `�/ �,� ° , o ,••% � &�d �� o g a w c c C N 0 0 • �4 D ' o r 1 Tr 29 lb • •n• a 1 0 ^ ♦ •, V U "C • W • •• /�' I o a o n a) r Nmust� ° e ,•,�����MI� eN� r o a o c W --4 W m N ��4a (n/ �/�• � O 2 a J a y • ; y 1000 • s 4 4 N 1 ; a n Q 3 p O ` a y I �� M J � (/���0..�� M J l • O j 4 Wu 4 e � I' r p 4 • � � c � y o , >• • o y w 4 J Cl pal t•: > � 1 ti m n J `' ' v y r� O m I11II n � �, N I M � z ♦I1 rn �a N O lie �1 9D �ZN = 391.6,3 D �° 6 Z2 rn Q � Q = w `' �� �D �' z : Q U� .tic° � m � � C o C s `�6+610 S1P V L fi CD �` 5\ co C O y ~O 9�� ti � o � p Q U J Z '° 90 cn_ A1 OD -4 all 04 ° ^3 (.a �I Ull or Z w m °- i m = 0 0 0D o y Cc, 2 o c, � ti n c z O cWJ1 / s/° L O o �� i � _ o o �" ��0g� Qom,��� tio� sQ lb a s�� O o L�J� �" rn 86 O O `,� - Cjn ® 200 Z %S ZO O� Q sti, ryn -- Q n 0 • Qu a <� D1 O7� 7 It m0.. u g/ ° 2 ul N N �L W C R SSg• �s , \\ C.) 0"', _o,: Z ? cl m e n m o a W �S 284 C) O r- o o W X n z z � .� 0?, o O o? 3 „OZ ,8£ ° 10 N D 4 Cl m c rn 2 ti m m w / 0 c„ OD m z cn /� - O w N — D 0 � cn 0 zo m m �/ �� OD m � u (rD D O m m a) x V�)' OD a' cr D � F N — (AM C to cn D s 6 �'. CD M D = z in m - O W 0 ca o r /g ��� ��4 S9 m O r Z W i D O z r nO szr O < > c can x 0 �jy o-4C) O n D T � r^ m m on o O = 2 S z = cn -n z cn Q Z O N < O -4 -� `c ? m II p n m -Z7D p m ® M -� r z Z x - Z ae (n v►_ Z .lic (° — W z m G) ;U C) — O O G) n v m a' o z m cn N.C. GRID --� �o N 0 W N M -< g c 0 -� U 4 cn cn _ D Z O ' m rn ., 1: - S m 3 m cs o e- �p13� ) c L� aS � � M �� ,fig (O31t1 o N r91 Sn i �I�IIlililllllilililililil�lllllllllllll1lilIII I Jill 111111Jill ! It 11IIIIllltliltltltllltltlt tllllitlllllll � STERLING i I I ' S 6 E l Zlt tl: 0lt 6! B' L 91 SI of E ZI t ata�aw S t I n it`i l lilii ii�ll lll :Illi:i1111I:III�1111Illllll lllllll11 Jill 11llllllll llllll�II IIIIIIIIIII IIII I 1 I�I I I I I1Ii ����IIIIII....I 111 I!�tllll� DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2019-0103 Certificate of Coverage No. NCC190103 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission,and the Federal Water Pollution Control Act,as amended, ARBD, LLC is hereby authorized authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Stone LCID Landfill 52 Rock Hill Drive Chapel Hill Chatham County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No.2018-01918 This Certificate of Coverage shall become effective 4/25/2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded. for S. Daniel Smith Interim Director, Division of Energy, Mineral,and Land Resources By the Authority of the Environmental Management Commission DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: IOC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 r WATERSHED PROTECTION DEPARTMENT n P.O.Box 548 CHATHAM COUNTY Pittsboro,NC 27312 NORTH C A R O L i N A Website:www.chathamnc.org Soil Erosion and Sedimentation Control LETTER OF APPROVAL—REVISED PLAN June 14,2021 Alan Stone 5180-A Big Woods Road Chapel Hill,NC 27517 Project Name: Stone LCID Landfill Phase 5 Project Number: 2018-01918/WP-21-196 Acres Approved: 28 Submitted by: Smith Gardner,Inc. Date Received: 6/11/2021 To The Above Named Person and Entity, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire two (2) years following the date of approval, regardless of whether land-disturbing activity has been undertaken or not. Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Section 10 (1) of the Chatham County Sedimentation and Erosion Control Ordinance requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Self-inspections and monitoring on your behalf are required for all sites receiving a Land-Disturbing Permit. These inspections must occur at a minimum of once a week and within 24 hours of any rainfall of one inch or greater. Copies of all reports must be kept on site and produced to Chatham County upon request. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Chatham County Sedimentation and Erosion Control Ordinance, this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please notify us when you would like to schedule a preconstruction conference. Notification shall be given at least 7 days prior to initiation of activity. Your cooperation is appreciated. Respectfully, Morgan DeWit,PE Environmental Engineer Chatham County Watershed Protection Department Enclosures: New NCG01 Permit Fact Sheet DocuSign Envelope ID: IOC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 n/ ° WATERSHED PROTECTION DEPARTMENT 80 East Street CHATHAM COUNTY Pittsboro,NC 27312 NORTH CAROLINA Website:chathamcountync.gov Office: (919)545-8344•E-mail:justin.hasenfus*chathamcountync.gov Soil Erosion and Sedimentation Control LETTER OF APPROVAL— REVISED PLANS November 1,2022 Alan Stone 5180-A Big Woods Road Chapel Hill,NC 27517 Project Name: Stone LCID Landfill Phase 5 Project Number: WP-21-196 Acres Approved: 19.0 Submitted by: Smith Gardner,Inc. Date Received: 10/17/2022 Reason for Original design of Sediment Basin A modified due to weathered Revision: rock encountered in field. To The Above Named Person(s) and/or Entity, This office has reviewed the revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Erosion and Sedimentation Control Plan: This plan approval shall expire (2) years following the date on this Letter of Approval,unless a Land-Disturbing Permit has been obtained within that initial two-year period and remains in effect as provided in G.S. 164.12 (H). Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Section 164.10 (L) of the Chatham County Sedimentation and Erosion Control Ordinance requires that a copy of the approved erosion control plan be on file at the job site. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Chatham County Sedimentation and Erosion Control Ordinance, this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with county, state and federal water quality laws, regulations and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Inspections: This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Section 164.12 (1) of the Chatham County Sedimentation and Erosion Control Ordinance requires self-inspections and monitoring for all sites receiving a Land Disturbing Permit. These inspections can be done by the Financially Responsible Party, or an agent thereof. These inspections must occur DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 at a minimum of once a week and within 24 hours of any rain event of 0.5 inch or greater. Copies of inspection records and reports must be kept on site and produced to Chatham County upon request. NPDES General Stormwater Permit NCGO10000: Please be aware that your project is covered by the new NPDES General Stormwater Permit NCGO10000 (Construction Activities). If you have already applied for and received coverage, you are required to provide updated information regarding your project to the North Carolina Department of Environmental Quality's Division of Energy, Mineral, and Land Resources by filing a "Modification Form". This can be found at https://deq..nc.gov/NCGO1. Land-Disturbing Permit: Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Chatham County's Land-Disturbing Permit must be posted at the job site. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Respectfully, Justin Hasenfus,CPESC Senior Watershed Specialist Chatham County Watershed Protection Department DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01857 County: Chatham County U.S.G.S.Quad:Farrington GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Alan Stone ARBD LLC Address: 5180A Big Woods Drive Chapel Hill NC,27517 Telephone Number: (919)971-0918 Size(acres) 35(approximately) Nearest Town Chapel Hill Nearest Waterway Haw River River Basin Cape Fear USGS HUC 03030002 Coordinates Latitude: 35.801940 Longitude:-79.032780 Location description: This site is located immediately west of the Dalton Drive,Big Woods Road intersection in Chatham County,North Carolina. Description of projects area and activity: This authorization is for permanent impacts to a single wetland associated with the construction of a stormwater basin for a commercial landfill as follows:Impact Site#1: 0.07 acre of permanent impact to Wetland WA for the construction of a permanent stormwater basin(see attached plans). Applicable Law: ® Section 404(Clean Water Act,33 USC 1344) ❑ Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number:NWP 18 Minor Discharges SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated October 18,2019.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C.Division of Coastal Management in Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact Andrew Williams at(919)554-4884 or Andrew.E.Williams2(ii)usace.army.mil. Date:2019.11.07 Corps Regulatory Official: r��adc W�l 16:13:47-05'00' Date: November 7,2019 Expiration Date of Verification: March 18,2022 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 A.Determination of Jurisdiction: 1. ® There are waters,including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403).This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters,including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B.Basis For Jurisdictional Determination: N/A.An Approved JD has not been completed. C.Remarks: none D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination from the local office of the Natural Resources Conservation Service,prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin,Appeal Review Officer 60 Forsyth Street SW,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by January 6,2020. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Date: 2019.1 1.07 Corps Regulatory Official: 16:1 1:17 -05'00' Andrew Williams Date of JD: November 7,2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer Satisfaction Survey, located online at http://cop2smgpu.usace.g,M.mil/cm apex/f?p=136:4:0. Copy furnished: Phil May Carolina Ecosystems 3040 NC Highway 42W Clayton,North Carolina 27520 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 Action ID Number: SAW-2019-01857 County: Chatham County Permittee: Alan Stone ARBD LLC Project Name: Stone Landfill/ARBD LLC/Chapel Hill NC/Chatham County/ Date Verification Issued: November 7, 2019 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest,North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR AP AL Applicant: Alan Stone ARBD LLC File Number: SAW-2019-01857 Date: November 7, 2019 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I-The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at htip://www.usace.q=.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT I REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However,you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, Mr. Philip Shannin,Administrative Appeal Review Officer Attn:Andrew Williams CESAD-PDO 69 Darlington Avenue U.S.Army Corps of Engineers, South Atlantic Division Wilmington,North Carolina 28403 60 Forsyth Street,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: 404)562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the ooportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: Andrew Williams,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin,Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 1OM15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 OUTLET PROTECTION, / TYP. _ -S:-TtAM, _ 27 280 —50 STREAM EWER — — —_— — WETLAND — — — BASIN B , ��0 ti0� 296 EMERGENCY SPILLWAY, TYP. N r S (L _ 7: L-:1 j/�/ / //// 0 50' 100' REFERENCES: 1. EXISTING TOPOGRAPHY OF THE FACILITY FROM GIS SURVEY PROVIDED BY CHATHAM COUNTY GIS, ACCESSED FEBRUARY 11, 2019. IMPACTS 2. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION DESCRIPTION DISPLAY QUANTITY Q DATED JULY 2019 BY CAROLINA ECOSYSTEMS. 3. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF WETLANDS 3049 ft2 THE CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PREPARED FOR: PR=PARED BY ARBO, LLC s STONE LCIO LANDFILLco SMITH +GARONER J CHAPEL HILL, NC ° BASIN B WETLAND IMPACTS 14 N.Boylan Avenue,Raleigh uc 27603 919.828.0577 j 1526 Richland St Columbia SC 29201 °m DRAWN: APPROVED: SCALE: DATE: PROJ=CT NO.: FIG-RE NO.: FILE NAME: g L.H.B. N.C.T. AS SHOWN Sep 2019 AReD 19-2 1 A0001 b © 2019 Smith Gardner, Inc. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Appendix B Erosion and Sedimentation Control Calculations Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Erosion and Sedimentation Control Plan Appendix B: Erosion and Sedimentation Control Calculations Table of Contents 1.0 Drainage and E&S Control Calculations - Overview 2.0 Analysis of Design Storms 3.0 Stormwater Routing (HydroCAD output)* • 2-Year 24-Hour Storm • 25-Year 24-Hour Storm • 100-Year 24-Hour Storm 4.0 Drainage Channel Analysis 5.0 Drop Inlet Analysis 6.0 Sedimentation Basin Analysis 7.0 Culvert Analysis 8.0 Outlet Protection Analysis 9.0 Concrete Pipe Analysis 10.0 Down Pipe Analysis Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023(Revised May 2024) Appendix B: Table of Contents Page 01 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Drainage&E&SC Cal cs.-Overview JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design stormwater conveyance,detention,and erosion and sedimentation control measures to remove and contain stormwater flow from the design storm. The design of these measures will be based on: • Design storm information for the site; • Peak discharge calculations using the Rational Method and/or USDA-NRCS(SCS)Methods;and • Stormwater routinq using USDA-NRCS(SCS)or other methods. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL. Federal Highway Administration(2001),Urban Drainage Design Manual,Hydraulic Engineering Circular No.22,FHWA NHI-01-021,Second Ed.,U.S.Dept.of Transportation,Washington,D.C. Georgia Soil and Water Conservation Commission(2000),Manual for Erosion and Sediment Control in Georgia,Fifth Edition,Athens,CA. HydroCAD Software Solutions,LLC(2006),HydroCAD Stormwater Modeling System Owner's Manual- Version 8,Chocorua,NH. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. North Carolina Division of Water Quality(July 2005)Updated Draft Manual of Stormwater Best Management Practices,(Public Comment Version),Raleigh,NC. Pennsylvania DEP Bureau of Watershed Protection(2000),Erosion and Sediment Pollution Control Program Manual. USDA-NRCS(1992),Computer Program for Project Formulation Hydrology(TR-20). USDA-NRCS(1986&1999 Update),Urban Hydrologyfor Small Watersheds(TR-55). Virginia Department of Conservation and Recreation(1992),Virginia Erosion&Sediment Control Handbook,Third Edition,Richmond,VA. ANALYSIS: The main design criteria will be to ensure that all stormwater conveyance and detention measures will be able to accommodate the runoff from the design storm. Drainage channels,culverts,etc.were designed based on the peak discharge to each measure. Detention measures were designed based on stormwater routing methods and/or State/local criteria. CALCULATIONS: - Peak Discharge Calculations: USDA-NRCS(SCS)Methods: Use HydroCAD program to determine the peak discharge to each device or structure. HydroCAD is based on the SCS unit hydrograph procedure,which is a principal component of NRCS TR-20. Alternatively spreadsheets can be used to determine flow rates using the procedures detailed in NRCSTR-55. SMITH GARDNER,INC. 01 D&E&SCOVERVIEWSG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 2 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Drainage&E&SC Cal cs.-Overview JOB# ARBD-21-1 CHECKED BY SAS Rational Method: Q=CIA (Malcom Eq.I-1) where: G = peak discharge(cfs) G = rational runoff coefficient I = applicable rainfall intensity(in/hr)of storm event(based on time of concentration) A = drainage area(acres) Time of Concentration: The time of concentration for use in determining the peak discharge in the NRCS and/or Rational methods can be determined bythe methods detailed in NRCSTR-55 or other methods. HydroCAD uses the NRCS methods. -Stormwater Routina: Stormwater routing was accomplished using the HydroCAD program,which is based on USDA-NRCS(SCS)methods. Unless otherwise specified,the unit hydrograph method was used. The storm type(i.e.Type 124-hr.,Type II 24-hr., etc.)was selected as appropriate for the project location. SMITH DRONER SMITH GARDNER,INC. 01 D&E&SCOVERMEWSG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Analysis of Design Storms JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To compile the expected design storm depths and intensities over various return periods. These design storm values will be used in various calculations. REFERENCES: Rainfall data was obtained from thefollowingreferences: Frederick,R.H.,V.A.Myers,and E.P.Anciello(1977),"Five to 60-Minute Precipitation Frequencyfor the Eastern and Central United States," NOAATechnical Memo.NWS HYDR&35,National Weather Service, NOAA,U.S.Dept.Of Commerce,Silver Spring,MD. U.S.Weather Bureau(1961),"Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to 100 Years," U.S.Weather Bureau Technical Paper 40. SMITH GARDNER,INC. 02_DESIC-N STORMS SG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 2/2 JOB# ARBD-21-1 SUBJECT Analysis of Design Storms DATE 12/22/2022 COMPUTED BY JCL CHECKED BY SAS LOCATION: Chapel Hill,INC RETURN PERIOD 2-YR P 100-YR P SOURCE DURATION (in) (in) 5min 0.48 0.76 NOAAHYDRO.35 15 min 0.97 1.53 NOAA HYDR035 60 min 1.69 3.23 NOAAHYDRO.35 2 hr to 24 hr Rainfall Events= USER INPUT USWB TP-40 DEPTH-DURATION-FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in) (in) (in) (in) (in) (in) 5 min 0.48 0.54 0.58 0.65 0.71 0.76 10 m i n 0.77 0.86 0.93 1.04 1.13 1.22 15 min 0.97 1.08 1.17 1.31 1.42 1.53 30 min 1.32 1.55 1.72 1.97 2.17 2.36 60 min 1.69 2.04 2.29 2.66 2.94 3.23 2 hr 2.00 2.46 2.84 3.30 3.68 4.04 3 hr 2.12 2.62 3.05 3.58 4.02 4.45 6 hr 2.55 3.15 3.66 4.33 4.88 5.44 12 hr 3.54 4.42 5.11 6.06 6.80 7.56 24 hr 3.53 4.42 5.11 6.06 6.80 7.56 I NTENSITY-DURATION-FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5 min 5.81 6.46 6.99 7.82 8.48 9.14 10 m i n 4.64 5.15 5.57 6.24 6.76 7.29 15 min 3.90 4.33 4.68 5.24 5.68 6.12 30 min 2.65 3.10 3.44 3.94 4.33 4.73 60 min 1.69 2.04 2.29 2.66 2.94 3.23 2 hr 1.00 1.23 1.42 1.65 1.84 2.02 3 hr 0.71 0.87 1.02 1.19 1.34 1.48 6 hr 0.43 0.53 0.61 0.72 0.81 0.91 12 hr 0.29 0.37 0.43 0.51 0.57 0.63 24 hr 0.15 0.18 0.21 0.25 0.28 0.32 SMITH GARNER SMITH GARDNER,INC. 02_DESIC4 STORMS SC DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SIB-B SB-B DC-N2 DC-N3 DC-N 1 DC-N4 SB-A S -A DA-N2 DA-N 1 DA-N3 O SB-D Area B tJ-N4Area A Area BD Area D DA-SW 2 DA-S3 \^ Y DC-S3 Area A Area D ❑ DA-S 1 DA-SW 1 \ O DC-S1 FDC-GDC- outh 1 Gabion YJ ce DC-RR I-� v Riprap DC-SW1 DC-S2 b Southwest Channel �g2 DC South 2 EI [W11 ast Inlet SB-C West Inlet SB-E Subca Reach and Link Drainage Diagram for ARBD Expansion 2023 Prepared by Smith Gardner, Inc. 5/24/2024 HydroCAD®8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Prepared by Smith Gardner, Inc. Page 2 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Area Listing (selected nodes) Area (acres) CN Description (subcats) 53.418 75 Chatham Co. Min (DA-N1,DA-N2,DA-N3,DA-N4,DA-S1,DA-S2,DA-S3,DA-SW1,DA-SW2) 53.418 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 3 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA-N1: Area A Runoff Area=379,900 sf Runoff Depth>1.20" Flow Length=865' Tc=8.7 min CN=75 Runoff=18.26 cfs 0.873 of Subcatchment DA-N2: Area B Runoff Area=152,733 sf Runoff Depth>1.20" Flow Length=730' Tc=8.6 min CN=75 Runoff=7.37 cfs 0.351 of Subcatchment DA-N3: Area B Runoff Area=172,692 sf Runoff Depth>1.20" Flow Length=593' Tc=5.0 min CN=75 Runoff=9.42 cfs 0.397 of Subcatchment DA-N4: Area D Runoff Area=143,917 sf Runoff Depth>1.20" Flow Length=672' Tc=5.9 min CN=75 Runoff=7.62 cfs 0.331 of Subcatchment DA-S1: Runoff Area=625,000 sf Runoff Depth>1.20" Flow Length=845' Tc=11.1 min CN=75 Runoff=27.44 cfs 1.434 of Subcatchment DA-S2: Runoff Area=1.100 ac Runoff Depth>1.20" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=2.61 cfs 0.110 of Subcatchment DA-S3: Area D Runoff Area=189,584 sf Runoff Depth>1.20" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=9.87 cfs 0.436 of Subcatchment DA-SW1: Runoff Area=10.790 ac Runoff Depth>1.20" Flow Length=732' Tc=5.2 min CN=75 Runoff=25.39 cfs 1.081 of Subcatchment DA-SW2: Area A Runoff Area=145,120 sf Runoff Depth>1.20" Flow Length=536' Tc=5.5 min CN=75 Runoff=7.73 cfs 0.334 of Reach DC-G: Gabion Avg. Depth=0.39' Max Vet=10.27 fps Inflow=25.39 cfs 1.081 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=24.95 cfs 1.080 of Reach DC-N1: Avg. Depth=1.10' Max Vet=3.02 fps Inflow=18.26 cfs 0.873 of n=0.030 L=300.0' S=0.0067'/' Capacity=68.63 cfs Outflow=17.04 cfs 0.870 of Reach DC-N2: Avg. Depth=0.41' Max Vet=5.28 fps Inflow=7.37 cfs 0.351 of n=0.030 L=500.0' S=0.0600'/' Capacity=205.89 cfs Outflow=6.90 cfs 0.350 of Reach DC-N3: Avg. Depth=0.71' Max Vet=3.10 fps Inflow=9.42 cfs 0.397 of n=0.030 L=350.0' S=0.0114'/' Capacity=89.86 cfs Outflow=8.53 cfs 0.396 of Reach DC-N4: Avg. Depth=0.41' Max Vet=5.69 fps Inflow=7.62 cfs 0.331 of n=0.030 L=430.0' S=0.0698'/' Capacity=222.02 cfs Outflow=7.11 cfs 0.330 of Reach DC-RR: Riprap Avg. Depth=0.39' Max Vet=5.63 fps Inflow=24.95 cfs 1.080 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=24.18 cfs 1.078 of DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 4 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Avg. Depth=0.68' Max Vet=5.42 fps Inflow=27.44 cfs 1.434 of n=0.030 L=891.0' S=0.0292'/' Capacity=215.61 cfs Outflow=25.84 cfs 1.425 of Reach DC-S2: DC-South 2 Avg. Depth=0.16' Max Vet=2.72 fps Inflow=2.61 cfs 0.110 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=2.41 cfs 0.110 of Reach DC-S3: Avg. Depth=0.52' Max Vet=2.32 fps Inflow=9.87 cfs 0.436 of n=0.030 L=833.0' S=0.0072'/' Capacity=107.12 cfs Outflow=7.92 cfs 0.430 of Reach DC-SW1: Southwest Channel Avg. Depth=0.39' Max Vet=3.59 fps Inflow=24.18 cfs 1.078 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=22.36 cfs 1.072 of Reach DC-SW2: Avg. Depth=0.31' Max Vet=4.20 fps Inflow=7.73 cfs 0.334 of n=0.030 L=370.0' S=0.0432'/' Capacity=262.47 cfs Outflow=7.22 cfs 0.332 of Reach El: East Inlet Avg. Depth=0.39' Max Vet=4.32 fps Inflow=27.58 cfs 1.534 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=27.14 cfs 1.533 of Reach WI: West Inlet Avg. Depth=0.27' Max Vet=5.31 fps Inflow=22.36 cfs 1.072 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=21.74 cfs 1.070 of Pond DI-1: Peak Elev=268.82' Inflow=27.58 cfs 1.534 of Outflow=27.58 cfs 1.534 of Pond DI-2: Peak Elev=283.69' Inflow=22.36 cfs 1.072 of Outflow=22.36 cfs 1.072 of Pond SB-A: SB-A Peak EIev=313.04' Storage=45,795 cf Inflow=23.61 cfs 1.202 of Primary=0.23 cfs 0.150 of Secondary=0.00 cfs 0.000 of Outflow=0.23 cfs 0.150 of Pond SB-B: SB-B Peak EIev=285.86' Storage=29,168 cf Inflow=15.18 cfs 0.745 of Primary=0.11 cfs 0.075 of Secondary=0.00 cfs 0.000 of Outflow=0.11 cfs 0.075 of Pond SB-C: SB-E Peak EIev=257.27' Storage=106,691 cf Inflow=47.57 cfs 2.603 of Primary=0.23 cfs 0.152 of Secondary=0.00 cfs 0.000 of Outflow=0.23 cfs 0.152 of Pond SB-D: SB-D Peak EIev=251.81' Storage=29,960 cf Inflow=11.95 cfs 0.760 of Primary=0.10 cfs 0.071 of Secondary=0.00 cfs 0.000 of Outflow=0.10 cfs 0.071 of Total Runoff Area= 53.418 ac Runoff Volume= 5.346 of Average Runoff Depth = 1.20" 100.00%Pervious Area= 53.418 ac 0.00%Impervious Area=0.000 ac DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 5 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N1: Area A Runoff = 18.26 cfs @ 12.01 hrs, Volume= 0.873 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 379,900 75 Chatham Co. Min 379,900 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment DA-N1: Area A Hydrograph 20 0 Runoff 19 18.26 cfs -- 18 Type 114-hr 2 ` R 17 16 >24 W-R 15 Rainfall',=3.53" 14 - - - - 13 Runoff Area=379900sf Runoff Vo n 12 11 fume=0.873 of LL 19 - - - Runoff Depth>l.20' f to w Length=865' 7 + 6 - - -TC=8.7 min 5 - - - - - CRf -75 3 2 ji 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 6 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N2: Area B Runoff = 7.37 cfs @ 12.01 hrs, Volume= 0.351 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 152,733 75 Chatham Co. Min 152,733 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment DA-N2: Area B Hydrograph g ❑Runoff 7.37 cfs 7 Type II 24-hr 2-YR 24-H R 6 Rainfall=3.53" 5 Runoff Area--152,733 sf Runoff Volume=0.351 of 4 Runoff Depth',>1.20" 3 _ Flow Length=730' Tc=8.6 m i n z CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 7 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N3: Area B [49] Hint: Tc<2dt may require smaller dt Runoff = 9.42 cfs @ 11.96 hrs, Volume= 0.397 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 172,692 75 Chatham Co. Min 172,692 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.6 77 0.3300 0.36 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 172 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 &MY Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 344 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 4.1 593 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-N3: Area B Hydrograph 10 ❑Runoff 9.42 cfs - Type II 24-hr 2-YR 9 24-H R 8 Rainfall=3.53" 7 Runoff Area=172,692 sf 6 Runoff Volume=0.397 of 5 Runoff Depth>1.20" LL ---_-_-. ---_- - _. 4 Flow Length=593' 3 Tc=5.0 min 2 CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 8 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N4: Area D [49] Hint: Tc<2dt may require smaller dt Runoff = 7.62 cfs @ 11.98 hrs, Volume= 0.331 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 143,917 75 Chatham Co. Min 143,917 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 95 0.3300 0.37 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 125 0.0480 10.31 103.12 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.0 7' Top.W=10.00' n= 0.030 Earth, grassed &winding 1.5 452 0.3300 4.97 0.03 Circular Channel (pipe), Diam= 1.0" Area= 0.0 sf Perim= 0.3' r= 0.02' n= 0.013 Corrugated PE, smooth interior 5.9 672 Total Subcatchment DA-N4: Area D Hydrograph - - - - ❑Runoff 8- 7.62 cfs Type II 24-hr 2-YR 7 24-H R 6 Rainfall=3.53" Runoff Area=143,917 sf w 5 Runoff Volume=0.331 of 4 Runoff Depth,>1.20•' Flow Length=672' 3 Tc=5.9 min 2 CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 9 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S1: Runoff = 27.44 cfs @ 12.04 hrs, Volume= 1.434 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 625,000 75 Chatham Co. Min 625,000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.5 170 0.1100 0.27 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 50 0.3300 4.02 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 11.1 845 Total Subcatchment DA-S1: Hydrograph 30 ■Runoff 27.44 cfs 26 - - - -''Type ff-24-hr 2-YR 28 24 . . -, 24-H R 22 ...... - - - - 11ainfalt,--3-•53" Rung rea=C25'000'sf - 20 18 Rwno f Vol-ume--t-434 of 16 LL - Runoff 0�;„th 0 14 1' �7 „ ------ - ngt _=_845'-- 10 Tc 1 1 - .1 min CIS-:75 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 10 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S2: [49] Hint: Tc<2dt may require smaller dt Runoff = 2.61 cfs @ 11.96 hrs, Volume= 0.110 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-S2: Hydrograph ❑Runoff 2.61 cfs Type II 24-hr 2-YR 24-H R Rainfall=3.53„2-Runoff Area=1.100 ac Runoff Volume=0.110 of 3 Runoff Depth>1.20" LL Flow Length=100' 1 Slope=0.3300 '/' Tc=5.0 min CN=75 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 11 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S3: Area D Runoff = 9.87 cfs @ 11.98 hrs, Volume= 0.436 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 189,584 75 Chatham Co. Min 189,584 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment DA-S3: Area D Hydrograph 11 I ❑Runoff 9.87 cfs 10 _11 24-h :Type r2 YR 9 24-W R :Rainfall',=3.53" 584, 7 Ru n off Area=189: ,sf 9 Runoff Volum 6 w e=O'.436 of LL Runoff ff Depth>1 20" 5 ow Len',gth=1,075' 4 , r 3 I TC=6.5 m i n C IMF=75 2 1 0 . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 12 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW1: [49] Hint: Tc<2dt may require smaller dt Runoff = 25.39 cfs @ 11.97 hrs, Volume= 1.081 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment DA-SW1: Hydrograph 28 ■Runoff H39 cfs 26 24 Type-11-24=hr 2=YR " 24=H R 22 nfall'=3 5 " 20 ------,,Rai �� - . �3 18 Runoff area=10.'790 ac Runoff Volume=-1':081'of w 16 14 --- -- - --- ----- ---R' ���-- 3 12 ff Depth>1.22 s ui'f0 10 f Io w Length=72` Tc-5.2 min - - - - - CN- ,75 4 2 . 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 13 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW2: Area A [49] Hint: Tc<2dt may require smaller dt Runoff = 7.73 cfs @ 11.97 hrs, Volume= 0.334 af, Depth> 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 2-YR, 24-HR Rainfall=3.53" Area (sf) CN Description 145,120 75 Chatham Co. Min 145,120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.1 120 0.3300 0.39 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 100 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 &MY Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 316 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.5 536 Total Subcatchment DA-SW2: Area A Hydrograph ❑Runoff 8 7.73 cfs Type II 24-hr 2-YR 7 24-H R 6 Rainfall=3.53" Runoff Area=145,120 sf 5-Runoff Volume=0.334 of 4 Runoff Depth>1.20•' Flow-Length=536' 3 Tc=5.5 min 2 CN=,75 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 14 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 25.39 cfs @ 11.97 hrs, Volume= 1.081 of Outflow = 24.95 cfs @ 11.98 hrs, Volume= 1.080 af, Atten= 2%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 10.27 fps, Min. Travel Time= 0.3 min Avg. Velocity= 3.05 fps, Avg. Travel Time= 1.1 min Peak Storage= 502 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.39' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.07' Top Width= 17.00' Length= 206.0' Slope= 0.1359'/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph ❑ Inflow 28 ❑outflow 24.95 cfs 26 Inflow Area=10.790 ac 24 22 Avg. Depth=0.39' Max Vet=10.27 fps 20 18 : ;. n=0.025 16 - - - L=206.0' 14 7 Capacit =558.40 cfs 10 " 8 4 ' 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 15 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N1: Inflow Area = 8.721 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 18.26 cfs @ 12.01 hrs, Volume= 0.873 of Outflow = 17.04 cfs @ 12.06 hrs, Volume= 0.870 af, Atten= 7%, Lag= 3.