Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20240308_Application_19-39
DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Mining Permit Application Stone LCIB Landfill R Mine ARBO, LLC Chapel Hill, North Carolina Prepared for: ARB0, LLC Chapel Hill, North Carolina STONE EXCAVATING March 2024 Prepared by: SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 ©2024 Smith Gardner,Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 This page intentionally left blank. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Mining Permit Application Stone LCID Landfill S Mine Chapel Hill, North Carolina Prepared For: ARBD, LLC Chapel Hill, North Carolina S+G Project No.ARBD-23-1 �%111111111 fll"� E"s's io• ��'-; DocuSignedby: - �••� SEAL EjOc C. _ 054367 ' (� 36/2024 CSECC95C937E4AC.e, •••:`'�� r��: �� Jesse C, Li, P.E. 1U F Project Engineer S I uCO3� , /EDocuSigned by: st" Q. Sm � �2 3 3,�6 2024 276482DFlAO9438... Z ; z Stacey A.Smith, RE, =� : �N� .ft Senior Engineer �'ir� �Ye,IA+�S��,♦♦ March 2024 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1919.828.0577 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 This page intentionally left blank. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Stone LCIB Landfill B Mine ARBD, LLC Mining Permit Application Table of Contents EXECUTIVE SUMMAY FIGURES Figure 1 - USGS Map Figure 2 - Highway Map Figure 3 - Volume Isopach (Proposed Expansion Area Excavation) Figure 4- Volume Isopach (Proposed Site Reclamation) APPENDICES Appendix A Mining Permit Application Form Appendix B Permits & Approvals Appendix C Erosion and Sedimentation Control Plan Appendix D Mine Drawings ARBD,LLC-Stone LCIB Landfill Mine Mining Permit Application March 2024 Table of Contents Page i DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 This page intentionally left blank. ARBD,LLC—Stone LCID Landfill Mine Mining Permit Application March 2024 Table of Contents Page ii DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 EXECUTIVE SUMMARY 1.0 BACKGROUND ARBD, LLC (ARBD) currently owns and operates an existing Land Clearing and Inert Debris (LCID) Landfill (Solid Waste Permit No. 1909-LCID-2010) located on Rock Hill Drive in Chatham County, North Carolina. The existing landfill limits encompasses approximately 20-acres. In February 2023, ARBD applied for a solid waste permit modification that would expand the Landfill facility approximately 40-acres for a total area of 60.6-acres. ARBD is applying to permit the current and proposed LCID landfill facility as a soil and sand mine as well. Historically, groundwater levels have been determined by the creek bed elevation and shallow test pit investigations. This approach was further verified through site reconnaissance by S+G in July 2022. 2.0 MINING METHODS ARBD plans to mine soil and sand using mining operations similar to those methods used at similar sites (excavators/trucks), although other methods are not prohibited. 3.0 ENVIRONMENTAL SITEASSESSMENT The proposed mine expansion area is bordered to the east and west by residential properties, to the north and south by streams outside of the proposed mine limits, and to the southeast by US Army Corps of Engineers property. Jordan Lake is also located east of the facility across from Big Woods Rd (SR-1716). Wetlands are present to the north and south, also outside of the footprint of the proposed mine limits.Wetland and stream field location was conducted by Carolina Ecosystems, Inc. on 2/28/2018 and 9/14/2022. The unnamed tributary is subject to the Cape Fear River Basin Rules. 4.0 EROSION AND SEDIMENTATION CONTROL Erosion and sedimentation (E&S) control measures will be constructed to prevent off-site sedimentation during operations. The proposed erosion and sediment (E&S) control measures are intended to be viable during mine operations and after mine reclamation. An Erosion and Sedimentation Control Plan is presented in Appendix C. 5.0 MINING EXCAVATION AND BACKFILL An engineering field survey of the mine was conducted via a UAS flight by Smith Gardner, Inc. on May 4, 2022. This topographic survey was compared with proposed site base grades to determine the gross excavation volume. Likewise, the survey was also compared to proposed reclamation grades to determine reclamation volume. The resulting volumes for the proposed expansion area are included in the summary table below. ARBD,LLC-Stone LCID Landfill Mine Mining Permit Application March 2024 Page 1 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Volume Summary of Proposed Mining Operations Description Volume ICY) Acreage Excavation 641,000 26 Reclamation 3,283,500 51 Please note that the "Excavation" volume is the required excavated volume from the existing topography to reach the proposed mine excavation grades (LCID landfill subgrade). The "Reclamation" volume is the volume required to fill from the mine excavation grades to the mine reclamation grades. AutoCAD volume analysis isopach drawings are included in Figures 2 and 3. 6.0 RECLAMATION PLAN The current reclamation plan for the proposed mine is a Land Clearing, and Inert Debris (LCID) Landfill,which operates under existing Solid Waste Permit No. 1909-LCID-2012 (Appendix B). Reclamation plans for this area are shown on the Mine Drawings (Appendix D). ?.0 MINING PERMIT APPLICATION The mining permit application form is located in Appendix A. Appendix A includes Bond Determination, Notices to adjacent land owners, and Land Entry Agreements. Mine Drawings are provided in Appendix G. Notifications were sent out in advance of this submittal and receipts are also provided in Appendix A. ARBD,LLC-Stone LCID Landfill Mine Mining Permit Application March 2024 Page 2 r� AVE VAR,! • • •a-• 4 ;f .r'��,� "'-" ' ■ � �-•; 'i � � J is ;�'� LIM :. ` ' '•i ':W • 1 111 111 111 � 111 ��3• • '•" "' • SMITH + GARONER SCALE DATE PROJECT IN Q ASSHOWN Dec. -: • DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB47OBC860 IN W ® E • • S �. � •,� , d i ' f ma's MINING FACILITY BOUNDARY F a m n g t o n (APPROXIMATE) ; V 1 / s r r 1 co / ` . • 06 CD CD fn . . . REFERENCE: 0 3000' 6000' N ROAD MAP FROM (CHATHAM COUNTY, NORTH CAROLINA ROAD MAP) PREPARED BY m NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. UPDATED DECEMBER 2023. c\j PREPARED FOR: PREPARED BY NC LIC.NO.F-1370(ENGINEERING) CID SITE LOCATION MAP SC COA NO.C01488 s ALLC SMITH+6ARONER J STONE LANDFILL LCID AND MINE PERMIT DRAWINGS 14 N.Boylan Avenue,Raleigh NC 27603 1919.828.0577 1526 Richland St.,Columbia SC 29201 O7 DRAWN. APPROVED: SCALE: DATE: PROJECT NO.: FIGURE NO.: FILE NAME: Of J.R.G. JCL AS SHOWN JAN. 2024 ARBD 23-1 2 FIGURE NO-2 © 2024 Smith Gardner, Inc. 0 � o C/) S m (D ��. 0 0 '�' o !ll///l/j i l/l/Ill llllltll i�/Ifl� 0:) l\\\•_���``?�\.! 'Ill///j IIII,/IIII r//ill (II! �\\` _' -��/j'r%�r,r m m \ \\\\\_ �i��ii-i„ //////'Ill\\1/I,..,I \\1 I(I lll'•_��•�.^,II/ /I 1p .-\\\\\111\\\`���% /�.''ir /:e✓ ~Ill i�lpllr�l( ��/ ( 1l �i F-f '�lw1AA C) I1 11/�111111r �gl\ r/)4iii it rN ✓ r� l � - � 1 \ li R\\I •\\l/4ii i / /. � C;xY-� / ,ri i \��O hn @1�qU\�\\gip\J\�\����\\\0\ \\\\\\P1�I CD OD Sul C) O A V AAA AAAA A P, vva ,_vvv vvvvq ll vvv v Ir `v Il Ili/ I l/l"i Y/-_� ��/� I � QAAVA A AAA 0A A A I I P 11 VAAAA A 11 A IVI II __ � 41� i//li i,l�l N.,/a + r� e 1 vovvvvv vvv vvvvli vlvq 0v�v vv vPv 1v nvv vv`vvI v0vi/ I /✓�:) It/I?/c\`%'�`�\\�\\\V\A1I 11 i ij•�1�' � ��f5I lr/�l+Il l l llAilr\,ll\1�Il ilI II ll,I�1l11,1r/l = y Y AA�\�q\vvV 1�1�\\\ _A\ �vv v vvv ' 1 vIII dUJv v � V`�..,,,r,4 A � ;olv v��J�llvv w� � vv41lln ipv 1 �.`i -,�vvkV lA aVA AVA`� �: d 1 ��i"�M e' �I VA II VAAv.� \VAAAA V1 � IIA� `VA1AVAJ1A� AI❑ VIAVA Vp _-�,a j1 11 CAI IIIII'1A A: 1'O IVAAAp nl V AA A A V • %� A // � V A V 1 A v . !I AAAA II I II II I I A A vvvv vv0v AIvv v A ev E - 7 G� 1.Iv v� A v I �I 41 II lIl �v I y�v/I ��`Ivv IIvIIII IIIIIIII lll� v i�%ii ';� i�/I n_o/rfl/ll\\\\.\� \ 1 1 ,\I1111111�1111\IIII\ \ 11'.i ijljl\IIII/ IIII�IIII��\II\�111111 %i'�����r // �..,\: � IIII 11\ 11 I\ I11i1 ,IIII ll;ull IIII III\ IIII IIII II��r 1 ,i//i///r llf i 1 � 1 Y � J \�J\\111\I\II\111\ \\ I I II I11 IIII III II1�11I\ 1\1 11\\I 1 1\ / � . vv��� %ice."=T-y � � `ti;16. � v .{ �w�dwvvlv�p�wv�IPwI .. Imlllpugh Illil//Illllu„q,�lln,, l v � VAA A�PV UTAU III/ll llu IIII IIIII Il rl /llll,,�� V , AAA AA\`VI /III IIIII II Ill/ U'•.1//l1 ) l �J l , A / � \VU AAA iI A ` V / II pn 111/1111/ 1AIll � � { � V I Ijj 1111111111A \411 Ah�//i II 1AAAA 1A�". VANVA Il �r , A 1 I IIII IIII 11Ilp"`- _1 , A AI A I V At 1HIAA I ; � ^ xV v`r ,IIIII IAA VAy_-c�_� 11AAIVAVA� \ II �� .e \ 1 1 l � I � • I \\ \1l1 ll\\11 `•I I \l) \'N 1 \\\\ ��VAII 111.14 � r�� f I;et l •�, I l \ - .'` 111 ar nn qnl lo\un 11 li'\Il,' - -a` 5 1• \j d I . :.1\Y ,lao \ i . I //i//- �. IIII 111 1 �� Z 21 C)OW G` _I �< --1�dC �R� w o <s�<svcn 3 CD 33" � - c ' N � '" --_ Q N N N O Wo aaOG)o ISO -U 04 0 000mcn W OA'u� s wommm nc n--1 m aaa> D n cn n z � v G:\CAD\ARBD LCID LandfilK ARBD 21-1\basedw s\excavation Dian ex ansion.dw -1/20/2023 11:31 AM 0 a O < O cn o c z ail c> 0 w S 3 m < CD N N O 1 q{IRII li '11 IVI�l/Ill\\\�~/%///////1 I \< }t { t 1 f}r/ n UD N V � N w N o m m -n co 0 << a) n OD Al AIf 3 �� . vvvvvvvv�v, /�/j �,� a\ )�, .A � A � .�1,��•o�o� � \ \tom � `//!o�j//� oez.=_ � �/ L 'O S { i r \ 1 yip\ xti �`� > y.. —— =z• ."� ti a 1 I ( .l yy < z �\ ti�`�`i zeokzv � JIB 'C • k T rn F AppendixA Mining Permit Application Mining Permit Application ARBD, LLC— Stone LCID Landfill R Mine Chapel Hill, North Carolina This page intentionally left blank. NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE:It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE- APPLICATION MEETING to discuss your intentions and address any questions. 1. Name of Mine Stone LCID Landfill & Mine County Chatham River Basin Cape Fear Latitude(decimal degrees to four places) 35.8004 Longitude(decimal degrees to four places) -79.0323 2. Name of Applicant ARBD, LLC Applicant Contact Alan Stone Consultant Contact Applicant Email alanrocs@gmail.com Consultant Email Telephone 919-971-0918 Telephone Cell Phone Cell Phone 3 Permanent Address for Receipt of Official Mail** 5180A Big Woods Road, Chapel Hill, NC 27517 4. Mine Office Address 52 Rock Hill Drive, Chapel Hill, NC 27517 5. Mine Manager Alan Stone Mine Manager Email alanrocs@gmail.com Telephone 919-971-0918 Cell Phone I certify that all details contained in is ermit application are true and correct to the best of our knowledge.We fully understand that an u misrepresentation of facts will be cause for permit revocation. Signature*** Date ya Print Name A Title vW� *This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond(security)that corresponds to this site. 'The Division of Energy,Mineral,and Land Resources must be notified of any changes in the permanent address or telephone number. *"Signature of company officer required. G.S.74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or,if a public hearing is held,within 30 days following the hearing and the filing of any supplemental information required by the Department.All questions must be addressed,and all required maps provided before this application can be considered complete.Attach additional sheets as needed. Revised September 21, 2021 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTE:All the following questions must be thoroughly answered regarding your mining operation for the intended life of the mine.All responses must be clearly conveyed on a corresponding, detailed mine map. A.GENERAL CHARACTERISTICS OF THE MINE 1. Answer all the following that apply: ❑�\ This is an application for a NEW permit. Indicate the total acreage at the site to be covered by the permit 60.6 (This is the acreage the new permit fee will be based upon.) Of this acreage,how much is owned and how much is leased? Acres owned: 60.60 Acres leased: Property owner if leased: This is an application for a MODIFICATION to a mining permit. Mining Permit Number: Total permitted acreage: Does the modification involve acreage within the previously approved permitted boundary? YES F-1NO If yes,indicate the acreage to be covered by this modification Does the modification involve acreage outside the previously approved permitted boundary? YES NO If yes,indicate the additional acreage to be covered by this modification NOTE:You must complete all of Section F of this application form entitled Notification of Adjoining Landowners Of the acreage to be added to the permit,will any portion be affected(i.e.:disturbed,ground cover removed)by the mining operation? YES NO If yes,indicate the acreage to be affected within the acreage to be added to the permit The modification fee is based upon the proposed new affected acreage within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. This is an application for TRANSFER of a mining permit. Mining Permit Number: Total permitted acreage: Revised September 21, 2021 P a y e 12 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 MINING FEE SCHEDULE A nonrefundable permit application processing fee when filing for a new mining permit,permit modification,or transferred permit is required as follows: APPLICATION TYPE 0—25 ACRES 26+ACRES New Permit Applications $3,750.00 $5,000.00 Permit Modifications $750.00 $1,000.00 Permit Transfers $100.00 $100.00 Annual Operating Fee $400.00 $400.00 Acres for new permits means the total acreage at the site to be covered by the permit.Acres for modification of permits means the new affected acres within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. 2. Name of all materials mined: Sand and SOII 3. Mining Method: ❑ Hydraulic Dredge ❑X Front-end Loader&Truck Shovel&Truck ❑ Dragline&Truck ❑ Self-loading Scraper ZExcavator&Truck ❑ Other(please explain): 4. Expected maximum depth of mine(feet) 40 Depth is relative to what benchmark?(e.g., natural ground level, mean seal level,road elevation,etc.) natural ground Expected average depth of mine(feet) 15 5. Has an area at this site been mined in the past? YESrl NO Z If yes,when and by whom was this activity conducted? 6. Estimated life of the operation(years): 30 NOTE:The Department may request clarification on how life of mine was calculated. Revised September 21, 2021 P a g e 3 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 B.MAPS 1. Clearly mark and label the location of your mining operation on six(6)copies of a 7.5-minute quadrangle and a county highway map.These maps,in addition to six(6)copies of all mine maps and reclamation maps, must be submitted with each permit application. 