Loading...
HomeMy WebLinkAbout20210824_DWR Return PDF of this form to DEMLR CO by email. cc DEMLR RO, DWR SPU. Send a copy to the permittee. DIVISION OF WATER RESOURCES MINING PERMIT APPLICATION REVIEW FORM THIS SECTION TO BE OUT BY DEIVILR DEMLR PERMIT: 78-52 Project Acti!7t Modification Transfer Release Applicant Name: Williams Dirt and Sand LLC Applicant's Email: County: Project Name: Williams Dirt and Sand YES NO Date Commencing Have land disturbing activities started?? X 171 01/01/2004 Latitude: 34.8664 Longitude: -79.0440 Please return comments to (at DEMLR CO): Adam Parr adam.parr@ncdenr.gov Comments due by: 09/08/2021 SECTION • TO BE FILLED OUT BY DWR YES NO Is this mine an active permit in BIMS? ✓ Is the RO concerned that the operation, as proposed, would violate standards of water quality? F 1 ✓ Comments: Per info provided by applicant. JID provid-led- showing no waters. Does this mine (or previous owner) have DWR back fees to pay? Ll ./ (If Yes, amount): Watershed/Stream Name & Classification: UT to Little Marsh Swamp C;Sw DWR Compliance Status of Mine: 401 Wetland Cert. required? ✓ 401 Wetland Cert. existing? ✓ (If Yes, Permit#): Does DWR RO have enough information to determine if a 401 certification is required? �✓ �✓ Is a Pumping Operation & Monitoring (OM) Plan needed? Are wetlands disturbed at this site? I ❑ I Z Does DWR RO suspect or know of nearby wetlands to the site? I ❑ 1 �✓ Is a wetland delineation required prior to DWR issuing the permit? I El I ✓ JD Consultant Onsite ❑ Offsite ❑ ❑ Stream Determination Needed? I ❑ I Z Stream Determination Completed? 1 ❑ z Does DWR RO need a statement that no wetlands/streams are disturbed for this project ❑ ❑✓ from applicant? Buffer Determination Needed? ✓ Buffer Determination Completed? �✓ Recycle system permit existing? Ll 1 ❑ (If Yes, Permit#): New Recycle System permit required? Enough information to determine? Rev.April 2021 Return PDF of this form to DEMLR CO by email. cc DEMLR RO,DWR SPU. Send a copy to the permittee. Non-discharge permit existing? (If Yes, Permit#): Will wastewaters discharge to HQW waters with a 7Q10=0? 7Q10 Flow: Unknown Permittee must determine Does DWR require DEMLR to hold the permit (e.g. so DWR can review it further or ❑ z because DWR requires more information)? Has Violation O&M Requirements HQW/7Q10 Concerns Pay back fees or renew DWR permit LI Other Please describe the reason to hold the permit: RO contact: Hold Until: Mine must wait to dewater until an O&M plan is approved? Reviewed by Central Office Date Regional Office Date DWR RO Surface Water Chad Turlington 08/23/2021 RO Aquifer Protection Section Rev.April 2021