Loading...
HomeMy WebLinkAbout20240515_Bond_Increase ROY COOPER n Governor ELIZABETH S.BISER Secretary QVAM VIOL WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality May 15, 2024 Certified Mail Return Receipt Requested 7022 0410 0003 1066 6082 Scott Reece The Quartz Corp.USA PO Box 309 Spruce Pine,NC 28777 RE: Altapass Mine Mining Permit No. 61-16 Mitchell County French Broad River Basin Dear Mr. Reece: Your application for a modification of the above referenced mining permit, has been approved but the modified permit shall not be issued until the Department has received the required bond or security pursuant to N.C.G.S. §74- 51(h) in an amount sufficient to cover the present operation. During the review of your company's reclamation bond file,it was determined that your company is not sufficiently bonded. The required bonds are as follows: Permit No. Mine Name Required Bond Amount 61-01 Chalk Mountain Mine $479,400.00 61-02 Wiseman-Sullins Mine $292,000.00 61-06 Pine Mountain Mine $477,700.00 61-16 Altapass Mine $41,600.00 61-17 Pete Lawson Mine L $471,200.00 61-18 Beaver Creek Mine $40,600.00 61-20 Duncan Mineam= $39,500.00 Total 84 III Pursuant to the passage of House Bill 56,which became law on October 4, 2017, as SL 2017-209,the cap on reclamation bonds pursuant to N.C.G.S. §74-54,has been raised from$500,000 to $1,000,000.You must immediately increase your bond total to $1,000,000 to cover your reclamation bond responsibility. Our records show that The Quartz Corp.USA currently holds a$500,000 surety with Federal Insurance Company. For your convenience,I have enclosed the calculations for each site, a bond form, an assignment of a savings account form, and an irrevocable standby letter of credit form. The name on the security form must be the same as the name appearing on the enclosed draft permit, i.e., The Quartz Corp.USA. In addition to one of these alternatives you may, upon request, substitute a cash deposit. Please review the reclamation bond worksheets and contact this office should you have any objections or questions concerning the permit conditions. N.C.G.S. §74-51 North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLINA _ Department^p Environmental o^a\ 919.707.9200 Page 2 Certified Mail 7022 0410 0003 1066 6082 provides that the operator has sixty(60)days following the mailing of a notice of the required bond in which to file the required surety. The permit cannot be issued until the required security has been received. No mining may be conducted until the permit is issued. N.C.G.S. §74-65 states that the issuance of a mining permit does not supersede or otherwise affect or prevent the enforcement of any zoning regulation or ordinance duly adopted by an incorporated city or county or by any agency or department of the State of North Carolina. Again, if you should have any questions on this matter please contact me, at(919) 707-9228. Sincerely, Co aay&L Corey Clayton Assistant State Mining Engineer Enclosures: Bond Worksheets,Bond Sheets cc: Ms. Shawna Riddle