7.5-minute quadrangles may be obtained from the N.C.Geological Survey: Mailing Address Physical Address 1612 Mail Service Center 512 N.Salisbury St.,5th Floor Raleigh,NC 27699-1612 Raleigh,NC 27604 Http://Portal.ncdenr.org/web/Ir/geological home (919)733-2423 County highway maps may be obtained from the N.C.Department of Transportation: Mailing Address Physical Address NCDOT GIS Unit NCDOT GIS Unit 1587 Mail Service Center 3401 Carl Sandburg Court Raleigh,NC 27699-1587 Raleigh,NC 27610 http://www.ncdot.rg/it/gis (919)212-6000 2. A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds, stockpiles,waste piles, processing areas/haul roads,mine excavations and any other major aspect of the mining operation that is proposed to be affected/disturbed during the life of the mining permit.A table/chart similar to the following will be acceptable: AFFECTED ACREAGE TABLE: For new permits,complete only the total affected acreage column. For modifications,complete all columns. CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTED ACREAGE ACREAGE Tailings/Sediment Ponds Stockpiles Waste piles Processing Areas/Haul Roads Mine Excavations Other(Please explain) Total Affected Acreage Total Permitted Acreage Revised September21, 2021 P a g e 14 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 3. Mine maps must be accurate and appropriately scaled drawings,aerial photographs,or enlarged topographic maps of the entire mine site.All aspects of the mine site must be clearly labeled on the maps along with their corresponding(approximate)acreage.Thus,all mine and reclamation maps must denote those activities that are intended to be conducted during the life of the mining permit.All maps must be of a scale sufficient to clearly illustrate the following,at a minimum: a) Property lines of the tract or tracts of land on which the proposed mining activity is to be located including easements and rights-of-way. b) Existing or proposed permit boundaries with geographic controls(e.g. metes and bounds,coordinates)labeled c) Initial and ultimate limits of clearing and grading d) Outline and width of all buffer zones(both undisturbed and unexcavated) e) Outline and acreage of all pits/excavations f) Outline and acreage of all stockpile areas g) Outline and acreage of all temporary and/or permanent overburden disposal areas h) Location and acreage of all processing plants(may be described as to location and distance from mine if sufficiently far removed) i) Locations and names of all streams,rivers,and lakes j) Outline and acreage of all settling and/or processing wastewater ponds k) Outline and acreage of all planned and existing access roads and on-site haul roads 1) Location of planned and existing on-site buildings m) Location and dimensions of all proposed sediment and erosion control measures n) Location of 100-year floodplain limits and wetland boundaries o) Names of owners of record, both public and private,of all tracts of land that are adjoining the mining permit boundary; if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts that are within 1,000 feet of the mining permit boundary must be provided on the mine map. p) Names of owners of record, both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream, river,or other watercourse, railroad track,or utility or other public right-of-way. If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary,must be provided on the mine map(s).NOTE:"Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. q) Map legend 1) Applicant name 5) Scale 2) Mine name 6) Symbols used and corresponding names 3) North arrow 7) Date prepared and revised 4) County 8) Name and title of person preparing map Map scales should meet the following guidelines: PERMITTED ACREAGE MAP SCALE 0—49 acres 1"=50' 50—199 acres 1"= 100' 200+acres 1"=200' NOTE:Smaller scaled maps may be acceptable if they clearly illustrate the above items. NOTE: In addition to the above,the maps must also include any site-specific information that is provided in the answers to the following questions(italicized questions/statements)in this application form.This application will not be considered complete without all relevant items being adequately addressed on the mine maps. Revised September 21, 2021 P a g e 15 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 C. PROTECTION OF NATURAL RESOURCES 1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence to the mine map(s).Attach additional sheets as needed. 1) Mine soil and sand to depths shown on plan or less. 2) Cover mined area with soil and re-seed. 2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to prevent offsite sedimentation(include specific plans for sediment and erosion control for mine excavation(s), waste piles, access/mine roads,and process areas),and give a detailed sequence of installation and schedule for maintenance of the measures.Locate and label all sediment and erosion control measures on the mine map(s)and provide typical cross-sections/construction details of each measure. Engineering designs and calculations are required to justify the adequacy of any proposed measures. See plan for erosion control measures. 3. A)Will the operation involve washing the material mined,recycling process water,or other wastewater handling? YES FX If yes, briefly describe all such processes including any chemicals to be used. B)Will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters of the State?FI YES FX If yes, briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of stabilization)on the mine map(s). Revised September 21, 2021 P a g e 16 Add Addtional Sheets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 C)Will any part of the proposed mine excavation(s)extend below the water table? YES � NO If yes,do you intend to dewater the excavation(s)? YES NO Estimated withdrawal rate in gallons per day: If yes,what impact,if any,will mine dewatering have on neighboring wells?Locate all existing wells on the mine map(s)that lie within 500 feet of the proposed excavation area. Provide data to support any conclusions or statement made,including any monitoring well data,well construction data, and current water withdrawal rates. Indicate whether the proposed mine locale is served by a public water system or private wells. D)If you answered yes to any of the above questions, provide evidence that you have applied for or obtained the appropriate water quality permit(s)(i.e., non-discharge, NPDES,Stormwater,etc.)from the Stormwater Program. In addition,the applicant is required to register water use with the Division of Water Resources,Ground Water Management Branch,if the operation withdraws more than 10,000 gallons per day and needs a capacity use permit from the Division of Water Resources,Ground Water Management Branch,if the operation lies in a capacity use area and withdraws more than 100,000 gallons per day. 4. A)Will the operation involve crushing or any other air contaminant emissions? YES zNO If yes,indicate evidence that you have applied for or obtained an air quality permit issued by the Division of Air Quality or local governing body. B)How will dust from stockpiles,haul roads,etc.,be controlled? The dust will be controlled with a water tanker truck or equivalent. Revised September 21, 2021 7 Add Addtional Sheets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 5. A)A buffer will be required between any mining activity and any mining permit boundary or right-of-way. It may be an unexcavated buffer(no excavation, but roadways,berms,and erosion&sedimentation control measures may be installed within it),an undisturbed buffer(no disturbance within the buffer whatsoever),or a combination of the two, depending upon the site conditions. Note that all buffers must be located within the mining permit boundaries. How wide a buffer will be maintained between any mining activity and any mining permit boundary or right-of-way at this site?A minimum buffer of 25 feet is recommended,although a wider buffer may be needed depending on site conditions. Show all buffer locations and widths on the mine map(s). A 50ft unexcavated mine buffer will be maintained. B)A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands unless smaller undisturbed buffers can be justified. Depending on site conditions,a buffer wider than 50 feet may be needed. How wide an undisturbed buffer will be maintained between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands at this site?Show all buffer locations and widths on the mine map(s). A 50ft buffer will be maintained. 6. A)Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries during mining. Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and minimum 3 horizontal to 1 vertical slopes or flatter for sandy material are generally required unless technical justification can be provided to allow steeper slopes. A 2:1 slope or flatter will be maintained during mining. B)Provide a cross-section on the mine map(s)for all fill slopes(berms, waste piles, overburden disposal areas,etc.), clearly indicating the intended side slope gradient,installation of any benches and/or slope drains(with supporting design information)if needed, and the method of final stabilization. Revised September 21, 2021 P a g e 18 Add Addtional Sheets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 C)In excavation(s)of unconsolidated(non-rock)materials,specify the angle of all cut slopes including specifications for benching and sloping. Cross-sections for all cut slopes must be provided on the mine map(s). A 2:1 slope or flatter will be maintained in any mining areas. D)In hardrock excavations,specify proposed bench widths and heights in feet.Provide cross-sections of the mine excavation clearly noting the angles of the cut slopes, widths of all safety benches and mine benches, and the expected maximum depth of the excavation. N/A - will not be excavating any hard rock. 7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling, house, public road,or public,commercial or industrial building from any mine excavation.Locate all such structures on the mine map if they are within 300 feet of any proposed excavation. None 8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area and when it will be implemented.Vegetated earthen berms,appropriate fencing and adequate boulder barriers may be acceptable high wall barricades.A construction detail/cross-section and location of each type of barricade to be used must be indicated on the mine map(s). The site will construct vegetated earthen berms and use existing tree cover. 9. Are acid producing minerals or soils present? YES ❑X NO If yes, how will acid water pollution from the excavation,stockpiles,and waste areas be controlled? Revised September 21, 2021 9 Add Addtional Sheets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 10. A)Describe specific plans(including a schedule of implementation)for screening the operation from public view such as maintaining or planting trees,bushes or other vegetation, building berms or other measures. Show the location of all visual screening on the mine map(s)and provide cross-sections through all proposed berms or proposed spacing, sizes and species for tree plantings. Mine and landfill operations will be surrounded by berms, existing tree cover, or both. B)Could the operation have a significantly adverse effect on the purposes of a publicly owned park,forest,or recreation area? If so,how will such effects(i.e.,noise,visibility,etc.)be mitigated? No 11. Will explosives be used?FI YES �NO If yes,specify the types of explosive(s)and describe what precaution(s)will be used to prevent physical hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations. Depending on the mine's location to nearby structures, more detailed technical information may be required on the blasting program(such as a third-party blasting study).Locate the nearest offsite occupied structure(s)to the proposed excavation(s)on the mine map and indicate its approximate distance to the proposed excavation. 12. Will fuel tanks,solvents,or other chemical reagents be stored on-site? YES F-1NO If yes, describe these materials, how they will be stored and method of containment in case of spill. Indicate the location(s)of all storage facilities on the mine map(s). -Diesel fuel for equipment. -Fuel oil tank with secondary containment measures. Revised September 21, 2021 Page 110 o�� o��t.�nal Shmets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 D. RECLAMATION PLAN 1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate the sequence and general methods to be used in reclaiming this land.This must include the method of reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment of any permanent drainage channels to a condition minimizing erosion,siltation and other pollution. This information must be illustrated on a reclamation map and must correspond directly with the information provided on the mine map(s). In addition, design information,including typical cross-sections,of any permanent channels to be constructed as part of the reclamation plan and the location(s)of all permanent channels must be indicated on the reclamation map. Site reclamation will be accomplished by expanding the existing LCID landfill and beneficial fill. A permit expansion application was submitted to the solid waste section in February 2023. Mine will be covered in soil and reseeded for pasture. Proposed drainage channels and sedimentation basin design are shown in the attached drawing set. 2. Is an excavated or impounded body of water to be left as part of the reclamation? YES FX If yes, illustrate the location of the body(s)of water on the reclamation map and provide a scaled cross-section(s) through the proposed body(s)of water.The minimum water depth must be at least 4 feet, measured from the normal low water table elevation, unless information is provided to indicate that a shallower water body will be productive and beneficial at this site. Will the body(s)of water be stocked with fish? YES FX NO If yes,specify species. 3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock including what kind of permanent barricade will be left.Acceptable permanent barricades are appropriate fencing,large boulders placed end-to-end,etc. Construction details and locations of all permanent barricades must be shown on the reclamation map. N/A - No rock is to be excavated. Revised September 21, 2021 Page 111 o�� o��t��nal Shmets NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 4. Indicate the method(s)of reclamation of overburden,refuse,spoil banks or other such on-site mine waste areas, including specifications for benching and sloping. Final cross-sections and locations for such areas must be provided on the reclamation map. N/A 5. A)Describe reclamation of processing facilities,stockpile areas,and on-site roadways. N/A B)Will any on-site roadways be left as part of the reclamation? YES FX If yes, identify such roadways on the reclamation map and provide details on permanent road and ditch line stabilization. 6. Describe the method of control of contaminants and disposal of scrap metal,junk machinery,cables,or other such waste products of mining.