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.02 fps, Min. Travel Time= 1.7 min Avg. Velocity = 1.18 fps, Avg. Travel Time= 4.2 min Peak Storage= 1,744 cf @ 12.03 hrs, Average Depth at Peak Storage= 1.10' Bank-Full Depth= 2.00', Capacity at Bank-Full= 68.63 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 14.00' Length= 300.0' Slope= 0.0067 '/' Inlet Invert= 318.00', Outlet Invert= 316.00' Reach DC-N1: Hydrograph - - - -,- - - ■ Inflow 18.26 cfs ❑outflow 19 20 " ,. I11f l OV1f Ar ' H1 18 17.04 cfs ------ "' Avg Depth-: F 17 Dep 1 16 " 15 -Max- Max-Ve l- 1r1 3. 14 �S n=0.0 0 13 3 10 r o S -0-0 8 - - - aaci = �, 3 c' 7 6 fS 5 4 3 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 16 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N2: Inflow Area = 3.506 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 7.37 cfs @ 12.01 hrs, Volume= 0.351 of Outflow = 6.90 cfs @ 12.05 hrs, Volume= 0.350 af, Atten= 6%, Lag= 2.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.28 fps, Min. Travel Time= 1.6 min Avg. Velocity= 1.84 fps, Avg. Travel Time=4.5 min Peak Storage= 670 cf @ 12.03 hrs, Average Depth at Peak Storage= 0.41' Bank-Full Depth= 2.00', Capacity at Bank-Full= 205.89 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 500.0' Slope= 0.0600 7' Inlet Invert= 318.00', Outlet Invert= 288.00' Reach DC-N2: Hydrograph ❑ Inflow g 7.37 cfs ❑outflow 6.90 cfs Inflow Area=3.506 ac 7-Avg. Depth=0.41' 6 Max Vet=5.28 fps 5 n=0.030 N 3 4 L=500.0' 0 S=0.0600 T 3 Capacity=205.89 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 17 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N3: Inflow Area = 3.964 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 9.42 cfs @ 11.96 hrs, Volume= 0.397 of Outflow = 8.53 cfs @ 12.02 hrs, Volume= 0.396 af, Atten= 9%, Lag= 3.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.10 fps, Min. Travel Time= 1.9 min Avg. Velocity= 1.10 fps, Avg. Travel Time= 5.3 min Peak Storage= 1,016 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.71' Bank-Full Depth= 2.00', Capacity at Bank-Full= 89.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 14.00' Length= 350.0' Slope= 0.0114 '/' Inlet Invert= 292.00', Outlet Invert= 288.00' Reach DC-N3: Hydrograph ❑ Inflow 9.42 cfs ❑Outflow 10 Inflow: Area=3.964 ac 9 8.53 cfs Avg. Depth=0.71' 8 Max Vet=3.10 fps 7 n=0.030 w 6 L=350.0' 0 5 LL 4 S=0.0114 '/' 3 Capacity=89.86 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 18 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N4: Inflow Area = 3.304 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 7.62 cfs @ 11.98 hrs, Volume= 0.331 of Outflow = 7.11 cfs @ 12.01 hrs, Volume= 0.330 af, Atten= 7%, Lag= 2.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.69 fps, Min. Travel Time= 1.3 min Avg. Velocity= 1.90 fps, Avg. Travel Time= 3.8 min Peak Storage= 566 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.41' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 430.0' Slope= 0.0698 7' Inlet Invert= 290.00', Outlet Invert= 260.00' Reach DC-N4: Hydrograph ❑ Inflow 7.62 cfs ❑Outflow 7.11 cfs Inflow Area=3.304 ac 7 Avg. Depth=0.41' 6 Max Vet=5.69 fps w 5 n=0.030 L=430.0' 0 4 S=0.0698 T 3 Capacity=222.02 cfs 2 ZZZ1ZzzZ/Z//1 ffiffim&� 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 19 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-RR: Ri prap [611 Hint: Submerged 1% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 24.95 cfs @ 11.98 hrs, Volume= 1.080 of Outflow = 24.18 cfs @ 11.99 hrs, Volume= 1.078 af, Atten= 3%, Lag= 1.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.63 fps, Min. Travel Time= 0.7 min Avg. Velocity= 1.59 fps, Avg. Travel Time= 2.3 min Peak Storage= 981 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.39' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.07' Top Width= 22.00' Length= 223.0' Slope= 0.0717 '/' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Ri prap Hydrograph ❑ Inflow 24.95 cfs ❑outflow 26 24..18 cfs Inflow Area=10.790 ac 24 22 Avg. Depth=0.39' 20 Max Vet=5.63 fps 18 n=0.035 w 16 3 14 L=223.0' LL 12 S=0.0717 T 10 Capacity=458.22 cfs 8 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 20 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Inflow Area = 14.348 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 27.44 cfs @ 12.04 hrs, Volume= 1.434 of Outflow = 25.84 cfs @ 12.11 hrs, Volume= 1.425 af, Atten= 6%, Lag= 4.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.42 fps, Min. Travel Time= 2.7 min Avg. Velocity= 1.84 fps, Avg. Travel Time= 8.1 min Peak Storage= 4,270 cf @ 12.07 hrs, Average Depth at Peak Storage= 0.68' Bank-Full Depth= 2.00', Capacity at Bank-Full= 215.61 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 891.0' Slope= 0.0292 7' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph ❑ Inflow 30 27.44 cfs ❑outflow 28 25.84 cfs Inflow Area=14.348 ac 26 ! Avg. Depth=0.68' 24 Max Vet=5.42 fps 22 20 ' - '- - '- n=0.030 18 16 L=891 .0' 1 ' 3 u. 2 0 14 10 Capacity=215.61 cfs - 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 21 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 2.61 cfs @ 11.96 hrs, Volume= 0.110 of Outflow = 2.41 cfs @ 12.04 hrs, Volume= 0.110 af, Atten= 8%, Lag= 4.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.72 fps, Min. Travel Time= 2.9 min Avg. Velocity= 0.85 fps, Avg. Travel Time= 9.3 min Peak Storage= 420 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.16' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 2.61 cfs ❑outflow Inflow Area=1 .100 ac 2.41 cfs Avg. Depth=0.16' 2 Max Vet=2.72 fps n=0.030 3 L=470.0' 0 LL S=0.0383 T 1 Capacity=247.01 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 22 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S3: Inflow Area = 4.352 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 9.87 cfs @ 11.98 hrs, Volume= 0.436 of Outflow = 7.92 cfs @ 12.14 hrs, Volume= 0.430 af, Atten= 20%, Lag= 9.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 2.32 fps, Min. Travel Time= 6.0 min Avg. Velocity= 0.76 fps, Avg. Travel Time= 18.2 min Peak Storage= 2,840 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.52' Bank-Full Depth= 2.00', Capacity at Bank-Full= 107.12 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 833.0' Slope= 0.0072 7' Inlet Invert= 294.00', Outlet Invert= 288.00' Reach DC-S3: Hydrograph 11 Cf ❑ Inflow 9.87 s ❑Outflow 10 Inflow Area=4.352 ac 9 Avg. Depth=0.52' 7.92 cfs 8 Max Vet=2.32 fps 7 n=0.030 N 3 6 L=833.0' 0 5 S 0.0072 T 4 3 Capacity=107.12 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 23 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW1: Southwest Channel [611 Hint: Submerged 2% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 24.18 cfs @ 11.99 hrs, Volume= 1.078 of Outflow = 22.36 cfs @ 12.06 hrs, Volume= 1.072 af, Atten= 8%, Lag= 3.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.59 fps, Min. Travel Time= 2.3 min Avg. Velocity= 1.02 fps, Avg. Travel Time= 8.0 min Peak Storage= 3,127 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.39' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 27.00' Length= 491.0' Slope= 0.0204 '/' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW1: Southwest Channel Hydrograph ❑ Inflow 26 24.18 cfs -- ❑outflow ' rl Inflow Area=10.790 ac 22.36 cfs 24 22 Avg. Depth=0.39' 20 Max Vet=3.59 fps 18 n=0.030 16 w 14 L=491 .0' FL 12 =0.0204 '/' 10 8 Capacity=392.33 cfs 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 24 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW2: Inflow Area = 3.331 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 7.73 cfs @ 11.97 hrs, Volume= 0.334 of Outflow = 7.22 cfs @ 12.01 hrs, Volume= 0.332 af, Atten= 7%, Lag= 2.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.20 fps, Min. Travel Time= 1.5 min Avg. Velocity= 1.24 fps, Avg. Travel Time= 5.0 min Peak Storage= 670 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.31' Bank-Full Depth= 2.00', Capacity at Bank-Full= 262.47 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 370.0' Slope= 0.0432 7' Inlet Invert= 338.00', Outlet Invert= 322.00' Reach DC-SW2: Hydrograph - ❑ Inflow 7.73 cfs ❑outflow 7.22 cfs Inflow Area=3.331 ac 7 Avg. Depth=0.31' 6 Max Vet=4.20 fps y 5 n=0.030 L=370.0' 4 S=0.0432 T 3 Capacity=262.47 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 25 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.39' Inflow Area = 15.448 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 27.58 cfs @ 12.11 hrs, Volume= 1.534 of Outflow = 27.14 cfs @ 12.12 hrs, Volume= 1.533 af, Atten= 2%, Lag= 0.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.32 fps, Min. Travel Time= 0.4 min Avg. Velocity= 1.32 fps, Avg. Travel Time= 1.5 min Peak Storage= 732 cf @ 12.11 hrs, Average Depth at Peak Storage= 0.39' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 115.0' Slope= 0.0522 '/' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach El: East Inlet Hydrograph ❑ Inflow 30 27.58 cfs ❑outflow 28 27.14 cfs Inflow Area=15.448 ac 26 - Avg. Depth=0.39' 24 22 Max Vet=4.32 fps 20 ! n=0.040 w 18 16 L=115.0' 3 LL 14 S=0.0522 T 12 I 10 Capacity=470.96 cfs a 6 4 r 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 26 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.26' Inflow Area = 10.790 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 22.36 cfs @ 12.06 hrs, Volume= 1.072 of Outflow = 21.74 cfs @ 12.07 hrs, Volume= 1.070 af, Atten= 3%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.31 fps, Min. Travel Time= 0.5 min Avg. Velocity= 1.55 fps, Avg. Travel Time= 1.8 min Peak Storage= 712 cf @ 12.06 hrs, Average Depth at Peak Storage= 0.27' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 170.0' Slope= 0.1294 '/' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach WI: West Inlet Hydrograph ❑ Inflow 22.36 24 74 cfs Inflow Area=1 ❑Outflow 21. 22 0.790 ac Avg. Depth=0.27' 20 18 Max Vet=5.31 fps 16 n=0.040 w 14 ` L=170.0' 3 12 LL 10 S=0.1294 T 8 Capacity=741 .72 cfs 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 27 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-1: [57] Hint: Peaked at 268.82' (Flood elevation advised) [61] Hint: Submerged 3% of Reach DC-S1 bottom [61] Hint: Submerged 16% of Reach DC-S2 bottom Inflow Area = 15.448 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 27.58 cfs @ 12.11 hrs, Volume= 1.534 of Outflow = 27.58 cfs @ 12.11 hrs, Volume= 1.534 af, Atten= 0%, Lag= 0.0 min Primary = 27.58 cfs @ 12.11 hrs, Volume= 1.534 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 268.82' @ 12.11 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=27.18 cfs @ 12.11 hrs HW=268.81' (Free Discharge) L1=Culvert (Passes 27.18 cfs of 124.72 cfs potential flow) L2=Orifice/Grate (Orifice Controls 27.18 cfs @ 2.06 fps) Pond DI-1: Hydrograph ❑Inflow 30 S ❑Primary 27.58 cfs 28 Inflow Area=15.448 ac 26 Peak Elev=268.82' 24 22 20 18 w 16 3 - ' .2 14 12 10 - j r 8 • r 6 4- 2- 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 28 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-2: [57] Hint: Peaked at 283.69' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 22.36 cfs @ 12.06 hrs, Volume= 1.072 of Outflow = 22.36 cfs @ 12.06 hrs, Volume= 1.072 af, Atten= 0%, Lag= 0.0 min Primary = 22.36 cfs @ 12.06 hrs, Volume= 1.072 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.69' @ 12.06 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.04627' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=21.99 cfs @ 12.06 hrs HW=283.69' (Free Discharge) L1=Culvert (Passes 21.99 cfs of 107.31 cfs potential flow) L2=Orifice/Grate (Weir Controls 21.99 cfs @ 1.43 fps) Pond DI-2: Hydrograph 22.36 cfs ■Inflow 24 __ 22.36 cfs __- e Primary Inflow Area=10.790 ac 22 20 - Peak Elev=283.69' 18 16 w 14 I 0 12 10 8- 6- 4- 2- 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 29 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Inflow Area = 12.053 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 23.61 cfs @ 12.04 hrs, Volume= 1.202 of Outflow = 0.23 cfs @ 12.15 hrs, Volume= 0.150 af, Atten= 99%, Lag= 6.5 min Primary = 0.23 cfs @ 12.15 hrs, Volume= 0.150 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 313.04' @ 20.00 hrs Surf.Area= 18,524 sf Storage= 45,795 cf Plug-Flow detention time= 258.2 min calculated for 0.150 of(13% of inflow) Center-of-Mass det. time= 157.0 min ( 964.0- 807.0 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.0813 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.23 cfs @ 12.15 hrs HW=311.62' (Free Discharge) L1=Culvert (Passes 0.23 cfs of 0.43 cfs potential flow) t2=Skimmer (Custom Controls 0.23 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=310.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 30 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Hydrograph - 23.61 cfs - - - ■ Inflow ■Outflow - - Primary 26 I',n �ow Area=12.053 1C ■Secondary 24 ' - - - - - - Peak-EIev=313.04' t rah e_=45,795_'Gf 22 -. 20 18 16 14 a 10 8 6 4 S —> 0.23 cfs 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 31 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Inflow Area = 7.471 ac, Inflow Depth > 1.20" for 2-YR, 24-HR event Inflow = 15.18 cfs @ 12.03 hrs, Volume= 0.745 of Outflow = 0.11 cfs @ 11.80 hrs, Volume= 0.075 af, Atten= 99%, Lag= 0.0 min Primary = 0.11 cfs @ 11.80 hrs, Volume= 0.075 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 285.86' @ 20.00 hrs Surf.Area= 11,832 sf Storage= 29,168 cf Plug-Flow detention time= 250.0 min calculated for 0.075 of(10% of inflow) Center-of-Mass det. time= 146.6 min ( 953.0- 806.4 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.11 cfs @ 11.80 hrs HW=283.20' (Free Discharge) L1=Culvert (Passes 0.11 cfs of 0.15 cfs potential flow) t2=Skimmer (Custom Controls 0.11 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=283.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 32 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Hydrograph 15.18 ■ Inflow c fs ■outflow - d =* . A71-Ac- Primary 17 n �fl li �+'af ■Secondary 16 ---------------- Peak E', ev 285.8'V - - tore - 9s�;68 14 ,' .' a Gf 12 ---- ---- ----,---- - ----,----- -- ----- ----- ----- w 10 w 0 8 " 6 - 5 4 3 .11 fs 2 0.11 cfs OAO cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 33 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E [61] Hint: Submerged 54% of Reach El bottom [61] Hint: Submerged 15% of Reach WI bottom Inflow Area = 26.238 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 47.57 cfs @ 12.10 hrs, Volume= 2.603 of Outflow = 0.23 cfs @ 12.05 hrs, Volume= 0.152 af, Atten= 100%, Lag= 0.0 min Primary = 0.23 cfs @ 12.05 hrs, Volume= 0.152 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 257.27' @ 20.00 hrs Surf.Area= 37,017 sf Storage= 106,691 cf Plug-Flow detention time= 257.6 min calculated for 0.152 of(6% of inflow) Center-of-Mass det. time= 149.8 min ( 961.5- 811.7 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.0167 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.23 cfs @ 12.05 hrs HW=254.70' (Free Discharge) L1=Culvert (Passes 0.23 cfs of 2.21 cfs potential flow) t2=5-in Skimmer (Custom Controls 0.23 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=254.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 34 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E Hydrograph 47.57 cfs ❑ Inflow ❑Outflow Inflow Area=26.238 ac o Se ma Secondary 50 Peak Elev=257.27' 45 Storage=106,691 cf 40 - - 35 w 30 0 25 LL 20 15 10 � 0.23 cfs 0.23 cfs 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 35 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Inflow Area = 7.656 ac, Inflow Depth > 1.19" for 2-YR, 24-HR event Inflow = 11.95 cfs @ 12.07 hrs, Volume= 0.760 of Outflow = 0.10 cfs @ 11.60 hrs, Volume= 0.071 af, Atten= 99%, Lag= 0.0 min Primary = 0.10 cfs @ 11.60 hrs, Volume= 0.071 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 251.81' @ 20.00 hrs Surf.Area= 14,257 sf Storage= 29,960 cf Plug-Flow detention time= 236.3 min calculated for 0.071 of(9% of inflow) Center-of-Mass det. time= 131.3 min ( 942.1 - 810.8 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.0200 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.10 cfs @ 11.60 hrs HW=249.21' (Free Discharge) L1=Culvert (Passes 0.10 cfs of 0.17 cfs potential flow) t2=Skimmer (Custom Controls 0.10 cfs) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=249.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 2-YR, 24-HR Rainfall=3.53" Prepared by Smith Gardner, Inc. Page 36 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Hydrograph 11.95 cfs ■ Inflow ■Outflow A - - - G C �� ■ Primary r . `7V ■Secondary 13 R eak E'rev25'I S',� 12 . 11- 9y�6Q ---- 41'ae- C -- 10 9 8 3 0 6- 5- 4 3 2 s 0.10 cfs 0.06 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 37 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA-N1: Area A Runoff Area=379,900 sf Runoff Depth>3.08" Flow Length=865' Tc=8.7 min CN=75 Runoff=46.18 cfs 2.238 of Subcatchment DA-N2: Area B Runoff Area=152,733 sf Runoff Depth>3.08" Flow Length=730' Tc=8.6 min CN=75 Runoff=18.63 cfs 0.900 of Subcatchment DA-N3: Area B Runoff Area=172,692 sf Runoff Depth>3.08" Flow Length=593' Tc=5.0 min CN=75 Runoff=23.63 cfs 1.018 of Subcatchment DA-N4: Area D Runoff Area=143,917 sf Runoff Depth>3.08" Flow Length=672' Tc=5.9 min CN=75 Runoff=18.94 cfs 0.848 of Subcatchment DA-S1: Runoff Area=625,000 sf Runoff Depth>3.08" Flow Length=845' Tc=11.1 min CN=75 Runoff=69.70 cfs 3.678 of Subcatchment DA-S2: Runoff Area=1.100 ac Runoff Depth>3.08" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=6.56 cfs 0.283 of Subcatchment DA-S3: Area D Runoff Area=189,584 sf Runoff Depth>3.08" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=24.71 cfs 1.118 of Subcatchment DA-SW1: Runoff Area=10.790 ac Runoff Depth>3.08" Flow Length=732' Tc=5.2 min CN=75 Runoff=63.74 cfs 2.772 of Subcatchment DA-SW2: Area A Runoff Area=145,120 sf Runoff Depth>3.08" Flow Length=536' Tc=5.5 min CN=75 Runoff=19.42 cfs 0.856 of Reach DC-G: Gabion Avg. Depth=0.66' Max Vet=13.77 fps Inflow=63.74 cfs 2.772 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=62.39 cfs 2.770 of Reach DC-N1: Avg. Depth=1.67' Max Vet=3.84 fps Inflow=46.18 cfs 2.238 of n=0.030 L=300.0' S=0.0067'/' Capacity=68.63 cfs Outflow=43.65 cfs 2.233 of Reach DC-N2: Avg. Depth=0.66' Max Vet=6.86 fps Inflow=18.63 cfs 0.900 of n=0.030 L=500.0' S=0.0600'/' Capacity=205.89 cfs Outflow=17.64 cfs 0.898 of Reach DC-N3: Avg. Depth=1.09' Max Vet=3.93 fps Inflow=23.63 cfs 1.018 of n=0.030 L=350.0' S=0.0114'/' Capacity=89.86 cfs Outflow=21.87 cfs 1.016 of Reach DC-N4: Avg. Depth=0.65' Max Vet=7.31 fps Inflow=18.94 cfs 0.848 of n=0.030 L=430.0' S=0.0698'/' Capacity=222.02 cfs Outflow=18.20 cfs 0.847 of Reach DC-RR: Riprap Avg. Depth=0.67' Max Vet=7.67 fps Inflow=62.39 cfs 2.770 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=61.32 cfs 2.767 of DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 38 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Avg. Depth=1.13' Max Vet=7.16 fps Inflow=69.70 cfs 3.678 of n=0.030 L=891.0' S=0.0292'/' Capacity=215.61 cfs Outflow=66.04 cfs 3.664 of Reach DC-S2: DC-South 2 Avg. Depth=0.28' Max Vet=3.76 fps Inflow=6.56 cfs 0.283 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=5.98 cfs 0.281 of Reach DC-S3: Avg. Depth=0.89' Max Vet=3.12 fps Inflow=24.71 cfs 1.118 of n=0.030 L=833.0' S=0.0072'/' Capacity=107.12 cfs Outflow=20.87 cfs 1.108 of Reach DC-SW1: Southwest Channel Avg. Depth=0.69' Max Vet=5.08 fps Inflow=61.32 cfs 2.767 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=56.85 cfs 2.757 of Reach DC-SW2: Avg. Depth=0.52' Max Vet=5.63 fps Inflow=19.42 cfs 0.856 of n=0.030 L=370.0' S=0.0432'/' Capacity=262.47 cfs Outflow=18.49 cfs 0.854 of Reach El: East Inlet Avg. Depth=0.68' Max Vet=6.04 fps Inflow=70.31 cfs 3.945 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=69.73 cfs 3.943 of Reach WI: West Inlet Avg. Depth=0.46' Max Vet=7.47 fps Inflow=56.85 cfs 2.757 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=56.34 cfs 2.755 of Pond DI-1: Peak Elev=269.18' Inflow=70.31 cfs 3.945 of Outflow=70.31 cfs 3.945 of Pond DI-2: Peak Elev=283.86' Inflow=56.85 cfs 2.757 of Outflow=56.85 cfs 2.757 of Pond SB-A: SB-A Peak Elev=314.41' Storage=73,008 cf Inflow=60.13 cfs 3.087 of Primary=10.35 cfs 1.575 of Secondary=0.00 cfs 0.000 of Outflow=10.35 cfs 1.575 of Pond SB-B: SB-B Peak Elev=286.82' Storage=40,992 cf Inflow=38.71 cfs 1.914 of Primary=8.33 cfs 1.185 of Secondary=0.00 cfs 0.000 of Outflow=8.33 cfs 1.185 of Pond SB-C: SB-E Peak Elev=258.57' Storage=157,494 cf Inflow=121.53 cfs 6.697 of Primary=21.24 cfs 3.515 of Secondary=0.00 cfs 0.000 of Outflow=21.24 cfs 3.515 of Pond SB-D: SB-D Peak Elev=252.62' Storage=42,016 cf Inflow=34.27 cfs 1.955 of Primary=8.08 cfs 1.178 of Secondary=0.00 cfs 0.000 of Outflow=8.08 cfs 1.178 of Total Runoff Area= 53.418 ac Runoff Volume= 13.710 of Average Runoff Depth =3.08" 100.00%Pervious Area= 53.418 ac 0.00%Impervious Area=0.000 ac DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 39 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N1: Area A Runoff = 46.18 cfs @ 12.00 hrs, Volume= 2.238 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 379,900 75 Chatham Co. Min 379,900 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment DA-N1: Area A Hydrograph 50 ❑Runoff 46.18 cfs 45 Type: II 24-hr' 25-YR 24-W R 40 - Rainfall!=6.06" 35 Runoff Area=379s'900'sf 30 Runofflum V� 'e=2'.238:of 25 - Runoff Depth>3.08" LL ---------_-------------- ---------- -------.- -----.---- --- ----- ----- 20 ,Flow Le: ngth=865' 15 ''I c=Q Tin 10 C `r IY=:75 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 40 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N2: Area B Runoff = 18.63 cfs @ 12.00 hrs, Volume= 0.900 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 152,733 75 Chatham Co. Min 152,733 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment DA-N2: Area B Hydrograph 20 ❑Runoff 18.63 cfs 19 - e ll_2 18 - X 25= R - ----- -- - ---- -- -nr 17 24-W R 16 15 Rain#all,=6.06" ;3 Runoff Area~ a 152 733 sf w 12 Runoff Valum 11 a-09=00 of. 3 10 Runoff Depth>3.08" LL 9 Flo ngth=730' 7 6 c=8.6 m i n 5 4 - - - - CN=75 3 2 1 0 . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 41 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N3: Area B [49] Hint: Tc<2dt may require smaller dt Runoff = 23.63 cfs @ 11.96 hrs, Volume= 1.018 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 172,692 75 Chatham Co. Min 172,692 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.6 77 0.3300 0.36 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 172 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 344 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 4.1 593 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-N3: Area B Hydrograph 26 23.63 c ■Runoff Types II 2'' 25-`�R 24 4-hr24=H R 22 20 - 'Rainfall: - 18 . -Rainfall I- - - Run off area- 2:692 sf 1727 -- R ff Vglume=l'�01-8 -a-f 14 wno LL epth „ 3 Q 12 Runoff D 10 nt T .0 min 6 CN-75 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 42 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N4: Area D [49] Hint: Tc<2dt may require smaller dt Runoff = 18.94 cfs @ 11.97 hrs, Volume= 0.848 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 143,917 75 Chatham Co. Min 143,917 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 95 0.3300 0.37 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 125 0.0480 10.31 103.12 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 1.5 452 0.3300 4.97 0.03 Circular Channel (pipe), Diam= 1.0" Area= 0.0 sf Perim= 0.3' r= 0.02' n= 0.013 Corrugated PE, smooth interior 5.9 672 Total Subcatchment DA-N4: Area D Hydrograph 21 - - - - ■Runoff 20 18.94 cfs 18 - - - - '- - - - rt_Y_pe, 1124=hr' -YR 25 19 17 - - - - 24-HR 16 - - - - - - - - - Ranfaii=6.O6" 15 Runoff Area=TA3sT7 sf 14 " 13 w 12 Runoff-Volume-- -848 of - R 8" 3 ff D ;pth'>3. LL $ " - - - -' -F=aw Len # =672' 9 7 1 - - - - - - - - - - - - - - - - - - - --- min CN-75 5 - 4 - - - - + 3 " 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 43 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S1: Runoff = 69.70 cfs @ 12.03 hrs, Volume= 3.678 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 625,000 75 Chatham Co. Min 625,000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.5 170 0.1100 0.27 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 50 0.3300 4.02 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 11.1 845 Total Subcatchment DA-S1: Hydrograph 75 69.70 cfs ■Runoff Type: 112 'hr 25-`�R 70 24=H R 65 60 55 Rainfall=6.a Runoff rea=625'000:sf 50 45 ff A D v 40 678 of - Runoff Vol-ume=3' LL 35 Run-- --off D_ pth>3.08" o 30 ', ', ', ', '',Fl_Ow_L ng#h=845' 25 Tc=A 1 1 AIn 20 - CN 75 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 44 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S2: [49] Hint: Tc<2dt may require smaller dt Runoff = 6.56 cfs @ 11.96 hrs, Volume= 0.283 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-S2: Hydrograph 7 ❑Runoff 6.56 cfs Type II 24-hr 25-YR 6 24-HR Rainfall=6.06"5-Runoff Area=1.100 ac 4 Runoff Volume=0.283 of Runoff Depth>3.08" LL 3 Flow Length=100' Slope=0.3300 '/' 2 Tc=5.0 min CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 45 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S3: Area D Runoff = 24.71 cfs @ 11.98 hrs, Volume= 1.118 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 189,584 75 Chatham Co. Min 189,584 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment DA-S3: Area D Hydrograph s 26 24.71 C f ❑Runoff TYpe,24 II 2 -hr, 25 `i(R 22 24 W R 20 Rainfall'=6.46" 18 Runoff Area=:189 584;sf _w16 -' Runoff Volume=l 118 of 3 14 LL 12 ow p 8" Runoff De th>3.0 10: Len' th,g =1075 F 8 Tc=6.5 m i n - - - 6 CN-,75 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 46 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW1: [49] Hint: Tc<2dt may require smaller dt Runoff = 63.74 cfs @ 11.96 hrs, Volume= 2.772 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment DA-SW1: Hydrograph 70 6 ■Runoff 3.74 cfs 60 65 TYpe r 25-YR 24=W R 55 " -- 50 Rainfall'=6.06" • p 45 Runoff area=10.''790ac 40 RunoffVolume=-2': 772 of 30 I----�'r - ---�',-----�',---R &' 3 35 ff ��';i1t�1>3.0 u0 - w Length=72` 25 Flo Tc-5 20 .2 m'-n 15 CN=75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 47 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW2: Area A [49] Hint: Tc<2dt may require smaller dt Runoff = 19.42 cfs @ 11.96 hrs, Volume= 0.856 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 145,120 75 Chatham Co. Min 145,120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.1 120 0.3300 0.39 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 100 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 316 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.5 536 Total Subcatchment DA-SW2: Area A Hydrograph 21 - - - - - ■Runoff 20 - - - -'" 19.42 cfs 19 - - - - - Type: - 11 �, ', ', 25-`�R �$ - - 2(4-ryH R 16 15 " '; ', ' ' ', Rainfall . 14 -, ! - Runoff Area�145 120:sf - 13 ' 12 -' Runoff Vol-ume=O':85f a€ - 11 " .- - - - - - - - - - - 3 epth 3.08" - LL 0 10 " ,. ', ', ', ', ', R ff D Flowc_L� - - - -n t --58` 7 - - - - C= 5rn - - - T in 6 ' ', r 5 " C1tF-75 4 " 3 " 2 'r 1 .. 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 48 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 63.74 cfs @ 11.96 hrs, Volume= 2.772 of Outflow = 62.39 cfs @ 11.97 hrs, Volume= 2.770 af, Atten= 2%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 13.77 fps, Min. Travel Time= 0.2 min Avg. Velocity= 3.77 fps, Avg. Travel Time= 0.9 min Peak Storage= 944 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.66' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.07' Top Width= 17.00' Length= 206.0' Slope= 0.1359'/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph 70 63.74 cfs ❑Oultflow cfs 62.39 Inflow 65 ;.. Area=10.790 ac 60 ! Avg. Depth=0.66' 55 50 Max Vet=13.77 fps 45 - n=0.025 35 - - - - - - - , - - - -.- - - L=206.0' LL 30 25 Capacit =558.40 cfs 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 49 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N1: Inflow Area = 8.721 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 46.18 cfs @ 12.00 hrs, Volume= 2.238 of Outflow = 43.65 cfs @ 12.04 hrs, Volume= 2.233 af, Atten= 5%, Lag= 2.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.84 fps, Min. Travel Time= 1.3 min Avg. Velocity= 1.39 fps, Avg. Travel Time= 3.6 min Peak Storage= 3,500 cf @ 12.02 hrs, Average Depth at Peak Storage= 1.67' Bank-Full Depth= 2.00', Capacity at Bank-Full= 68.63 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 14.00' Length= 300.0' Slope= 0.0067 '/' Inlet Invert= 318.00', Outlet Invert= 316.00' Reach DC-N1: Hydrograph ❑ Inflow 50 46.18 cfs ❑outflow 43.65 cfs I of low: Area=8.721 ac 45 _40 - Avg. Depth=1 .67' 35 Max Vet=3.84 fps N 30 n=0.030 3 25 L=300.0' 0 LL 20 S=0.0067 T 15 Capacity=68.63 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 50 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N2: Inflow Area = 3.506 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 18.63 cfs @ 12.00 hrs, Volume= 0.900 of Outflow = 17.64 cfs @ 12.04 hrs, Volume= 0.898 af, Atten= 5%, Lag= 2.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.86 fps, Min. Travel Time= 1.2 min Avg. Velocity = 2.23 fps, Avg. Travel Time= 3.7 min Peak Storage= 1,323 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.66' Bank-Full Depth= 2.00', Capacity at Bank-Full= 205.89 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 500.0' Slope= 0.0600 7' Inlet Invert= 318.00', Outlet Invert= 288.00' Reach DC-N2: Hydrograph --------------------- ■ Inflow 18.63 cfs . . ' ' , ❑outflow - -- oE - 19 - - - - 64 cfs 18 Avg De17 pth 0.66 16 - - - -'- - - -' - - Max V 6-# - 15 -' . e1=6.& 13 14 11 — 00 �� c 10 - - - ., 8 /� 9 - - - -S-W--0 00 7 7 1- as =2Q58 - cit 9 cfs 5 r r 4 3 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 51 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N3: Inflow Area = 3.964 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 23.63 cfs @ 11.96 hrs, Volume= 1.018 of Outflow = 21.87 cfs @ 12.00 hrs, Volume= 1.016 af, Atten= 7%, Lag= 2.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.93 fps, Min. Travel Time= 1.5 min Avg. Velocity = 1.32 fps, Avg. Travel Time= 4.4 min Peak Storage= 2,020 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.09' Bank-Full Depth= 2.00', Capacity at Bank-Full= 89.