Loading...
HomeMy WebLinkAbout20240506_ADI_54-72 �diHESTAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality May 6,2024 Certified Mail Return Receipt Requested 7022 0410 0003 1066 6907 James E. & Susan S. Rouse 6219 Hwy 55 West Kinston,NC 28504 RE: Rouse Pit Lenoir County Neuse River Basin Dear Mr. &Ms. Rouse: We have reviewed the application you submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and §74-51 of the Mining Act of 1971, please provide the additional or revised information in accordance with the following comments: 1. During a recent site inspection, it was noted that there is an active 2.75 unpermitted site immediately southwest of the proposed site. The activity at this location must be permitted or reclaimed. Please clearly indicate and label on the mine map any existing operations. Please clarify your intent with the existing excavation. 2. Your response to item C.7 indicates that berms will be maintained around the site for screening purposes. No details were provided for screening berms on the mine maps. Please clearly indicate ad label on the mine map the location of any screening berms. Please provide construction and maintenance details for the screening berms. 3. Your response to item C.10 indicates that a stand of cedar trees will provide additional screening. These trees appear on the map outside of the permit boundary. Screening and buffers need to be included within the permit boundary. 4. You have proposed a 25'unexcavated buffer between the mine excavation and the adjoining properties to the west. Please clarify what types of activities (road, berms, erosion measures, etc.) are proposed to occur in this buffer. Please clarify if there will be additional screening in these buffers to screen from public view. Please clarify if there will be additional screening in these buffers to mitigate dust leaving the property. Please note, this office may request additional information, not included in this letter as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA - oaaa�emaienmronmenmiuuality /`� 919.707.9200 Certified Mail 7022 0410 0003 1066 6907 Mr. &Ms. Rouse Page 2 In order to complete the processing of your application,please forward two (2) copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy, Mineral,and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 5B.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, Adam Parr,PE State Mining Engineer cc: Mr. Samir Dumpor,PE