(Note definition of refuse in The Mining Act of 1971.) No off-site-generated waste shall be disposed of on the mine site without prior written approval from the NC Department of Environmental Quality, Division of Energy,Mineral,and Land Resources and either the Division of Waste Management(DWM)or local governing body.If a disposal permit has been issued by DWM for the site,a copy of said permit must be attached to this application.All temporary and permanent refuse disposal areas must be clearly delineated on the mine map(s)and reclamation map, along with a list of items to be disposed in said areas. All scrap metals brought on site will be sold to scrap dealers. Revised September 21, 2021 Page 112 - o�� o��t��nal Shots NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 7. Describe your plan for revegetation or other surface treatment of the affected areas.This plan must include recommendations for year-round seeding,including the time of seeding and the amount and type of seed,fertilizer, lime and mulch per acre.The recommendations must include general seeding instructions for both permanent and temporary revegetation. Revegetation utilizing only tree plantings is not acceptable. Recommendations can be sought from: a. Authorized representatives of the local Soil and Water Conservation District; b. Authorized representatives of the NC Forest Service, Department of Agriculture and Consumer Services; c. Authorized county representatives of the North Carolina Cooperative Extension Service,specialists and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at North Carolina State University; d. North Carolina licensed landscape architects; e. Private consulting foresters referred by the NC Forest Service,Department of Agriculture and Consumer Services; f. N.C. Erosion and Sedimentation Control Planning and Design Manual; g. N.C.Surface Mining Manual:A Guide for Permitting,Operation and Reclamation; h. Others as may be approved by the Department. Lime Rate of Application(tonslacre): See mine drawings Fertilizer Analysis and Rate of Application(lbs/acre): See mine drawings Seed type(s)and rate(s)of application included year-round seeding schedule(lbslacre): NOTE: Include legumes SEED TYPES SEEDING DATES SEEDING RATES See mine drawings See Mine Drawings See Mine Drawings Mulch Type,Rate of Application(lbslacre),and Method of Anchoring: See mine drawings Other Vegetative Cover(s)Type(s)and Rate(s)of Application Including Seeding Schedule(lbslacre,trees/ acre,spacing of trees/shrubs,etc.): See mine drawings Revegetation and/or reforestation plan approved by: Signature Date Print Name Title Agency Revised September 21, 2021 Page 113 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 E.DETERMINATION OF AFFECTED ACREAGE AND BOND The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to$5,000 per affected acre)for each permitted mine site based upon the acreage approved by the Department to be affected during the life of the mining permit. Please insert the approximate acreage, for each aspect of the mining operation, that you intend to affect during the life of this mining permit(in addition,please insert the appropriate reclamation cost/acre for each category from the Schedule of Reclamation Costs provided with this application form) OR you can defer to the Department to calculate your bond for you based upon your maps and standard reclamation costs: CATEGORY AFFECTED RECLAMATION RECLAMATION ACREAGE COST/ACRE COST Tailings/Sediment Ponds 1.60 Ac. X $ 500 /Ac. = $ 800.00 Stockpiles 0.00 Ac. X $ /Ac. = $ 0.00 Waste Piles 0.00 Ac. X $ /Ac. = $ 0.00 Processing Area/Haul Roads 7.10 Ac. X $ 1,800 /Ac. = $ 12,780.00 Mine Excavation 1.50 Ac. X $ 2,000 /Ac. = $ 3,000.00 Other 13.30 Ac. X $ 1,750 /Ac. = $ 23,275.00 TOTAL AFFECTED AC.: 23.50 Ac. TOTAL PERMITTED AC.: 60.60 Ac. Temporary&Permanent Sedimentation&Erosion Control Measures: Divide the TOTAL AFFECTED AC.above into the following two categories:a)affected acres that drain into proposed/existing excavation and/or b)affected acres that will be graded for positive drainage where measures will be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands. a) Internal Drainage 0.00 Ac. b) Positive Drainage 23.50 Ac. X $1,500.00 = $ 35,250.00 SUBTOTAL COST:$ 755105.00 Inflation Factor: SUBTOTAL COST LIFE OF MINING OPERATION OR LIFE INFLATION COST OF LEASE(YEARS) 0.02 X $ 75,105.00 X 30 = $ 45,063.00 Total Reclamation Bond Cost: TOTAL RECLAMATION BOND COST= SUBTOTAL+INFLATION = $120,100.00 Round down to the nearest$100.00 NOTE:The reclamation bond cannot exceed$1 million per GS 74-54 Revised September 21, 2021 Page 114 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 SCHEDULE OF RECLAMATION COSTS Based upon range of$500-$5,000 per affected acre COMMODITY CODES: SG Sand and/or Gravel DS Dimension Stone PF Pyrophyllite CL Clay/Shale GS Gemstone FS Feldspar OL Olivine PE Peat Borrow Borrow/fill dirt MI Mica KY Kyanite/Sillimanite/Andalusite AU Gold CS Crushed Stone LI Lithium PH Phosphate TI Titanium OT Other TYPE T/S PONDS STOCKPILES WASTE PILES P.AREA/H.R. MINE EXCAVATION $5001ac. (L) $500/ac. (L) SG, GS, Borrow $1800/ac. $2000/ac. $1800/ac. 1500(FI) 2000(PD) CS, DS, FS, MI, LI, 500(L) 1800 2000 2000 500(L) PF,OL, KY 1500(FI) 2500(PD) 1000(L) 2000(L) PH 2500 5000 5000 2500(FI) 5000(PD) CL 1000(L) 2500 5000 5000 2000(L) 2500(FI) 3700(PD) PE,AU,TI,OT 1000(L) 2500 3000 3500 2000(L) 2500(FI) 5000(PD) (L)=Reclamation to a lake and revegetating side slopes (FI)=Reclamation by filling in and revegetating (PD)=Reclamation by grading for positive drainage&revegetating AS PER NCAC 15A 513.0003,IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE BOND CALCULATION WORKSHEET,YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS FROM A THIRD-PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO THE FOLLOWING ADDRESS: Mining Program, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612 ALL ESTIMATES MUST INCLUDE THE FOLLOWING,AS A MINIMUM: •FINAL GRADING COSTS PER ACRE •LIME AND FERTILIZER COSTS PER ACRE •YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE(FROM APPROVED REVEGETATION PLAN IN APPLICATION/PERMIT DOCUMENT) •MULCH AND ANCHORING COSTS PER ACRE •ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED RECLAMATION PLAN FOR THE SITE IN QUESTION YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION. Revised September 21, 2021 Page 115 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 F.NOTIFICATION OF ADJOINING LANDOWNERS The"Notice"form,or a facsimile thereof,attached to this application must be sent certified or registered mail, return receipt requested,to: (1)the chief administrative officer of each county and municipality in which any part of the permitted area is located as indicated on the mine map(s); (2)all owners of record, both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s);and (3)all owners of record, both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s)."Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. The only exception to the above method of giving notice is if another means of notice is approved in advance by the Director, Division of Energy,Mineral,and Land Resources. A copy of a tax map(or other alternative acceptable to the Department)must be mailed with the completed"Notice"form(the proposed overall permit boundaries and the names and locations of all owners of record of lands adjoining said boundaries must be clearly denoted on the tax map). The"Affidavit of Notification"attached to this application must be completed,notarized and submitted to the Department,with the remainder of the completed application form before the application will be considered complete. NOTES: THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS AND ALL MODIFICATIONS OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA,AS REQUIRED BY NCGS 74-50(b1). SEE THE NEXT TWO PAGES FOR THE"NOTICE"FORM AND THE"AFFIDAVIT OF NOTIFICATION" Revised September 21, 2021 Page 116 Notified Parcel Address List: Adjoining Land Owner Address Randy J. Amell & Holly L.Amell 5219 Big Woods Rd, Chapel Hill, NC 27517 United States of America C/O US Army Corps of Engineers, PO Box 144, Moncure, NC 27559-0144 Gerald H. Negley 188 Bush Creek Ln, Chapel Hill, NC 27517-9027 Michael Theil &Sharon Theil 348 Bush Creek Ln, Chapel Hill, NC 27517 Margaret Tiano 188 Hawthorn PI, Chapel Hill, NC 27517-9363 Elizabeth Grabowski 640 Tanager Ln, Chapel Hill, NC 27517 Ricki D. Goode &Joan M. Cunningham 644 Tanager Ln, Chapel Hill, NC 27517-6457 Gary M. Anderson &Susan E. Anderson 920 Jordan Hills Chapel Hill, NC 27517-6440 Bruce W. Hollis & Kelly A.S. Hollis 960 Jordan Hills, Chapel Hill, NC 27517-6440 Helen B. Stone 5180 Big Woods Rd, Chapel Hill, NC 27517-8888 Big Woods Properties, LLC 5180A Big Woods Rd, Chapel Hill, NC 27517-8888 Alan Hugh Stone* 5180A Big Woods Rd, Chapel Hill, NC 27517-8888 Marlon K. Stone 1325 Bennington Dr NW, Concord, NC 28027 Chief Administrative Officer Address (Chatham County Manager) Dan LaMontagne PO Box 1809, Pittsboro, NC 27312 *Alan Hugh Stone is the applicant NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 NOTICE Pursuant to provisions G.S.74-50(bl)of The Mining Act of 1971, Notice is hereby given that ARBD, LLC has applied on 01/31/2024 to the Division of Energy, (Applicant Name) (Date) Mineral,and Land Resources, North Carolina Department of Environmental Quality, 1612 Mail Service Center, Raleigh, North Carolina 27699-1612,for(check one): ❑X a new surface mining permit, a modification of an existing surface mining permit to add land to the permitted area;or a modification of an existing surface mining permit to add land to the permitted area with no disturbance in the area proposed. Please note that future modification(s)may be submitted by the applicant to allow disturbance within this area without re-notification of adjoining landowners. The applicant proposes to mine sand and soil on 60.60 acres located 7.70 (Mineral,Ore) (Number) (Number) miles south of Chapel Hill offlnearroad SR-1716, Big Woods Rd (Direction) (Nearest town) (Number, Name) in Chatham County. *SEE ATTACHED MAP FOR PROPOSED PERMIT BOUNDARIES AND CORRESPONDING ADJOINING LANDOWNER NAMES AND LOCATIONS* In accordance with G.S.74-50(bl),the mine operator is required to make a reasonable effort,satisfactory to the Department,to notify all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary).In addition,the mine operator must also notify the chief administrative officer of the county or municipality in which any part of the permitted area is located. Any person may file written comment(s)to the Department at the above address within thirty(30)days of the issuance of this Notice or the filing of the application for a permit,whichever is later. Should the Department determine that a significant public interest exists relative to G.S.74-51,a public hearing will be held within 60 days of the end of the 30-day comment period specified above. A copy of the permit application materials is on file and available for public review during normal business hours at the above listed address as well as at the appropriate regional office.For information regarding the specifics of the proposed mining activity,please contact the applicant at the following telephone number: 919-971-0918 For information on the mining permit application review process,please contact the Mining Program staff at(919)707-9220. Please note that the Department will consider any relevant written comments/documentation within the provisions of the Mining Act of 1971 throughout the application review process until a final decision is made on the application. ARBD, LLC, Alan Stone Addressee/Owner of Record's Name and Address Name of Applicant.Include Contact Person&Company Name,if Applicable 01/10/2024 5180A Big Woods Rd, Chapel Hill, NC 27517 Date of Issuance of this Notice/Mailed to Addressee/Owner of Record Address of Applicant Revised September 21, 2021 1 Add Page Page 117 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 AFFIDAVIT OF NOTIFICATION 1, Alan Stone an applicant,or an agent,or employee of an applicant,for a new Mining Permit,or a modification of an existing Mining Permit to add land to the permitted area,from the N.C.Department of Environmental Quality,being first duly sworn,do hereby attest that the following are all known owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary(including,where an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary)and that notice of the pending application has been caused to be mailed,by certified or registered mail,return receipt requested,to said owners of record at their addresses shown below,such notice being given on a form provided by the Department: Adjoining Landowner Name Address f See attached list See attached list Attach additional list if necessary. I do also attest that the following individual is the chief administrative officer of the county or municipality in which any part of the permitted area is located and that notice of the pending application has been caused to be mailed,by certified or registered mail, return receipt requested,to said office at the following address: Dan LaMontagne (Chatham County Manager) PO Box 1809, Pittsboro, NC 27312 Chief Administrative Officer Name Address (i.e.:City Manager,County Manager,Mayor,etc.) The above attestation was made by me while under oath to provide proof satisfactory to the Department that a reasonable effort has been made to notify all known owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary(including,where an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of cts adjoining these tracts,that are within 1,000 feet of the mining permit boundary)and the chief administr9FR r municipality in which any part of the permitted area is located in compliance with N.C.G.S. 74-50(b100 (d).I understand that it is the responsibility of th applicant to retain the receipts of mailing showing re cause o e mailed and to provide them to t e Dep meet upon request. . dSignature of Appcantorgent Date If person executing Affidavit is an agent or employee of an applicant,provide the following information: Name of Applicant Alan Stone Title of person executing Affidavit re-5 1, 1, N I r 0 a I..�I✓&J-V0 a Notary Public of the County of wll- State of North Carolina,do hereby certify that appeared before me this day and under oath acknowledged that the abovqAAffidavit was made by him/her. Nicole McNeill Witness rn hand and notarial seal,this a day of - +� NOTARY PUBLIC Nota � � My commission expires: Chatham County,NC 024 ry. OMMI Y j Revised September 21, 2021 Page 118 Add Addtional List G:\CAD\ARBD LCID Landfill\ARBD 23-1\ GIS\ARBD 23 1.aprx .0116 r _ _ 3 N ■ m N N N N N N N N (o M J W Vl A w N-� ■ mzDm = T ■ ■ m v < m o D c D m ■ ■ Z O = �2 D =r M 0 W j J J J d1 J (O(D(O CD (O CO(O CO O O O O O J J J J N 0 D Z In Z W (O J(O O O(O(O J V A A W W Ol W J O O O-u C7 D o D Z7 A O(�O N O A V w (�71 u, M Vet D. Vpt D. 0� N N(011 v N W m D o-0 D Z m O p C7 CD O G (O O(O A W N W A (O W O V M V N O V W M(O M O v ND � z;u c r � L� 0- O G -U-0 (n O O O O O O O O O ID IDO O O O O O O O O O O O O O O O O CD D-u C .Z7 m Z (n V V V V V V V V V V V V V V V V V V V V V V V V V V V (o(o 0(0 m co W W(o W W W W W W W W W W W W W W.... C Z m U7 m Z CC) m A A A A A A A A A D. A A A A A A A A? A A A A A N A O N D G) O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0<- te r 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v G r N O z O up O Z o m c W V (P 11 U7CD M W W W m Vt W V W W CIl CIl Vl Vl A(Jl W COOD W W W W CO?W W 0 v W O �W W W J N W O v O A Zo W.Z7 O Z7 G) v M M MJW O W(JJt (Olt VW Vt CDMW A m m M� J N A N O y r (n O D W N N M W W W Vt V A w N(O W V(O w W O V D -< Zu n � w m D Z r m o(o W io o� io io iv of W m N O;;a cn CA W A W(O w 1 O W W V Ut Ut W W W O W O O A J(D W i n CD C)� (nm W J Q)(P W W W W D M D 3 m W y --1 o r p =D m W W W W W W c n m 0` �� �o m 0 0 0 D0 0 o xx2x22222cov AN a Om m O < m o 0 0 o m o o m m m m m m m m m c b u m m m v F m m < m D m-�-�- �- �-�-N N N N N N N N N n m ci v sv 3 a 0 o D m L �-v �- O s m M W W o z n m 0003ooWWWWWWW D� G M m m � - Z=S N D o m 000000 m o D a > =ya m CD CD CDTTT > > > > > > dm m M w o m W* o -m m 3 = r r r r r r 0 y 0 �{ to o D m n o 1 r O =0 . 3 3 o m m m m J w o s O _ GO Inn 0 ***me It see no (7) ♦ O ♦ `/ J' � � ♦ ♦ w � ♦ Ora��p ♦ C� O ♦ � ♦♦♦ N Q 0 o z O �O ■ ■ ■ O ■ O ■ � W ■ • N ■ ♦ � NO N ■ ♦ W ♦ D � pie n O ♦♦♦♦ o p O N •, 9-6 01 ♦� N T� N m DRAWN: APPROVED: SCALE: FIGURE NO.: 91982AA577 JDM JCL PARCEL NOTIFICATION MAP DATE PROJECT NO AS SHObV FILENAME FIG 1 SMITH+ 6ARONER 144.8WanAwerMUeigh,NC2?603 i NCII111411F•137 OGINEFRING) DEC 2023 ARBD 23-1 ARBD-B0023 ..SENDER:COMPLETE THIS SECTION COMPLE7E THIS r SECTIONDELIVERY ■ Complete items 1,2,and 3. A. ign ur ❑Agent ■ Print your name and address on the reverse AV— ❑Addressee so that we Can return the Gard to you. ece ed b Name) C. Date of Delivery ■ Attach this card to the back of the mailpiece, ` . or on the front if space permits. ► N� ..!! 1. Article Addressed to: D. Is delivery address different from item 1? ❑Yes if YES,enter delivery address below: ❑No Chatham County Manager Attn: Dan LaMontagne PO Box 1809 Pittsboro,-NC 27312 3. Service Type ❑Priority Mail Express® III�III�I III I�IIII III�III II IIIII IIII IIIII I III ❑Adult Signature ❑Registered Mall R ❑Adult Signature Restricted Delivery ❑Registered Mall Restricted I}Q Certified Mail® ❑SI nature Conitrmallo:n'" CC77 Certified Mail Restricted Delivery ❑Slgnat��pr n 9590 9402 6785 1074 7148 73 ❑Collect on Delivery g 2. Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery cured Mail 7 0 2 0 3160 0000 5 7 4 5 3 519 zd al Restrlcted Delivery per S DoMesticfietum Receipt PS Form 3811,July 2020 PSN 7530-02-000-9053 SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY Complete items 1,2,and 3. A. Signature Print your name and address:on the reverse ❑Agent so that we can return the cardle you. I ❑Addressee i Attach this card to the.baCk 6�*e mailpiece, B i ed by(� N @) Date of Delivery or on the front if space-permits. 1. Article Addressed to: D. Is delivery address different from item 1? ❑Yes If YES,enter delivery address below: ❑No Helen B.Stione 5180 Big Woods Rd Chapel Hill, NC 27517-8888 3. Service Type ❑Priority Mail Express® II 111111 IIII ICI 111111111111111111111111111111 ❑Adult R Signature ❑Registered Mail ❑Adult Signature Restricted Delivery ❑Registered Mail Restricted Id Certified Maila Delivery 9590 9402 6785 1074 9135 42 ❑Certified Mail Restricted Delivery ❑Signature Confirmation^+ ❑Collect on Delivery ❑Signature Confirmation 2. Article Number{Transler from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery Insured Mail 7020 3160 0000 5745 3 618 Insured Mail Restricted Delivery (over$500) PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3. A. Signatu ■ Print your name and address on the reverse X ❑Agent so that we can return the card to you. I samrenee • Attach this card to the back of the mailpiece, $ c ' ad by Name) C. ate of livery or on the front if space permits. 1 itivin 1. Article Addressed to: D. Is delivery adWss differte rom item 1? Yes ...r If YES,enter delivery address below: Gerald H. Negley 188 Bush Creek Ln Chapel Hill, NC 27517-9027 3. Service Type ❑Priority Mail Express® III'�lpl�ll lll�IIIIIII�IIIIIIIIII��III�IIII�II ❑Adult Signature ❑Registered MailR iEll�plk IAI IIAp ❑Adult Signature Restricted Delivery ❑Registered Mail Restricted Certified WHO Delivery 9590 9402 6785 1074 7148 42 v Certified Mail Restricted Delivery ❑signature ConfirmationTM ❑Collect on Delivery ❑Signature Confirmation 2. Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery ',isured Mall 7020 3160 0000 5745 3540 isured Mall Restricted Delivery )ver$500) PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3. A. SignatKe ■ Print your name and address on the reverse ❑Agent so that we can return the card to you. D J Addressee ■ Attach this card to the back of the mailpiece, B. 1v by(Prl ed e) C. a of De ery or on the front if space permits. 1. Article Addressed to: D. Is dell ry address different from item 1? ❑Y If YES,enter delivery address below: ❑No Randy Amell & Holly Amell 5219 Big Woods Rd Chapel Hill, NC 27517 III�III�I III I�I I II II I�II I I I I II II I�III I�I II�II 3. Service Type ❑Priority Mail Expresso ❑Adult Signature ❑Registered MaiITM ❑Adult Signature Restricted Delivery ❑Registered Mail Restricted Certified Mail® Delivery 9590 9402 6785 1074 7148 66 Certified Mail Restricted Delivery ❑Signature ConfirmationTM ❑Collect on Delivery ❑Signature Confirmation 2. Article Number f7ransrer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery '--ured Mail 7020 3160 0000 5745 3526 grad Mali Restricted Delivery s5�o) PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt SENDER: COMPLETE THIS SECTION COMPLETE THIS SECTION ON DELIVERY 'M Complete items 1,2,and 3. A. Signature k Pri nt your name ali4jaddress an the reverse C ❑Agent .so that we can returh the card to you. ��' Addressee it iAttgch this card to the Back of the maiipiece, B. Fl6ceived by(Printed Name) C. Date of Delivery • or on the front if space permits. jIC 1. Article Addressed to: D. Is delivery address different from item 1? ©Yes If YES,enter delivery address below: E5'%o Elizabeth Grabowski 640 Tanager Ln Chapel Hill, NC 27517 3. Service Type ❑Priority Mail Express® II�III II I IIII I I I II II I I II I I I I II II I II I I II II�II ❑Adult Signature ❑Registered Mail ❑ R Adult Signature Restricted Delivery ❑Registered Mail Restricted Certified msii J Delivery 9590 9402 6785 1074 7148 11 Certified Mail Restricted Delivery ❑Signature ConfirmationTM ❑Collect on Delivery ❑Signature Confirmation 2. Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery red Mail 7020 3160 0000 5745 3571 $5M it Restricted Delivery PS Form 3811,July 2020 PSN 7530-02-000-9053 Oci:.gsiir:Return Receipt Y � SENDER: / •N COMPLETE THIS SECTIONON ■ Complete items 1,2,and 3. a ure ■ Print your name and•address on the reverse [3 Agent so that we can retq!d the card to you. X ❑Addressee ■ Attach this card ib•the-bgk.of the mailpiece, S. Recel d by(Prin ame) O. Date of Delivery or on the front if'spac;Mornits. let 1. Article Addressed to: D. Is delivery addkAs different from item 1? ❑Yes If YES,enter delivery address below: ❑ No United States of America C/O US Army Corps of Engineers PO Box 144 Moncure, NC 27559-0144 3. Service Type ❑Priority Mall Express( II IIIIII IIII III I II II I I II I I I I II II IIII III I.Il I II ❑Adult Signature ❑Registered MI ❑Adult Signature Restricted Delivery ❑Reglstered MaiW Rl Restricted' Certified Mail® Delivery 9590 9402 6785 1074 714869 Certified Mail Restricted Delivery ❑signature Cengrmatlon7m ❑Collect on Delivery ❑Signature Confrrmallon 2. Article Number(Transfer from service label) ❑Collect on Delivery Restricted Delivery Raslricted Delivery ^'-,ured Mail 7 0 2 0 3160 0000 5 7 4 5 3533 :w,ed Mall Restricted Delivery er 5 al 1 PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Resift. SENDER: . •N COMPLETE THIS SECTION ON DELIVERY ■ Complete Iteir_)s 1,2,and 3. A. Signatu a Print your naW and address on the reverse / ❑Agent so that we c4.return the card to you. Addressee ■ Attach this card to the back of the mailpiece, . Received by(Printed game) C.D&te of Delivery or on the front if space permits. 1. Article Addressed to: D. Is delivery address different from item 1? ❑Yes If YES,enter delivery address below: ❑ No Marlon K. Stone 1325 Bennington Dr NW Concord, NC 28027 3. Service Type ❑Priority Mail Expresso III IIIIII IIII IIIIII II I I II I I I I IIIII I II II IIII III ❑Adult Signature ❑Registered Mal Rl ❑Adult Signature Restricted Delivery ❑Registered Mail Restricted Certified Mall® Delivery 9590 9402 6785 1074 9135 28 Certified Mall Restricted Delivery ❑Signature ConfirmationTM ❑Collect on Delivery ❑Signature Confirmation 2. Article N_urrtb r ffransfer from service label) ❑Collect on Delivery Restricted Delivery Restricted Delivery —Insured Mall 7020 3 1 6 0 0000 5745 3632 Insured Mall Restricted Delivery (over$500) PS Form 3811,July 2020 PSN 7530-02-000-9053 Domestic Return Receipt 4. COMPLETE • � Complete items 1,2,and 3. A. Signs to Print your name and address on the reverse X �, ❑Agent so that we can return the card to you. ❑Addressee ■ Attach this card to the back of the mailpiece, B. Rec 'ved by(Pdny Name) C.Deitelof Deli ry or on the front if space permits. �e."X � j2 1. Article Addressed to: D. Is delivery address different from item 17 Yes Big Woods Properties, LLC If YES,enter delivery address below. ❑No 5180A Big Woods Rd Chapel Hill, NC 27517-8888 3.II I IIIIII IIII IIIIII II I I II I I I I IIIII I II I II I II III Re Service Type ❑Priority Mall Express® 11 ❑Adult Signature EI Registered MaiITM ❑Adult Signature Restricted Delivery OR egistered Mail Restricted g Certified Mail® Delivery 959.0 9402 6785 1074 9135 35 ❑Certified Mall Reslrcted Delivery ❑Signature ConfirmationTM ❑Collect on Delivery ❑Signature Confrmatlon 2. Article Number(Transfer from service IahelJ ❑Collect on Delivery Restricted Delivery Restricted Delivery '-cured Mail 7020 3160 0000 5745 3625 cured Mail Restricted Dellvery ver$500) PS Form 3811,July 2020 PSN 7530-02-000-9053 Dorttestlo Retr: Pecelpt This page intentionally left blank. NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G,S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: APPLICANT: Signature Signature* Print Name Alan Stone Print Name Alan Stone Title(if applicable) President Title President Company(if applicable) ARBD, LLC Company ARBD, LLC Address See attached property list Mine Name Stone LCID Landfill and Mine Telephone 91 9-971 -0918 Telephone 919-971-0 18 Date Signed Date Signed *Signature must be the same as the individual who signed Page 1 of this application. One original and five 5 copies of the completed application,six 6 copies of all location maps,mine maps and reclamation ma s and the a ppro p riate processin fee in the form a check or rn oney order Payabbe to the North Carolina De artment of Environmental Qua Ii must be sent to the Ralei q h Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Revised September 21, 2021 Page 119 Add Additional List ARBD, LLC Parcels PARCEL PIN OWNER PHYSICAL TOWN/ ZIP NO. ADDRESS CITY 65049 9794-00-06-6670 ARBD LLC ROCK HILL DR Chapel 27517 Hill 68340 9791-00-06-5834 ARBD LLC ROCK HILL DR Chapel 27517 Hill 76383 9794-00-07-7340 ARBD LLC ROCK HILL DR Chapel 27517 Hill 77630 9794-00-06-2132 ARBD LLC 263 ROCK HILL DR Chapel 27517 Hill 79314 9794-00-01-6956 ARBD LLC BIG WOODS RD Chapel 27517 Hill 79315 9794-00-06-8964 ARBD LLC BIG WOODS RD Chapel 27517 Hill 87334 9794-00-16-1724 ARBD LLC ROCK HILL DR Chapel 27517 Hill 87481 9794-00-96-9735 ARBD LLC L-7 CK HILL DR Chapel 27517 Hill 87482 9794-00-06-3570 ARBD LLC ROCK HILL DR Chapel 27517 Hill NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: APPLICANT: Signature ,. Signature* Print Name Helen B. Stone Print Name Alan Stone Title(if applicable) Title President Company(if applicable) Company ARBD, LLC Address See attached property list Mine Name Stone LCID Landfill and Mine Telephone 919-971 -0918 Telephone Date Signed Date Signed *Signature must be the same as the individual who signed Page 1 of this application. One original and five 5 copies of the completed application,six(61 copies of all location maps,mine maps and reclamation ma Rs,and the appropTiate processing fee in the form a check or money order payable to the North Carolina Department of Environmental Quality most be sent to the Raleigh Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Revised September 21, 2021 Page 119 Add Addtional List Helen B.Stone Parcels PARCEL PIN OWNER PHYSICAL ADDRESS TOWN/ ZIP NO. CITY 19591 9794-00-05-3751 STONE HELEN B 5180 BIG WOODS RD Chapel 27517 _ Hill 71711 9786-00-06-4069 STONE HELEN B 465 ROCK HILL DR Chapel 27517 Hill 91533 9794-00-06-7335 STONE HELEN B �155 ROCK HILL DR Chapel 27517 Hill 91537 9794-00-16-1542 STONE HELEN B 26 RODNEY LN Chapel 27517 Hill 91538 9794-00-16-0208 STONE HELEN B 64 RODNEY LN Chapel 27517 Hill 91539 9794-00-06-8170 STONE HELEN B 128 CABIN LN Chapel 27517 Hill 91540 9794-00-05-7905 STONE HELEN B 140 CABIN LN Chapel 27517 Hill 91541 9794-00-05-3876 STONE HELEN B CABIN LN Chapel 27517 Hill 91543 9794-00-06-5204 STONE HELEN B 221 ROCK HILL DR Chapel 27517 Hill 91544 9794-00-06-9414 STONE HELEN B 115 ROCK HILL DR Chapel 27517 Hill 91545 9784-00-96-7064 STONE HELEN B 424 ROCK HILL DR Chapel 27517 J l Hill 91546 9784-00-96-5097 STONE HELEN B 452 ROCK HILL DR Chapel 27517 Hill 91547 9784-00-96-3282 1 STONE HELEN B 500 ROCK HILL DR Chapel 27517 _ Hill 91550 9781-00-95-3963 STONE HELEN B 467 ROCK HILL DR Chapel 27517 Hill NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a band forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: /� APPLICANT: Signature (,.// Signature* Print Name Jam/Dalton John Stone Print Name Alan Stone Title(if applicable) Title President Company(if applicable) Company ARBD, LLC Address 240 Cabin Ln Mine Name Stone LCID Landfill and Mine Chapel Hill, NC 27517 Telephone 919-971 -0918 Telephone Date Signed Date Signed "Signature must be the same as the individual who signed Page 1 of this application. One on inai and five 5 copies of the completed application,six 5 copies of all location ma s mine maps and reclamation maps,and the appro riate proces.sin fee in the form a check or mone order a able to the North Carolina De artment of Environmental Quality must be sent to the Raleigh Central office at the address listed on the front cover of this a lieation form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Page 1 19 Add Addtional List NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh, NC 27699-1612 Division of Energy, Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our(ands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to carry out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: APPLICANT: i, - Signature �: Signature*Print Name Marion K. Stone Print Name Alan Stone Title(if applicable) Title President Company(if applicable) Company AR BD, LLC Address 394 Rock Hill Dr Mine Name Stone LCID Landfill and Mine Chapel Hill, NC 27517 Telephone 919_971 -0918 Telephone Date Signed -7�'f-258--9268 � Date Signed *Signature must be the same as the individual who signed Page 1 of this application. One original and five 5 co les of the completed aRplication six B copies of all location maps.mine maps and reclamation ma Ps and the a P PToRriate Processin fee in the form a check or mo n ey order payable to the North Carolina Department of Environmental uality must be sent to the Raleigh Central Office at the address listed on the front cover of this applieation form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Revised September 21, 2021 P a g e l 19 Add Addtional List Appendix Permits B Approvals Mining Permit Application ARBD, LLC— Stone LCID Landfill R Mine Chapel Hill, North Carolina This page intentionally left blank. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP STATf � Issuance:February 9,2021 File ID: 1516661 ROY COOPER a Page 1 of 9 Governor MICHAEL S.REGAN zc Secretary MICHAEL SCOTT `aMv '` Director NORTH CAROLINA Environmental Quality STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION SOLID WASTE MANAGEMENT FACILITY Permit No. 1909-LCID-2010 ARBD LLC d/b/a STONE COMPANY LLP and ALAN HUGH STONE is hereby issued a Permit to Construct and Operate Stone Landfill LCID Phases 1, 2, 3, & 4 Located north of the intersection of Rock Hill Drive and Big Woods Road, Chapel Hill, Williams Township, North Carolina in Chatham County, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deeds recorded for this property listed in Attachment No. 1 of this permit. Sherri C. Stanley, Supervisor Permitting Branch Solid Waste Section Division of Waste Management 1646 Mail Service Center,Raleigh,North Carolina 27699-1646 Phone:919-707-8200 Internet: hfps:Hdeq.ne.gov/abouVdivisions/waste-management An Equal Opportunity 1 Affirmative Action Employer DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 2 of 9 ATTACHMENT 1 GENERAL PERMIT CONDITIONS AND INFORMATION Permit to Operate Data Table Permit Status Issuance EExpiration 1909-LCID-2010 Active February 9, 2021 February 9, 2026 PART I: GENERAL PERMIT CONDITIONS 1. This permit is issued by the North Carolina Department of Environmental Quality,Division of Waste Management, Solid Waste Section(Section). In accordance with North Carolina Solid Waste Management Rules(Rule) 15A NCAC 13B .0201 (e),a land clearing and inert debris (LCID) solid waste management facility permit may be combined in two parts: a Permit to Construct and a Permit to Operate. The Permit to Construct conditions are contained in Attachment 2 of this permit and the Permit to Operate conditions are contained in Attachment 3 of this permit. 2. The persons to whom this permit is issued ("permittee") are the owners and operators of the solid waste management facility. 3. The permit to operate for this facility issued August 7, 2015 was recorded in the Chatham County Register of Deeds on August 17, 2015 in Deed Book 01813, Page 0070 to Page 0080. 4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other instrument of transfer must contain in the deed description section, in no smaller type than that used in the body of the deed or instrument, a statement that the property has been used as a land clearing and inert debris landfill and a reference by book and page to the recordation of the permit. 