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 14.00' Length= 350.0' Slope= 0.0114 7' Inlet Invert= 292.00', Outlet Invert= 288.00' Reach DC-N3: Hydrograph 3.63 ■ Inflow 26 fs :Inflow: Ai3.9 4 ra 0 outflow 24 ? c � 'r �' 21.87 cfs Avg Depth"t 0 ' 9 22 20 M_ax Vel- 18 - 3 f 16 ----- 3 0, 14 I S 10 t' = 9.S 8 apaci Y $ 6 cfs 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 52 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N4: Inflow Area = 3.304 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 18.94 cfs @ 11.97 hrs, Volume= 0.848 of Outflow = 18.20 cfs @ 12.00 hrs, Volume= 0.847 af, Atten= 4%, Lag= 1.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.31 fps, Min. Travel Time= 1.0 min Avg. Velocity = 2.30 fps, Avg. Travel Time= 3.1 min Peak Storage= 1,106 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.65' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 430.0' Slope= 0.0698 7' Inlet Invert= 290.00', Outlet Invert= 260.00' Reach DC-N4: Hydrograph ■ Inflow 21 - - - - 18.94 cfs ❑outflow 20 -" . 1 of how''.= ra='330 19 ,' 18.20 cfs - C- 18 17 "' / 1/g. E�1 �i- � 15 I 16 FYI�A V 14 - - - ''r - 0.03 F 12 0 10 L=430.0'- M g �E' s 8 ee'�� //}} Ca ,—L 2.0 7 pacit 2 ifs 5 - - - - - - 4 3 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 53 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-RR: Riprap [61] Hint: Submerged 2% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 62.39 cfs @ 11.97 hrs, Volume= 2.770 of Outflow = 61.32 cfs @ 11.98 hrs, Volume= 2.767 af, Atten= 2%, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.67 fps, Min. Travel Time= 0.5 min Avg. Velocity = 1.98 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,782 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.67' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 7' Top Width= 22.00' Length= 223.0' Slope= 0.0717 7' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Ri prap Hydrograph fi - - - ■ Inflow 2.39 cfs ❑outflow -------------- 65 61.32 cfs �nffdw Area_1 0.700 ac 55 Avg Depth=0. 7' 60 " 50 " ,...., Max Vet=7.67 fps n=0.035 45 w 40 j 35 - - - -', = 23,0'- L 30 s4-00-17 ` 1- 20 . a a 5$,2 p , cif 4 . fs 25 " 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 54 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Inflow Area = 14.348 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 69.70 cfs @ 12.03 hrs, Volume= 3.678 of Outflow = 66.04 cfs @ 12.09 hrs, Volume= 3.664 af, Atten= 5%, Lag= 3.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.16 fps, Min. Travel Time= 2.1 min Avg. Velocity= 2.24 fps, Avg. Travel Time= 6.6 min Peak Storage= 8,423 cf @ 12.05 hrs, Average Depth at Peak Storage= 1.13' Bank-Full Depth= 2.00', Capacity at Bank-Full= 215.61 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 891.0' Slope= 0.0292 '/' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph ❑ Inflow 69.70 cfs ❑outflow 75 70 66.04 cfs of low Area=14.348 ac 65 Avg. ,Depth=1_.13'_ _ 60 ` - - - - Max Vet : 7.16 fps 55 50 n=0.030 N 45 40 - L=891 .0' 3 - - - - - - - - - - - -'- - - - - - ' - - LL 35 S=0.0292 T 30 25 Capacity=215.61 cfs 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 55 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 6.56 cfs @ 11.96 hrs, Volume= 0.283 of Outflow = 5.98 cfs @ 12.01 hrs, Volume= 0.281 af, Atten= 9%, Lag= 3.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.76 fps, Min. Travel Time= 2.1 min Avg. Velocity= 1.02 fps, Avg. Travel Time= 7.7 min Peak Storage= 778 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.28' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 7 6.56 cfs ❑outflow Inflow Area=1 .100 ac 5.98 cfs 6 Avg. Depth=0.28' 5 Max Vet=3.76 fps n=0.030 3 4 L=470.0' O LL 3 S=0.0383 T 2 Capacity=247.01 cfs 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 56 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S3: Inflow Area = 4.352 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 24.71 cfs @ 11.98 hrs, Volume= 1.118 of Outflow = 20.87 cfs @ 12.09 hrs, Volume= 1.108 af, Atten= 16%, Lag= 6.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.12 fps, Min. Travel Time= 4.4 min Avg. Velocity = 0.93 fps, Avg. Travel Time= 14.9 min Peak Storage= 5,716 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.89' Bank-Full Depth= 2.00', Capacity at Bank-Full= 107.12 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 833.0' Slope= 0.0072 '/' Inlet Invert= 294.00', Outlet Invert= 288.00' Reach DC-S3: Hydrograph ------------------- ■ Inflow 24.71 cfs 4.352 0 outflow �a- 26 I ofow' Ar ac 24 Avg22 - - - - - - 20.87 cfs Depth- .8 '- ICI ax-Ve l=3.1.2 f 20 ; _ -fps 18 —0` O 4 _ n 3Q- � 16 14 - - - -L=833.O1 3 S=0.0072 ''/' u. 12 - - - --- - - - - - - - - 10 s Capacity,=147.1'2-cfs- 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 57 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW1: Southwest Channel [61] Hint: Submerged 4% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 61.32 cfs @ 11.98 hrs, Volume= 2.767 of Outflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 af, Atten= 7%, Lag= 2.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.08 fps, Min. Travel Time= 1.6 min Avg. Velocity = 1.27 fps, Avg. Travel Time= 6.4 min Peak Storage= 5,789 cf @ 12.00 hrs, Average Depth at Peak Storage= 0.69' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 27.00' Length= 491.0' Slope= 0.0204 '/' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW1: Southwest Channel Hydrograph 61.32 c ■ Inflow fs ❑outflow 65 Inflow Area=1'0.790 ac 60 56.85 cfs -- Avg. ,Depth=0.69 55 Max 50 - -- - ��� - , e 45- n=0.030 -'. w 40 35 - - - - =491 :01 LL 30 —�- �+ 3 S 0.0 25 a a 39-2.3 20 G � ,city= 3 ifs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 58 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW2: Inflow Area = 3.331 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 19.42 cfs @ 11.96 hrs, Volume= 0.856 of Outflow = 18.49 cfs @ 11.99 hrs, Volume= 0.854 af, Atten= 5%, Lag= 1.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.63 fps, Min. Travel Time= 1.1 min Avg. Velocity = 1.53 fps, Avg. Travel Time= 4.0 min Peak Storage= 1,253 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.52' Bank-Full Depth= 2.00', Capacity at Bank-Full= 262.47 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 370.0' Slope= 0.0432 7' Inlet Invert= 338.00', Outlet Invert= 322.00' Reach DC-SW2: Hydrograph ■ Inflow cfs 9.42 ❑outflow 21 -', 20 3 18.49 cfs Inflow Aron- .331 19 - - - - -i- - - 'r Av . Depth--0.52 18 16 15 13 -' - - - - n--0.0 30 L 70 10 11 r u - 71- 8 r = 3624 7 - ... �, pacity- cfs 5 4 - 3 2 , 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 59 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.68' Inflow Area = 15.448 ac, Inflow Depth > 3.06" for 25-YR, 24-HR event Inflow = 70.31 cfs @ 12.08 hrs, Volume= 3.945 of Outflow = 69.73 cfs @ 12.09 hrs, Volume= 3.943 af, Atten= 1%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.04 fps, Min. Travel Time= 0.3 min Avg. Velocity = 1.64 fps, Avg. Travel Time= 1.2 min Peak Storage= 1,337 cf @ 12.09 hrs, Average Depth at Peak Storage= 0.68' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 115.0' Slope= 0.0522 7' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach El: East Inlet Hydrograph 6 70 cfs ■ Inflow 70.31 cfs ❑outflow 75 Inflow 70 - - - A�ea ' 6.448- c- 65 Avg :Depth-O 68`- so 55 Max Yel-6 04 fps 50 n 0.-040----- w 45 40 L=115.0' ' 3 - EEL-: 35 S 0.0522 'l' 30 . 25 Capacity�470.96 cfs I I 20 15 10 r r 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 60 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.46' Inflow Area = 10.790 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Outflow = 56.34 cfs @ 12.03 hrs, Volume= 2.755 af, Atten= 1%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.47 fps, Min. Travel Time= 0.4 min Avg. Velocity = 1.92 fps, Avg. Travel Time= 1.5 min Peak Storage= 1,289 cf @ 12.03 hrs, Average Depth at Peak Storage= 0.46' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 170.0' Slope= 0.1294 7' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach WI: West Inlet Hydrograph ■ Inflow 56.85 cfs ❑outflow 60 - 56.34 cfs Inflow Area=1',0.7,90 ac 55 Avg.vg.- Dep Ath=0.46' 45 � - Max Vel7 47 fps 40 -0.040 35 - r., LL 30 25 - Capa y 4-0.129 T- .20 .., - cit '� =741 � ds- 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 61 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-1: [57] Hint: Peaked at 269.18' (Flood elevation advised) [61] Hint: Submerged 5% of Reach DC-S1 bottom [61] Hint: Submerged 18% of Reach DC-S2 bottom Inflow Area = 15.448 ac, Inflow Depth > 3.06" for 25-YR, 24-HR event Inflow = 70.31 cfs @ 12.08 hrs, Volume= 3.945 of Outflow = 70.31 cfs @ 12.08 hrs, Volume= 3.945 af, Atten= 0%, Lag= 0.0 min Primary = 70.31 cfs @ 12.08 hrs, Volume= 3.945 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 269.18' @ 12.08 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=69.06 cfs @ 12.08 hrs HW=269.17' (Free Discharge) L1=Culvert (Passes 69.06 cfs of 129.79 cfs potential flow) L2=Orifice/Grate (Orifice Controls 69.06 cfs @ 2.88 fps) Pond DI-1: Hydrograph ❑Inflow ❑Primary S Inflow Area— C1 C 15.448 75 70.31 cfs 70 65 Peak EIev=269.18' 60 , 55 50 I N 45 3 40 LL 35 30 , 25 20 - 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 62 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-2: [57] Hint: Peaked at 283.86' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Outflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 af, Atten= 0%, Lag= 0.0 min Primary = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.86' @ 12.02 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.04627' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=55.29 cfs @ 12.02 hrs HW=283.85' (Free Discharge) L1=Culvert (Passes 55.29 cfs of 110.01 cfs potential flow) L2=Orifice/Grate (Weir Controls 55.29 cfs @ 1.95 fps) Pond DI-2: Hydrograph 56.85 c ■Inflow fs bW - -- - '- - - -0 - ■Primary ', 85cfs �nf� ' 60 56. Area=10.7, ac 55 � �-s7,96 50 2 , Pe ak- v e 45 40 35 0 30 25 20 15- - 10 - 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 63 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Inflow Area = 12.053 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 60.13 cfs @ 12.02 hrs, Volume= 3.087 of Outflow = 10.35 cfs @ 12.33 hrs, Volume= 1.575 af, Atten= 83%, Lag= 18.1 min Primary = 10.35 cfs @ 12.33 hrs, Volume= 1.575 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 314.41' @ 12.33 hrs Surf.Area= 21,081 sf Storage= 73,008 cf Plug-Flow detention time= 163.5 min calculated for 1.570 of(51% of inflow) Center-of-Mass det. time= 86.0 min ( 872.5- 786.5 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.08137' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=10.32 cfs @ 12.33 hrs HW=314.41' (Free Discharge) L1=Culvert (Inlet Controls 10.32 cfs @ 5.84 fps) 2=Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 10.27 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=310.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 64 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Hydrograph cfs 60.13 ■ Inflow ---- I ---- - ',-----',-----', ---- I---------- ----- ■Outflow ■ Primary ■Secondary 65 n - 60 eA Ef@V=���.41-i 55 ���" . �� �"' _ Stora e=73,QO8 'cf 50 45 40 w 35 3 - - -'- - - - - - - - - - - -+,- - - -+,- - - -, - - - a 30 25 20 10.35 cfs 10.35 cfs 15 10 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 65 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Inflow Area = 7.471 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 38.71 cfs @ 12.01 hrs, Volume= 1.914 of Outflow = 8.33 cfs @ 12.24 hrs, Volume= 1.185 af, Atten= 78%, Lag= 13.7 min Primary = 8.33 cfs @ 12.24 hrs, Volume= 1.185 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 286.82' @ 12.24 hrs Surf.Area= 12,787 sf Storage= 40,992 cf Plug-Flow detention time= 136.1 min calculated for 1.182 of(62% of inflow) Center-of-Mass det. time= 63.5 min ( 849.3- 785.8 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.33 cfs @ 12.24 hrs HW=286.81' (Free Discharge) L1=Culvert (Inlet Controls 8.33 cfs @ 6.79 fps) 2=Skimmer (Passes < 0.11 cfs potential flow) t3=Orifice/Grate (Passes < 13.65 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=283.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 66 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Hydrograph ■ Inflow 38.71 c fs ■Outflow ■ Primary -- Area- -/ .47 1 �' rs- -- ■Secondary lnf�ovu ', Peak E'lev 28 40 c Q 35 Storage=40 9 92 cf 30 w 25 0 20 IL 15 8.33 cfs 8.33 cfs 10 5 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 67 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E [61] Hint: Submerged 76% of Reach El bottom [61] Hint: Submerged 21% of Reach WI bottom Inflow Area = 26.238 ac, Inflow Depth > 3.06" for 25-YR, 24-HR event Inflow = 121.53 cfs @ 12.06 hrs, Volume= 6.697 of Outflow = 21.24 cfs @ 12.43 hrs, Volume= 3.515 af, Atten= 83%, Lag= 22.2 min Primary = 21.24 cfs @ 12.43 hrs, Volume= 3.515 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 258.57' @ 12.43 hrs Surf.Area= 41,254 sf Storage= 157,494 cf Plug-Flow detention time= 162.2 min calculated for 3.515 of(52% of inflow) Center-of-Mass det. time= 84.4 min ( 874.5- 790.2 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.01677' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=22.56 cfs @ 12.43 hrs HW=258.57' (Free Discharge) L1=Culvert (Inlet Controls 22.56 cfs @ 7.18 fps) 2=5-in Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 22.48 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=254.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 68 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E Hydrograph 121.53 cfs IMInflow utflow n Ar a 26 3$ a(', rima ry — econdary -Peak Elev=2' Re8. 7' 130 120 e 1 110 Stora g = 57,494 cf 100 90 80 -- 70 60 50 40 21.24 cfS 21.24 cfs 30 20 , 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 69 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Inflow Area = 7.656 ac, Inflow Depth > 3.06" for 25-YR, 24-HR event Inflow = 34.27 cfs @ 12.04 hrs, Volume= 1.955 of Outflow = 8.08 cfs @ 12.33 hrs, Volume= 1.178 af, Atten= 76%, Lag= 17.3 min Primary = 8.08 cfs @ 12.33 hrs, Volume= 1.178 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 252.62' @ 12.33 hrs Surf.Area= 15,308 sf Storage= 42,016 cf Plug-Flow detention time= 140.5 min calculated for 1.174 of(60% of inflow) Center-of-Mass det. time= 66.9 min ( 856.1 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.0200 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.07 cfs @ 12.33 hrs HW=252.62' (Free Discharge) L1=Culvert (Inlet Controls 8.07 cfs @ 6.58 fps) 2=Skimmer (Passes < 0.10 cfs potential flow) t3=Orifice/Grate (Passes < 10.03 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=249.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by Smith Gardner, Inc. Page 70 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Hydrograph - - - - ■ Inflow 34 cfs ■outflow 38 f1ow'Area=7Primary 1f1' ■Se ondary 34 Peak E',fev�252-.6'2' - 36 32 -Storage=4 cf ,©16 28 - - - - - - - - - - - - - - - --- - - 26 24 w 22 20 18 16 14 8.08 cfs 12 8.08 cfs 10 8 6 4 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 71 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DA-N1: Area A Runoff Area=379,900 sf Runoff Depth>4.31" Flow Length=865' Tc=8.7 min CN=75 Runoff=63.79 cfs 3.135 of Subcatchment DA-N2: Area B Runoff Area=152,733 sf Runoff Depth>4.31" Flow Length=730' Tc=8.6 min CN=75 Runoff=25.73 cfs 1.261 of Subcatchment DA-N3: Area B Runoff Area=172,692 sf Runoff Depth>4.32" Flow Length=593' Tc=5.0 min CN=75 Runoff=32.56 cfs 1.427 of Subcatchment DA-N4: Area D Runoff Area=143,917 sf Runoff Depth>4.32" Flow Length=672' Tc=5.9 min CN=75 Runoff=26.12 cfs 1.189 of Subcatchment DA-S1: Runoff Area=625,000 sf Runoff Depth>4.31" Flow Length=845' Tc=11.1 min CN=75 Runoff=96.40 cfs 5.154 of Subcatchment DA-S2: Runoff Area=1.100 ac Runoff Depth>4.32" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=9.04 cfs 0.396 of Subcatchment DA-S3: Area D Runoff Area=189,584 sf Runoff Depth>4.32" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=34.04 cfs 1.566 of Subcatchment DA-SW1: Runoff Area=10.790 ac Runoff Depth>4.32" Flow Length=732' Tc=5.2 min CN=75 Runoff=87.87 cfs 3.883 of Subcatchment DA-SW2: Area A Runoff Area=145,120 sf Runoff Depth>4.32" Flow Length=536' Tc=5.5 min CN=75 Runoff=26.78 cfs 1.199 of Reach DC-G: Gabion Avg. Depth=0.78' Max Vet=15.17 fps Inflow=87.87 cfs 3.883 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=86.18 cfs 3.882 of Reach DC-N1: Avg. Depth=1.92' Max Vet=4.18 fps Inflow=63.79 cfs 3.135 of n=0.030 L=300.0' S=0.0067'/' Capacity=68.63 cfs Outflow=60.48 cfs 3.130 of Reach DC-N2: Avg. Depth=0.78' Max Vet=7.49 fps Inflow=25.73 cfs 1.261 of n=0.030 L=500.0' S=0.0600'/' Capacity=205.89 cfs Outflow=24.43 cfs 1.258 of Reach DC-N3: Avg. Depth=1.27' Max Vet=4.26 fps Inflow=32.56 cfs 1.427 of n=0.030 L=350.0' S=0.0114'/' Capacity=89.86 cfs Outflow=30.32 cfs 1.424 of Reach DC-N4: Avg. Depth=0.76' Max Vet=7.95 fps Inflow=26.12 cfs 1.189 of n=0.030 L=430.0' S=0.0698'/' Capacity=222.02 cfs Outflow=25.20 cfs 1.187 of Reach DC-RR: Riprap Avg. Depth=0.80' Max Vet=8.55 fps Inflow=86.18 cfs 3.882 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=84.70 cfs 3.878 of DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type // 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 72 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Avg. Depth=1.33' Max Vet=7.85 fps Inflow=96.40 cfs 5.154 of n=0.030 L=891.0' S=0.0292'/' Capacity=215.61 cfs Outflow=91.49 cfs 5.137 of Reach DC-S2: DC-South 2 Avg. Depth=0.34' Max Vet=4.18 fps Inflow=9.04 cfs 0.396 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=8.30 cfs 0.394 of Reach DC-S3: Avg. Depth=1.07' Max Vet=3.45 fps Inflow=34.04 cfs 1.566 of n=0.030 L=833.0' S=0.0072'/' Capacity=107.12 cfs Outflow=29.33 cfs 1.554 of Reach DC-SW1: Southwest Channel Avg. Depth=0.84' Max Vet=5.68 fps Inflow=84.70 cfs 3.878 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=79.28 cfs 3.866 of Reach DC-SW2: Avg. Depth=0.62' Max Vet=6.20 fps Inflow=26.78 cfs 1.199 of n=0.030 L=370.0' S=0.0432'/' Capacity=262.47 cfs Outflow=25.60 cfs 1.197 of Reach El: East Inlet Avg. Depth=0.82' Max Vet=6.73 fps Inflow=97.32 cfs 5.531 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=96.71 cfs 5.528 of Reach WI: West Inlet Avg. Depth=0.56' Max Vet=8.42 fps Inflow=79.28 cfs 3.866 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=77.94 cfs 3.863 of Pond DI-1: Peak EIev=269.50' Inflow=97.32 cfs 5.531 of Outflow=97.32 cfs 5.531 of Pond DI-2: Peak EIev=283.95' Inflow=79.28 cfs 3.866 of Outflow=79.28 cfs 3.866 of Pond SB-A: SB-A Peak EIev=315.40' Storage=94,795 cf Inflow=83.57 cfs 4.326 of Primary=12.30 cfs 2.499 of Secondary=15.12 cfs 0.309 of Outflow=27.41 cfs 2.808 of Pond SB-B: SB-B Peak EIev=287.53' Storage=50,385 cf Inflow=53.74 cfs 2.682 of Primary=9.22 cfs 1.614 of Secondary=22.85 cfs 0.334 of Outflow=32.07 cfs 1.948 of Pond SB-C: SB-E Peak EIev=259.61' Storage=202,311 cf Inflow=168.80 cfs 9.391 of Primary=25.63 cfs 5.410 of Secondary=27.95 cfs 0.782 of Outflow=53.58 cfs 6.191 of Pond SB-D: SB-D Peak EIev=253.37' Storage=53,827 cf Inflow=48.86 cfs 2.741 of Primary=9.03 cfs 1.715 of Secondary=13.39 cfs 0.243 of Outflow=22.42 cfs 1.958 of Total Runoff Area= 53.418 ac Runoff Volume= 19.209 of Average Runoff Depth =4.32" 100.00%Pervious Area= 53.418 ac 0.00%Impervious Area=0.000 ac DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 73 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N1: Area A Runoff = 63.79 cfs @ 12.00 hrs, Volume= 3.135 af, Depth> 4.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 379,900 75 Chatham Co. Min 379,900 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment DA-N1: Area A Hydrograph 70 63.79 cfs 65 Type ype H 24 00-YR -hr 1 60 24-W R 55 50 , - - - ,,Rainfall',=7.56" 45 Runoff Area-379,900 0---- w 40 _-_Runoff Vo_Ium'e=_3'.135 of 3 35 Runoff Depth>4 31" U. 30 Flow Length- 65'-8 25 20 --- --- TC 8.7 IM in- 15 CN-75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 74 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N2: Area B Runoff = 25.73 cfs @ 12.00 hrs, Volume= 1.261 af, Depth> 4.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 152,733 75 Chatham Co. Min 152,733 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment DA-N2: Area B Hydrograph 28 ❑Runoff 25.73 cfs 26 Type II 24': hr- - 100-YR 24 24-W R 22 7.56,. 18 Ru n off Area-152,733 sf 16 Runoff Volume=l'.261:of 3 14 a Runoff Depth>4 31" LL 12 Flow tongth=7�j 10 30-8.6 min 8 Tc 6 CN-,75 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 75 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N3: Area B [49] Hint: Tc<2dt may require smaller dt Runoff = 32.56 cfs @ 11.96 hrs, Volume= 1.427 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 172,692 75 Chatham Co. Min 172,692 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.6 77 0.3300 0.36 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 172 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 344 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 4.1 593 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-N3: Area B Hydrograph 36 - - - ■Runoff 34 32.56 c s 00- TY�e-11-24, - --YR 32 ' .- * � 30 24=H R 28 " f Rainall'=7.5 ' - 26 6 22 . 24 off Area- 692 of Run 172 �noff Vailume=1, - R �4�7! a# ,6o Run off De th>4. 2LL .. C 14 -',- - - gta� �� w F la Le 12 10 Ci 5 0 1 n 8 ,75 - 6 4 2 " 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 76 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-N4: Area D [49] Hint: Tc<2dt may require smaller dt Runoff = 26.12 cfs @ 11.97 hrs, Volume= 1.189 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 143,917 75 Chatham Co. Min 143,917 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.2 95 0.3300 0.37 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 125 0.0480 10.31 103.12 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.0 7' Top.W=10.00' n= 0.030 Earth, grassed &winding 1.5 452 0.3300 4.97 0.03 Circular Channel (pipe), Diam= 1.0" Area= 0.0 sf Perim= 0.3' r= 0.02' n= 0.013 Corrugated PE, smooth interior 5.9 672 Total Subcatchment DA-N4: Area D Hydrograph 28 ❑Runoff 26.12 cfs 26 Type II 24-hr 100-YR 24 24-W R 22 20 Rainfall=7.56" 18 Runoff Area=143,917'sf 16 Runoff Volume=1.189 of c 14 Runoff Depth>4.32" " 12 Flow Length=672' 10 8 Tc=5.9 min 6 CN=75 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 77 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S1: Runoff = 96.40 cfs @ 12.03 hrs, Volume= 5.154 af, Depth> 4.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 625,000 75 Chatham Co. Min 625,000 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.5 170 0.1100 0.27 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 50 0.3300 4.02 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 11.1 845 Total Subcatchment DA-S1: Hydrograph 105 96.40 c ■Runoff 100 fs Type E124: 00-YR - - 95 - 90 ----- -' ------- - - - - - - - - hr '� 85 ! - - - ! 24-H R- Ral - -, _75 . rlfa[C-7.56" $0 Runoff-Area=625 000'-af- 70 65 - - - - - w 60 Runoff Vo�uine=5 154-of- � s, 55 .' pth '�"LL __________________________________________________________ ________________ - e >4. Flow Len th 845` 0 50 _ _ _ _ uno D 45 40 Tc 11 30 1 ruin 35 _ 25 CN-75 20 15 J -�' -- --- ----- 10 .' 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 78 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S2: [49] Hint: Tc<2dt may require smaller dt Runoff = 9.04 cfs @ 11.96 hrs, Volume= 0.396 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment DA-S2: Hydrograph 10 ❑Runoff 9.04 cfs 9 Type II 24-hr 100-YR $ 24-HR Rainfall=7.56" 7 _ . Runoff Area=1.100 ac 6-Runoff Volume=0.396 of 3 5 Runoff Depth>4.32" LL 4 _ . Flow Length=100' Slope=0.3300 '/' 3 Tc=5.0 min 2 CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 79 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-S3: Area D Runoff = 34.04 cfs @ 11.98 hrs, Volume= 1.566 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 189,584 75 Chatham Co. Min 189,584 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment DA-S3: Area D Hydrograph 38 ❑Runoff 36 34.04 cfs 34 - - - - - - - - - - - Type H 24' 00-YR 32 *�� 30 24--W-R 28 Rainfall's=7.56" 26 24 '..' Runoff Area=189584;sf N 22 Rwnof Volume- - - - - 2o f Vo a=1�566 of 18 - - Runoff Depth>4 32" u 16 Flow 14 Len',gth :1=,075' Ff 12 - - -Te=6.5 min 10 8 - - - -CN-75 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 80 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW1: [49] Hint: Tc<2dt may require smaller dt Runoff = 87.87 cfs @ 11.96 hrs, Volume= 3.883 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment DA-SW1: Hydrograph 95 - - - - - ■Runoff 87.87 cfs - e fl_ 24-hr '�00-YR 90 .- T nn 85 80 24=H R 75 , - - - Rainfall c" 70 - - - 7 56 Runoff area" 790 - 65 _q 60 ' � ' ' ' � 10. laCi w 55 Runoff Marl-urge=-1883, of w r __ --- __ - r., 50 3 - - - R - ff_QEpth' 2" LL 45 u1nQ 35 .." f IoW Length 732' - 40 30 - c=5.2 min - 25 20 ! -CN=,75 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 81 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Subcatchment DA-SW2: Area A [49] Hint: Tc<2dt may require smaller dt Runoff = 26.78 cfs @ 11.96 hrs, Volume= 1.199 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 145,120 75 Chatham Co. Min 145,120 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.1 120 0.3300 0.39 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 100 0.0500 10.52 105.24 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 & 3.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 316 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.5 536 Total Subcatchment DA-SW2: Area A Hydrograph 28 Rs 26.78 C ■Runoff -26 ! Type I',I 24 hr 1 00-YR ------------ 24 - - - - -24-H-R Rainfall=7.W' 22 20 R 18 unoff Area-:145 120',sf ff Va e=1' 199 of v 16 Runo Ium 0 14 >4.� - - ------------- " Runoff-Depth' 2LL nt - 12 w Le g = 6 --1=to 10 , TC=5.5 min81 -- DH~75 - g " 4 2 0 5 6 7 8 L I 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 82 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 87.87 cfs @ 11.96 hrs, Volume= 3.883 of Outflow = 86.18 cfs @ 11.96 hrs, Volume= 3.882 af, Atten= 2%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 15.17 fps, Min. Travel Time= 0.2 min Avg. Velocity = 4.07 fps, Avg. Travel Time= 0.8 min Peak Storage= 1,184 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.78' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 206.0' Slope= 0.1359 '/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph 87.87 c ■ Inflow fs ❑Outflow - - -_ - lnfl` Aria-10 95 90 86.18 cfs - ate- - hC- Ag. ;'Qth 85 Q� 80 T �+ 75 70 65 - 2 60 n 0_.O fn 55 n 0V V 50F -0.1 359, 0 45 - apaci E � � � J58.4 35 - �-— 0tS 3025 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 83 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N1: Inflow Area = 8.721 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 63.79 cfs @ 12.00 hrs, Volume= 3.135 of Outflow = 60.48 cfs @ 12.03 hrs, Volume= 3.130 af, Atten= 5%, Lag= 2.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.18 fps, Min. Travel Time= 1.2 min Avg. Velocity= 1.48 fps, Avg. Travel Time= 3.4 min Peak Storage= 4,467 cf @ 12.01 hrs, Average Depth at Peak Storage= 1.92' Bank-Full Depth= 2.00', Capacity at Bank-Full= 68.63 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 14.00' Length= 300.0' Slope= 0.0067 '/' Inlet Invert= 318.00', Outlet Invert= 316.00' Reach DC-N1: Hydrograph ❑ Inflow 70 63.79 cfs ❑outflow 65 60.48 cfs 1 of I ow' Area=8.721 ac 60 ' Avg. Depth=1 .92' 55 Max Vet=4.18 fps 50 45 _ n=0.030 .>!' 40 3 35 - L=300.0' 0 30 5=0.0067 T 25 20 Capacity=68.63 cfs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 84 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N2: Inflow Area = 3.506 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 25.73 cfs @ 12.00 hrs, Volume= 1.261 of Outflow = 24.43 cfs @ 12.03 hrs, Volume= 1.258 af, Atten= 5%, Lag= 2.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.49 fps, Min. Travel Time= 1.1 min Avg. Velocity = 2.40 fps, Avg. Travel Time= 3.5 min Peak Storage= 1,680 cf @ 12.01 hrs, Average Depth at Peak Storage= 0.78' Bank-Full Depth= 2.00', Capacity at Bank-Full= 205.89 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 500.0' Slope= 0.0600 7' Inlet Invert= 318.00', Outlet Invert= 288.00' Reach DC-N2: Hydrograph FE -flow 25.73 cfs - - ❑outflow 24.43 cfs - - - :Inflow:,Aroa-',3.506 'dG 28 -= - -' 22 QQ 24 r, vg. ept -7- - ps- 20 Max- el: 18 . -n-=0.030- k' 16 i 00.0' 0 14LL — S=0. 12 0600 71 . G �3aCltQJr' .$� 10 . y G fs 6 4 " 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 85 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N3: Inflow Area = 3.964 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 32.56 cfs @ 11.96 hrs, Volume= 1.427 of Outflow = 30.32 cfs @ 11.99 hrs, Volume= 1.424 af, Atten= 7%, Lag= 2.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.26 fps, Min. Travel Time= 1.4 min Avg. Velocity = 1.41 fps, Avg. Travel Time= 4.1 min Peak Storage= 2,568 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.27' Bank-Full Depth= 2.00', Capacity at Bank-Full= 89.86 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 14.00' Length= 350.0' Slope= 0.0114 7' Inlet Invert= 292.00', Outlet Invert= 288.00' Reach DC-N3: Hydrograph 36 32.56 c ■ Inflow fs I ❑Outflow 34 32 �. 30.32 cfs n � �4 �c g th= 30 Av .- Dep 28 ,- 26 'I ' ' l 'dX e- ps- 24 0.030 22 n—' 20 18 - , 3 Oe 14 S 0.-0�11 rL 16 . Ca 3 City=89.$ 12 6 cfs 8 ,. 6 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 86 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-N4: Inflow Area = 3.304 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 26.12 cfs @ 11.97 hrs, Volume= 1.189 of Outflow = 25.20 cfs @ 11.99 hrs, Volume= 1.187 af, Atten= 4%, Lag= 1.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.95 fps, Min. Travel Time= 0.9 min Avg. Velocity = 2.47 fps, Avg. Travel Time= 2.9 min Peak Storage= 1,401 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.76' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.02 cfs 2.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 14.00' Length= 430.0' Slope= 0.0698 7' Inlet Invert= 290.00', Outlet Invert= 260.00' Reach DC-N4: Hydrograph { ------------------- ■ Inflow ❑Outflow 28 ------------- Ar . cs I n#how' 3.304 G[ 25.20 cfs 26 ear� .yC 24 ;, Avg Depth-0.76' 22 ---- Max 1eI .9 20- 6 #ps n-0.030 18 . 