5. By beginning construction or receiving waste at this facility, the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Construction and operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit, and the approved plan identified in Attachment 1, "List of Documents for the Approved Plan". Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. 7. The permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, "List of Documents for Approved Plan," and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 3 of 9 8. The owner or operator shall notify the Department within 30 days of a significant change in accordance with G.S. 130A-295.2(g). The owner or operator shall submit an application to amend the permit for any change in ownership or corporate structure. 9. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for sedimentation and erosion control, and a General or Individual National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does not remove the permittee's responsibilities for compliance with any other local, state or federal rule, regulation or statute. Pro erties Approved for the Solid Waste Facility Chatham County, N.C.,Register of Deeds Book Page Grantor Grantee Acres 0595 0291 A. Hugh Stone and 6.60 Helen B. Stone Alan Hugh Stone 1411 0517 Cynthia W. Stone Alan Hugh Stone 2.21 0524 0747 A. Hugh Stone and Alan Hugh Stone 4.25 Helen B. Stone 0826 0314 A. Hugh Stone and Alan Hugh Stone 3.39 Helen B. Stone 1554 0319 A. Hugh Stone and Alan Hugh Stone 20.59 Helen B. Stone 826 0314 A. Hugh Stone and Alan Hugh Stone 0.98 Helen B. Stone Total Site Acrea e: 38.02 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 4 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) Permitting History Doc/File Permit Action Date ID 1909-LCID-2010 Original Issuance Permit to Construct/Operate May 28, 2010 10409 Permit Amendment, Expansion August 7, 2015 24484 Permit Amendment, Renewal February 9, 2021 151661 List of Documents for Approved Plan Note—Documents referenced in this permit (e.g., DIN/FID 1234567) can be viewed online at the NC Solid Waste Section website in the Documents database 1. Application for LCID Landfill Permit. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 10383. September 2009. 2. Application for LCID Expansion. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 24250. March 2015. 3. 2020 Permit Renewal Application Stone LCID Landfill. Prepared by: Smith+Gardner Engineers. Prepared for: ARBD, LLC. FID 1390647. February 2020. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 5 of 9 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT PART I: GENERAL PERMIT CONDITIONS 1. Construction of all solid waste management units within this facility must be in accordance with the pertinent approved plans included in Attachment 1, "List of Documents for the Approved Plan". 2. Modification or revision of any approved plan or changes during construction require approval by the Section and may constitute a permit modification and be subject to a permitting fee. 3. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act NCGS 113A-50, et seq., and rules promulgated under 15A NCAC 4. The facility must furnish a copy of the approved Sedimentation and Erosion Control Plan from the NC Division of Energy, Mineral and Land Resources, Land Quality Section, to the Solid Waste Section. 4. Modifications to the approved sedimentation and erosion control activities require approval by the NC Division of Energy, Mineral and Land Resources, Land Quality Section. The Solid Waste Section must be notified of any modifications. 5. Facility construction must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirement under Sections 401 and 404 of the Clean Water Act, as amended. EROSION AND SEDIMENTATION CONTROL REQUIREMENTS 6. All earth disturbing activities must be conducted in accordance with the Sedimentation Pollution Control Act of 1973 (15 NCAC 4) and consistent with any other local, state or federal requirements. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Modifications to the approved sedimentation and erosion control activities require approval by the North Carolina Land Quality Section. The permittee must notify the Section of any sedimentation and erosion control plan modifications. PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 6 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 9. The landfill is permitted for a total gross capacity of 920,721 cubic yards (CY) including 106,149 cubic yards in the existing 4.87-acre landfill. Gross capacity is the measured volume between the bottom of waste and the top of final cover. Development of the landfill is approved as shown in the approved operation plans and drawings listed in Attachment 1 List of Approved Documents (FID 1390647) and summarized below. Phase Development Acreage Capacity (CY) Status Phase 1 2.43 54,305 Existing Phase 2 2.44 51,844 Existing Phase 3 8.14 352,836 Existing Phase 4 5.58 243,936 Existing Phase 5 1 5 217,800 Proposed TOTAL 1 23.6 920,721 10. The facility capacity will be completed when fill reaches the final grades as shown in the approved facility drawings (FID 1390647). Any additional capacity at the facility will require the permittee to complete the application process as required under NC Solid Waste Management Rule 15A NCAC 13B .0563 et seq. 11. The following is required prior to receiving solid waste in the new phase. a. Written certification from a registered professional engineer must be submitted to the Section certifying that the waste disposal unit(s) has been constructed in accordance with the approved plan. b. The disposal unit boundary must be accurately delineated with permanent markers in accordance with 15A NCAC 13B .0201(g). c. A site inspection and pre-operative meeting must be conducted by a representative of the Section. The permittee must notify the Section and make arrangements for the site inspection and pre-operative meeting. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 7 of 9 ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: GENERAL PERMIT CONDITIONS 1. The facility must be adequately secured by means of gates, chains,berms, fences, or other security measures approved by the Section to prevent unauthorized access. 2. Signs must be posted at the site entrance that state that no hazardous waste or liquid waste can be received at the facility; that provide information on dumping procedures and hours of operation; and that show the permit number, site contact's name and phone number, emergency contact information and the waste types accepted for disposal at the facility. Traffic signs or markers must be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. 3. Access roads shall be of all-weather construction and shall be maintained to allow access by vehicles transporting waste, Department staff, and fire-fighting vehicles. 4. The permanent markers that delineate the waste disposal boundary must be maintained at all times. 5. Copies of this permit, the approved plans, and all records required to be maintained by the permittee must be maintained at the facility and made available to the Section upon request during normal business hours. 6. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act, N.C.G.S. 113A-50 et seq., and rules promulgated under 15A NCAC 4. The Section must be notified of any approved modifications to the sedimentation and erosion control plan. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Fire lanes must be established and maintained at all times. The dimensions of the fire lanes must be coordinated with the Fire Marshall having jurisdiction over the site. 9. Open burning of solid waste is prohibited unless approval has been obtained from the Division, the local government, and the Division of Air Quality in accordance with 15A NCAC 02D .1900 prior to any burning activity. 10. The owner or operator shall provide equipment on-site to control fires and make arrangements with the local fire protection agency to provide fire-fighting services. Fires must be reported to the regional waste management specialist with 24 hours or the occurrence, followed by a written notification within 15 calendar days of the occurrence. 11. Financial assurance as required by state rules and statutes must be continuously maintained for the duration of the facility and updated and submitted annually to the Section by the anniversary date of the issuance of this permit. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 8 of 9 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 12. This Permit to Operate expires February 9, 2026 or when the facility capacity reaches the final grades as shown in the approved facility drawings (FID 1390647). Pursuant to 15A NCAC 13B .201(c), the permittee must submit a permit renewal application prepared in accordance with 15A NCAC 13B .0565 and .0566 to the Section no later than August 9, 2025. 13. This Permit to Operate authorizes the continued operation of Phase 1, Phase 2, Phase 3, and Phase 4 of the LCID Landfill as shown in the approved plans and drawings indicated in Attachment 1, List of Documents for Approved Plan 14. This facility is permitted to receive land clearing waste;yard trash;untreated and unpainted wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-294(m). 15. Revisions to the design or operation of the facility require written approval of the Section and may be subject to a permitting fee. 16. Solid waste in the landfill shall be compacted. Slopes shall not exceed a ratio of three horizontal to one vertical (3:1) at any time. 17. An operator must be on duty at all times while the site is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. COVER MATERIAL REQUIREMENTS 18. All waste shall be covered with no less than six inches of soil monthly or when the active area reaches one (1) acre in size, whichever occurs first. More frequent cover may be required when necessary to prevent the site from becoming a nuisance, or to mitigate conditions associated with fire, windblown materials, vectors, or excessive water infiltration. Any soils used for cover at the site shall meet unrestricted use standards for soils as defined in G.S. 130A-310.65. 19. The facility must maintain a supply of cover material adequate to cover the working face in case of an emergency or fire at all times. 20. Areas that will not have additional wastes placed on them for three months or more, but where final termination of disposal operations has not occurred, shall be covered with no DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 9 of 9 less than one foot of soil cover sloped to direct the flow of surface water from the landfill, and stabilized with vegetative ground cover or other stabilizing material. The Division may require further action to correct any condition that the Division determines may be injurious to the public health, or a nuisance to the community. 21. The owner or operator shall meet the closure and post-closure requirements of 15A NCAC 13B .0567(b) and(c). DRAINAGE CONTROL AND WATER PROTECTION REQUIREMENTS 22. All required sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility. 23. Ground water quality at this facility is subject to the classification and remedial action provisions of 15 NCAC 2L. 24. Solid waste must be placed a minimum of four feet above the seasonal high water table in accordance with Rule 15A NCAC 13B .0564(9). 25. Solid waste shall not be disposed in standing water. Surface water shall be diverted away from the operational area and shall not be impounded over waste. 26. Leachate shall be maintained and managed on-site. RECORDKEEPING AND REPORTING 27. The permittee must maintain a record of the amount of solid waste received at the facility. On or before August 1 annually, the permittee must submit an annual facility report to the Solid Waste Section, on forms prescribed by the Section PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 oF�E STATE oF� 73 D� ' y ROY COOPER - v Governor ELIZABETH S.BISER Secretaryfssr coca. MICHAEL SCOTT NORTH CAROLINA Director Environmental Quality May 19, 2022 Sent Via Email - ray.maxwell@gaston ov.com Alan Stone Owner ARBD, LLC 5180-A Big Woods Road Chapel Hill, NC 27517 Subject: Phase 5 - Approval to Operate Stone Landfill LCID Chatham County, Permit# 1909-LCID-2010, File ID 1677023 Dear Alan, The Division of Waste Management, Solid Waste Section (Section) has completed review of the Phase 5 Construction Certification submittal (file ID number 1676421) for the above referenced facility. The document was submitted on your behalf by Smith+Gardner, Inc., and received by the Section on May 11, 2022. The certification document contained the information that was required to be submitted to the Section, by the conditions of the permit to construct and operate, prior to beginning operations in Phase 5 of the landfill. No issues of concern were noted with any of the information provided in the report. Based on the Engineer's Certification, and the review of the report, the Section approves operation of Phase 5. If you should have any questions regarding this matter, please contact me at (919) 707-8229, or by email at jordan.russ@ncdenr.gov . Sincerely, �?A A�-- Jordan Russ Permitting Engineer CC: Stacey Smtih - Smith+Gardner Jesse Li - Smith+Gardner Chuck Kirchner - NC DEQ D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management - 217 West Jones Street 1 1646 Mail Service Center I Raleigh,North Carolina 27699-1646 NORTH CAROLINA N. oeParonemmrnrironmemaiouai� � 919.707.8200 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2019-0103 Certificate of Coverage No. NCC190103 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission,and the Federal Water Pollution Control Act,as amended, ARBD, LLC is hereby authorized authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Stone LCID Landfill 52 Rock Hill Drive Chapel Hill Chatham County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No.2018-01918 This Certificate of Coverage shall become effective 4/25/2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded. for S. Daniel Smith Interim Director, Division of Energy, Mineral,and Land Resources By the Authority of the Environmental Management Commission DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 This page intentionally left blank. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01857 County: Chatham County U.S.G.S.Quad:Farrington GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Alan Stone ARBD LLC Address: 5180A Big Woods Drive Chapel Hill NC,27517 Telephone Number: (919)971-0918 Size(acres) 35(approximately) Nearest Town Chapel Hill Nearest Waterway Haw River River Basin Cape Fear USGS HUC 03030002 Coordinates Latitude: 35.801940 Longitude:-79.032780 Location description: This site is located immediately west of the Dalton Drive,Big Woods Road intersection in Chatham County,North Carolina. Description of projects area and activity: This authorization is for permanent impacts to a single wetland associated with the construction of a stormwater basin for a commercial landfill as follows:Impact Site#1: 0.07 acre of permanent impact to Wetland WA for the construction of a permanent stormwater basin(see attached plans). Applicable Law: ® Section 404(Clean Water Act,33 USC 1344) ❑ Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number:NWP 18 Minor Discharges SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated October 18,2019.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C.Division of Coastal Management in Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact Andrew Williams at(919)554-4884 or Andrew.E.Williams2(ii)usace.army.mil. Date:2019.11.07 Corps Regulatory Official: 16:13:47-05'00' Date: November 7,2019 Expiration Date of Verification: March 18,2022 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 A.Determination of Jurisdiction: 1. ® There are waters,including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403).This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters,including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B.Basis For Jurisdictional Determination: N/A.An Approved JD has not been completed. C.Remarks: none D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination from the local office of the Natural Resources Conservation Service,prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin,Appeal Review Officer 60 Forsyth Street SW,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by January 6,2020. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Date: 2019.1 1.07 Corps Regulatory Official: �� � 16:1 1:17 -05'00' Andrew Williams Date of JD: November 7,2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer Satisfaction Survey, located online at http://cop2smgpu.usace.g,M.mil/cm apex/f?p=136:4:0. Copy furnished: Phil May Carolina Ecosystems 3040 NC Highway 42W Clayton,North Carolina 27520 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Action ID Number: SAW-2019-01857 County: Chatham County Permittee: Alan Stone ARBD LLC Project Name: Stone Landfill/ARBD LLC/Chapel Hill NC/Chatham County/ Date Verification Issued: November 7, 2019 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest,North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR AP AL Applicant: Alan Stone ARBD LLC File Number: SAW-2019-01857 Date: November 7, 2019 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I-The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at htip://www.usace.q=.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT I REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However,you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, Mr. Philip Shannin,Administrative Appeal Review Officer Attn:Andrew Williams CESAD-PDO 69 Darlington Avenue U.S.Army Corps of Engineers, South Atlantic Division Wilmington,North Carolina 28403 60 Forsyth Street,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: 404)562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the ooportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: Andrew Williams,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin,Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 1OM15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 "lJ� OUTLET PROTECTION, / SLRMAM 27— —50 STREAM BUFFER — — —_— — WETLAND — — — BASIN B EMERGENCY SPILLWAY, TYP. r � / / N S n / //// 0 50' 100, REFERENCES: 1. EXISTING TOPOGRAPHY OF THE FACILITY FROM GIS SURVEY PROVIDED BY CHATHAM COUNTY GIS, ACCESSED FEBRUARY 11, 2019. IMPACTS 2. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION DESCRIPTION DISPLAY QUANTITY Q DATED JULY 2019 BY CAROLINA ECOSYSTEMS. 3. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF WETLANDS 3049 ft2 N THE CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PREPARED FOR: PR=PARED BY ARBD,LLC s STONE LCID LANDFILL SMITH+GARONERCHAPEL HILL, NC J BASIN B WETLAND IMPACTS 14 N.Boylan Avenue,Raleigh NC 27603 1919.828.0577 1526 Richland St.,Columbia SC 29201 O7 DRAWN. APPROVED: SCALE: DATE: PROJECT NO.: FIGURE NO.: FILE NAME: Of L.H.B. N.C.T. AS SHOWN Sep 2019 ARBD 19-2 1 A0001 © 2019 Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 Montalvo, Sheri A From: lase rfiche.ncdenr.gov@mccicloud.io Sent: Tuesday, May 9, 2023 10:13 PM To: alanrocs@gmail.com; philm@inverenv.com; George.L.Phillips@usace.army.mil Cc: Thomas, Zachary T Subject: [External] Decision for 20191299 Ver 2 Stone Landfill Stormwater Basin Improvement CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. The review for this project has been completed and a copy of our decision can be found in the project link provide below. If you have any questions, contact information is provide below and is included in the decision letter. Project Number: 20191299 Version: 2 Reviewer:Zachary.Thomas Zachary.Thomas-zachary.thomas@ncdenr.gov Reviewing Office: Project Link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=2744870 This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses aren't monitored. i Appendix C Erosion and Sedimentation Control Plan Mining Permit Application ARBD, LLC— Stone LCID Landfill R Mine Chapel Hill, North Carolina This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina Prepared for: ARBO, LLC Chapel Hill, NC STONE EXCAVATING February 2023 Prepared by: SMITH4GARONER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 O 2023 Smith Gardner,Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner,Inc. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Erosion and Sedimentation Control Plan Stone LCID Landfill Chatham County, North Carolina Prepared For: ARBD, LLC Chapel Hill, NC S+G Project No. ARBD-21-1 ��15114111111ffff/// \A c A..o''''% z`•Q� SEAL Docusigned by: = 054367 — C• s •3/f/2023 CSECC95C937E4AC �i� •�/•'VG1N '� Jesse C. Li, P.E. ''/�111,1111111►11`0` Project Engineer #;*#,►ii1t11.1.1rf,###� DocuSigned by: # �/•, ''II.1 SEAL �f Q. tMtTu 023 02 J-/2023 3369FBA008BB44%.. Stacey A.Smith, P.E. Senior Engineer ' ., ' ' A #OP.- , f+flfh111111-*-t February 2023 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.057? DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCIB Landfill Chatham County Erosion and Sedimentation Control Plan Table of Contents Paqe 1.0 NARRATIVE.....................................................................................................................2 1.1 Project Description......................................................................................................2 1.2 Site Location.................................................................................................................2 1.3 Contact Information.....................................................................................................2 1.3.1 Engineer...........................................................................................................2 1.3.2 Owner...............................................................................................................3 1.4 Existing Site Conditions...............................................................................................4 1.5 Adjacent Areas.............................................................................................................4 1.6 Site Soils Information ..................................................................................................4 2.0 DESIGN GUIDELINES AND PROCEDURES.....................................................................4 3.0 RUNOFF CALCULATIONS...............................................................................................5 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES - INITIAL...............................5 4.1 Sediment Basins..........................................................................................................5 4.2 Drainage Channels......................................................................................................6 4.3 Drop Inlets....................................................................................................................6 4.4 Culverts ........................................................................................................................6 4.5 Silt Fence......................................................................................................................6 4.6 Vegetative Stabilization ...............................................................................................6 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES - FINAL.................................7 5.1 Side Slope Swales........................................................................................................7 5.2 Down Pipes...................................................................................................................7 6.0 SCHEDULE FOR IMPLEMENTATION ..............................................................................7 7.0 INSPECTION AND MAINTENANCE.................................................................................8 FIGURES Figure 1 USGS Map (Farrington Quadrangle) APPENDICES Appendix A Current Deeds & Solid Waste Permit Appendix B Erosion and Sedimentation Control Calculations Appendix C Erosion and Sedimentation Control Technical Specifications Appendix D Erosion and Sedimentation Control Plans and Details DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 1.0 NARRATIVE 1.1 Project Description ARBD, LLC currently operates a Land Clearing and Inert Debris (LCID) landfill at their Landfill facility located off of Rock Hill Drive in Chatham County. The landfill property is proposing an expansion from a 38-acre site to a 60-acre site operating under NC DEQ Solid Waste Permit No. 19-9. A copy of the current NC Solid Waste Permit is shown in Appendix A. This plan discusses both the initial and long term (final) erosion and sedimentation control measures used on this project. 1.2 Site Location The attached USGS map (Farrington Quadrangle) shows the approximate location of the site and the location of stormwater outfalls for this project. Additional information is as follows: Address: 52 Rock Hill Drive Chapel Hill, NC 27517 Coordinates (Site Entrance): Latitude: 35.80 degrees Longitude: -79.03 degrees River Basin: Cape Fear Receiving Streams) Jordan Lake (Stream Classification): 1.3 Contact Information 1.3.1 En ineer For questions regarding this erosion and sedimentation control plan, please contact the following: Smith Gardner, Inc. Attn.: Stacey A. Smith, P.E. 14 N. Boylan Ave. Raleigh, NC 27603 Phone: (919) 828-0577 Email: stacey(dsmithgardnerinc.com. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 1.3.2 Owner The owner of the site and the person to contact should sediment control issues arise during the land-disturbing activity is as follows: ARBD LLC Attn: Alan Stone, President 5180-A Big Woods Road Chapel Hill, NC 27517 Phone: (919) 971-0918 The property includes multiple parcels as shown below. Copies of the deeds are shown in Appendix A. PIN Book Page Acreage Grantor Grantee 9794-00-06-6670 2.60 9791-00-06-5834 4.25 9794-00-07-7340 3.39 9794-00-06-2132 1.80 9794-00-01-6956 1828 0533 2.00 Alan H. Stone ARBD LLC 9794-00-06-8964 2.00 9794-00-16-1724 2.21 9794-00-96-9735 20.59 9794-00-06-3570 0.98 9794-00-05-3751 1.29 9794-00-06-7335 0.92 9794-00-16-1542 0.84 9794-00-06-8170 1.12 9794-00-05-7905 2.18 Mildred P. 9794-00-05-3876 3.10 Ramsey, Elbert 9794-00-05-6511 0289 0206 2.06 Ramsey, Lillian P. Alan Hugh Stone 9794-00-06-5204 1.91 Shaw&Joseph & Helen B. Stone 9794-00-06-9414 0.93 Shaw 9784-00-96-7064 0.97 9784-00-96-5097 0.86 9784-00-96-3282 1.28 9781-00-95-3963 1.18 9794-00-06-4069 0729 0038 1.17 Helen B. Stone Marlon K. Stone 9786-00-06-4069 0680 1073 1.01 A. Hugh Stone Helen B. Stone Total Site Acreage: 60.64 Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 1.4 Existing Site Conditions ARBD owns and operates a LCID landfill under NC Solid Waste Permit No. 19-09. The LCID landfill has been in operation since 2003. The facility entrance is located at 52 Rock Hill Drive. Rock Hill Drive is a gravel road off of Big Woods Road. The elevation varies from 390 ft in the southern portion of the existing landfill property to 250 ft in the eastern portion of the property. 1.5 Adjacent Areas The site lies between Dalton Drive to the North and Rock Hill Drive to the South. There is an unnamed creek running in the Northern portion of the site and Jordan Lake sites adjacent to the site on the East. 1.6 Site Soils Information According to the USDA Natural Resources Conservation Service soil survey (see Drawing S11, the native surficial soils at the site fall under the categories Nanford-Badin Complex, Goldston-Badin Complex, and Georgeville-Badin Complex. For purposes of runoff calculations, the soils at the site can be classified as being in hydrologic soil group (HSG) "B". 2.0 DESIGN GUIDELINES AND PROCEDURES The erosion and sediment control design for the landfill was conducted based on guidelines and procedures as set forth in the following references: A. HydroCAD Software Solutions, LLC (2006), HydroCAD Stormwater Modeling System Owner's Manual - Version 8, Chocorua, NH. B. Malcom, H. Rooney (1989 & 2003 Supplement), Elements of Urban Stormwater Design, NC State Univ., Raleigh, NC. C. North Carolina Division of Land Resources (2013 Update), North Carolina Erosion & Sediment Control Planning & Design Manual, Raleigh, NC. D. Chatham County Chapter 164.16 Ordinance on Soil Erosion and Sedimentation Control Design and Performance Standards. E. North Carolina Stormwater BMP Manual (2018) Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 3.0 RUNOFF CALCULATIONS All stormwater flow volumes were calculated using the HydroCAD computer program (utilizing USDA-NRCS (SCS) methods) and/or the Rational Method based on a 10-year 24-hour storm event. Rainfall quantities and/or intensities used in the analyses were derived from an analysis of design storms for the site. Drainage areas were determined using a planimeter and/or AutoCAD on topographic sheets of the project area. For each drainage area, runoff curve numbers (SCS methods) and/or runoff coefficients (Rational Method) were selected based on ground cover conditions, where required the Chatham County minimum design standard (c=0.60) was used. Times of concentration were calculated by HydroCAD using SCS methods. 4.0 EROSION AND SEDIMENTATION CONTROL MEASURES- INITIAL The following erosion and sedimentation control measures are to be constructed as part of the proposed construction. Appendices B, C, and D to this plan include calculations, technical specifications, and plans and details (project drawings) for each of these measures, respectively. In most cases, the following erosion and sedimentation control measures were designed using the final drainage areas which were found to represent a worst case for design. Each calculation indicates what condition was used in the analysis. 4.1 Sediment Basins There are four (4) permanent (Sediment Basins A, B, D, and E) sediment basins which will serve the site. Sediment Basin A is existing and is located on the west side of the existing landfill. Sediment Basin B is also existing and is located to the north side of the Landfill. Sediment Basin D is to be located to the east side of the existing landfill. Finally, Sediment Basin E will be located south of the proposed expansion area. These basins were designed in accordance with E&SCP&DM Section 6.61 and the Chatham County Stormwater Ordinance Section 164.16. Sediment basins are subject to several design requirements. Each sediment basin must have a basin volume of 3,600 ft3/acre of disturbed area and should have a surface area (measured at crest of principal spillway (riser)) of 400 ft2/cfs (based on the peak flow from the 10-year storm). Each basin must include a riser/barrel principal spillway and must have an emergency spillway (preferably a weir type spillway). The crest of the emergency spillway is set one foot above the invert of the riser and the spillway must pass the peak run off from the design storm event with one foot (min.) of freeboard to the crest of berm. Each riser/barrel assembly must be provided with an anchor displacing a buoyant weight of at least 1.1 times the weight of water displaced by the riser. Each riser must also be provided with a method of dewatering the basin. In addition to E&SCP&DM requirements, each sediment basin was designed to have an adequate surface area to achieve an 80% settling efficiency of a 40-micron (silt size) Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF particle at the peak discharge from the design storm. Each sediment basin was modeled with the HydroCAD computer program and a spreadsheet was used to verify the design requirements. 