42 16 + 0 12 S=0.0698 'F1' . - - - - c it. pa : =222,0 - y 2 cfs 10 8 ' I I 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 87 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-RR: Riprap [61] Hint: Submerged 3% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 86.18 cfs @ 11.96 hrs, Volume= 3.882 of Outflow = 84.70 cfs @ 11.98 hrs, Volume= 3.878 af, Atten= 2%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.55 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.15 fps, Avg. Travel Time= 1.7 min Peak Storage= 2,214 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.80' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 '/' Top Width= 22.00' Length= 223.0' Slope= 0.0717 '/' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Ri prap Hydrograph ------------------------------------- - - ------------ ■ Inflow Outflow 90 86.18 cs95 84.70 cfs �� �dWAre1 © 85 75 g ,Depth=0.80' 80 70 WPM pS 65 ." ax -0.0 60 n--` - L-- 3 `-w 55 50 — O - - - - 0 45 u - - - - - - - — 40 ," 07 -1-7I 35 30 apacity 458 2 Cfs 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 88 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S1: DC-South 1 Inflow Area = 14.348 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 96.40 cfs @ 12.03 hrs, Volume= 5.154 of Outflow = 91.49 cfs @ 12.08 hrs, Volume= 5.137 af, Atten= 5%, Lag= 3.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.85 fps, Min. Travel Time= 1.9 min Avg. Velocity = 2.42 fps, Avg. Travel Time= 6.1 min Peak Storage= 10,691 cf @ 12.05 hrs, Average Depth at Peak Storage= 1.33' Bank-Full Depth= 2.00', Capacity at Bank-Full= 215.61 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 891.0' Slope= 0.0292 7' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph - - - --- - ------------ 96.40 c Inflow 105 fs ■outflow InfF, - 4.3 - 48 ge - 100 ..', ' Ar@ +, 49 cfs 90hDe Avg p -. 3' 1 85 75 ax el 85 f 80 70 - - -- .030 _ 65 ,' - - - -r- - - -L=8910' ------------- 55 u 5O0Z92',-'/` 0 50 45 - - Pap�W tlm2"�5 �1 cfs 40 " 35 30 / ,- - - - '- - - - -'r r r - - - - '- - - - 25 - -- - - - '- - - - -'r 20 - 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 89 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 9.04 cfs @ 11.96 hrs, Volume= 0.396 of Outflow = 8.30 cfs @ 12.01 hrs, Volume= 0.394 af, Atten= 8%, Lag= 3.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.18 fps, Min. Travel Time= 1.9 min Avg. Velocity= 1.10 fps, Avg. Travel Time= 7.1 min Peak Storage= 967 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.34' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 10 9.04 cfs ❑outflow 9 Inflow' Area=1 .100 ac 8.30 cfs Avg. Depth=0.34' 7 Max Vet=4.18 fps w 6 n=0.030 3 5 L=470.0' 0 LL 4 S=0.0383 T 3 Capacity=247.01 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 90 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-S3: Inflow Area = 4.352 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 34.04 cfs @ 11.98 hrs, Volume= 1.566 of Outflow = 29.33 cfs @ 12.08 hrs, Volume= 1.554 af, Atten= 14%, Lag= 6.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.45 fps, Min. Travel Time= 4.0 min Avg. Velocity = 1.01 fps, Avg. Travel Time= 13.8 min Peak Storage= 7,294 cf @ 12.01 hrs, Average Depth at Peak Storage= 1.07' Bank-Full Depth= 2.00', Capacity at Bank-Full= 107.12 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 833.0' Slope= 0.0072 7' Inlet Invert= 294.00', Outlet Invert= 288.00' Reach DC-S3: Hydrograph ■ Inflow 38 34.04 cfs ❑outflow 36 ---- --- ::Inflow:: Aroa= 34 29. Avg.- th=4.0 '- 32 QFip �� 33 cfs 30 I I 28 26 3.4 x e - 5 ps 24 30- 22 20 - - - -L=833.0'- 0 18 16 S=0 00 72 , 14 y=10_ 71�- - - - h cfs- 12 C pat 10 " 8 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 91 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW1: Southwest Channel [61] Hint: Submerged 5% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 84.70 cfs @ 11.98 hrs, Volume= 3.878 of Outflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 af, Atten= 6%, Lag= 2.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.68 fps, Min. Travel Time= 1.4 min Avg. Velocity = 1.38 fps, Avg. Travel Time= 5.9 min Peak Storage= 7,186 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.84' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 491.0' Slope= 0.0204 7' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW1: Southwest Channel Hydrograph 8 4.7 ■ Inflo w ❑outflo w0 c90 fs aC85 Inflow p 'e1 ,�.��© 79.28 cfs 80 Avg. 0 84'' Depth 75 . 70 Max Vel=5 68 fps 65 60 n- 0 55 . - L- 91. 50 0 45 - -----------', IL 40 �' �' �' ���,0204: 71 35 30 a�itY=3 =2.3 ===ifs- Ca ---- 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 92 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach DC-SW2: Inflow Area = 3.331 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 26.78 cfs @ 11.96 hrs, Volume= 1.199 of Outflow = 25.60 cfs @ 11.99 hrs, Volume= 1.197 af, Atten= 4%, Lag= 1.7 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.20 fps, Min. Travel Time= 1.0 min Avg. Velocity = 1.65 fps, Avg. Travel Time= 3.7 min Peak Storage= 1,565 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.62' Bank-Full Depth= 2.00', Capacity at Bank-Full= 262.47 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 370.0' Slope= 0.0432 '/' Inlet Invert= 338.00', Outlet Invert= 322.00' Reach DC-SW2: Hydrograph 6.78 c ■ Inflow 28C2 fs - -!'1r�.C� ❑outflow 3331 25.60 cfs nf-�ow' 26 24 ., Avg Depth=E}.G2' Max a 22 20 -- '0-fpS i 18 ." - - - -:-n=0.030 _ > 16 v 0 14 12 S=0.0432 'f' C pacit =262,4 - $ , � 7cfs 10 " 6 4 , 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 93 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.82' Inflow Area = 15.448 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 97.32 cfs @ 12.07 hrs, Volume= 5.531 of Outflow = 96.71 cfs @ 12.08 hrs, Volume= 5.528 af, Atten= 1%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.73 fps, Min. Travel Time= 0.3 min Avg. Velocity= 1.78 fps, Avg. Travel Time= 1.1 min Peak Storage= 1,656 cf @ 12.08 hrs, Average Depth at Peak Storage= 0.82' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 115.0' Slope= 0.0522 '/' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach El: East Inlet Hydrograph In ow j 105 97.32 cfs ❑Oultflow 100 96.71 cfs ----- 1 of 1ow'Area=15.448 ac 95 90 - - - - Avg. Depth=0.82' 85 - - 80 Max Vet 6.73 fps 75 70 -n=©.040 65 60 ': L=1150' 55 0 50 - LL S=0.0522 7' 45 Capcit y 40 =470.96 cfs 35 30 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 94 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Reach WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.56' Inflow Area = 10.790 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Outflow = 77.94 cfs @ 12.02 hrs, Volume= 3.863 af, Atten= 2%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.42 fps, Min. Travel Time= 0.3 min Avg. Velocity = 2.08 fps, Avg. Travel Time= 1.4 min Peak Storage= 1,589 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.56' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 170.0' Slope= 0.1294 '/' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach WI: West Inlet Hydrograph c ■ Inflow 79.28 fg ❑Outflow 8580 Areac 77.94 cfs 75 70 " Avg. �,De : th=0.56'- 65 - -- Max V�1-8.42 fps- - 60 , 55 n 3 _ .0� 45 - U LL 40 S 294: /' 35 30 �' - - fs - 25 20 " 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 95 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-1: [57] Hint: Peaked at 269.50' (Flood elevation advised) [61] Hint: Submerged 6% of Reach DC-S1 bottom [61] Hint: Submerged 19% of Reach DC-S2 bottom Inflow Area = 15.448 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 97.32 cfs @ 12.07 hrs, Volume= 5.531 of Outflow = 97.32 cfs @ 12.07 hrs, Volume= 5.531 af, Atten= 0%, Lag= 0.0 min Primary = 97.32 cfs @ 12.07 hrs, Volume= 5.531 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 269.50' @ 12.07 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=95.35 cfs @ 12.07 hrs HW=269.47' (Free Discharge) L1=Culvert (Passes 95.35 cfs of 133.95 cfs potential flow) L2=Orifice/Grate (Orifice Controls 95.35 cfs @ 3.97 fps) Pond DI-1: Hydrograph ■Inflow Prima 100 " s2 ifs a=1 48 - - ■Primary S Are 5.4'�n#��w ' 105 -% . 97. �� 95 - - - -+- - - - 90 Peak- 85 r r r 80 75 : - - - - - - - - 70 ' -- ."- - - - 'r i 65 60 3 55 0 50 " a 45 40 35 - - - 30 - - - - '- - - - --- - - - '- r- - - i 25 '"" :- - - - - - - 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 96 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond DI-2: [57] Hint: Peaked at 283.95' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Outflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 af, Atten= 0%, Lag= 0.0 min Primary = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.95' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.0462 7' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=77.37 cfs @ 12.01 hrs HW=283.94' (Free Discharge) L1=Culvert (Passes 77.37 cfs of 111.46 cfs potential flow) L2=Orifice/Grate (Weir Controls 77.37 cfs @ 2.18 fps) Pond DI-2: Hydrograph 7979.28 C ❑Infl w o fs Inflow ❑Primary 85 28 cfs Area=1,0.790 ac 80 Peak-75 P� Elev 2 3.9 70 65 60 55 w 50 3 45 LL 40 35 30 25 20; 10= r 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 97 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Inflow Area = 12.053 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 83.57 cfs @ 12.02 hrs, Volume= 4.326 of Outflow = 27.41 cfs @ 12.20 hrs, Volume= 2.808 af, Atten= 67%, Lag= 11.1 min Primary = 12.30 cfs @ 12.20 hrs, Volume= 2.499 of Secondary= 15.12 cfs @ 12.20 hrs, Volume= 0.309 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 315.40' @ 12.20 hrs Surf.Area= 22,932 sf Storage= 94,795 cf Plug-Flow detention time= 131.8 min calculated for 2.799 of(65% of inflow) Center-of-Mass det. time= 62.8 min ( 841.6- 778.8 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.08137' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=12.29 cfs @ 12.20 hrs HW=315.40' (Free Discharge) L1=Culvert (Inlet Controls 12.29 cfs @ 6.96 fps) 2=Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 51.24 cfs potential flow) Secondary OutFlow Max=14.91 cfs @ 12.20 hrs HW=315.40' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 14.91 cfs @ 1.70 fps) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 98 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-A: SB-A Hydrograph - - - - - - - - - - 83.57 cfs ■ Inflow ■Outflow - - -12.� c Primary ■Secondary n - 53 Peak Efev=315.4080 90 85 ' ' I I I I -----------75 ----- ::Storage—-94,7 95 'c70 65 60 --- - - --- - - - - - - - - - - w 55 50 . c 45 EL: 40 E27.41 cfs - - - --- - - - - - - 35 30 25 20 15.12 cfs s 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 99 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Inflow Area = 7.471 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 53.74 cfs @ 12.01 hrs, Volume= 2.682 of Outflow = 32.07 cfs @ 12.12 hrs, Volume= 1.948 af, Atten= 40%, Lag= 6.6 min Primary = 9.22 cfs @ 12.12 hrs, Volume= 1.614 of Secondary= 22.85 cfs @ 12.12 hrs, Volume= 0.334 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 287.53' @ 12.12 hrs Surf.Area= 13,504 sf Storage= 50,385 cf Plug-Flow detention time= 110.2 min calculated for 1.942 of(72% of inflow) Center-of-Mass det. time= 47.2 min ( 825.3- 778.2 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=9.18 cfs @ 12.12 hrs HW=287.50' (Free Discharge) L1=Culvert (Inlet Controls 9.18 cfs @ 7.48 fps) 2=Skimmer (Passes < 0.11 cfs potential flow) t3=Orifice/Grate (Passes < 18.53 cfs potential flow) Secondary OutFlow Max=21.08 cfs @ 12.12 hrs HW=287.50' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 21.08 cfs @ 1.91 fps) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 100 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-B: SB-B Hydrograph ■ Inflow 53.74 cfs l A ■outflow 1 ���C��/ .47 1 -ac- 0 Primary 60 11lOW ■Secondary 55 " Peak E'rev27.5'3' Storage=50,385 cf 50 " 45 " 40 I 32.07 cfs I I I I I I I w 35 3 30 .. M 25 22,85 cfs 20 - 15 cfs 10 �. 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 101 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E [61] Hint: Submerged 93% of Reach El bottom [61] Hint: Submerged 25% of Reach WI bottom Inflow Area = 26.238 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 168.80 cfs @ 12.05 hrs, Volume= 9.391 of Outflow = 53.58 cfs @ 12.27 hrs, Volume= 6.191 af, Atten= 68%, Lag= 13.1 min Primary = 25.63 cfs @ 12.27 hrs, Volume= 5.410 of Secondary= 27.95 cfs @ 12.27 hrs, Volume= 0.782 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 259.61' @ 12.27 hrs Surf.Area= 45,342 sf Storage= 202,311 cf Plug-Flow detention time= 129.8 min calculated for 6.171 of(66% of inflow) Center-of-Mass det. time= 61.6 min ( 843.9- 782.2 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.01677' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=25.60 cfs @ 12.27 hrs HW=259.60' (Free Discharge) L1=Culvert (Inlet Controls 25.60 cfs @ 8.15 fps) 2=5-in Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 97.31 cfs potential flow) Secondary OutFlow Max=27.30 cfs @ 12.27 hrs HW=259.60' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 27.30 cfs @ 2.08 fps) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 102 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-C: SB-E Hydrograph l - - - - - - - - - - ----------- 170 168.80 j flow s utflowInflow Area=26.238 acimaryecondary 180 Peak Elev=259.61' 160 Storage=202,311 d 150 140 130 120 w 110 100 - - - - - 0 90 80 53.58 cfs 70 60 50 40 27.95 cfs s 30 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 103 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Inflow Area = 7.656 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 48.86 cfs @ 12.03 hrs, Volume= 2.741 of Outflow = 22.42 cfs @ 12.20 hrs, Volume= 1.958 af, Atten= 54%, Lag= 10.2 min Primary = 9.03 cfs @ 12.20 hrs, Volume= 1.715 of Secondary= 13.39 cfs @ 12.20 hrs, Volume= 0.243 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 253.37' @ 12.20 hrs Surf.Area= 16,280 sf Storage= 53,827 cf Plug-Flow detention time= 116.2 min calculated for 1.958 of(71% of inflow) Center-of-Mass det. time= 51.0 min ( 832.2- 781.2 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.0200 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=9.02 cfs @ 12.20 hrs HW=253.37' (Free Discharge) L1=Culvert (Inlet Controls 9.02 cfs @ 7.35 fps) 2=Skimmer (Passes < 0.10 cfs potential flow) t3=Orifice/Grate (Passes < 17.69 cfs potential flow) Secondary OutFlow Max=13.22 cfs @ 12.20 hrs HW=253.37' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 13.22 cfs @ 1.63 fps) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by Smith Gardner, Inc. Page 104 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 5/24/2024 Pond SB-D: SB-D Hydrograph ■ Inflow 48.86 c fs ■Outflow — 656-aC- ■ Primary In#1o�nr Area- . ■Secondary 50 Pe ak E'fev2a3.3' ' storage-53,827 45 C� 40 35 30 -' 22.42cfs - - - -j- - - -, - - - 0 25 a 20 15 13.39 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PRQIECT Stone LCID Landfill Expansion SHEET 1 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design drainage channels,ditches,etc.to handle stormwater flow from the design storm(s). The main design criteria will be to ensure that all drainage channels,ditches,etc.will be able to accommodate the peak discharge from the design storm without overtopping and without exceeding the allowable shear stress and/or velocity of the selected channel lining. REFERENCES: Federal Highway Administration(2001),Urban Drainage Design Manual,Hydraulic Engineering Circular No.22,FHWA NHI-01-021,Second Ed.,U.S.Dept.of Transportation,Washington,D.C. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. Pennsylvania DEP Bureau of Watershed Protection(2000),Erosion and Sediment Pollution Control Program Manual. ANALYSIS: The following approach is used in the design of drainage channels: 1- Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). For permanent linings(Grass,TRM,rip rap,gabions,etc.)use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. For grass lined channels,a smaller design storm(2-Yr 24-Hr- unless otherwise specified)is used to evaluate temporary linings. 2- Input other design parameters(bottom width;side slopes;minimum freeboard,min./max. slopes;and channel lining). 3. Based on the design parameters calculate normal depth of flow,velocity,Froude number,and maximum shear stress for both max./min.slopes. Also determine the critical slope and corresponding normal depth. 4. Compare the velocity and/or shear stress to allowable values(the maximum slope val ues will control). If val ues are exceeded,revise design parameters as required. 5. Based on normal depth values and required freeboard(generally use the greater of 6 inches or 25%of the flow depth),determine the minimum channel depth and top width for both max./min. slopes(the minimum slope values will control). 6. If the channel has a significant curved reach,evaluate the shear stress and superelevation of the water surface in the bend. CALCULATIONS: Manning's Equation: 1.49AR2'3S"2 AV (HEC-22 Eq.5-5) Q= = n where: Q = discharge(cfs) n = Manning's roughness coefficient(See Below) A = cross sectional area of flow(ft2) R = hydraulic radius(ft)=A/P P = wetted perimeter S = slope of channel(ft/ft) V = average channel velocity(ft/sec) SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 2 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Maximum Shear Stress(Tractive Force Method zd = ),d,S' (HEC-22 Eq.5-13) where: ro = maximum shear stress on channel lining(psf) y = unit weight of water(62.4 pcf) d = maximum depth of flow(ft) S = channel slope(ft/ft) Froude Number: v Fr= TTA where: F, = Froude number(dimensionless) v = flow velocity(ft/sec) g = acceleration of gravity (32.2 ft/sec`) A = cross-sectional area of flow(ft`) T = top width of flow(ft) Note that A/T=the hydraul is depth(D).For Fr>1.0,flow is supercritical;Fr<1.0,flow is subcritical;Fr=1.0,flow is critical. Critical Slope: The critical slope(Sj is the slope at which Fr=1.0. When the slope is between 0.7S.and 1.3S.,unstable flow may occur as small flow disturbances can initiate a change in the flow state. If slopes are within this range,consider additional freeboard. Manning's Roughness Coefficient(nl: Gr ass: R v6 n= (HEC-22 Eq.5-6-5-10) [K+ 19.971og(R'4So.4)] where: R = hydraulic radius(ft) K = vegetative coefficient(depending on retardance class) =15.8(Class A) =23.0(CA ass B) =30.2(G ass C) =34.6(CA ass D) =37.7(G ass E) S = slope of channel(ft/ft) Rip Rap: 1/6 n= Y (PA DEP Manual Fig.3) 21.6 log(d 5 + 14 o where: y = depth of flow(ft) 050 = median size of rip rap(ft) SMITH DRONER SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 3 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Curved Channels(Where Applicable Shear Stress in Bend: zh = Khzd (HEC-22 Eq.5-15) where: r o = bend shear stress(psf) Kb = function of Rc/B(use HEC-22 Chart 21) ro = maximum shear stress on channel lining(psf) Fc = radius to the centerl ine of the channel (ft) B = bottom width of channel (ft) Superelevation at Outside of Bend: T, T Z (HEC-22 Eq.5-11 modified) A d= 0.5 gR,. where: A 0 = superelevation of water surface between the outer channel bank and the centerline of the channel (avg.water surface before bend)(ft) V = average channel velocity(ft/sec) T = top width of flow(ft) g = acceleration of gravity (32.2 ft/sec2) A, = radius to the centerl ine of the channel (ft) Allowable Shear Stress/Velocity: Grass-Lined Channels: For grass-lined channels,an allowable velocity approach is applicable for slopes flatter than 10%. For slopes of 10%and steeper appropriate permanent linings should be used. For use in the evaluation of curved channels,the following allowable shear stress values(lb/ftz)can be assumed based on retardance cl ass: Gass A: 3.7 Gass B: 2.1 G ass C: 1 Gass D: 0.6 CA ass E: 0.35 Rip Rap-Lined Channels: For rip rap-lined channels,an allowable velocity approach is applicable for slopes flatter than 10%(see table below). For slopes of 10%or steeper,use the following equation: zaz/'_ = 4 x dso (HEC-22 Eq.5-17) where: ra„ow = allowable shear stress(psf) 050 = median size of rip rap(ft) SMITH GARDNER SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 4 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Riprap Gradation, Filter Blanket Requirements,Maximum Velocities Graded Rock Size in Filter Blanket Re uirements** Placement VWX NSA No. Max- dso* Min. Size NSA No. Thickness (ftlsec R-1 1.5 .75 No.8 FS-1 N/A 2.5 R-2 3 1.5 1 FS-1 WA 4.5 R-3 6 3 2 FS-1 3 6.5 RA 12 6 3 FS-2 4 9.0 R-5 18 9 5 FS-2 6 11.5 R-6 24 12 7 FS-3 8 13.0 R-7 30 15 12 FS-3 10 i 14.5 The d5o stone size is the size exceeded by 50%of the total weight of the tonnage shipped(i.e. 50% by weight shall consist of pieces larger than the d5o stone size"). ** This is a general standard. Soil conditions at each site should be analyzed to determine actual filter size. A suitable woven or non-woven geotextile underlayment,used according to manufacturer's recommendations,may be substituted for the filter stone. Ref• PA DEPManua)Table 5 Reno Mattress or Gabion-Lined Channels: For Reno mattress or gabion-lined channels,use allowable velocityfor slopes flatter than 10%and allowable shear stress for slopes of 10%or steeper(see table below). Maximum Permissible Velocities for Reno Mattress& Gabions Permissible* Permissible— Thickness Rock Fill Shear Stress Type In Inches Gradation in Velocity(fps) Iblfts .025-.030 _6 _ 3-6 6.0 8,35 Reno 625-A30 6-10 3_6 12.0 8.35 Mattress .025-.030 10-12 3-6 15.0 8.35 025-.030 12-18 4-6 1 18.0 1 8,35 Gabion .027 >18 5-9 1 22.0 8.35 * Permissible velocities may be increased by the introduction of sand mastic grout. Refer to manufacturer's recommendations/specifications for permissible velocities and for recommendations regarding filters or geotextile fabric underlayment when using Reno mattresses or gabions for channel linings. -Based on vegetation completely grown. Ref. PA DEPManua/Table 95 SMITH -GQRONER SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PRQIECT Stone LQD Landfill Expansion SHEET 5/9 JOB# ARBD-21-1 SUBJECT Drainage Channel Analysis(Grass Lined) DATE 5/24/2024 COMPUTED BY JCL Channel No. DG141-DG144 CHECKED By SAS Design Parameters: PEAK DISCHARGE,Q?= 17.0 ft3/s Source:HydroCAD 2-Yr 24-Hr PEAK DISCHARGE,Q?5= 43.7 ftl/s Source:HydroCAD25-Yr24-Hr Bottom Width,B= 2.0 ft Permanent Grass Lining Temporary Lining Left Side Slope,zr= 3.0 horizontal:1 vertical Grass Relardance= D Temporary Lining Used(Y/N)= Y Right Side Slope,zz= 3.0 horizontal:1 vertical K= 34.6 RECP Product Name=NA Green-Curlex I,or equal V_= 5.0 ft/sec Manning's Coefficient,n= 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 Ib/ft2 = 1.55 Ib/ft2 Maximum Channel Slope,S_= 0.020 ft/ft Bare Ground(If Temporary Liner Not Usedy Minimum Channel Slope,Sm _` 0.010 ft/ft Manning's Coefficient,n= 0.020 V_= 2.0 ft/sec Normal Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm.Depth) Roughness of Flow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Velocity(V)or of Safety Comment V Coefficient A P R=A7P T DeWT V Q F,(Normal) rd Sh.Stress(S) v�,/v„or ft n ft2 ft ft ft ft fl/s ft3/s # Ib/ft2 Used? r-/ry 02 Maximum Slope: 0.90 0.035 4.23 7.69 0.55 7.40 0.57 4.04 17.1 0.94 1.1 S 1.4 CX Minimum Slope: 1.06 0.035 5.49 8.70 0.63 8.36 0.66 3.13 17.2 0.68 0.7 S 2.3 CX 025 Maximum Slope: 1.61 0.050 11.00 12.18 0.90 11.66 0.94 3.97 43.6 0.72 2.0 V 1.3 O.K. Minimum Slope: 1.92 0.052 14.90 14.14 1.05 13.52 1.10 2.94 43.8 0.49 1.2 V 1.7 O.K. Critical Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Section Flow Average Froude Uniform-Flow (Grit.Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T DeWT Z=ADr�z Q 1/1 F,(0-ifical) S, ft n ft, ft ft ft ft ft�s ft'/s fl/s # ft/ft C2 0.87 0.035 4.01 7.50 0.53 722 0.56 2.99 17.0 4.23 1.00 0.023 Slopes Near So-Check Freeboard. C25 1.38 0.047 8.47 10.73 0.79 10.28 1 0.82 7.69 43.7 5.15 1.00 0.037 Flow is Stable. Determination of Minimum Channel Depth&Top Width(Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 2.11 14.66 2.42 16.52 SMITH GARDNER,INC DO North DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PRQIECT Stone LQD Landfill Expansion SHEET 6/9 JOB# ARBD-21-1 SUBJECT Drainage Channel Analysis(Grass Lined) DATE 5/24/2024 COMPUTED BY JCL Channel No. DC-S7-DGS3&DC-SW2 CHECKED By SAS Design Parameters: PEAK DISCHARGE,Q?= 25.8 ft3/s Source:HydroCAD 2-Yr 24-Hr PEAK DISCHARGE,Q?5= 66.0 ftl/s Source:HydroCAD25-Yr24-Hr Bottom Width,B= 5.0 ft Permanent Grass Lining Temporary Lining Left Side Slope,zr= 3.0 horizontal:1 vertical Grass Relardance= D Temporary Lining Used(Y/N)= Y Right Side Slope,zz= 3.0 horizontal:1 vertical K= 34.6 RECP Product Name=NA Green-Curlex I,or equal V_= 5.0 ft/sec Manning's Coefficient,n= 0.035 Minimum Freeboard= 0.5 ft r,,_= 0.60 lb/ft' 1.55 Ib/ft, Maximum Channel Slope,S_= 0.025 ft/ft Bare Ground(If Temporary Liner Not Usedy Minimum Channel Slope,Sm _` 0.010 ft/ft Manning's Coefficient,n= 0.020 V_= 2.0 ft/sec Normal Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm.Depth) Roughness of Flow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Velocity(V)or of Safety Comment V Coefficient A P R=A7P T DeWT V Q F,(Normal) rd Sh.Stress(S) v�,/v„or ft n ft2 ft ft ft ft fl/s ft3/s # Ib/ft2 Used? r-/ry 02 Maximum Slope: 0.77 0.035 5.63 9.87 0.57 9.62 0.59 4.63 26.1 1.07 1.2 S 1.3 CX Minimum Slope: 0.98 0.035 7.78 11.20 0.69 10.88 0.72 3.34 26.0 0.70 0.6 S 2.5 CX 025 Maximum Slope: 1.45 0.047 13.56 14.17 0.96 13.70 0.99 4.89 66.4 0.87 2.3 V 1.0 O.K. Minimum Slope: 1.87 0.050 1984. 16.83 1.18 16.22 1.22 3.33 66.1 0.53 1.2 V 1.5 O.K. Critical Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Section Flow Average Froude Uniform-Flow (Grit.Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T DeWT Z=ADr�z Q 1/1 F,(0-ifical) S, ft n ft, ft ft ft ft ft�s ft'/s fl/s # Wit C2 0.80 0.035 5.92 10.06 0.59 9.80 0.60 4.60 26.1 4.41 1.00 0.022 Slopes Near So-Check Freeboard. C25 1.34 0.046 12.09 13.47 0.90 13.04 0.93 11 64 66.0 5.46 1 00 0.033 Slopes Near Sc-Check Freeboard. Determination of Minimum Channel Depth&Top Width(Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.95 16.70 2.37 19.22 SMITH GARDNER,INC DC-South DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 7/9 JOB# ARBD-21-1 SUBJECT Drainage Channel Analysis(Reno/Mattress/Gabi on) DATE 12/5/2022 COMPUTED BY JCL Channel No. DC-South(Gabion) CHECKEDBY SAS Design Parameters. PEAK DISCHARGE,Q25= 62.4 ft5/s Source: HydroCAD 25-Yr 24-Hr Bottom Width,B= 5.0 ft Reno Mattress/Gabion Lining Left Side Slope,z,=■ 3.0 horizontal:1 vertical Product Type=12'Reno Mattress Right Side Slope,Z2= 3.0 horizontal:1 vertical Manning's Coefficient,n= 0.030 eaow= 15.0 ft/sec Minimum Freeboard= 0.5 ft zeaow= 8.4 lb/ft' Maximum Channel Slope,S_= 0.150 ft/ft Minimum Channel Slope,Smjn= 0.020 ft/ft Normal Depth Depth of Flow Manning's Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm.Depth) Roughness of Flow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Velocity(V)or of Safety Comment Y Coefficient A P R=A/P T D=A/T V Q F,(Normal) ad Sh.Stress(S) V,/Io„JV„ or ft n ft, ft ft ft ft ft/s ft,/s # lb/ft' Used? ze�iaw/xp Maximum Slope: 0.70 0.030 4.97 9.43 0.53 9.20 0.54 12.55 62.4 3.01 6.6 S 1.3 0.K. Minimum Slope: 1.19 0.030 10.20 12.53 0.81 12.14 0.84 6.12 62.5 1.18 1.5 V 2.4 0.K. Critical Depth Depth of Flow Manning's Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform-Flow (Grit.Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y. Coefficient A P R=AIP T D=AiT z=gw112 Q V� F,(Oitical) S, ft n ft2 It ft ft ft ft2.5 ft3/s ft/s # ft/ft 1.30 0.030 11.57 13.22 0.88 12.80 0.90 11.00 62.4 5.39 1.00 0.014 Flow is Stable. Determination of Minimum Channel Depth&Top Width Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft It 1.20 12.20 1.69 15.14 SMITH GARHNER.INC. Reno Mattress-Gabion DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 8/9 JOB# ARBD-21-1 SUBJECT Drainage Channel Analysis(Rip Rap Lined) DATE 12/5/2022 COMPUTED BY JCL Channel No. DC-South(Rip Rap) CHECKEDBY SAS Design Parameters. PEAK DISCHARGE,Q25= 61.3 ft3/s Source: HydroCAD 25-Yr 24-Hr Bottom Width,B= 10.0 ft Rip Rap Lining Left Sid.Slope,z,=■ 3.0 14horizontal:1 vertical D.= 0.50 ft Right Side Slope,Z2= 3.0 horizontal:1 vertical VNrow= 13.0 ft/sec zeliow= 2.0 lb/ft' Minimum Freeboard= 0.5 ft Maximum Channel Slope,S_= 0.099 ft/ft Minimum Channel Slope,Smj,,= 0.010 ft/ft Normal Depth Depth of Flow Manning's Area Wetted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm.Depth) Roughness of Flow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Velocity(V)or of Safety Comment Y Coefficient A P R=A/P T D=A/T V Q F,(Normal) ad Sh.Stress(S) V,/Io„JV„ or ft n ft, ft ft ft ft ft/s ft,/s # lb/ft' Used? ze�iow/xp Maximum Slope: 0.77 0.053 9.48 14.87 0.64 14.62 0.65 6.55 62.0 1.43 4.8 V 2.0 0.K. Minimum Slope: 1.33 0.045 18.61 18.41 1.01 17.98 1.03 3.32 61.7 0.57 0.8 V 3.9 0.K. Critical Depth Depth of Flow Manning's Area Wetted Hydraulic Top Hydraulic Section Flow Average Froude Uniform-Flow (Grit.Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y. Coefficient A P R=AIP T D=AiT z=4w 112 Q Vo F,(Oitical) So ft n ft, ft ft ft ft ft2.5 ft3/s ft/s # ft/ft 0.95 0.050 12.21 16.01 0.76 15.70 0.78 10.76 61.1 5.00 1.00 0.040 Flow is Stable. Determination of Minimum Channel Depth&Top Width Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.27 17.62 1.83 20.98 SMITH GARHNER.INC. Rip Rap DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PRQIECT Stone LQD Landfill Expansion SHEET 9/9 JOB# ARBD-21-1 SUBJECT Drainage Channel Analysis(Grass Lined) DATE 12/5/2022 COMPUTED BY JCL Channel No. DC-SW1 CHECKED By SAS Design Parameters: PEAK DISCHARGE,Q?= 22.4 ft3/s Source:HydroCAD 2-Yr 24-Hr PEAK DISCHARGE,Q?5= 56.9 ftl/s Source:HydroCAD25-Yr24-Hr Bottom Width,B= 15.0 ft Permanent Grass Lining Temporary Lining Left Side Slope,zr= 3.0 horizontal:1 vertical Grass Retardance= D Temporary Lining Used(Y/N)= Y Right Side Slope,zz= 3.0 horizontal:1 vertical K= 34.6 RECP Product Name=NA Green-Curlex I,or equal V_= 5.0 ft/sec Manning's Coefficient,n= 0.035 Minimum Freeboard= 0.5 ft rw,_= 0.60 lb/ft' = 1.55 Ib/ft, Maximum Channel Slope,S_= 0.050 ft/ft Bare Ground(If Temporary Liner Not Usedy Minimum Channel Slope,Sm _` 0.010 ft/ft Manning's Coefficient,n= 0.020 V_= 2.0 ft/sec Normal Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Average Flow Froude Maximum Allowable Factor (Norm.Depth) Roughness of Flow Perimeter Radius Width Depth Velocity Rate Number Shear Stress Velocity(V)or of Safety Comment V Coefficient A P R=A7P T DeWT V Q F,(Normal) rd Sh.Stress(S) v�,/v„or ft n ft2 ft ft ft ft ft/s ft3/s # Ib/ft2 Used? r-/ry 02 Maximum Slope: 0.33 0.035 5.28 17.09 0.31 16.98 0.31 4.35 22.9 1.37 1.0 S 1.5 CX Minimum Slope: 0.52 0.035 8.61 18.29 0.47 18.12 0.48 2.58 22.2 0.66 0.3 S 4.8 CX 025 Maximum Slope: 0.70 0.050 11.97 19.43 0.62 19.20 0.62 4.78 57.2 1.07 2.2 V 1.0 O.K. Minimum Slope: 1.16 0.055 21.44 22.34 0.96 21.96 0.98 2.65 56.8 0.47 0.7 V 1.9 O.K. Critical Depth Depth of Flow Manning's Area Welted Hydraulic Top Hydraulic Section Flow Average Froude Uniform-Flow (Crit.Depth) Roughness of Flow Perimeter Radius Width Depth Factor Rate Velocity Number Critical Slope Comment Y Coefficient A P R=A/P T DeWT Z=ADr�z Q 1/1 F,(0-ifical) S, ft n ft, ft ft ft ft ft�s ft'/s ft/s # ft/ft C2 0.40 0.035 6.48 17.53 0.37 17.40 1 0.37 3.95 22.4 346 1.00 0.025 Flow is Stable. C25 0.73 0.051 12.55 1962. 