4.2 Drainage Channels Drainage channel calculations were conducted using a reformulation of Manning's Equation in a spreadsheet format. The calculations determine the normal depth of flow based on the peak discharge from the design storm (from HydroCAD) and assumed channel dimensions/slope(s). Both temporary and/or permanent channel linings were chosen, as appropriate, based on the calculated velocity and/or shear stress. Steeper channels (if specified) were analyzed as riprap channels in accordance with NRCS procedures. Temporary channel linings (if specified) were designed based on the peak discharge from a 2-year and 25-year design storm. 4.3 Drop Inlets Four (4) Weir-type drop inlets will be used in the perimeter drainage channel to route flows into Sediment Basin E. These drop inlets were designed either using HydroCAD or a spreadsheet based on an analysis of the flow capacity of the open sides (weirs) of the drop inlet compared to the maximum flow from the design storm. Prior to vegetative stabilization of the perimeter channel, each drop inlet will be protected from sedimentation by a placing a wire mesh and coarse aggregate filter around all sides of the drop inlet. 4.4 Culverts There are four (4) culverts which will be used at the site to convey flow beneath roadways and embankments. These culverts will be directed to Sediment Basin E. Culverts were designed either using HydroCAD or a spreadsheet based on an analysis of inlet and outlet control under the influence of the design storm to determine the maximum headwater elevation. Where required, culvert outlets were designed for outlet stabilization based on criteria set forth in E&SCP&DM, Section 6.41. 4.5 Silt Fence Silt fencing design was based on criteria set forth in E&SCP&DM, Section 6.62 including the limitation of 100 feet of fencing for each acre of drainage area. 4.6 Ve etative Stabilization Vegetative stabilization will be in accordance with the seeding schedule on the project drawings and/or in the project specifications. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 6 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 5.0 EROSION AND SEDIMENTATION CONTROL MEASURES- FINAL The following erosion and sedimentation control measures are to be constructed as art of final cover construction. The design and permitting of these controls are under jurisdiction of NC DEQ Solid Waste Section, the measures listed below are proposed and subject to change during a subsequent permit modification. 5.1 Side Slope Swales Side slope swales (diversion berms) are to be placed along final cover side slopes at 20 to 30 foot vertical increments. Flow from the side slope swales is directed to the down pipes or perimeter channels. The capacity and need for lining of the swales was checked using the same procedures as described above for drainage channels. 5.2 Down Pipes Down pipes will be used to carry flows from side slope swales to the bottom of final cover slopes. Down pipes were designed based on an analysis of inlet and outlet control under the influence of the design storm to determine the governing headwater condition. Down pipes will be adequately anchored to the landfill side slopes by use of a soil cover and each will be discharged either directly to perimeter channels or sediment traps (with rip rap outlet protection). 6.0 SCHEDULE FOR IMPLEMENTATION Erosion and sedimentation control measures will be established prior to, or as soon as practical thereafter, any land disturbance or construction activities may begin in that portion of the site which drains to the erosion control measures. The following general schedule will be followed for this project: A. Flag the clearing limits and identify any tree protection areas. B. Install temporary gravel construction entrance/exit. C. Clear the vegetated portion of the site and install silt and stone filter fencing prior to stripping/grubbing. D. Site shall be inspected and approved by Chatham County. E. Only strip/grub areas required for installation of structures, berms, and drainage channels. Other areas will be stripped/grubbed once the skimmer basins are completed. F. Install sediment basin outlet structure; outlet protection and/or channel, berm, and emergency spillway. G. Perform earthwork as required for construction. H. Perform fine grading and establish permanent vegetation on completed areas. I. After stabilization, remove silt and stone filter fencing and other temporary measures and install permanent vegetation on the disturbed areas. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page? DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Soil stabilization will be achieved on any area of the site where land disturbing activities have temporarily or permanently ceased according to the following schedule: A. All perimeter dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3 horizontal to 1 vertical (3H:1V) will be provided temporary or permanent stabilization with ground cover and erosion control blanket as soon as practicable but in any event within 7 calendar days from the last land disturbing activity. B. All other disturbed areas will be provided temporary or permanent stabilization with ground cover as soon as practicable but in any event within 15 calendar days from the Last land disturbing activity. C. Basins, traps, channels, and diversions will be lined with anchored rolled erosion control products or rip rap and/or vegetated upon construction. D. Permanent ground cover for all disturbed areas will be established within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. 7.0 INSPECTION AND MAINTENANCE All erosion and sedimentation control measures will be inspected at least once every 7 calendar days and within 24 hours after any storm event of greater than 1-inch of rain per 24-hour period and appropriate maintenance conducted. A rain gauge will be maintained on the site and a record of the rainfall amounts and dates will be kept. During inspections, any stormwater discharges from the site will be observed for stormwater discharge characteristics to evaluate the effectiveness of the erosion and sedimentation control measures incorporating Best Management Practices (BMPs). If visible sedimentation is leaving the disturbed limits of the site, corrective action will be taken immediately to control the discharge of sediments. Maintenance activities will include, but not be limited to the following: A. The removal and satisfactory disposal of trapped or deposited sediments from basins, traps, barriers, filters, and/or drainage features/devices; B. Replacement of filter fabrics used for silt fences upon loss of efficiency; and C. Replacement of any other components which are damage or cannot serve the intended use. Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Page 8 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page left intentionally blank. r� . . .r'��,� "'-" ' ■ � �-•; 'i � � J is ;�'� Pao IV agkk ILI "';IN .0 if ilk �l�r s� � ,� • A lqjjj&��X MW • 1 111 111 111 � 111 ��3• • '�-' '-- • 998200577 SMITH + GARONER SCALE DATE PROJECT IN Q ASSHOWN Dec. -: • DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF AppendixA Current Deeds & Solid Waste Permit Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0533 FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Nov 16, 2015 AT 04:13:21 pm BOOK 01828 START PAGE 0533 END PAGE 0535 INSTRUMENT# 11214 EXCISE TAX (None) Excise Tax:S 0 Mail after recording to:Grantee This instrument was prepared by: Paul S.Messick,Jr.,Attorney at Law,Pittsboro,NC If checked,the property includes the primary residence of at least one of the Grantors.(NCGS§105-317.2) NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED, made this -31�day of November 2015 between ALAN H. STONE, unmarried, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTOR; and ARBD, LLC, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTEE. The designation Grantor and Grantee as used herein shall include parties, their heirs, successors, and assigns, and shall include singular, plural, masculine,feminine or neuter as required by context. WITNESSETH The Grantor,for a valuable consideration paid by the Grantee,the receipt of which is hereby acknowledged,has and by these presents does grant,bargain,sell and convey unto the Grantee in fee simple,all that certain lot or parcel of land situated in Chatham County,North Carolina and more particularly d-:scribed as follows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee,that Grantor is seized of the premises in fee simple,has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. The property hereinabove described are properties acquired by Grantor by instrument recorded in Book Page of the Chatham County Registry. Title to the property hereinabove described is subject to the following exceptions: Easements and restrictions of record. IN WITNESS WHEREOF,the Grantor has hereunto set his hand an ea /da and year first above written. (SEAL) ALAN H.STONE,unmarried STATE OF NORTH CAROLINA COUNTY OF 4\,.a.,PA I, a Notary Public of v.u-4 County and State aforesaid, certify that ALAN,*. TB�'its}arried, personally appeared before me this day and acknowledged the execution of the foregoing instrume P Y PP Y g gg T;A Witness my hand and official stamp or seal,this Z-day of 1U v'y 20�i My Commission Expires: Printed Name: N'��(u C:� c < -°� `'• •.`` Notary Public DocuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0534 EXHIBIT A TRACT I: (Tax Parcel No.77630)ALL of Lot 8 according to a plat entitled"Property of A.Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RLS, dated August 29, 1983 and recorded in Plat Book 37, Page 19,Chatham County Registry,reference to which is hereby made for a more particular description. TRACT II: (Tax Parcel Nos. 87481, 87482, & 76383) ALL that certain tract or parcel of land containing 26.191 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry,reference to which is hereby made for a more particular description. TRACT III: (Tax Parcel No. 68340) ALL that certain tract or parcel of land containing 4.944 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone"prepared by Smith and Smith Surveyors,dated May 21,2001 and recorded in Plat Slide 2001-298,Chatham County Registry,reference to which is hereby made for a more particular description. TRACT IV: (Tax Parcel No.65049)ALL of Lot A containing 3.001 acres,more or less,according to a plat entitled,"Property of Alan Hugh Stone and wife,Cynthia W. Stone,"prepared by Gerald M.White, PE,RLS,dated May 21, 1992 and recorded in Plat Slide 92-207,Chatham County Registry,reference to which is hereby made for a more particular description. TRACT V: (Tax Parcel No. 87344)ALL of Lot B containing 3.856 acres,more or less,according to a plat entitled,"Property of Alan Hugh Stone and wife,Cynthia W.Stone,"prepared by Gerald M.White, PE,RLS,dated May 21, 1992 and recorded in Plat Slide 92-207,Chatham County Registry,reference to which is hereby made for a more particular description. TRACT VI: (Tax Parcel No. 79314) ALL of Lot 1 containing 2.000 acres, more or less,according to plat entitled "Site Plan for Alan Hugh Stone"prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298,Chatham County Registry,reference to which is hereby made for a more particular description. (Said lot is a part of Tracts II and V above) TRACT VII: (Tax Parcel No. 73915) ALL of Lot 2 containing 2.000 acres,more or less,according to plat entitled"Site Plan for Alan Hugh Stone"prepared by Smith and Smith Surveyors,dated September 11, 2001 and recorded in Plat Slide 2001-448, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts II,III,IV,and V above.) SAVE AND EXCEPT: BEGINNING at a point in the northern right of way line of Rock Hill Drive,and running thence North 28 degrees 50 minutes 41 seconds West 154.88 feet from an existing iron pipe,a common corner between Stone lots described by deed recorded in Book 595,Page 291 and Book 524, Page 747,Chatham County Registry;thence North 62 degrees 59 minutes 02 seconds East 302.63 feet to a point in the western right of way line of an existing 60 foot private road;thence along the right of way of said road South 56 degrees 34 minutes 34 seconds East 66.37 feet to a point;thence South 27 degrees 00 minutes 58 seconds East 55.41 feet to a point in the northern right of way line of Rock Hill Drive; thence along said drive South 73 degrees 09 minutes 15 seconds West 35.20 feet to an existing iron pipe; thence further South 62 degrees 59 minutes 02 seconds West 268.91 feet to the point or place of BEGINNING,containing 0.800 acre and denominated as"Well Lots"on the plat entitled"Well Lot Map Alan Hugh Stone" prepared by Smith and Smith Surveyors dated March 26, 2015, a copy of which is attached hereto as Exhibit B and incorporated herein by reference. DocuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0535 EXHIBIT B 9R' g THIS MAP IS NOT A CER77RED SURVEY AND HAS NOT BEEN REVIEWED BY A I °� $ LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPLICABLE 64 64 LAND DEVELOPMENT REGULA770NS. V1C Off MAP —RuV A=O®BOW SATs PAIi 20 PUT arc TOOL-YDB pACr+r77TY ALlyPfSS` W�1./4 NG AK P7517 ALC QSTAMZS.9,tlMN n91aV ARE U.S AMOEY TSFT rAN/ZOVTAC a?OL;4 145t A7lE]V7S AREA BY 7W aMa Ad/ I � � I ALAN H. STONE 1 1 D.B. 524,PG 747 PLAT VJDE 2001-298 ALAN H. STONE ' AP 0\ 6 r/P PL sr sX�aE YoloiPa 291 -298 l EPP YP EP �/ i2110.t op w Y6, Y Aq OP A as�95H TONEAF Ocswo 60' efo °rE°su -��-- Y\N PUT 37JDE 2001-298 (st>= �l^ —— PIN 9794-06-6670 f AKPAR j 65049 \\ [/ /'�aenvc 51;g;41" S t9n W N�y90 � _/�arRaaurF tau>rov)�� 554 `✓//� �Acnac id W /Pms o 2 HEU LOT �2 �w ,P o.800 ACRE r W URUTY x � DP �TMD6 WIPM 2 R24W21-w�Mom ~ 1 P.B. 37, PG 19 un rr 1 \IDS P.B. 37,Pa 19 A. HUGH S70NE, ET UX PLAT BK. 37, PC. 19 /V i9\ P.B. J7 Pa 19 \ pG°3EUMEMARY / THIS IS A PRELIMINARY DRA AND S NOT TO BE USED ASS A A SURVEY TO TRANSFER ANY PROPERTY SHOWN HEREON. f00 O 60 10 a^�/7/T /��yT 77E�77I)IjQL///tO��T//nM.yA7/PE J�\�/}/7fj7� TJf.&OD l 31lL.rLl V RU�1.Ar/t ll SM V'�✓ 1 inch = 100 It _0_ERim trot. Yf1UAfB]DIYY9F.pdAUl/g7MT1;AgRM GuvaAVA R2_ _ SO i t Of Smith and Smith x mu nFlM 8T r-1w, CCR-A(.