0.64 19.38 1 0.65 10.10 57.3 4.57 1.00 0.044 Slopes Near Sc-Check Freeboard. Determination of Minimum Channel Depth&Top Width(Based on 025) Maximum Slope Minimum Slope Minimum Minimum Minimum Minimum Channel Top Width Channel Top Width Depth T Depth T ft ft ft ft 1.20 22.20 1.66 24.96 SMITH GARDNER,INC DC-Southwest DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 3 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drop Inlet Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design drop inlets to handle stormwater flow from the design storm(s). The main design criteria wil I be to ensure that all drop inlets will be able to accommodate the peak rate of run off from the design storm without exceeding the allowable headwater depth. REFERENCE: Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. ANALYSIS: The following approach is used in the design of drop Inlets: 1. Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). Use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. 2. As appropriate,analyze the inlet structure as a weir-type inlet and/or grated inlet. 3. Analyze the outlet structure separately by evaluating its behavior as a culvert. CALCULATIONS: Weir-Type Inlet=>Use the Weir Equation: Q= CW LH312 (Malcom Eq.1-6) where: Q = peak discharge(cfs) Ca = weir coefficient(=3.0 for free overfal l) L = length of weir(ft) H = driving head(ft) (=allowable headwater above crest of weir) Grated Inlet=>Use the Orifice Equation: Q= Cd A 2gh (Malcom Eq.1-7) where: G = peak discharge(cfs) Cd = coefficient of discharge(0.6=typical value) A = cross-sectional area of flow at orifice entrance(ft) 9 = acceleration of gravity(32.2 ft/seC2) h = driving head(ft)(=allowable headwater above grate) SMITH GARNER,INC. DROP INLET SG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 2/3 JOB# ARBD-21-1 SUBJECT Drop Inlet Analysis DATE 12/5/2022 COMPUTED BY JCL CHECKED BY SAS Drop Inlet No.: DI-1(x2) Peak Discharges PEAK DISCHARGE,Q25(cfs)= 83.8 Source: HydroCAD 25-Yr 24-Hr Drop Inlet Parameters: Weir Coefficient= 3.0 Coefficient of Discharge(Orifice)= 0.6 Allowable Driving Head(ft)= 1.5 Weir-Tyne Inlet: L(ft)= 32 Q(cfs)= 176.4 SMITH GARDNER SMITH GARNER,INC. Di-1 DROP INLET SG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 3/3 JOB# ARBD-21-1 SUBJECT Drop Inlet Analysis DATE 12/5/2022 COMPUTED BY JCL CHECKED BY SAS Drop Inlet No.: 13I-2(x2) Peak Discharges PEAK DISCHARGE,Q25(cfs)= 56.9 Source: HydroCAD 25-Yr 24-Hr Drop Inlet Parameters: Weir Coefficient= 3.0 Coefficient of Discharge(Orifice)= 0.6 Allowable Driving Head(ft)= 1.5 Weir-Tyne Inlet: L(ft)= 32 Q(cfs)= 176.4 SMITH GARDNER SMITH GARNER,INC. Di-2 DROP INLET SG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 18 DATE 5/7/2024 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design a sediment basin(s)to satisfy erosion and sediment control requirements and to handle the flow from the design storm. REFERENCES: American Concrete Pipe Association(1996),"Design Data 41 - Manhole Floatation",ACPA,Irving,TX. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. Virginia Department of Conservation and Recreation(1992),Virginia Erosion&Sediment Control Handbook,Third Edition,Richmond,VA. ANALYSIS: The following approach is used to properly size and evaluate each sediment basin: 1. Design for Wet(If Applicable)and Dry Storage. 2. Route Design Storm. 3. Design Outlet Structures(Design Riser/Barrel Structures and Perform Riser Base Calculations, Anti-Seepage Collar Calculations,&Emergency Spillway Calculations). CALCULATIONS: Design for Wet(If Applicable)and Dry Storage: Determine required wet(if applicable)and dry storage volumes based on applicable erosion and sedimentation control requirements. If applicable,calculate the desired surface area at the principal spillway. For some locations: A= 0.01Qf, where: A = desired surface area(acres) G F = peak discharge from design storm(cfs) (NC- Use 10-yr 24-hr storm;C4- Use 2-yr 24-hr storm) Set up a stage-storage relationship for the proposed basin as shown below. Based on this relationship and the required volume(s)and/or desired surface area,determine the required wet storage(if applicable)and dry storage elevations. Alternatively the elevation(s)can be determined from a graphical stage-storage relationship. S= KZ' (Malcom Eq.III-7) where: 5 = storaqe volume(ft) K b = linear regression constants describing the stage-storage relationship z = stage referenced to the bottom elevation included in the analysis(ft) Set sediment basin cleanout elevation. SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 2 OF 18 DATE 5/7/2024 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Size the outlet device to release the dry storage volume(WON/)over the desired drawdown period(typical ly this is a minimum of 24 hours). Use the following equation: As 2h (from Original Edition of NCE&SCP&DM) A TCd(20,428) where: A, = surface area of dewaterinq hole(s)(ft) A s = surface area of basin(at principal spillway)(ft) h = average head of water above hole(=(elev.of principal spillway-elev.of wet storage or(if not applicable)bottom of basin)/2)(ft) C o = coefficient of contraction(=0.60) 7 = detention time(hrs.)(vary over recommended limits) Select a standard pipe size and number of holes. Verifythat the projected drawdown period is within the recommended limits. Where desired,size a drain for the basin for maintenance. The drain should dewater the basin(to principal spillway)within 24 hours. Use the above equation to determine Ao of the basin drain. The inlet of the drain should be protected from the sediment storage zone. Evaluate basin shape. Compare with the recommended length to width ratio. If this ratio is not achieved,the basin should be modified or baffles should be added as required. Route Design Storm: Route the design storm through the basin and determine the maximum pool elevation and the peak discharge(via HydroCAD,spreadsheet methods,or other). Depending on local requirements,multiple design storms may need to be considered and the peak discharge may need to be compared with the pre-development value. Based on the peak stage of the design storm,check settling efficiency of the design particle. The design particle is typically40 microns(0.04 mm)(within silt size criteria). Settling Velocity of Design Particle V = g �(S S _ 1)]d2 (Malcom Eq.IV-3) 18 v J where: �� = settling velocity(ft/s) -convert from(m/s) 9 = gravitational acceleration(m/s2) 55 = specific gravity of design particle V = kinematic viscosity ofthefluid(m2/s) (=1.14 x 10-6 mz/s(a�15C- Ref.Streeter,1975) a = diameter of design particle(m) Surface Area As = WsZ(b-1) (Malcom Eq.IV-7) where: A, = surface area at given stage(Z)(ft) Ks,b = linear regression constants describing the stage-storage relationship SMITH DRONER SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 3 OF 18 DATE 5/7/2024 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Settling Efficiency E= 1- L1+ VOAS1 N (Malcom Eq.IV-1) NQ J where: E = settling efficiency(decimal fraction-convert to%) A a = surface area at given stage(Z)(ft) N = number of effective cells(N=2 with forebay) G = discharge at given stage(Z)(cfs) -Design of Outlet Structures: Design riser/barrel structures based on information used in routing the design storm. Design base for riser structure to resist design uplift force. Base must have a buoyant weight of at least the design uplift force. If a concrete riser structure is used,the buoyant weight of the riser can be accounted for in the calculations. Design Uplift Force(otQ T — WTop — Wsott — Rsotr (from VAE&SCH Spec.3.14) F= (FS)V, ,,-,,, — WRfser where: TF = design uplift force(I bs) FS = factor of safety(use 1.25) VRiser = interior volume of the riser(ft2)(base elevation to principal spillwayelevation) VH2c = density of water(62.4 pcf) WRiser buoyant weight of riser(not including base or top)(Ibs) WTop = buoyant weight of riser top(Ibs) Wso;i = buoyant weight of soil backfill around riser(above base projection)(Ibs) Rso;i = sliding resistance of soil backfill around riser(Ibs)' See American Concrete Pipe Association Design Data 41 for more information. Volume of Concrete for Base V on = T F T F (from VAE&SCH Spec.3.14) W,_,, (150- 62.4) where: t' volume of concrete(ft) W coic6 = buoyant weight of concrete(150-62.4=87.6 I bs) Anti-Seepage Col lar(s) Determine anti-seepage collar requirements based on the following equation. Alternatively,a filter diaphragm maybe designed. LS = y z+ 4)1 1+ 0.25- s�IJ (VA E&SC Handbook p.1II-102) where: L, = length of pipe in the saturated zone(ft) y = distance from barrel invert to riser crest(ft) 2 = slope of upstream embankment(zH:1V) s = pipe slope(ft/ft) SMITH GARDNER SMITH GARNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 4 OF 18 DATE 5/7/2024 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Determine Ls and use design chart to determine anti-seepage collar requirements. If more than one col lar is used, the spacing between collars should be 14 times the projection(P)of the collar above the barrel. The first collar should beset at 2P from the riser or a minimum length to bury collar in slope. Emergency Spillway Design crest length of emergency spillway to handle flow from the design storm using the following equation. Determine peak flow from stormwater routing program. If applicable,design outlet channel as a drainage channel or rock chute. QP = CIILH312 (Malcom Eq.1-6) where: C F = peak discharge from design storm(cfs) C w = weir coefficient(=3.0 for free overfal I) L = length of weir(ft) h = driving head(ft) (=allowable headwater above crest of weir or calculated value from stormwater routing program) SMITH GARDNER SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 5/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Basin No.: DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAGE: Areas Drelning Into Basin: Area Drainage Area (acres) Drainage Area 12.1 Total= 12.1 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.) 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0.0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 43,560 Multipier(X)for Desired Surface Area(OP x X) 0.01 Al(rest of Principal Spillway Peak Discharge into Basin(Op)(cfs)_� 60.1 From HydroCAD-25-Yr,24-Hr.Storm Desired Surface Area(Ac)= 0.60 Desired Surface Area(ft')= 26,193 Determine Staae-Slorage Function: Contour Area Area Incremental Omulatly Stage InS InZ Zest (ft2) (acres) Vol ume(ft) Volume(ft') (ft) 311 11,000 0.25 0 0.0 312 16,600 0.38 20,700 20,700 1.5 9.94 0.41 1.50 314 20,314 0.47 36,914 57,614 3.5 10.96 1.25 3.47 316 24,053 0.55 44,367 101,981 5.5 11.53 1.70 5.53 Linear Regression Constants: Ks= 12,551 Storage=12551 e1.22 b= 122 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 317 317 316 316 315 315 314 314 C K a 313 a 313 N N 312 312 311 311 310 310 0 5,000 10,000 15,000 20,000 25,000 30,000 0 20,000 40,003 60,000 60,000 10o0o0 120,000 surface Area(sf) storage(cf) SMITH- GARDNER SMITH GARDNER,ING Basin A SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 6/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY SAS Basin Design Devations• EI ev.of Bottom of Basin(ft)= 311.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 311.0 Selected Elev.of Wet Storage(Permanent Pool)= 311.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 43,560=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 313.8 Selected Bev.of Principal Spillway(ft)= 314.1 O.K. Actual Total Storage Volume(ft')= 50,181 O.K. Desired Surface Area(ft')= 26,193 Actual Surface Area at Principal Spillway(ft')= 19,828 No Good.Increase Surface Area at Permanent Pool If Possible. aeanout: Cleanout Requirement(%of Wet Storage)= 50 Enter"0"if Not Applicable Geanout Requirement(%of Total Storage)= Basin Cleanout Volume(ft')= 0 Based on 50%of Wet Storage Volume Basin Geanout Elevation(ft)= 311.0 Dewstering of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 50,181=Volume at Principal Spillway Required Orifice Diameter(in)= 4.0 From www.fsirclothskimmer.00m Based on 5 Day Drawdown Basin Shape• Length of Basin(ft)= 200 Measured at Principal Spillway Elevation Width of Basin(ft)= 100 Measured at Principal Spillway Elevation Desired Length to Width Ratio(X1)= 2 Actual Length to Width Patio(X1)= 2.0 O.K. SMITH GARDNER SMITH GARDNER,INI1 basin A SED BASIN-GENERPL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 7/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:25-Yr,24-Hr Design Storm Rainfall(in)=6.06 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 314.4 Surface Area at Maximum Pool(ft')= 20,244 Peak Discharge(ds)= 10.4 Check Settling Efficiency Particle Data: Diam.(microns)= 40 Specific Gravity= 2.65 Settl ing Val oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 3 Settling Efficiency(%)= 98.0 O.K. DESIGN OUTLETSTRUCTURES• Design Riser/Barrel Structures, Riser Desicm Type of Riser:Concrete-Rectangular Top of Riser Base Elevation(ft)= 310.0 Elev.of Principal Spillway(ft)= 314.1 Riser Top Elevation(ft)= 314.0 Riser Height(ft)= 4.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Size:3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 312.1 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:3.0'x 3.0' Invert Elevation: 312.0 Concrete Riser Wall Thickness(in)= 6.0 2.5 Riser Inside Length(ft)= 3.0 Riser Inside Wdth(ft)= 3.0 Approx.Red.Concrete Riser Interior Volume(cf)= 37 Approx.Red.Concrete Riser Vol.of Concrete(d)= 29 Barrel Design, Type of Barrel: HOPE Diameter(in)= 18 Inv.In Elevation(ft)= 311.3 Inv.Out Elevation(ft)= 304.8 Length(ft)= 80.0 Slope(ft/ft)= 0.081 SMITH GARONER SMITH GARDNER,ING Basin A SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 8/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Poser Base Calculations, Design Uplift Force Factor of Safety= 1.25 F(unadjusted)(lbs)= 2,878 0 Approx.Rect.Concrete Riser Buoyant Wt.(I bs)= 2,011 Factors in 80%of the Buoyant Weight of the Concrete Riser to Account for Outlets. 0 0 Buoyant WI.of Riser Top(I bs)= 0 Buoyant Wt.of Surrounding Soil Acting on Ext.Base(I bs)= 0 Sliding Resistance of Surrounding Soil(I bs)= 0 F(adj usted)(I bs)= 867 Concrete Base: Required Volume of Concrete(ft')= 9.9 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 0.5(includes Concrete III Inside of Box) Actual Volume of Concrete(ft')= 12.5 OK. Anti-Seepage Collar Calculations:(Alternatively-Design Flltar Dia hr m Slope of Upstream Embankment(zHAV)= 3 Slope of Outlet Pipe(ft/ft)= 0.081 L.(ft)= 41 Number of Collars: 2 Length of Fach Collar(ft)= 4.5 From Design Chart Based on L.and No.of Collars Width of Each Collar(ft)= 4.5 From Design Chart Based on L.and No.of Collars Collar Projection,P(ft)= 1.5 Spacing of Subsequent Anti-Seep Collars(ft)= 21=14P Emergency Spillway Calculations, Crest Elev.(ft)= 315.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 316.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 1(1 24-Hr.Storm;Assume 20 ofs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin A Bev.of Bottom of Basin(ft)= 311.0 Cl eanout FJ ev.(ft)= 311.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 314.1 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 315.0 Top of Bar m El ev.(ft)= 316.0 Top of Berm Width(ft)=- Barrel Diameter(in)= 18 Barrel Slope(%)= 8.1 SMITH GARDNER SMITH GARDNER,ING Basin A MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill SHEET 9/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Basin No.:�B DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAGE: Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 7.5 Total= 7.5 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.) 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 27,000 Multipier(X)for Desired Surface Area(OP x X) 0 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)_� 38.7 From HydroCAD-25-Yr,24-Hr.Storm - Desired Surface Area(Ac)= 0.39 Desired Surface Area(ft')= 16,862 Determine Staae-Slorage Function: Contour Area Area Incremental Omulatly Stage InS InZ Zest (ft') (acres) Vol ume(ft) Volume(ft') (ft) 283.0 7,600 0.17 0 0.0 284 10,080 0.23 8,840 8,840 1.0 9.09 0.00 1.00 286 11,968 0.27 22,048 30,888 3.0 10.34 1.10 2.97 288 13,975 0.32 25,943 56,831 5.0 10.95 1.61 5.04 Linear Regression Constants Ks= 8,806 Storage=8806 a 1.15 b= 115 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 289 289 288 288 287 287 286 286 C i a 285 9 285 a w 284 284 283 283 282 282 0 5,000 10,000 15,000 0 10,000 20,000 30,000 40,000 50,000 60,000 Surface Area(en Storage(cf( SMITH- GARDNER SMITH GARDNER,ING BasinB SEDBASIN-DENS ARBDExpansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 10/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Basin Design Devations• EI ev.of Bottom of Basin(ft)= 283.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 283.0 Selected Elev.of Wet Storage(Permanent Pool)= 283.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 27,000=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 285.6 Selected Bev.of Principal Spillway(ft)= 286.0 OK. Actual Total Storage Volume(ft)= 31,267 OK. Desired Surface Area(ft')= 16,862 Actual Surface Area at Principal Spillway(ft')= 12,021 Increase Surface Area at Permanent Pool if Possible. Oeanout: Cleanout Requirement(%of Wet Storage)= 0 Enter"0"if Not Applicable Oeanout Requirement(%of Total Storage)= 50 Basin Cleanout Volume(ft')= 15,634 Based on 50%of Total Storage Volume Basin Cleanout Elevation(ft)= 284.6 Dewatering of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 31,267=Volumsat Principal Spillway Required Orifice Diameter(in)= 4.0 From www.fairclothskimmer.com Based on 5 Day Drawdown ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:25-Yr,24-Hr Design Storm Rainfall(in)=6.06 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 286.8 Surface Area at Maximum Pool(ft')= 12,475 Peak Discharge(GIs)= 8.3 Check Settling Efficiency, Particle Data: Dian,(microns)= 40 Specific Gravity= 2.65 Settl ing Vel oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 3 Settling Efficiency(%)= 96.5 OK. SMITH GARDNER SMITH GARDNER,ING Basin B MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 11/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS DESIGN OUTLETSTRUCTURES• Design Poser/Barrel Structures, Riser Deal= Typeof Riser:HDPE-Circular Topof Riser Base Elevation(ft)=. 280.0 Elev.of Principal Spillway(ft)= 286.0 Riser Top Elevation(ft)= 282.5 Riser Height(ft)= 2.5 Outlets: Outlet No.1(for Dewatering Dry Storage): Si—3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 283.1 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:24"Diam.Orifice Invert Elevation: 286.0 Riser Inside Diameter(ft)=0 2.0 Approx.are.Riser Interior Volume(cf)= 19 Barrel Design, Type of Barrel: HOPE Diameter(in)= 15 Inv.In Elevation(ft)= 283.0 Inv.Out Elevation(ft)= 280.0 Length(ft)= 40.0 Slope(ft/ft)= 0.075 Poser Base Calculations, Design Uplift Force, Factor of Safety= 1.25 F(unadjusted)(Ibs)= 1,470 0 0 0 HOPE Riser Buoyant Weight(Ibs)= 0 Buoyant WI.of Riser Top(I bat= 0 T x T x 0.6 x Buoyant Wt.of Concrete(87.6 per) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.V)x Buoyant Wt.of Soil(40 pcf) Sl iding Resistance of Surrounding Soil(Ibs)= 0 F(adj usted)(I bat= 1,470 Concrete Base: Required Volume of Concrete(ft')= 16.8 Length Width ' Width(ft)= Thickness(ft)_ Actual Volume of Concrete(ft)= 25.0 OK. Emergency Spillway Calculations, Crest Elev.(ft)= 287.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 288.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 100-W,24-Hr.Storm;Assume 20 cfs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin B Bev.of Bottom of Basin(ft)= 283.0 Cl eanout FJ ev.(ft)= 284.6 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 286.0 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 287.0 Top of Bar m El ev.(ft)= 288.0 Topof Berm Wldth(ft)=_ 10 Barrel Diameter(in)= 15 Barrel Sl ope(%)=' 7.5 SMITH >GARONER SMITH GARDNER,ING Basin B MD BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: 1O=E7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill SHEET 12/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY sas Basin No.: DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAGE: Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 7.7 Total= 7.7 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.)= 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 27,720 Multipier(X)for Desired Surface Area(OP x 1)= 0 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)=� 34.3 From HI-25-Yr,24-Hr.Storm - Desired Surface Area(Ac)= 0.34 Desired Surface Area(ft')= 14,941 Determine Stage-Storage Function: Contour Area Area Incremental Omulatly Stage InS InZ Zest (ft2) (acres) Vol ume(ft) Volume(ft') (ft) 249.0 500 0.01 0 0.0 250 12,000 0.28 6,250 6,250 1.0 8.74 0.00 0.99 252 14,500 0.33 26,500 32,750 3.0 10.40 1.10 3.09 254 17,100 0.39 31,600 64,350 5.0 11.07 1.61 4.90 Linear Regression Constants' Ks= 6,332 Storage=6332 a 1.46 b= 146 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 255 255 254 254 253 253 252 252 C i ° 251 9 251 N N 250 250 249 249 248 248 0 5,000 10,000 15,000 20,000 0 20,000 40,600 60,000 80,000 Surface Area(sr) Storsge(cf( SMITH- GARDNER SMITH GARDNER,ING Basin D MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 13/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JOL CHECKED BY sas Basin Design Devations• EI ev.of Bottom of Basin(ft)= 249.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 249.0 Selected Elev.of Wet Storage(Permanent Pool)= 249.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 27,720=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 251.8 Selected Bev.of Principal Spillway(ft)= 252.2 O.K. Actual Total Storage Volume(ft)= 34,527 O.K. Desired Surface Area(ft')= 14,941 Actual Surface Area at Principal Spillway(ft')= 15,7330.K. aeon"(: Cleanout Requirement(%of Wet Storage)= 0 Enter"0"if Not Applicable Geanout Requirement(%of Total Storage)= 50 Basin Cleanout Volume(ft')= 17,264 Based on 50%of Total Storage Volume Basin Cleanout Elevation(ft)= 251.0 DewAltring of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 34,527=Volume at Principal Spillway Required Orifice Diameter(in)= 3.0 From www.fairclothskimmer.com Based on 5 Day Drawdown ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:25-Yr,24-Hr Design Storm Rainfall(in)=6.06 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 252.6 Surface Area at Maximum Pool(ft')= 16,606 Peak Discharge(GIs)= 8.1 Check Settling Efficiency, Particle Data: Dian,(microns)= 40 Specific Gravity= 2.65 Settl ing Vel oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 3 Settling Efficiency(%)= 98.2 OK. SMITH GARDNER SMITH GARDNER,ING Basin D MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill SHEET 14/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY sea DESIGN OUTLETSTRUCTURES• Design Poser/Barrel Structures, Riser Deal= Typeof Riser:HDPE-Circular Topof Riser Base Elevation(ft)=. 250.0 Elev.of Principal Spillway(ft)= 2522 Riser Top Elevation(ft)= 252.0 Riser Height(ft)= 2.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Si-3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 250.0 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:24"Diam.Orifice Invert Elevation: 252.0 Riser Inside Diameter(ft)=0 2.0 Approx.are.Riser Interior Volume(cf)= 7 Barrel Design, Type of Barrel: HOPE Diameter(in)= 18 Inv.In Elevation(ft)= 249.0 Inv.Out Elevation(ft)= 248.0 Length(ft)= 50.0 Slope(ft/ft)= 0.020 Poser Base Calculations, Design Uplift Force, Factor of Safety= 1.25 F(unadjusted)(Ibs)= 539 0 0 0 HOPE Riser Buoyant Weight(Ibs)= 0 Buoyant WI.of Riser Top(I bat= 0 T x T x 0.6 x Buoyant Wt.of Concrete(87.6 per) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.V)x Buoyant Wt.of Soil(40 pcf) Sl iding Resistance of Surrounding Soil(Ibs)= 0 F(adj usted)(I bat= 539 Concrete Base: Required Volume of Concrete(ft')= 6.2 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 1.0 Actual Volume of Concrete(ft)= 25.0 OK. Emergency Spillway Calculations, Crest Elev.(ft)= 253.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 254.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 100-W,24-Hr.Storm;Assume 20 cfs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin D Bev.of Bottom of Basin(ft)= 249.0 Cl eanout FJ ev.(ft)= 251.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 252.2 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 253.0 Top of Bar m El ev.(ft)= 254.0 Top of Berm Wldth(ft)=- 10 Barrel Diameter(in)= 18 Barrel SI ope(%)=�1111111111111.0 SMITH >GARONER SMITH GARDNER,ING Basin D MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: 1O=E7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill Expansion SHEET 15/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Basin No.:�E DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAGE Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 26.2 Total= 26.2 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.)= 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0.0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 1,800 To Crest of Principal Spillway Required Storage Capacity(ft')= 47,088 Multipier(X)for Desired Surface Area(OP x 1)= 0.01 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)=� 121.5 From HI-25-Yr,24-Hr.Storm Desired Surface Area(Ac)= 1.22 Desired Surface Area(ft')= 52,925 Determine Stage-Storage Function: Contour Area Area Incremental Omulatly Stage InS InZ Zest (ft') (acres) Vol ume(ft) Volume(ft') (ft) 254 28,400 0.65 0 0.0 256 33,600 0.77 62,000 62,000 2.0 11.03 0.69 2.01 258 39,000 0.90 72,600 134,600 4.0 11.81 1.39 3.94 260 46,900 1.08 85,900 220,500 6.0 12.30 1.79 6.05 Linear Regression Constants: Ks= 27,751 Storage=27751 el.15 b= 115 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 261 261 260 260 — 259 259 258 258 257 257 w 256 a 256 255 4: 255 254 254 253 253 0 10,000 20,000 30,000 40,000 50,000 a 50,000 100,000 151 200,000 250,000 Surface Area(sf) Storage(cf( SMITH GARDNER SMITH GARDNER,ING Basin E SED BASIN-GENERAL PRBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill Expansion SHEET 16/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Basin Design Sevations• EI e,of Bottom of Basin(ft)= 254.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Bay.of Wet Storage(Permanent Pool)= 254.0 Selected Elev.of Wet Storage(Permanent Pool)= 254.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 47,088=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 255.6 Selected Bev.of Principal Spillway(ft)= 258.0 OK. Actual Total Storage Volume(ft)= 136,840 OK. Desired Surface Area(ft')= 52,925 Actual Surface Area at Principal Spillway(ft')= 39,374 Increase Surface Area at Permanent Pool if Possible. ■ DewAltring of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 136,840=Volume at Principal Spillway Required Orifice Diameter(in)= 5.0 From www.fairclothskimmer.com Based on 5 Day Drawdown Basin Shape, Length of Basin(ft)= 520 Measured at Principal Spillway Elevation Width of Basin(ft)= 140 Measured at Principal Spillway Elevation Desired Length to Width Ratio(X1)= 2 Actual Length to Width Patio(X1)= 3.7 O.K. SMITH GARDNER SMITH GARDNER,INI1 6asln E SED BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill Expansion SHEET 17/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:25-Yr,24-Hr Design Storm Rainfall(in)=6.06 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 258.6 Surface Area at Maximum Pool(ft')= 40,147 Peak Discharge(ds)= 21.2 Check Settling Efficiency Particle Data: Diam.(microns)= 40 Specific Gravity= 2.65 Settl ing Val oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 3 Settling Efficiency(%)= 97.9 O.K. DESIGN OUTLETSTRUCTURES• Design Riser/Barrel Structures, Riser Desicm Type of Riser:Concrete-Rectangular Top of Riser Base Elevation(ft)= 254.0 Elev.of Principal Spillway(ft)= 258.0 Riser Top Elevation(ft)= 258.0 Riser Height(ft)= 4.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Size:5"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 254.5 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:4'x4'Box Invert Elevation: 258.0 Concrete Riser Wall Thickness(in)= 6.0 Riser Inside Length(ft)= 3.0 Riser Inside Wdth(ft)= 3.0 Approx.Red.Concrete Riser Interior Volume(cf)= 36(Top of Base to Principal Spillway) Approx.Red.Concrete Riser Vol.of Concrete(d)= 28 Barrel Design, Type of Barrel: Concrete Diameter(in)= 24 Inv.In Elevation(ft)= 254.0 Inv.Out Elevation(ft)= 253.0 Length(ft)= 60.0 Slope(ft/ft)= 0.017 SMITH GARDNER SMITH GARDNER,ING Basin E SED BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LGD Landfill Expansion SHEET 18/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/7/2024 COMPUTED BY JCL CHECKED BY SAS Poser Base Calculations, Design Uplift Force Factor of Safety= 1.25 F(unadjusted)(lbs)= 2,808 0 Approx.Rect.Concrete Riser Buoyant Wt.(Ibs)= 1,962 Factors in 80%of the Buoyant Weight of the Concrete Riser to Account for Outlets. 0 0 Buoyant WI.of Riser Top(Ibs)= 0 7'x T x 0.5'x Buoyant Wt.of Concrete(87.6 pct) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.5')x Buoyant Wt.of Soil(40 pct) Sliding Resistance of Surrounding Soil(Ibs)= 0 F(adjusted)(lbs)= 846 Concrete Base: Required Volume of Concrete(ft')= 9.7 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 1.0(includes Concrete III Inside of Box) Actual Volume of Concrete(ft')= 25.0 OK. Anti-Seepage Collar Calculations:(Alternatively-Design Flltar Dia hr m Slope of Upstream Embankment(zHAV)= 3 Slope of Outlet Pipe(ft/ft)= 0.017 L.(ft)= 30 Number of Collars: 2 Length of Fach Collar(ft)= 3.8 From Design Chart Based on L.and No.of Collars Width of Each Collar(ft)= 3.8 From Design Chart Based on L.and No.of Collars Collar Projection,P(ft)= 0.875 Spacing of Subsequent Anti-Seep C011ars(ft)= 12=14P Emergency Spillway Calculations, Crest Elev.(ft)= 259.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 260.0 Required Capacity(cts)= 20.0 From HydroCAD-No Outflow from 1(1 24-Hr.Storm;Assume 20 ofs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin E Bev.of Bottom of Basin(ft)= 254.0 Cl eanout El ev.(ft)= 0.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 258.0 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 259.0 Top of Bar m El ev.(ft)= 260.0 Top of Berm Wdth(ft)=_ 10 Barrel Diameter(in)= 24 Barrel Slope(%)= 1.7 SMITH GARDNER SMITH GARDNER,ING BasinE SEED BA N-DENERPLP DExpansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Figure 5A.33 (2) Anti-Seep Collar Design Charts 14 IC 9 Two C Ilp s 8 cu m I Z7. x 0 v 7 N in `. ... 6 5 N 4 a 3 2 COL AR PROJECTION , V, FEET I 2 3 4 5 200 IZ 150 a� PP J V L 100 ' c J �( 'V � G g w d NOTE This procedure is for a 15% i{screose in the length of the 0 flow path. October 1991 Third Printing Page 5AA5 Ncw York Guideline for Urban Erasion and Sedim- it Control DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT ARBD Stone LCID Landfill Expansion SHEET 1 OF 3 DATE 11/18/2022 COMPUTED BY JCL SUBJECT Culvert Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design culverts to handle stormwater flow from the design storm(s). The main design criteria will be to ensure that al I culverts will be able to accommodate the peak discharge from the design storm without exceeding the allowable headwater depth. REFERENCE: Debo,T.N.,and Reese,A.J.,Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL,1995, p.333. ANALYSIS: The following approach is used in the design of culverts(after Debo and Reese): 1. Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). Use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. 2. Input Culvert Parameters: HW, = allowable headwater depth(ft) h = number of pipes used G P,PE = peak discharge/N (cfs) E = culvert diameter(in) Type of Culvert(i.e.,Concrete,CMP,etc.) L = culvert length(ft) s = culvert slope(ft/ft) n = Manning's number k E = entrance loss coefficient a C = critical depth(use critical depth figures)(ft) CALCULATIONS: Inlet Control: A. Enter Inlet Control Nomograph with D& QplpE and find HW/D for the proper entrance type. B. Compute HW. If HWexceeds HWA,try larger culvert. Outlet Control: A. Enter outlet control nomograph with L,KE,&D. B. To compute HW,connect the length scale for the type of entrance condition and culvert diameter scale with a straight line,pivot on the turning line,and draw a straight line from the design discharge through the turning point to the head loss scale H. Compute HW from the following equation: HW= H+h,-LS + D�where: ho - d'2 or tailwater depth,whichever is greater. C. If HWexceeds HWA ,try larger culvert. SMITH GARNER,INC. CULVERT ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT ARBD Stone LGD Landfill Expansion SHEET 2/3 JOB# ARBD-21-1 SUBJECT Culvert Analysis DATE 11/18/2022 COMPUTED BY JCL CHECKED BY SAS Culvert No.: G1 Peak Discharge; PEAK DISCHARGE,Q25 Ids)= 83.8 Source: HydroCAD 25-Yr 24-Hr Culvert Parameters: Allowable HW Depth(ft)= 5 Number of Pipes,N= 2 (;pipe(cfs)= 41.9 Culvert Diameter,D(in)= 36 Type of Culvert= RCP Invert In Elev.(ft)= 263.0 Invert Out Elev.(ft)= 260.0 Culvert Length,L(ft)= 60 Culvert Slope,S(ft/ft)= 0.05 Manning's Number,n= 0.013 Entrance Loss Coef.,ke= 0.5 Critical Depth(ft)= 1.7 Tailwater Depth(ft)= 1.0 Case 1: Inlet Control HW/D= 1.2(From Inlet Control Nomograph) HW(ft)=F 3.5 INLET CONTROL GOVERNS! 0 SMITH GARDNER SMITH GARGNER,INC. C-1 CULVERTARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT ARBD Stone LGD Landfill Expansion SHEET 3/3 JOB# ARBD-21-1 SUBJECT Culvert Analysis DATE 11/18/2022 COMPUTED BY JCL CHECKED BY SAS Culvert No.: C-2 Peak Discharge: PEAK DISCHARGE,XJ(cfs)= 56.9 Source: HydroCAD 25-Yr 24-Hr Culvert Parameters: Allowable HW Depth(ft)= 5 Number of Pipes,N= 2 Opipe(cfs)= 28.4 Culvert Diameter,D(in)= 36 Type of Culvert= RCP Invert In Elev.(ft)= 279.0 Invert Out Elev.(ft)= 276.0 Culvert Length,L(ft)= 65 Culvert Slope,S(ft/ft)= 0.0462 Manning's Number,n= 0.013 Entrance Loss Coef.,ke= 0.5 Critical Depth(ft)= 1.7 Tailwater Depth(ft)= 1.0 Case 1: Inlet Control HW/D= 0.9(From Inlet Control Nomograph) HW(ft)= 2.6 INLET CONTROL GOVERNS! 0 SMITH GARDNER SMITH GARDNER,INC. C-2 CULVERTARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 CHART 1 B Q 180 10,000 I66 8,000 EXAMPLE I3) 158 6 000 0.42 inches (33 fast) 6' 6. s�odo 0•1ZO ate s 144 B 5 4,000 Nw 132 D hat 4, 3,000 (1) 2.5 6.0 3 4. 120 7.4 2,000 4• Id8 3• "D in toot 3' 86 1,000 ' 800 84 Soo // 2. 2` 500 72 400 / 2. = 300 x 1,5 1.5 Z N Z 60 200 F 1.5 _ Z W 54 / a a W46 �0 100 > / cC 80 a 0 � 60 a 1.0 1.0 A2 W 0 5 D SCALE E TYPECE 0 Ir 1.0 W III yy 9 Speara edge with C C-2 4! 33 a a G Qa (2) Groove sad will' 30 headwall z 6 6 131 Groove sod •8 27 projecting 10 .7 T- Y4 8 .7 6 To-its seal*(2)or(3)project 2 1 5 horlxontaUr to scats(1),then 4 use straight ieciinad line through 0 and O scales,or reverse as .6 3 illustrated. t3 •6 18 2 I5 .5 .5 1.0 .5 f2 HEADWATER DEPTH FOR HEADWATER SCALES Za3 CONCRETE PIPE CULVERTS REVISED MAY1964 WITH INLET CONTROL BUREAU OF PUBLIC ROADS JAN.194" DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 CHART 4B 0 3 2 3. do CANNOT EXCEED TOP OF PIPE I i 2. L5' L0 la, 00 10 20 30 40 50 60 70 80 90 100 DISCHARGE-Q-CFS 6 8 5 7 H w6. LLJ 159 9' W u 4 6 v 9' 7' ' v H B = 4 3 do CANNOT EXCEED TOP OF PIPE 5 � p 7 W 6' I ❑ Q U DIA, Q 20 100 200 300 400 500 600 700 BOO 900 1000 DISCHARGE-0-CFS t U U 14 12 10 8 6 I do CANNOT EXCEED TOP OF PIPE 3' I l' 9'DIA. 40 1000 2000 3000 4000 DISCHARGE-Q -CFS BUREAU OF PUBLIC ROADS JAN. 1964 CRITICAL DEPTH CIRCULAR PIPE DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithoardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Outlet Protection Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design outlet protection for culverts and/or drainage channels based on the maximum flow from the design storm. Rip rap aprons are appl icable when the Froude Number(Fr)is less than or equal to 2.5 (Debo and Reese). For higher Froude Numbers,rip rap outlet basins,baffled outlets,and/or other methods are more appropriate. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL, Section 8.11-pp.289-290;Section 12.6- pp.523-526. Federal Highway Administration(2000),Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Circular No. 14,FHWA EPD-86-110,Metric Ed.,U.S.Dept.of Transportation, Washington,D.C. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,INC. ANALYSIS: For each outlet,determine the Froude Number(Fr)based on the pipe Manning's number,diameter,slope, and design discharge. Use the methods described in Section 8.11 of Debo and Reese. Select the method of outlet protection,as appropriate,and perform design calculations. Rip Rap Aprons: If Fr<2.5,a rip rap apron may be used. The following design approach is based on Section 12.6 of Debo and Reese and Section 8.06 of the NC Erosion&Sediment Control Planning and Design Manual: 1. Determine the tailwater condition and select the appropriate design chart. 2• Using the appropriate design chart,determine the d5o rip-rap size and minimum apron length (La)based on the maximum design flow(Q),flow depth(d),and/or velocity(v)(depending on whether the pipe is flowing full or partiallyfull). 3. Using the same chart,determine apron dimensions. 4. Determine the maximum stone diameter: dmax=1.5 x d50 5. Determine the apron thickness: Thickness=1.5 x dmax(No Filter Geotextile) Thickness=1.5 x d5o(With Filter Geotextile) Other Methods: If Fr>2.5,consider the use of a rip rap basin,baffled outlet,or other device. Design method according to FHA guidelines using HY8-Energy program(or other documented source). SMITH GARDNER,INC. OUTLET PROTECTION ARBD Expansion DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 212 JOB# ARBD-21-1 SUBJECT Outlet Protection Analysis-Rip Rap Aprons(Circular Pipe) DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS Rip Rap Aprons: Outlet Sediment Basin D Sediment Basin E Down Pipe Outlet Pipe Type: CPP CPP CPE Manning's Coefficient: 0.018 0.018 0.018 Diameter(Dc)(in)= 15 18 18 Slope(%)= 4.3 1.7 33.0 Design Discharge(cfs)= 8.1 21.2 19.6 Source of Discharge Data: HydroCAD 25-Yr 24-Hr HydroCAD 25-Yr 24-Hr HydroCAD 25-Yr 24-Hr K= 0.260 0.674 0.140 0(degrees)= 224 265 265 Flow Depth(d)(in)= 10.3 15.1 15.1 Flow Area(ft)= 0.9 1.6 1.6 Flow Velocity(v)(ft/sec)= 9.0 13.4 12.4 Froude Number= 1.70 2.11 1.94 Rip Rap Aprons Applicable? Yes Yes Yes Tailwater Condition(Low or High)*: Low Low Low d�(ft)**= 0.50 0.50 1.50 dm.(ft)= 0.75 0.75 2.25 Apron Thickness(X)(ft): ----- ----- ----- No Geotexti I e: 1.13 1.13 3.38 With Geotextile: 0.75 0.75 2.25 Apron Dimensions(ft): ----- ----- ----- Length(La)**= 11 16 15 Width(Vv)= 12.3 17.5 16.5 *Tailwater Conditions: Low: Tw<0.5Dc; High: Tw>0.5Dc **Value from Chart. SMITH GARONER SMITH GARRNFR,INC. Rip Rap Aprons(Circular Pipe) CUTLET PROTECTION ARBD Expansion 000uoign Envelope ID: 1ncrosrF-000y-41ea-9V4oFassoaFo DOB 1 Appendices pipe diannete 50 I It 20 4f 14' Outlet a il!111i, I W 4[ - :I I I M Lj o 2 U) 200 La 70 HIM Ti .. ........ 0 Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition(T°<0.5 diameter). u,noms 0.06.3 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 i 3Do Outlet W = Do + 0.4La 12pipe diameter (Do) L _� ff a 110 Ti - a lwa r 0.5D 1 ' ik _ _ _ o } I if 11- Jill 100 90 U 1 80 } cv n n QQ,� 70 " 4 n I ! CO �Zt, 60 n a l } � I/, { r f 50 tj _ 3 f 30 I, C !' + I } } - v 2 l��A!! 20 m N Nr (A 10 `A4I o i L I 1 ii a IIIIV 25 v=20 a a o I iti a 1,l `o 2 v= 15 �Il. 1 1, 0 3 5 10 20 50 100 200 500 1000 � Discharge ft 3/sec Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full,maximum tailwater condition(Tw>-0.5 diameter). 8.06.4 Rev.12/93 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PRQIECT Stone LCID Landfill Expansion SHEET 1 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To determine the loads acting on each concrete pipe and evaluate the required pipe strength. Select the appropriate class of pipe to satisfy the strength requirement. REFERENCES: American Concrete Pipe Association(2011),Concrete Pipe Design Manual,ACPA,Vienna,VA. American Society for Testing and Materials,"ASTM C 76-Standard Specification for Reinforced Concrete Culvert,Storm Drain,&Sewer Pipe",ASTM,Philadelphia. ANALYSIS: The analysis is based on the following procedure recommended bythe American Concrete Pipe Association(ACPA). Note that the design parameters will vary depending on what condition the pipe is installed(trench,positive projecting embankment,negative projecting embankment,or jacked/tunneled). 1. Determination of Earth Load,WF: Based on the assumed concrete pipe parameters(size,backfill,etc.)use the tables and figures in the Concrete Pipe Design Manual(CPDM)to determine the earth load acting on the pipe or the following equations. Note that the values determined in the tables and figures are based on a backfill unit weight of 100 Ibs/ft3. This value must be adjusted for the anticipated backfill unit weight. Also,for a negative projecting embankment condition,values for projection ratio,p'(vertical distance between the top of the pipe and natural ground divided by the trench width),and settlement ratio,rsd,must be determined in order to use the figures. Table 40 of the CPDM gives suggested values for rsd based on the value of p'. Positive Projecting Embankment Soil Load: W, =VAFxPL (CPDM Eqn.4.1) PL=ys[H+DO(4—;T) Do (CPDM Egn.4.2) a where: WE = earth load,(Ibs/LF) VAF = vertical arching factor(CPDM Illustration 4.7) PL = prism load,(Ibs/LF) ys = average unit weight of soil cover(Ibs/ft') h = height of backfill over top of pipe(ft) G c = outside diameter of pipe(ft)(given in CPDM Table 42). Trench Soil Load: z Doi�4 Wd — CeYsBd + 8 Ys (CPDM Egn.4.3) —2 Kl,'H B 1—e ., (CPDM Eqn.4.4) Cd 2K�c where: VYo = fill load for trench condition,(Ibs/LF) 6, = trench load coefficient ys = average unit weight of soil cover(Ibs/ft') 5, = width of trench(ft) G c = outside diameter of pipe(ft)(given in CPDM Table 42). h = height of backfill over top of pipe(ft) K = ratio of active lateral unit pressure to vertical unit pressure k = tan�',coefficient of friction between fill material and sides of trench SMITH GARNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 2 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS Per the CPDM: K'U = 0.1924 max.for granular materials without cohesion KP = 0.165 max.for sand and gravel Ku = 0.150 max.for saturated top soil K'U = 0.130 max.for ordinary clay Ku = 0.110 max.for saturated clay 2. Determination of Live Load,W : Based on the concrete pipe parameters(size,backfil I,etc.)use the tables in the CPDM to determine the live load acting on the pipe. Note that the values for backfill heights of 10 feet or more and considered insignificant to the design of the pipe. 3. Selection of Installation Tyne: Select the Standard Installation based on the guidance given in the CPDM. Note that a Type 1 Standard Installation requires the highest construction qualityand degree of inspection while a Type 4 Standard Installation requires virtually no construction qualityor inspection. 4. Determination of Bedding Factors: Determine the bedding factors based on the guidance given in the CPDM. For embankment installations, the bedding factor,Bfe,is found from Illustration 4.22 of the CPDM depending on the selected Standard Installation. For trench installations the bedding factor is based on the following equation: B7 — f —((Bt�Bd\—Bj+Bf (CPDM Eqn.4.22) `B,—Bc J where: B, = variable bedding factor,trench 5, = bedding factor,embankment(CPDM Illustration 4.22) 6' = minimum bedding factor,trench(CPDM Illustration 4.23) 5, = trench width at top of pipe(ft) 5, = outside horizontal span of pipe(ft) 6' = transition width at top of pipe(ft)(given in CPDM Tables 13-39). Use CPDM Illustration 4.25 to determine the live load bedding factor,BfLL- 5. Application of Factor of Safety.FS: According to the ACPA,a factor of safety of 1.0 should be applied if the 0.01-inch crack strength is used as the design criterion rather than the ultimate strength. 6. Selection of Pipe Strength/Class: The required three-edge bearing strength of circular reinforced concrete pipe is expressed as Djoad in the following equation: —[WLE+WEW ] FSDL-d + +—B f B,.J D (CPDM Eqn.4.24) where: VYE = earth load on pipe(Ibs/linear ft) VYF = fluidIoadonpipe(Ibs/Ii near ft)(=yH,xAp1pe=62.41bs/ft'xTV/4) W' = live load on pipe(Ibs/linear ft) 5, = bedding factor = Bfefor embankment installations = Bf�for trench installations 5fLL = live load bedding factor FS = factor of safety G = pipe diameter(ft) SMITH GARDNER SMITH GARDNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PROJECT Stone LCID Landfill Expansion SHEET 3 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS Note that if BfLL is greater than Bfe for embankment installations or Bf,for trench installations,use Bfe or Bf,in place of BfLL. Select class of reinforced concrete pipe based on the following ASTM C-76 guidelines: Maximum CL-11 For 0.01-inch Crack Pipe Gass (Ib/If/ft of diameter I 800 11 1,000 III 1,350 IV 2,000 V 3,000 SMITH GARDNER SMITH GARNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 4/4 JOB# ARBD-21-1 SUBJECT Concrete Pipe Strength Analysis DATE 12/22/2022 (Trench Condition) COMPUTED BY JCL CHECKED BV SAS Culvert No.: C-1 &C-2 Concrete Pipe Parameters: Type of Pipe= Circular,Concrete Pipe Diameter,G(in)= 36 Outside Horizontal Span,Bc(ft)(=G c)= 3.67(From CPDM Table 42) Height of Backfill,h(ft)= 2.0 Backfill Type= Sand&Gravel Backfill Unit Wt.(Ibs/ft3)= 110 Standard Instal lation= Type 4 Trench Width,Bo(ft)= 6.0 Must be<transition width. Ct°herwise,treat as Embankment Installation. Transition Width,6�,(ft)= 7.7(From CPDM- Table23) Ku' 0.150(conservative for sand&gravel backfill) Determine Earth and Fluid Loads: Co (Ibs/LF)= 0.32 VP, (Ibs/LF)= 1,415 WF (Ibs/LF)= 441 Determine Live Load: WL(Ibs/LF)= 750(From CPDM Table 42) Determine Bedding Factors: Embankment Bedding Factor,6 f= 2.3(From CPDM III ustration 4.22) Min.Trench Bedding Factor,5 r= 1.7(From CPDM III ustration 4.23) Variable Trench Bedding Factor,Bh= 2.0 Live Load Bedding Factor,5f«= 2.2(From CPDM III ustration 4.25) Factor of Safety: Factor of Safety,FS= 1.00(Use 1.0 for Reinforced;1.25 to 1.5 for Non-Reinforced) Selection of Required Pipe Strength/Class: GL—(I bs/LF/ft)=1 424 Pipe Class Max.D-Load 1 800 Use Class I RCP 11 1,000 111 1,350 IV 2,000 V 3,000 (Table per ASTM C 76) SMITH GARQNER SMITH GARNER,INC. Trench(G1) CONCRETE PIPE SGV2 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ADDRESS TEL WEB SMITH GA R a N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PRQIECT Stone LCID Landfill Expansion SHEET 1 OF 3 DATE 11/9/2022 COMPUTED BY JCL SUBJECT Down Pipe Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design down pipes to handle the peak discharge from the design storm. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NCState Univ.,Raleigh,NC. ANALYSIS: The following approach is used in the design of rain gutters and down pipes: 1. Determine the peak discharge from the design storm(s). Use the Rational Method. 2. For each pipe size,determine the maximum area(A),to handle the predicted peak discharge(Q)with an added factor of safety. Analyze rain gutters and down pipes based on partial flow to determine flow depth and velocity then compare the full flow capacity of each pipe size with the calculated peak flow rate to verify the desired factor of safety. Analyze down pipe inlets as a culvert under inlet control. CALCULATIONS: Down Pipe Inlets(Inlet Control Determine O„ -. For ZSG: Qmax = 0.372CdD(Z)3/2 (Malcolm Equation III-13) For Z>S: / D\i/z Qmax = 0.0437CdD2 I Z-24 I (Malcolm Equation III-13) where: Cmax = flow capacity of inlet(cfs) 2 = height of water above pipe invert(ft) allowable headwater depth(HW) C d = coefficient of discharge C = inside diameter of pipe(in) Determine Factor of Factor of Safety FS= Qmax Q Iterate the drainage area(A)to each drainage structure that Cmax/Q%the desired factor of safety. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 PRQIECT Stone LCID Landfill Expansion SHEET 2 OF 3 DATE 11/9/2022 COMPUTED BY JCL SUBJECT Down Pipe Analysis JOB# ARBD-21-1 CHECKED BY SAS Down Pipes: Determine Flow Capacity of Pipe: O.463"813S72 Q,,,ax __ (D&REquation 8.24) n where: 6 max = flow capacity of pipe(cfs) G = inside diameter of pipe(ft) 5 = pipe slope(ft/ft) n = Manning's roughness coefficient Determine Factor off��Safety_(FSL FS Iterate the drainage area(A)to each drainage structure that Cmm/Q a the desired factor of safety. Determine Flow Depth: h = 2 1 cos 8)),D (D&R Equation 8.29) where: h = flow depth(inches) 0 = central angle(degrees) IT 1/2 uz 1/2 (D&REquation 8.28) B 2 �1— (1—(�cK) K = constant K- 0.673QnD-8/3S-1/2 (D&REquation 8.27) Determine Flow Velocity: QD2 (0- sing) (D&REquation 8.30for"A") 8 where: l/ = f I ow vel oci ty(ft/sec) A = cross-sectional area of flow(ft) SMITH GARONER DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5 DOB 1 PROJECT Stone LCID Landfill Expansion SHEET 3/3 JOB# ARBD-21-1 SUBJECT Down Pipe Analysis(CPE Pipe) DATE 11/9/2022 COMPUTED BY JCL CHECKED BY SAS Input Parameters: Manning's Rougness Coefficient= 0.020 -->CPE Pipe(Type S-Use 0.012;Type C-Use 0.02) Runoff Coefficient= 0.60 Rainfall Intensity= 8.96 IN/HR--->50 YR-5MIN STORM Allowable Headwater Depth(Above Pipe Invert)(Down Pipe Inlets)= 2.0 FEET Crifice Coef.OF Discharge(Down Pipe lnl ets)= 0.6 TYPICAL Down Pipe Inlets uno o um X-Ziectional Flow Capacity ID Drainage Area (Q) Pipe I.D. Area A.) Factor of Safety (AC) (CFS) (IN) (SF) (CFS) (>/=1.10) Max.Area-12" 0.78 4.19 12.0 0.79 4.62 1.10 Max.Area-15" 1.16 6.24 15.0 1.23 6.92 1.11 Max.Area-18" 1.60 8.60 18.0 1.77 9.50 1.10 Max.Area-24" 2.56 13.76 24.0 3.14 15.15 1.10 Down Pipes Runoff Volume Flow Capacity ID Drainage Area (Q) Pipel.D. Pipe Slope A.) Factor of Safety K q Flow Depth Flow Area Flow Velocity (AC) (CFS) (IN) (%) (CF5) (>/=1.10) ((ONSTANT) (-265`) (IN) (SF) (FPS) Max.Area-12" 2.20 11.83 12.0 33 13.30 1.12 0.277 232 8.65 0.61 19.51 Max.Area-15" 4.00 21.50 15.0 33 24.11 1.12 0.278 233 10.84 0.95 22.65 Max.Area-18" 6.60 35.48 18.0 33 39.21 1.11 0.282 235 13.16 1.38 25.64 Max.Area-24" 12.40 66.66 24.0 25 73.50 1.10 0.283 235 17.57 2.47 27.04 SMITHIAHQHER S M ITH GARGNER,INC. CPE Pi pe DOWN PIPE SG DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Appendix C Erosion and Sedimentation Control Technical Specifications Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Technical Specifications Stone LCID Landfill Chatham County, North Carolina Prepared for: ARBO, LLC Chapel Hill, NC February 2023 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 O 2023 Smith Gardner,Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner,Inc. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Technical Specifications Stone LCID Landfill Chatham County, North Carolina Prepared For. ARBD, LLC Chapel Hill, NC S+G Project No.ARBD-21-1 .� N CAN ., 0 �O ,ji': DacuSigned by: ZZ:a SEAL e. U 054367 1 13 1/2023 C5ECC95C337E4A'�.. �� � Jesse C. Li NGINe11.w"' Project Engineer ''�i SSEI"C- "" 010*#�1aiLu stir+i#ems DacuSigned by:;#� •,-Y ##� S� Q. w1lTu SEAL 3 1/2023 3389FB 008BB�1�_. Stacey A.Smith, P.E. Uzi= Senior Engineer +r `• ,' +�+tIfJlJ111i6�*Y** February 2023 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Stone LCID Landfill Chatham County Technical Specifications Table of Contents Section Specification 02110 Site Preparation 02222 Excavation 02223 Embankment 02240 Geotextiles 02270 Erosion and Sedimentation Control 02271 Rip Rap 02275 Rolled Erosion Control Products 02608 Precast Concrete Structures 02720 Stormwater Systems 02930 Revegetation Stone LCID Landfill Technical Specifications February 2023 Table of Contents Page i DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02110 SITE PREPARATION Site Preparation: Site Preparation includes clearing, grubbing, and stripping operations which precede the proposed construction. A. Description 1. General: a. The Contractor shall furnish all labor, material, and equipment to complete Site Preparation in accordance with the Contract Drawings and these Specifications. b. Principal items of work include: 1. Notifying all authorities owning utility lines running to or on the property. Protect and maintain all utility lines to remain and cap those that are not required in accordance with instructions of the Utility Companies, and all other authorities having jurisdiction. 2. Clearing the site within the clearing limits, including removal of grass, brush, shrubs, trees, loose debris, and other encumbrances except for trees to remain. 3. Boxing and protecting all areas to be preserved. 4. Removing all topsoil from designated areas and stockpiling on site where directed by the Engineer for future use. 5. Disposing from the site all debris resulting from work under this Section. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 B. Materials Not Used. C. Submittals Not Used. D. Construction Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 1. Clearing of the Site: a. Clearing Limits, as shown on the Contract Drawings, shall be established by the Owner's Surveyor. Once established, the clearing Limits shall be inspected and approved by the Engineer prior to clearing the affected areas. b. Before removal of topsoil, and start of excavation and grading operations, the areas within the clearing Limits shown on the Contract Drawings shall be cleared and grubbed. C. Clearing shall consist of cutting, removal, and satisfactory disposal of aLL trees, fallen timber, brush, bushes, rubbish, fencing, and other perishable and objectionable material. Should it become necessary to remove a tree, bush, brush, or other plants outside the clearing limits, the Contractor shall do so only after permission has been granted by the Engineer. d. Excavation resulting from the removal of trees, roots, and the Like shall be filled with suitable material, as approved by the Engineer, and thoroughly compacted per the requirements contained in Section 02223, Embankment, of these Specifications. e. In temporary construction easement locations, only those trees and shrubs shall be removed which are in actual interference with excavation or grading work under this Contract, and removal shall be subject to approval by the Engineer. However, the Engineer reserves the right to order additional trees and shrubs removed at no additional cost to the Owner, if such, in their opinion, they are too close to the work to be maintained or have become damaged due to the Contractor's operations. 2. Stripping and Stockpiling Existing Topsoil: a. Existing topsoil and sod on the site within areas designated on the Contract Drawings shall be stripped to whatever depth it may occur, and stored in Locations directed by the Engineer. b. The topsoil shall be free of stones, roots, brush, rubbish, or other unsuitable materials before stockpiling. C. Care shall be taken not to contaminate the stockpiled topsoil with any unsuitable materials. 3. Grubbing: a. Grubbing shall consist of the removal and disposal of all stumps, roots, logs, sticks, and other perishable materials to a depth of at least 6 inches below ground surfaces. Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 b. Large stumps located in areas to be excavated may be removed during grading operations, subject to the approval of the Engineer. 4. Disposal of Cleared and Grubbed Material: No open burning of clearing debris will be allowed on this project. The Contractor may grind woody materials into wood mulch and either remove from the site or stockpile on-site in the Location(s) approved by the Owner. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02222 EXCAVATION Excavation: Excavation includes excavating, sealing, hauling, scraping, undercutting, removal of accumulated surface water or ground water, stockpiling, and all necessary and incidental items as required for bringing the landfill and related structures to the specified lines and grades. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment required to complete Excavation of the project area in accordance with the Contract Drawings and these Specifications, except as noted below: a. Clearing and grubbing and removal of topsoil is addressed in Section 02110, Site Preparation, of these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Site Preparation 02110 Embankment 02223 Erosion and Sedimentation Control 02270 3. Definitions: a. Excavation: shall consist of the removal and satisfactory disposal and/or stockpiling of all materials (borrow and/or unsuitable materials included) located with the limits of construction including widening cuts and shaping of slopes necessary for the preparation of roadbeds, slope areas,cutting of any ditches, channels,waterways, entrances, and other work incidental thereto. b. Borrow: shall consist of approved on-site material required for the construction of embankments/fills or for other portions of the work. C. Unsuitable Material: is any in-place or excavated material which contains undesirable materials or is in a state which is not appropriate, in the opinion of the Engineer, for the intended use or support of planned structures, embankment, or excavation. This may include but not be limited to organic material,waste/refuse, soft, or wet material not meeting required specifications, etc. d. Unsuitable Material Overexcavation: shall consist of the removal and satisfactory disposal of all unsuitable material located within the limits of Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 construction and below subgrade elevations shown or indicated on the Contract Drawings. Where excavation to the subgrade elevations results in a subgrade or slopes of unsuitable material, the Contractor shall overexcavate such material to below the grades shown or indicated on the Contract Drawings or as otherwise directed by the Engineer. B. Materials Excavation shall include the removal of all soil,weathered rock, boulders, conduits, pipe, unsuitable material, and all other obstacles encountered and shown or indicated on the Contract Drawings and/or specified herein. D. Construction 1. The Contractor shall conduct Excavation activities in such a manner that erosion of disturbed areas and off-site sedimentation is absolutely minimized as outlined in Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. The Contractor shall excavate to the lines and grades shown on the Contract Drawings and stockpile all suitable excavated materials. As the excavation is made, the materials will be examined and identified to the Engineer. The Contractor will perform all surveys necessary to establish and verify lines and grades for all Excavation, including pipe excavations, soil overexcavation, and anchor trenches. 3. Stockpiling: Stockpiles shall be properly sloped and the surfaces sealed by the Contractor at the end of each working day, or during the day in the event of heavy rain, to the satisfaction of the Engineer. 4. The Contractor shall protect all existing facilities and structures including, but not limited to, existing utilities, monitoring wells, signs, grade stakes, etc. during the grading and stockpiling operations. 5. All excavations shall be made in the dry and in such a manner and to such widths as will give ample room for properly constructing and inspecting the structures and/or piping they are to contain and for such sheeting, timbering, pumping, and drainage as may be required. 6. The Contractor shall be responsible for the control of surface and subsurface water when necessary. Except for certain erosion and sedimentation control measures and other areas designated to impound water, all areas shall be graded to drain. 7. Excavation slopes shall be flat enough to avoid sloughs and slides that will cause disturbance of the subgrade or damage of adjacent areas. Slides and overbreaks which occur due to negligence, carelessness, or improper construction techniques on the part of the Contractor shall be removed and disposed of by the Contractor as directed by the Engineer at no additional cost to the Owner. Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 8. The intersection of slopes with natural ground surfaces, including the beginning and ending of cut slopes, shall be uniformly rounded. All protruding roots and other vegetation shall be removed from slopes. 9. The bottom of all excavations for structures and pipes shall be examined by the Engineer for bearing value and the presence of unsuitable material. If, in the opinion of the Engineer, additional Excavation is required due to the low bearing value of the subgrade material, or if the in-place materials are soft,yielding, pumping and wet, the Contractor shall remove such material to the required width and depth and replace it with thoroughly compacted structural fill, or material directed by the Engineer. No payment will be made for subgrade disturbance caused by inadequate Dewatering or improper construction methods. 10. Any areas excavated below design subgrade elevations by the Contractor, unless directed by the Engineer, shall be brought back to design elevations at no cost to the Owner. The Contractor shall place and compact such material in accordance with Section 02223, Embankment, of these Specifications. 11. The Contractor shall dispose of excess or unsuitable excavation materials on-site at locations) approved by the Owner. 12. The Contractor shall properly level-off bottoms of all excavations. Proof-rolling shall be conducted with appropriate equipment. 13. Upon reaching subgrade elevations shown in excavation areas, the Contractor shall scarify subgrade soils to a minimum depth of 6" and obtain the Engineer's approval of quality. If unsuitable materials are encountered at the subgrade elevation, perform additional excavations as approved by the Engineer to remove unsuitable materials. 14. Overexcavation and Backfill: a. Where subgrade materials are determined to be unsuitable, such materials shall be removed by the Contractor to the lengths,widths, and depths approved by the Engineer in advance and backfilled with compacted Embankment in accordance with Section 02223, Embankment, of these Specifications. b. No additional payment will be made for such overexcavation and backfill 1 foot or less than the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade) as this is considered superficial. C. Where overexcavation of unsuitable material is greater than 1 foot beneath the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade), payment shall be made on a unit price basis for overexcavation and backfill and the measured quantity shall include the entire excavation quantity below the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade) elevations. The unit price for overexcavation and backfill shall include disposal of unsuitable materials. Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-3 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 15. All cuts shall be brought to the grade and cross section shown or indicated on the Contract Drawings, or established by the Engineer, prior to final inspection. 16. The Contractor shall protect finished lines and grades of completed excavation against excessive erosion, damage from trafficking, or other causes and shall repair any damage at no additional cost to the Owner. 17. Trench Excavation: a. All pipe Excavation and trenching shall be done in strict accordance with these Specifications, all applicable parts of the OSHA Regulations, 29 CFR 1926, Subpart P, and other applicable regulations. In the event of any conflicts in this information, safe working conditions as established by the appropriate OSHA guidelines shall govern. b. The minimum trench widths shall be as indicated on the Contract Drawings. Enlargements of the trench shall be made as needed to give ample space for operations at pipe joints. The width of the trench shall be limited to the maximum dimensions shown on the Contract Drawings, except where a wider trench is needed for the installation of and work within sheeting and bracing. C. Except where otherwise specified, excavation slopes shall be flat enough to avoid slides which will cause disturbance of the subgrade, damage to adjacent areas, or endanger the lives or safety of persons in the vicinity. d. Hand excavation shall be employed wherever, in the opinion of the Engineer, it is necessary for the protection of existing utilities, poles, trees, pavements, obstructions, or structures. e. No greater length of trench in any location shall be left open, in advance of pipe laying, than shall be authorized or directed by the Engineer and, in general, such Length shall be limited to approximately one hundred (100) feet. f. Pipe Bedding: All pipe bedding shall be as shown on the Contract Drawings, unless otherwise specified herein, or shall be approved by the Engineer. 18. Sheeting and Bracing_ a. The Contractor shall furnish, place, and maintain such sheeting and bracing which may be required to support sides of Excavation or to protect pipes and structures from possible damage and to provide safe working conditions in accordance with current OSHA requirements. If the Engineer is of the opinion that at any point sufficient or proper supports have not been provided, he may order additional supports put in at the sole expense of the Contractor. The Contractor shall be responsible for the adequacy of all sheeting and bracing used and for all damage resulting from sheeting and bracing failure or from placing, maintaining, and removing it. b. The Contractor shall exercise caution in the installation and removal of sheeting to ensure that excessive or unusual loadings are not transmitted to any new or Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 existing structure. The Contractor shall promptly repair at their expense any and all damage that can be reasonably attributed to sheeting installation or removal. C. All sheeting and bracing shall be removed upon completion of the work. 19. If grading operations are suspended for any reason whatsoever, partially completed cut and fill slopes shall be brought to the required slope and the work of seeding and mulching or other required erosion and sedimentation control operations shall be performed at the Contractor's sole expense. 20. Surveying: Upon completion of the landfill subgrade, the subgrade shall be surveyed on 100-foot centers and at slope breaks (including all tops and toes of slope, points of grade change, etc.) to ensure the top of the subgrade meets the grades specified on the Contract Drawings. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02223 EMBANKMENT Embankment: Embankment is the on-site compacted fill that provides the foundation and the berms for the containment area, the subgrade for some access roadways and structures, and backfill around structures and piping. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete Embankment including borrowing, hauling, screening, discing, drying, compaction, control of surface and subsurface water, final grading, sealing, and all necessary and incidental items as detailed or required to complete the Embankment, all in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these Specifications. ASTM D 698 Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). ASTM D 1556 Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. ASTM D 2167 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method. ASTM D 2216 Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. ASTM D 2487 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System). ASTM D 2488 Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ASTM D 2937 Standard Test Method for Density of Soil in Place by the Drive Cylinder Method. ASTM D 4643 Standard Test Method for Determination of Water(Moisture) Content of Soil by the Microwave Oven Method. ASTM D 4959 Standard Test Method for Determination of Water(Moisture) Content of Soil by Direct Heating Method. ASTM D 6938 Standard Test Methods for In-Place Density and Water Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 4. Quality Assurance: Quality Assurance during placement of Embankment will be provided by the Owner. 5. Definitions: a Embankment: Shall include construction of all site earthwork including roadways, subgrade, perimeter berm embankments, including preparation of the areas upon which materials are to be placed. Embankment may also be referred to as structural and/or controlled fill. All Embankment materials may be either (off-site) Select Borrow or(on-site) Borrow unless otherwise noted on Contract Drawings or specified by the Engineer. b. Prepared Subgrade: The ground surface after clearing, grubbing, stripping, excavation, scarification, and/or compaction, and/or proof rolling to the satisfaction of the Engineer. C. Well-Graded: A mixture of particle sizes that has no specific concentration or lack thereof of one or more sizes. Well-graded does not define any numerical value that must be placed on the coefficient of uniformity, coefficient of curvature, or other specific grain size distribution parameters. Well-graded is used to define a material type that,when compacted, produces a strong and relatively incompressible soil mass free from detrimental voids. d. Unclassified Fill: The nature of materials to be used is not identified or described herein but must be approved by the Engineer prior to use. B. Materials 1. Embankment materials shall consist of clean well-graded natural soil classified as SP, SW, SM, SC, ML, or CL (ASTM D 2487) containing no topsoil or other deleterious material. Other material classifications may be approved by the Engineer. Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 2. Stones or rock fragments shall not exceed one half the maximum lift thickness as compacted in any dimension. Isolated rocks shall be a maximum of 24-inches in any dimension. C. Construction 1. The Contractor shall conduct Embankment activities in such a manner that erosion of disturbed areas and off-site sedimentation is absolutely minimized as outlined in Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. All placement and compaction of Embankment shall be performed only when the Engineer is informed by the Contractor of intent to perform such work. 3. Embankment shall be placed and compacted to the lines and grades shown on the Contract Drawings. Placement of Embankment outside the construction limits shall occur only as directed and approved by the Engineer. The Contractor will perform all surveys necessary to establish and verify lines and grades for all Embankment. 4. The Contractor shall protect all existing facilities including, but not limited to, utilities and monitoring wells. 5. Subgrade Preparation: a. The Engineer shall inspect the exposed subgrade prior to placement of Embankment to assure that all rocks, topsoil,vegetation, roots, debris, or other deleterious materials have been removed. b. Prior to placement of Embankment, the exposed subgrade shall be proofrolled using a static smooth-drum roller, loaded tandem axle dump truck, or other suitable equipment in the presence of the Engineer. Any soft or unsuitable materials revealed before or during the in-place compaction shall be removed as directed by the Engineer and replaced with suitable Embankment. 6. Surfaces on which Embankment is to be placed, shall be scarified or stepped in a manner which will permit bonding of the Embankment with the existing surface. 7. The Contractor shall be responsible for preparing the materials for the Embankment, including but not limited to, in-place drying or wetting of the soil necessary to achieve the compaction criteria of these Specifications. 8. Embankment materials shall be placed in a manner permitting drainage and in continuous, approximately horizontal layers. 9. Compaction Requirements: Stone LCIO Landfill Technical Specifications February 2023 Embankment Page 02223-3 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 a. The Contractor shall compact Embankment in accordance with the requirements shown in Table 1 of this section. If Embankment does not meet the specified requirements, the Contractor shall rework the material, as may be necessary and continue compaction to achieve these requirements, or remove and replace the material to achieve the specified requirements, at Contractor's expense. b. Each lift shall be compacted prior to placement of succeeding lifts. In confined areas, mechanical equipment, suitable for small areas and capable of achieving the density requirements, shall be required. C. Lift compaction shall be performed with an appropriately heavy, properly ballasted, penetrating-foot or smooth-drum vibratory compactor depending on soil type. Compaction equipment shall be subject to approval by the Engineer. 10. Embankment that becomes excessively eroded, soft, or otherwise unsuitable shall be removed or repaired by the Contractor as directed by the Engineer, at no cost to the Owner. 11. The exposed surface of Embankment shall be rolled with a smooth-drum roller at the end of each work day to protect from adverse weather conditions. 12. Where Embankment is to be placed and compacted on slopes that are steeper than 3H:1V, the subgrade shall be benched to a minimum depth of 6 inches and the Embankment shall be placed in horizontal lifts. 13. Backfilling for Structures and Piping_ a. All structures, including manholes and pipes shall be backfilled with Embankment as shown in the Contract Drawings and as described in these Specifications. b. Where sheeting is used, the Contractor shall take all reasonable measures to prevent loss of support beneath and adjacent to pipes and existing structures when sheeting is removed. If significant volumes of soil cannot be prevented from clinging to the extracted sheets, the voids shall be continuously backfilled as rapidly as possible. The Contractor shall thereafter limit the depth below subgrade that sheeting will be driven in similar soil conditions or employ other appropriate means to prevent loss of support. C. When backfilling around structures, do not backfill until concrete has sufficiently cured (as determined by the Engineer) and is properly supported. Place backfill in a manner to avoid displacement or damage of structures. 14. Surveying: Upon completion of the landfill subgrade, the subgrade shall be surveyed on 100 foot centers and at slope breaks (including all tops and toes of slope, points of grade change, etc.) to ensure the top of the subgrade meets the grades specified on the Contract Drawings. Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-4 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Table 1: Required Embankment Properties Required % Maximum Lift Item Standard Required Moisture Thickness Proctor Content' (Compacted) (ASTM D698)2 (inches) Embankment Beneath 98 2% of Optimum 8 Structures and Roads' (std. Proctor) Embankment 95 8 Backfill Around Structures 95 As Required for 8 Compaction Backfill in Pipe Trenches 95 6 Unclassified Fill N/A N/A N/A Notes: 1. Embankment beneath structures shall be considered to include a zone 10 feet out from the foundation of the structure extending down to the natural ground on a 45'slope. Embankment beneath roads shall be considered to include all embankment placed within 3 vertical feet of the final wearing surface and shall also include shoulders. 2. Determine field density using ASTM D 6938, ASTM D 1556, ASTM D 2167, or ASTM D 2937. 3. Determine field moisture content using ASTM D 6938,ASTM D 2216,ASTM D 4643, or ASTM D 4959. 4. The Engineer may allow exceptions to the above criteria for areas outside of the containment area which are not subject to significant long-term loads. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02240 GEOTEXTILES Geotextiles: For the proposed construction, a Type GT-S (Separator/Filter) is specified. The Type GT-S Geotextile will be placed in the between soil subgrade and aggregate in access roads, and in some erosion control and drainage applications. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Geotextiles including all necessary and incidental items as detailed or required for the Contractor to complete the installation in accordance with the Contract Drawings and these Specifications, except as noted below: a. Geotextiles used as a Silt Fence is covered under Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) and the American Association of State Highway and Transportation Officials (AASHTO) are hereby made a part of these specifications. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture, and Heat in a Xenon-Arc Type Apparatus. ASTM D 4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity. ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextiles. ASTM D 4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. ASTM D 4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ASTM D 5261 Standard Test Method for Measuring Mass per Unit Area of Geotextiles. ASTM D 6241 Standard Test Method for the Static Puncture Strength of Geotextiles and Geotextile Related Products Using a 50 mm Probe. AASHTO M 288 Standard Specification for Geotextiles. 4. Quality Assurance: Quality Assurance during installation of Geotextiles will be provided by the Owner. B. Materials 1. General: The materials supplied under these Specifications shall consist of new, first-quality products designed and manufactured specifically for the purpose of this work, which shall have been satisfactorily demonstrated, by prior use, to be suitable and durable for such purposes. Labels on each roll of Geotextile shall identify the length, width, lot and roll numbers, and name of Manufacturer. 2. The Type GT-S Geotextile shall be a nonwoven spunbonded or nonwoven needlepunched synthetic fabric consisting of polyester or polypropylene manufactured in a manner approved by the Engineer. Woven fabrics may be used in certain applications if approved in advance by the Engineer. 3. All Geotextiles shall conform to the properties listed in Table 1 of this section. C. Submittals Prior to the installation of Geotextiles, the Contractor shall submit the following to the CQA Engineer: 1. Mill Certificate and Sample: Prior to shipping to the site, the Contractor shall submit a mill certificate or affidavit signed by a legally authorized official of the Manufacturer for each type of Geotextile attesting that the Geotextiles meet the physical and manufacturing requirements stated in these Specifications. The Contractor shall also submit a sample of each Geotextile to be used. The samples shall be labeled with the product name and be accompanied by the Manufacturer's specifications. 2. Shipping, Handling, and Storage Instructions: The Manufacturer's plan for shipping, handling, and storage shall be submitted for review. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 3. Seaming Procedures: Submit proposed seaming procedures including proposed method and equipment. 4. Quality Control Certificates: For Geotextiles delivered to the site, quality control certificates, signed by the Manufacturer's quality assurance manager shall be provided which represent every roll of each type of Geotextile supplied. Each certificate shall have the roll identification number(s), test methods, frequency, and test results. At a minimum, the test results and frequency of testing shall be as shown in TabLe 2 of this section. 5. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into the construction. D. Construction 1. Shipping, Handling, and Storage: ALL Geotextiles shall be shipped, handled, and stored in strict accordance with the Manufacturer's recommendations. 2. Failing CQA Material Control Tests: Geotextiles that are rejected upon testing shall be removed from the project site and replaced at Contractor's cost. Sampling and CQA testing of Geotextiles supplied as replacement for rejected material shall be performed by the Engineer at Contractor's cost. 3. Installation: a. The surface receiving the Geotextiles shall be prepared to a relatively smooth condition, free of obstructions, standing water, excessive depressions, debris, and very soft, excessively wet, and/or loose pockets of soil. This surface shall be approved by the Engineer prior to Geotextile placement. b. Geotextiles shall be placed to the Lines and grades shown on the Contract Drawings. At the time of installation, Geotextiles shall be rejected by the Engineer if they have defects, rips, holes, flaws, evidence of deterioration, or other damage. C. The Geotextiles shall be placed smooth and free of excessive wrinkles. d. On slopes, Geotextiles shall be anchored at the top and unrolled down the slope. In the presence of wind, all Geotextiles shall be weighted with sandbags or other material as appropriate. Geotextiles uplifted by wind may be reused upon approval by the Engineer. 4. Seams: Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-3 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 a. All Geotextile seams shall be continuously sewn or heat bonded with methods approved by the Engineer. Overlapping of seams may also be allowed if approved in advance by the Engineer. All seams must be approved by the Engineer. b. On slopes of 6H:1V or steeper, all seams shall be oriented parallel to (in the direction of)the slope unless otherwise approved by the Engineer. C. Seams to be sewn shall be sewn using a Type 401 stitch. One or two rows of stitching may be used. Each row of stitching shall consist of 4 to 7 stitches per inch. The minimum distance from the geotextile edge to the stitch line nearest to that edge (seam allowance) shall be 1.5 inches if a Type SSa (prayer or flat) seam is used. The minimum seam allowance for all other seam types shall be 1.0 inches. d. Seams to be heat bonded shall be bonded using hot plate, hot knife, ultrasonic, or other approved devices. 5. Repair Procedures: a. Any Geotextile that is torn, punctured, or otherwise damaged shall be repaired or replaced, as directed by the Engineer, by the Contractor at no additional cost to the Owner. The repair shall consist of a patch of the same type of Geotextile placed over the failed areas and shall overlap the existing Geotextile a minimum of 18 inches from any point of the rupture. Patches shall be spot sewn or heat bonded so as not to shift during cover placement. b. Slopes Flatter Than 6H:1V: Damaged areas of a size exceeding 10 percent of the roll width shall be removed and replaced across the entire roll width with new material. Damaged areas of a size less than 10 percent of the roll width may be patched. C. Slopes of 6H:1V or Steeper: Geotextile panels which require repair shall be removed and replaced with new material. Replacement material shall be sewn as previously described in this specification. 6. Cover Placement: a. Except when designed to remain exposed, Geotextiles shall be covered in a timely manner to limit potential UV damage. Unless otherwise approved by the Engineer, covering shall occur within 30 days of installation. Extension of this time may be considered by the Engineer based on weather conditions (i.e. prolonged cloud cover during 30 day period) or technical information provided by the Manufacturer that would justify an extension. (1) The Engineer may conduct sampling and testing of any Geotextiles exposed for a period longer than allowed to verify the material properties. The cost associated with this testing and the subsequent repair(s) shall be borne solely by the Contractor regardless of the test results. In no case will the maximum length of exposure be greater than 60 days without verification of material properties. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 b. Placement of cover over Geotextiles shall be performed in a manner as to ensure that the Geotextiles or underlying materials are not damaged. Cover material shall be placed such that excess tensile stress is not mobilized in the Geotextile. Table 1: Required Geotextile Properties Value' Property Test Method Units Type GT-S Geotextile Construction NWz or W3 (NW = Nonwoven) ----- ----- (W=Woven) Mass per Unit Area (Unit ASTM D 5261 oz/ydz N/A Weight) UV Resistance (500 hrs) ASTM D 4355 % 70 Strength Class' AASHTO M 288 Class 2 Tensile Properties: ASTM D 4632 Grab Strength lbs 160 (NW) 250 (W) Grab Elongation % > 50 (NW) < 50 (W) Puncture Resistance ASTM D 6241 lbs 410 (NW) 950 (W) Trapezoidal Tear Strength ASTM D 4533 lbs 55 (NW) 90 (W) Apparent Opening Size ASTM D 4751 U.S. 70+ (AOS) Sieve Permittivity ASTM D 4491 sec-' 1.0 Notes: 1. Minimum Average Roll Value (MARV). 2. Nonwoven geotextiles that have been heat calendered are not acceptable, unless approved by the Engineer in advance. 3. Woven geotextiles shall be approved in advance by the Engineer. Woven geotextiles formed exclusively with slit film fibers are not acceptable. 4. AASHTO M 288 criteria include the above listed requirements for: Tensile Properties, Puncture Resistance, Trapezoidal Tear Strength, and Burst Strength. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Table 2: Required Manufacturer Quality Control Tests Property Test Method7 Minimum Test Frequency Mass per Unit Area (Unit Weight) ASTM D 5261 200,000 ft2 Ultraviolet Resistance (500 hrs) ASTM D 4355 Periodic Tensile Properties ASTM D 4632 200,000 ft2 Apparent Opening Size (AOS) ASTM D 4751 Periodic Permittivity ASTM D 4491 Periodic Puncture Resistance ASTM D 6241 200,000 ft2 Trapezoidal Tear Strength ASTM D 4533 200,000 ft2 END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Geatextiles Page 02240-6 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02270 EROSION AND SEDIMENTATION CONTROL Erosion and Sedimentation Control: Erosion and Sedimentation Control is a system of construction and engineered measures (devices, structures, practices, etc.) which act to minimize surface water induced erosion of disturbed areas and the resulting off-site sedimentation. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of and maintain Erosion and Sedimentation Control measures and related work in accordance with the Contract Drawings and these Specifications. All Erosion and Sedimentation Control work shall be in accordance with the latest edition of the North Carolina Erosion and Sediment Control Planning and Design Manual as well as applicable regulations. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Rip Rap 02271 Rolled Erosion Control Products 02275 Stormwater Systems 02720 Revegetation 02930 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these specifications. ASTM D 3786 Test Method for Hydraulic Bursting Strength of Knitted Goods and Nonwoven Fabrics: Diaphragm Bursting Strength Tester Method. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water(Xenon-Arc Type Apparatus). ASTM D 4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity. ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextiles. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 ASTM D 4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. ASTM D 4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. ASTM D 4833 Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products. B. Materials 1. Permanent Sediment or Detention Basins: Permanent sediment or detention basins shall be constructed as shown on the Contract Drawings. 2. Permanent Drainage Channels, Diversions, Swales, and Ditches: Permanent drainage channels, diversions, swales, and ditches shall be constructed as shown on the Contract Drawings. 3. Silt Fence: Silt fences shall be constructed as shown on the Contract Drawings and as needed, based on the Contractor's discretion and Engineer's approval. The silt fence is a permeable barrier erected within and downgradient of small disturbed areas to capture sediment from sheet flow. It is made of filter fabric buried at the bottom, stretched, and supported by posts and wire mesh backing. Silt fence shall conform to the following properties: a. Posts: Posts shall be 1.33 lb/linear foot steel (preferred) or wood with a minimum length of 5 feet. Steel posts shall be "U" or"7-type. Wood posts shall have a minimum diameter of 4-inches. b. Filter Fabric: Filter fabric shall be a woven geotextile made specifically for sediment control. Filter fabric shall conform to the properties listed in Table 1 of this section. 4. Rip Ram Rip Rap shall conform to the requirements of Section 02271, Rip Rap, of these Specifications. 5. Rolled Erosion Control Products (RECPs): Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Rolled Erosion Control Products (RECPs) shall conform to the requirements of Section 02275, Rolled Erosion Control Products, of these Specifications. 6. Other Work: In addition to the Erosion and Sedimentation Control measures shown on the Contract Drawings, the Contractor shall provide adequate means to prevent any sediment from entering any storm drains, drop inlets, ditches, streams, or bodies of water downstream of any area disturbed by construction. Excavation materials shall be placed upstream of any trench or other excavation to prevent sedimentation of off-site areas. In areas where a natural buffer area exists between the work area and the closest stream or water course, this area shall not be disturbed. All paved areas shall be scraped and swept as necessary to prevent the accumulation of dirt and debris. Work associated with this provision shall be considered incidental to the project and no separate payment will be made. 7. Temporary and Permanent Ground Cover: The Contractor shall provide temporary or permanent ground cover(or other acceptable measure(s)) adequate to restrain erosion on erodible slopes or other areas within 21 calendar days following completion of any phase of grading. The Contractor shall provide permanent ground cover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following the completion of construction. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results, prior to installation, that all Erosion and Sedimentation Control materials manufactured for the project have been produced in accordance with these Specifications. 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. Establishment of Erosion and Sedimentation Control Measures: a. All Erosion and Sedimentation Control measures will be constructed according to the Contract Drawings and these Specifications. b. Due to the nature of the work required by this Contract, it is anticipated that the location and nature of the Erosion and Sedimentation Control measures may need to be adjusted to reflect the current phase of construction. C. Erosion and Sedimentation Control measures shall be established prior to the work in a given area. Where such practice is not feasible, the Erosion and Sedimentation Control measure(s) shall be established immediately following completion of the clearing operation. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 d. The construction schedule adopted by the Contractor will impact the placement and need for specific measures required for the control of erosion. The Contractor shall develop and implement such additional techniques as may be required to minimize erosion and prevent or correct the discharge of sediment outside the limits of construction (unless controlled by other on-site measure(s)). e. The location and extent of Erosion and Sedimentation Control measures shall be revised at each phase of construction that results in a change in either the quantity or direction of surface runoff from construction areas. All deviations from the control provisions shown on the Contract Drawings shall have the prior approval of the Engineer. 2. Inspection and Maintenance of Erosion and Sedimentation Control Measures: a. The Contractor shall furnish the labor, material, and equipment required for the inspection and maintenance of all Erosion and Sedimentation Control measures. Maintenance shall be scheduled as required for a particular measure to maintain the removal efficiency and intent of the measure. b. All Erosion and Sedimentation Control measures shall be inspected at least once every seven calendar days and within 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour period and appropriate maintenance conducted. A rain gauge shall be maintained on the site and a record of the rainfall amounts and dates shall be kept properly. C. Maintenance shall include, but not be limited to: (1) The removal and satisfactory disposal of trapped or deposited sediments from basins, traps, barriers, filters, and/or drainage features/devices; (2) Replacement of filter fabrics used for silt fences upon loss of efficiency; and (3) Replacement of any other components which are damaged or cannot serve the intended use. d. The Contractor shall accept and maintain any existing sediments that are included in existing sediment basins and traps that accept or will accept stormwater flow and or sediment accumulation from all areas within the Contractor's limits of construction. All of these sediment basins and/or traps shall be cleaned of sediments accumulated during the performance of this pro lect. e. Sediments removed from Erosion and Sedimentation Control measures shall be disposed of in locations that will not result in off-site sedimentation as approved by the Engineer. f. All Erosion and Sedimentation Control measures shall be maintained to the satisfaction of the Engineer until the site has been stabilized. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 3. Graded Slopes and Fills: The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetated cover or other adequate measures. 4. Finish Grading: All disturbed areas shall be uniformly graded to the lines, grades, and elevations shown on the Contract Drawings. Except for certain erosion and sedimentation control measures and other areas designated to impound water, all areas shall be graded to drain. Finished surfaces shall be reasonably smooth, compacted, and free from irregular surface changes. Unless otherwise specified, the degree of finish shall be that ordinarily obtainable from either blade or scraper operations. Areas shall be finished to a smoothness suitable for application of topsoil. 5. Revegetation: Revegetation shall conform to the requirements of Section 02930, Revegetation, of these Specifications. 6. Cleanup: a. The Contractor shall remove from the site all debris from their work including, but not limited to, branches, paper, and rubbish in all landscape areas, and remove temporary barricades as the work proceeds. b. All areas shall be kept in a neat, orderly condition at all times. Prior to final acceptance, the Contractor shall clean up the entire landscaped area to the satisfaction of the Engineer. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Table 1: Required Silt Fence Filter Fabric Properties Property Test Method FUnits Value' Grab Tensile Strength' ASTM D 4632 lbs 90 x 90 Grab Elongation ASTM D 4632 % 20 (Max.) Ultraviolet Resistance (500 hrs) ASTM D 4355 % 80 Apparent Opening Size (AOS) ASTM D 4751 U.S. Sieve 30+ Permittivity ASTM D 4491 sec-' 0.05 Notes: 1. Minimum Average Roll Value (MARV). 2. Values for machine and cross machine direction (MD x XD), respectively. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-6 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02271 RIP RAP Rip Rai This section includes all rip rap aprons and channel protection. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Rip Rap for protection of earthen slopes against erosion as indicated, including all necessary and incidental items, in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Geotextiles 02240 Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the North Carolina Department of Transportation (NCDOT) are hereby made a part of these Specifications. NCDOT Standard Specifications for Roads and Structures. B. Materials 1. Rip Ram Rip Rap shall be of the size indicated on the Contract Drawings and shall conform to NCDOT Section 1042, Rip Rap Materials. 2. Geotextiles: Geotextiles shall conform to the requirements outlined in Section 02240, Geotextiles, of these Specifications. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results prior to installation, that all Rip Rap has been produced in accordance with these Specifications. Stone LCID Landfill Technical Specifications February 2023 Rip Rap Page 02271-1 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. Surface Preparation: a. Trim and dress all areas to conform to the Contract Drawings as indicated with tolerance of 2 inches from theoretical slope lines and grades. b. Bring areas that are below allowable minimum tolerance limit to grade by filling with compacted Embankment material similar to adjacent material. C. Geotextiles shall be placed as shown on the Contract Drawings and in accordance with Section 02240, Geotextiles, of these Specifications. d. Do not place any stone material on the prepared surface prior to inspection and approval to proceed from the Engineer. 2. Placing Rip Rai Rip Rap shall be placed in accordance with NCDOT Section 876, Rip Rap. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Rip Rap Page 02271-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02275 ROLLED EROSION CONTROL PRODUCTS Rolled Erosion Control Products: Rolled Erosion Control Products (RECPs) include erosion control blankets (ECB) and turf reinforcement mats (TRM) pLaced in channels and on slopes. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of all RECPs in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Erosion and Sedimentation Control 02270 Revegetation 02930 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these specifications. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water(Xenon-Arc Type Apparatus). ASTM D 6475 Standard Test Method for Measuring Mass per Unit Area of Erosion Control Blankets. ASTM D 6524 Standard Test Method for Measuring the Resiliency of Turf Reinforcement Mats. ASTM D 6525 Standard Test Method for Measuring Nominal Thickness of Permanent Erosion Control Products. ASTM D 6566 Standard Test Method for Measuring Mass per Unit Area of Turf Reinforcement Mats. ASTM D 6818 Standard Test Method for Ultimate Tensile Properties of Turf Reinforcement Mats. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 B. Materials 1. General: The materials supplied under these Specifications shall consist of new, first-quality products designed and manufactured specifically for the purpose of this work, which shall have been satisfactorily demonstrated, by prior use, to be suitable and durable for such purposes. Labels on each RECP shall identify the length, width, product name, and name of Manufacturer. 2. Erosion Control Blanket (ECB) (Single Net): ECB (single net) shall consist of a machine-produced mat of straw or wood excelsior fiber covered on the top side with a photodegradable extruded plastic or woven biodegradable netting and sewn togetherwith degradable thread. ECB (single net) shall also conform to the properties listed in Table 1 of this section. ECB (single net) shall be EroNet S75, as manufactured by North American Green, CURLEX I, as manufactured by American Excelsior Company, LANDLOK S1, as manufactured by Propex GeoSolutions, or approved equal. Flexterra Flexible Growth Media (FGM), as manufactured by Profile Products, applied at a minimum rate of 3,500 lbs/acre (or equal product/application rate) is an acceptable substitute for ECB to be placed on 2H:1V slopes (a minimum rate of 3,000 lbs/acre shall be used on 3H:1V slopes). 3. Turf Reinforcement Mat (TRM): TRM (Type 1) shall consist of a dense web of crimped and interlocking polypropylene fibers positioned between two biaxially oriented nets and mechanically bound together by parallel stitching with polypropylene thread. TRM shall be designed to accelerate seedling emergence, exhibit high resiliency, and possess strength and elongation properties to limit stretching in a saturated condition. TRM shall be stabilized against chemical and UV degradation which are normally found in a natural soil environment and shall have no biodegradable components. TRM shall also conform to the properties listed in Table 1 of this section. TRM shall be LANDLOK 435, as manufactured by Propex GeoSolutions, or approved equal. 4. Anchors: Anchors for RECPs shall consist of machine made staples of No. 8 gauge new steel wire formed into a "U" shape. The size when formed shall be not less that 8 inches in length with a throat of not less than 1 inch in width. Longer anchors may be required for loose soils. Other anchors, such as metal pins or plastic pegs, may also be used if approved in advance by the Engineer. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 C. Submittals The Contractor shall submit the following to the Engineer: 1. Mill Certificate and Sample: Prior to shipping to the site, the Contractor shall submit a mill certificate or affidavit signed by a legally authorized official of the Manufacturer for each RECP attesting that each RECP meets the physical and manufacturing requirements stated in these Specifications. The Contractor shall also submit a sample of each RECP to be used. The sample shall be labeled with the product name and be accompanied by the Manufacturer's specifications. 2. Installation Guidelines/Instructions: The Manufacturer's guidelines/instructions for installation shall be submitted for review. 3. Furnish copies of delivery tickets or other approved receipts as evidence for materials received that will be incorporated into the construction. D. Construction 1. Shipping, Handling, and Storage: All RECPs shall be shipped, handled, and stored in strict accordance with the Manufacturer's recommendations. 2. Installation - General: a. Placing of RECPs shall be done immediately following seeding. Seeding shall be performed in accordance with Section 02930, Revegetation, of these Specifications. b. RECPs shall be placed to the lines and grades shown on the Contract Drawings. The earth surface shall be smooth and free from stones, clods, or debris which will prevent the contact of the RECP with the soil. Care shall be taken to preserve the required line, grade, and cross section of the area. C. RECPs shall be unrolled in the direction of the flow of water and shall be applied without stretching so that it will lie smoothly but loosely on the soil surface. d. At the time of installation, RECPs shall be rejected, if they have defects, rips, holes, flaws, evidence of deterioration, or other damage. e. The Engineer may require adjustments in the installation requirements to fit individual conditions. 3. Installation - Channels: RECPs installed in channels shall be unrolled parallel to the direction of water flow. The first roll shall be centered longitudinally in the channel and anchored with staples. Subsequent rolls shall be installed outward to the edges of the channel and be lapped to allow installation of a common row of anchors. RECP ends shall be overlapped with the Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 upstream ends on top ("shingled"). Refer to the Contract Drawings and/or the Manufacturer's installation guidelines/instructions for installation details. 4. Installation - Slopes: RECPs installed on slopes shall be oriented in vertical strips and anchored. Subsequent rolls shall be installed outward to the edge(s) of the original roll and be lapped to allow installation of a common row of anchors. RECP ends shall be shingled. Refer to the Contract Drawings and/or the Manufacturer's installation guidelines/instructions for installation details. 5. Maintenance: Maintenance of RECPs shall be in accordance with Section 02270, Erosion and Sedimentation Control, of these Specifications. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Table 1: Required Rolled Erosion Control Product Properties Property Test Method Units Value' Erosion Control Blanket (ECB) (Single Net) 0.5+ 10% Mass per Unit Area ASTM D 6475 lbs/yd' (Straw) 0.7+ 10% (Excelsior) Tensile Strength' ASTM D 6818 lbs/ft 50 x 65 Tensile Elongation ASTM D 6818 % 20 Maximum Permissible Shear ----- lbs/ft' 1.55 Stress (Un-Vegetated) Functional Longevity ----- months 12 Turf Reinforcement Mat(TRM) Mass per Unit Area ASTM D 6566 oz/yd' 8 Thickness ASTM D 6525 inches 0.35 Tensile Strength' ASTM D 6818 lbs/ft 225 x 175 Tensile Elongation ASTM D 6818 % 50 (max.) Resiliency ASTM D 6524 % 80 UV Resistance (1,000 Hours) ASTM D 4355 % 80 Maximum Permissible Shear Large Scale lbs/ft' 5 Stress (Long-Term Vegetated) Notes: 1. Typical for ECB. 2. Values for machine and cross machine direction NO x XD), respectively. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02608 PRECAST CONCRETE STRUCTURES Precast Concrete Structures: Precast Concrete Structures are used in the stormwater systems. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Precast Concrete Structures in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Stormwater Systems 02720 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these Specifications. ASTM A 615 Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. ASTM C 443 Standard Specification for Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets. ASTM C 478 Standard Specification for Precast Reinforced Concrete Manhole Sections. ASTM C 497 Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile. ASTM C 990 Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants. ASTM C 1433 Standard Specification for Precast Reinforced Concrete Box Sections for Culverts, Strom Drains, and Sewers. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-1 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 B. Materials 1. Precast Concrete Boxes: All precast concrete boxes shall be constructed from non- shrink, 4,000 psi compressive strength concrete in conformance with ASTM C 1433 and as detailed on the Contract Drawings. 2. Joints: Alljoints shall be sealed with preformed plastic gaskets in conformance with ASTM C 990 or rubber gaskets in conformance with ASTM C 443. 3. Steps: ALL steps shall be constructed of 0.5 inch reinforcing rod completely encased in corrosion-resistant rubber or plastic. The upper surfaces of each step shall have a traction tread of self cleaning rubber cleats and guide lugs on both sides to prevent slippage. 4. Frames and Covers: Frames and covers shall consist of cast iron frames and covers (Vulcan Foundry, or equal) equipped with steel handles and shall be of the opening size as indicated on the Contract Drawings. Markings on the covers shall indicate the intended use of the structure and shall be acceptable to the Owner. 5. Markings: All Precast Concrete Structures shall include markings clearly identifying the date of manufacture, the name of the manufacturer, and any other pertinent information. C. Submittals The Contractor shall submit the following to the Engineer: 1. The Contractor shall submit shop drawings for Precast Concrete Structures for approval at least 4 weeks prior to construction. Shop drawings shall show complete design, installation, and construction information in such detail as to enable the Engineer to determine the adequacy of the proposed units for the intended purpose. Details of steel reinforcement size and placement shall be included. The shop drawings shall include a schedule which will list the size and type of precast structure at each location where the precast structures are to be used. 2. Submit a certification and summary of all required test results, prior to installation, that all Precast Concrete Structures have been produced in accordance with these Specifications. D. Construction 1. The Precast Concrete Structures shall be installed at the locations and to the elevations indicated on the Contract Drawings. The Contractor shall give the Engineer sufficient notice so they may observe the field Location and installation activities. 2. The Precast Concrete Structures will be bedded and backfilled as indicated on the Contract Drawings. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-2 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 3. Precast Concrete Structures which are damaged or become damaged will be rejected or shall be repaired in a manner approved by the Engineer at the Contractor's sole expense. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-4 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02720 STORMWATER SYSTEMS Stormwater Systems: Stormwater Systems shall include all piping, pipe fittings, headwalls, flared end sections, drop inlets, manholes, and other appurtenances designated to convey stormwater. A. Description 1. General: The contractor shall furnish all labor, material, and equipment to complete installation of Stormwater Systems in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Rip Rap 02271 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM), the American Association of State Highway and Transportation Officials (AASHTO), and the North Carolina Department of Transportation (NCDOT) are hereby made a part of these specifications. ASTM C 76 Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. ASTM C 150 Standard Specification for Portland Cement. ASTM D 1248 Standard Specification for Polyethylene Plastics Molding and Extrusion Materials For Wire and Cable. ASTM D 2321 Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. ASTM D 3350 Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. AASHTO M 36 Specification for Corrugated Steel Pipe. Stone LCID Landfill Technical Specifications February 2023 Starmwater Systems Page 02720-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 AASHTO M 252 Specification for Corrugated Polyethylene Drainage Tubing, 3 to 10 Inch Diameter. AASHTO M 294 Specification for Corrugated Polyethylene Pipe, 12 to 36 Inch Diameter. NCDOT Standard Specifications for Roads and Structures and Roadway Standard Drawings. B. Materials 1. Corrugated Polyethylene (CPE) Pipe: CPE pipe and fittings shall be of the sizes and type shown on the Contract Drawings and shall conform to every aspect of AASHTO M 252 (3 to 10 inch diameters) or AASHTO M 294 (12 to 36 inch diameters). All Type S CPE pipe shall have watertight joints. 2. Flared End Sections: Flared end sections shall be reinforced and shall be fabricated from the same materials meeting the same requirements as the pipe to which they are connected. All reinforced concrete and corrugated metal flared end sections shall meet the requirements of the NCDOT. Corrugated polyethylene flared end sections shall be as recommended by the pipe manufacturer. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results, prior to installation, that all Stormwater Systems have been produced in accordance with these Specifications. 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. All piping shall be installed by skilled workmen and in accordance with the best standards for piping installation. Proper tools and appliances for the safe and convenient handling and installation of the pipe and fittings shall be used. 2. All pieces shall be carefully examined for defects, and no piece shall be installed which is known to be defective. If any defective piece should be discovered after having been installed, it shall be removed and replaced at the Contractor's expense. 3. Prior to installation, the Contractor is responsible for checking the fit of design elevations for Stormwater Systems with existing conditions (i.e. conflicts with other structures, fit within existing drainage channels/features, ability to have minimum cover, etc.). The Stone LCID Landfill Technical Specifications February 2023 Stormwater Systems Page 02720-2 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Contractor shall notify the Engineer of any conflicts and/or necessary field adjustments prior to installation for resolution or concurrence. 4. Excavation and backfilling of pipe trenches shall be as described in Section 02222, Excavation and Section 02223, Embankment, respectively, of these Specifications. 5. Following proper preparation of the trench subgrade, pipe and fittings shall be carefully lowered into the trench so as to prevent dirt and other foreign substances from gaining entrance into the pipe and fittings. Proper facilities shall be provided for lowering sections of pipe into trenches. No materials shall be dropped or dumped into the trench. 6. Water shall be kept out of the trench until jointing and backfilling are completed. When work is not in progress, open ends of pipe, fittings, and valves shall be securely closed so that no water, earth, or other substance will enter the pipes, fittings, or valves. Pipe ends Left for future connections shall be valved, plugged, or capped, and anchored as required. 7. All Stormwater Systems shall be installed to accurate lines and grades with no abrupt changes in line or grade. 8. The full length of each section of pipe shall rest solidly upon the bed of the trench, with recesses excavated to accommodate bells, couplings,joints, and fittings. Before joints are made, each pipe shall be well bedded on a solid foundation. No pipe shall be brought into position until the preceding length has been thoroughly bedded and secured in place. Pipe that has the grade orjoint disturbed after laying shall be taken up and re-laid by the Contractor at their own expense. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Starmwater Systems Page 02720-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page left intentionally blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 SECTION 02930 REVEGETATION Revegetation: Revegetation includes permanent Revegetation of all site areas disturbed by the Contractor whether inside the Contract Limits or not. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete Revegetation in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Rolled Erosion Control Products 02275 3. Correction Period: The Contractor shall be responsible for the satisfactory establishment and growth of a permanent stand of vegetation as judged by the Engineer. During this period, the Contractor shall be responsible for the maintenance items described in Paragraph D.4 (Maintenance) of this Specification. B. Materials 1. Limestone: Unless otherwise defined by specific soil tests, supply agricultural grade ground limestone conforming to the current "Rules, Regulations, and Standards of the Fertilizer Board of Control." 2. Fertilizer: Unless otherwise defined by specific soil tests, supply commercial fertilizer meeting applicable requirements of State and Federal law. Do not use cyanamic compounds of hydrated time. Deliver fertilizer in original containers labeled with content analysis. 3. Grass Seed: Supply fresh, clean, new-crop seed. Do not use seed which is wet, moldy, or otherwise damaged. Deliver seed in standard sealed containers labeled with producer's name and seed analysis, and in accord with US Department of Agriculture Rules and Regulations under Federal Seed Act. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-1 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 4. Mulch: Supply clean, seed-free, threshed straw of oats,wheat, barley, rye, beans, or other locally available mulch material. a. Do not use mulch containing a quantity of matured, noxious weed seeds or other species that will be detrimental to seeding, or provide a menace to surrounding Land. b. Do not use mulch material which is fresh or excessively brittle, or which is decomposed and will smother or retard growth of grass. 5. Binder: Supply emulsified asphalt or synthetic binder. 6. Water: Supply potable, free of substances harmful to growth. 7. Application rates, seed types, and other requirements shall be in accordance with Table 1 of this section. C. Submittals The Contractor shall submit the following to the Engineer: 1. Results of soil tests performed and proposed modifications, if any, to the specified requirements. 2. Certificates for each grass seed mixture, stating botanical and common name, percentage by weight, and percentages of purity, germination, and weed seed. Certify that each container of seed delivered is fully labeled in accordance with Federal Seed Act and equals or exceeds specification requirements. 3. Copies of invoices for fertilizer, showing grade furnished and total quantity applied. D. Construction 1. The Contractor shall establish a smooth, healthy, uniform, close stand of grass from the specified seed. Prior to Revegetation, the Contractor shall adequately test the soils to be revegetated to ensure the adequacy of the specified requirements. Any modifications to these requirements deemed necessary after the review of soil test results, shall be at the Contractor's sole expense. The Engineer will perform the observations to determine when successful Revegetation is achieved. 2. Soil Preparation: a. Limit preparation to areas which will be planted soon after preparation. b. Loosen surface to minimum depth of four (4) inches. C. Remove stones, sticks, roots, rubbish and other extraneous matter over three (3) inches in any dimension. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-2 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 d. Spread time uniformly over designated areas at the rate specified in Table 1 of this section. e. After application of time, prior to applying fertilizer, loosen areas to be seeded with double disc or other suitable device if soil has become hard or compacted. Correct any surface irregularities in order to prevent pocket or low areas which will allow water to stand. f. Distribute fertilizer uniformly over areas to be seeded at the rate specified in Table 1 of this section. (1) Use suitable distributor. (2) Incorporate fertilizer into soil to depth of at least two (2) inches. (3) Remove stones or other substances which will interfere with turf development or subsequent mowing. g. Grade seeded areas to smooth, even surface with loose, uniformly fine texture. (1) Roll and rake, remove ridges and fill depressions, as required to meet finish grades. (2) Fine grade just prior to planting. 3. Seeding: a. Use approved mechanical power driven drills or seeders, mechanical hand seeders, or other approved equipment. b. Distribute seed evenly over entire area at the rate specified in Table 1 of this section. C. Stop work when work extends beyond most favorable planting season for species designated, or when satisfactory results cannot be obtained because of drought, high winds, excessive moisture, or other factors. d. Resume work only when favorable condition develops, or as directed by the Engineer. e. Lightly rake seed into soil followed by light rolling or cultipacking. f. Immediately protect seeded areas against erosion by mulching or placing Rolled Erosion Control Products in accordance with Section 02275 of these Specifications,where applicable. (1) Spread mulch in a continuous blanket at the rate specified in Table 1 of this section. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-3 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 (2) Immediately following spreading mulch, secure with evenly distributed binder at the rate specified in Table 1 of this section. (3) For slopes not steeper than 3H:1V and as an option to using binder to secure mulch, use a mulch anchoring tool operated along the contour of the slope. 4. Maintenance: The Contractor shall be responsible for maintaining all seeded areas through the end of their warranty period. The Contractor shall provide, at their expense, protection of all seeded areas against damage at all times until acceptance of the work. Maintenance shall include, but not be limited to, the following items: a. Regrade and revegetate all eroded areas until adequately stabilized by grass. b. Remulch with new mulch in areas where mulch has been disturbed by wind or maintenance operations sufficiently to nullify its purpose. Anchor as required to prevent displacement. C. Replant bare areas using same materials specified. d. Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Table 1: Seeding Schedule Material Seed Type Application Rate (See Note 11 Lime ----- 4,000 lbs/acre Fertilizer(10-20-20) ----- 500 lbs/acre Seed: Tall Fescue 50 lbs/acre Centipede 5 lbs/acre Permanent: Bermudagrass3 35 lbs/acre Sericea Lespedeza 20 lbs/acre Seasonal Nurse Crop See Note 2 Temporary: Seasonal Nurse Crop See Note 2 Mulch ----- 4,000 - 5,000 lbs/acre Binder ----- 400 gallons/acre Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-4 DocuSign Envelope ID: 10C7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Notes: 1. Application rates and/or chemical analysis shall be confirmed or established by a soil test(s). 2. Use seasonal nurse crop in accordance with seeding dates as stated below: May 1 -August 15 40 lbs/acre German Millet January 1 — May 1 120 lbs/acre Rye (grain) August 15 — December 31 120 lbs/acre Rye (grain)\ Annual Lespedoza (Kobe) 50 lbs/acre 3. From September 10 — February 28, use unhulled Bermudagrass. From March 1 —August 31, use hulled Bermudagrass. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-5 DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Appendix Erosion and Sedimentation Control Plans and Details Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 Please see site drawings under Attachment I of this submittal. DocuSign Envelope ID: 1OC7CE7F-CCD9-4198-9643-FBE9D8F5DOB1 This page intentionally left blank.