& n a Abht O`y yrliyaf�[viY P paT)gV OE �-:-e.aMg R k-1 41 y Aia Rye An�o. �w;�R '�-ae» AOU AY-w vac-atr[ DocuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF - 11k__( qq3 PG 9�_I e© NORTH CAROLINA CHATHAM COUNTY' �Ic3 THIS DEED, made this 31st day of May, 1963, by MTLDRED P. RAMSEY and husband, ELBERT RAMSEY, and LILLIAN P, SHAW and husband, JOSEPH SHAW, parties of the first part, to A. HUGH STONE and wife, HELEN B. STONE, of Chatham County, North Carolina, parties of the second part, WITNESSETH That said parties of the first part in consideration of TEN DOLLARS ($10.00) and other valuable considerations to them paid by said parties of the second part, the receipt of which is hereby acknowledged, have bargained and sold, and by these presents do grant, bargain, sell and convey unto said parties of the second part and their heirs and assigns, a certain lot or parcel of land in Williams Township, Chatham County, North Carolina, bounded and described as follows: BEGINNING at a.rock and pointers in the southeastern corner of Lot No. 1 of the division of the Calvin W. Powell home tract, common corner of Hugh Stone and Curtis V. Dowdy and H. N. Butler, and running thence along and with Dowdy and Butler line South 68 deg. 52 min. East 560.75 feet to an iron pipe corner, known as the "Old Shotgun Barrell Corner" in an old roadbed; thence with the line of Dowdy and Butler North 59 deg. 22 min. East 669 feet to an iron pipe; thence with the line of Dowdy and Butler North 48 deg. 51 min. East 255.90 feet to an iron pipe; thence with the line of Dowdy and Butler South 79 deg. 35 min. East 796.66 feet to an iron pipe on the West bank of Big Bush Creek; thence South 79 deg. 35 min. East 30 feet to a point in the center of said creek; thence down the course of said Bush Creek as the same meanders in a southeastern direction the following courses and distances: South 37 deg. 04 tin. East 205 feet, South 21 deg. 04 min. East 168 feet, South 39 deg. 41 min. 78 feet; South 28 deg, 19 min. East 238 feet, South.24 deg. 41 min. East 153 feet, South 12 deg. 06 min. West 63 feet, South 47 deg. 54 min. East 377.50 feet, North 71 deg. 46 min. East 11$ Feet, South 26 deg. 46 min. West 97 feet and South 12 deg. 12 min. East 193.11 feet to a railroad spike in a bridge in the center of the intersection of said Big Bush Creek with N. C. Secondary Road No. 1715; thence along and with the center line of said N. C. Secondary Road No. 1715 South 60 deg. 13 min. 30 seconds West 914.38 feet to an iron pipe; thence North 0 deg. 23 min. West 113 feet to an iron pipe, stone and ash pointer, Hugh Stone Is corner; thence along and with said Hugh Stone's line North 0 deg. 03 min. West 925.36 feet to an iron pipe; thence with the line of Hugh Stone North 87 deg. 42 min. West•2,000.4o feet t0 an iron pipe, known as "The Old Dogwood Corner"; thence with the line of Hugh Stone DTorth 1 DopuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SEP 2 2 21 NJ '97 07337 BOCK 729 PAGE Excke To. Recording Time,Book and Page Tax Lot No........................................ ............ . ..... ...... Parcel Identifier No......................................... Verifiedby.................... ..........................................County on the................day of.......... ....................................... 19............ by .......................................'...11 — I ........ ........ Mail after recording to Grantee,._.... ........... ............... ........... 1 .... I--....................... ..........I �I I................. ..... . ..... . .... ..........11............ This instrument was prepared by , Paul, S...Messioki Jr,A Attorney-a-t at-Laws Pittsbarcr�--NC.... ........................ Brief description for the Index NORTH CAROLINA NON-WARRANTY DEED THIS DEED made this .....day of Augyr.:I; by and between GRANTOR GRANTEE HELEN B. STONE, free trader MARLON K. STONE 3405 Lazy Day Lane Charlotte, NC 28269 Enter In appropriate block for each party:name,address,and.It appropriate,character of entity,e.g.corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties,their heirs,successors,and assigns,and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of......... .... . ............... ..... , Williams., ....... Township, Chatham., County,North Carolina and more particularly described as follows: ALL of Lot 12 containing 50,762 square feet,more or less,according to a plat entitled"Property of A.Hugh Stone and wife,Helen B.Stone"prepared by Gerald M.White,RLS,dated August 29,1983,recorded in Plat Book 37,Page 20 of the Chatham County Registry,reference to which is hereby made for a more particular description. Docu Sign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF I BOOK 729 PAGE 39 The property hereinabove described was acquired by Grantor by instrument recorded in A map showing the above described property is recorded in Plat Book. .37_. _ page 20 TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. The Grantor makes no warranty,express or implied,as to title to the property hereinabove described. IN WITNESS WHEREOF, the Grantor has hereunto el his hand and al.or if rate,has caused this Inxtru ment to be slgnrd In I[s eorporWri name by Its duly an{h.rlxrtl ofllcert and Its seal to be hereunto Alflaed by auth city of 1,isoard of s 1r et r,the day And year first t. above written. 1 --------------------.-- _ , 7 (Corporate Name) --------(SEAL) a Pre Eradi4"r By: . v _-_-_President -_______________.._________________ .___.__._.___-__._...______________.__(HEAL) ATTEST: R ---------------------------Secretary(Corporate Seat) two J SE;4flVil )jr',',, j NORTHCAROLINA.------ }LgI�.________________Cuunly, .___..----- __________________(SEAL) x�PJr•r O I.a Notary Public of the County and state aforesaid, certify that--_Helen S. Stories.- free trader ��r�pTAq� 9 -- - -- -- -- -- --- ------ --- -- - - - ----- - ---------------- Grant." . ate+ • T u personally appeared before me this day and acknowledged the...cull."of the foregoing instrument.Wltnrss my • Q c) q = hand and official stamp ur seal,this..28 dayor Au" y 97 _ I 1 _ '•••.....•• •+ MY commission e.ptrea: 4/25/2000___ ':z� rnbue f�RAiGsiRAttEtP NORTH CAROLINA------------------ -County. ' I,a Notary Public of the County and Stale aforesaid, certify that Dersonally came before me this day and acknowledged that_ --he Is., ------------------".-•----------'y _ secretary of a -------------- ----------------------------a North Carolina corporation,and that by authority duly t0 given and as the act of the eorporatloh,the f.reg.ing Instrument was signed In its name by Its._____ P President,sealed with its corporate seal nd attested b ' a y--------__- as Its _--------------------------Secretary. Witness MY hand and official stamp or seal,this__--- day of ---------_-------------- >• My commission e.Plrea:____________ __ _________________________________N.tarY Public The NORTH CAROLINA,CHATHAM COUNTY The foregoing Certificate(s)of GINA P. WE13STER ---------- Public is(ere)certified to be correct.This Instrument was presented for re istratlon et u/+ Notarypes) P M�,on Se tember�� 1997 9 2:2 1 ara and r —o•eloek hewn ah the REBA fd,THOMAS cords In Book 729 REORiTER OF DE6D8 FOR CHA By ��Page 38_ TRAM couHTT ay ...................... Assistant Rapist of Deso COUNTY N.C.ear Assoc Porm No.7®1977_A __.co ia,.cor Irr,vasrla.�ns,N.c.xh166 fylme A Ae«aw..aa Iti N...Bar Aaer,-Iss1 t _ lbN DocuSign Envelope 0:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF _..�.�_...__..__...�...,..._............... ... ..__...,........._._.r...�..T-.__...... .._....._.._......_........ DEC 15 9 55 a11'95 0 o FF 680 PAGE1073 F Z.1.T. Recording Time,Book and Page TaxLot No.... ...... ........ ....... .................. o.... ...... ........ ....... .................. Parcel Identifier No........................................................................... Verifiedby........................................................................ County on the................day of........................................................,1Y............ } b nn11 Mail after recording to ...Grantee...... ?7s ......................I............ .............. ..................................9... ..x................. .............................................. f................................. ....•................................... This instrument was prepared by...Paul S. Messicks•Jr. ACtorney..at:..Law.+ PiCtsboro•t••NC,••,27312 1 Brief description for the Index NORTH CAROLINA NON-WARRANTY DEED THIS DEED made this..!3. ....day of......,,.Aecembez..................................19....951...,by and between GRANTOR GRANTEE A. HUGH STONE HELEN B. STONE I i s� Enter In appropriate block for each party;name,addreu,and,it appropriate,character of entity,e.g.corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties,their heirs,successors,and assigns,and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that fcertain lot or parcel of land situated in the City of............. .......................................... ..Williams Township, Chatham ............1...I............. - County,North Carolina and more particularly described as follows: Tract One-, ALL of Lot No.2 containing 2.46 acres,more or less,according to a plat recorded in Plat Book 26, Page 62 of the Chatham County Registry, reference to which is hereby made for a more 1 particular description, Tract Two: ALL of Lots 12 and IS containing 60,762 square fee and 43,961 square feet,respectively, according to a plat entitled"Property of A.Hugh Stone and wife,Helen B.Stone"prepared by Gerald M. White,RLS,dated August 29,1983,recorded in Plat Book 37,Page 20 of the Chatham County Registry, reference to which is hereby made for a more particular description. It is the purpose and intent of this conveyance to effectuate a partial settlement of marital property between the parties pursuant to an agreement between them dated November 30,1995 and G.S.1 b0- 29(d). From and after the execution and delivery hereof,the Grantor shall have no further right,title or interest herein by virtue of the mantel relationship and Grantee shall have the right,without the joinder or consent of the Grantor,to mortgage or convey the property conveyed herein, N.C.aw Aupe.roan No.7 0 1977— DocuSign Envelope ID:EOA3AE9F-0561-4294-8973-A51A5CD3F4CF - I ` 680 PAGE1074 The property hereinabove described was acquired by Grantor by instrument recorded in ................. ................................._. ................................... A map showing the above described property is recorded in Plat Book...... ...page......................... TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. The Grantor makes no warranty,express or Implied,as to title to the property hereinabove described. i IN WITNESS WHEREOr, the Onntor,hat hereuote t Als band and seal,or corporate,h 7twsed tab I. rumens to be sl aed in 1b eerporste name by Ito duly authorlxed ofticert and Ito seal to be hereoato art/%above written. th o Its Board 01, to the der and year art. I (Corporate Name) ---• z A. xu cx szoiv By: .•-•-............... 4 ------------------------------ W .__.________________________________________ W__Preeldeat ,'i~ _____-___..._(aEA ATTEST: 'Y e w ; -_``-„`�ltotnt►► --�eecretary(corporate seat) ......... ...........(SEAL) .rYl )�7r ,.---- r�� ;• �` a. NORTH CArto4fNA.. ..............County. gM L a Notary Public of the Cosaq and state aferotald,certify that._At_-klAgh_ itQ[k.@------------------•-- --------------------•••-------------•-------•------------------------------'------••----------•- Ouster, I 1 - - '�' '•," p personally appeared before me this day and aCkaow N the exeeatba of the foregoing,lastmment wltaei mr r•.,�•+n+/�t`���,t`l.�` m hand and oats-stamp or teat,this Mr of_ L le ..,err%i)117111tt Is la My commission expires:____ -:!_�C¢v�xrr ------Notary Publle SISAL.SVAMP NORTH CAROLINA._______...._ ________________County, f, a Notary Public of the County and State afere"Id,Certify that ••••-_- 9 personally came before me this day and acknowledged that__•_he is---------------------------Secretary of x _a North Corollas.eo---------------------------------------- rponuer,sea that p areheNtr atuy even and as tee act of the corporation,the foregoing instrument was signed In He ease by its--------------- PPre ident,seale4 with Its Corporate teal and attested by----------- A.Its--------...................secretary. Witness MY hand and official stamp or seal.this____- day of--------------------------_es--_--, bly Cemmisston expires:-----------____________________ NORTH CAROLINA,CRATE"COUNTY The foregoing Certifics*s)of GINA F. WEBSTER Notary(ia)Public, is(are)certified to be correct. This instrument was presented for registration at 9:55 o'clock a.m- on December 15 1995,and recorded in Book 680 ,Page 1073 Reba G.Tbonw,REGISTER OF DEEDS FOR CHATHAM COUNTY By ,_Assistant-Register of Deods N.C.Bat A—,Form No.7 0 1977-.wr exiw.a�.,i...,sw 1rr.vr•„ur,u.c two aaw.s ar M+i....+n..,M M.C.M 1„•¢—lit �D DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP STATf � Issuance:February 9,2021 File ID: 1516661 ROY COOPER a Page 1 of 9 Governor MICHAEL S.REGAN zc Secretary MICHAEL SCOTT `aMv '` Director NORTH CAROLINA Environmental Quality STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION SOLID WASTE MANAGEMENT FACILITY Permit No. 1909-LCID-2010 ARBD LLC d/b/a STONE COMPANY LLP and ALAN HUGH STONE is hereby issued a Permit to Construct and Operate Stone Landfill LCID Phases 1, 2, 3, & 4 Located north of the intersection of Rock Hill Drive and Big Woods Road, Chapel Hill, Williams Township, North Carolina in Chatham County, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deeds recorded for this property listed in Attachment No. 1 of this permit. Sherri C. Stanley, Supervisor Permitting Branch Solid Waste Section Division of Waste Management 1646 Mail Service Center,Raleigh,North Carolina 27699-1646 Phone:919-707-8200 Internet: hfps:Hdeq.ne.gov/abouVdivisions/waste-management An Equal Opportunity 1 Affirmative Action Employer DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 2 of 9 ATTACHMENT 1 GENERAL PERMIT CONDITIONS AND INFORMATION Permit to Operate Data Table Permit Status Issuance EExpiration 1909-LCID-2010 Active February 9, 2021 February 9, 2026 PART I: GENERAL PERMIT CONDITIONS 1. This permit is issued by the North Carolina Department of Environmental Quality,Division of Waste Management, Solid Waste Section(Section). In accordance with North Carolina Solid Waste Management Rules(Rule) 15A NCAC 13B .0201 (e),a land clearing and inert debris (LCID) solid waste management facility permit may be combined in two parts: a Permit to Construct and a Permit to Operate. The Permit to Construct conditions are contained in Attachment 2 of this permit and the Permit to Operate conditions are contained in Attachment 3 of this permit. 2. The persons to whom this permit is issued ("permittee") are the owners and operators of the solid waste management facility. 3. The permit to operate for this facility issued August 7, 2015 was recorded in the Chatham County Register of Deeds on August 17, 2015 in Deed Book 01813, Page 0070 to Page 0080. 4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other instrument of transfer must contain in the deed description section, in no smaller type than that used in the body of the deed or instrument, a statement that the property has been used as a land clearing and inert debris landfill and a reference by book and page to the recordation of the permit. 5. By beginning construction or receiving waste at this facility, the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Construction and operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit, and the approved plan identified in Attachment 1, "List of Documents for the Approved Plan". Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. 7. The permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, "List of Documents for Approved Plan," and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 3 of 9 8. The owner or operator shall notify the Department within 30 days of a significant change in accordance with G.S. 130A-295.2(g). The owner or operator shall submit an application to amend the permit for any change in ownership or corporate structure. 9. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for sedimentation and erosion control, and a General or Individual National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does not remove the permittee's responsibilities for compliance with any other local, state or federal rule, regulation or statute. Pro erties Approved for the Solid Waste Facility Chatham County, N.C.,Register of Deeds Book Page Grantor Grantee Acres 0595 0291 A. Hugh Stone and 6.60 Helen B. Stone Alan Hugh Stone 1411 0517 Cynthia W. Stone Alan Hugh Stone 2.21 0524 0747 A. Hugh Stone and Alan Hugh Stone 4.25 Helen B. Stone 0826 0314 A. Hugh Stone and Alan Hugh Stone 3.39 Helen B. Stone 1554 0319 A. Hugh Stone and Alan Hugh Stone 20.59 Helen B. Stone 826 0314 A. Hugh Stone and Alan Hugh Stone 0.98 Helen B. Stone Total Site Acrea e: 38.02 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 4 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) Permitting History Doc/File Permit Action Date ID 1909-LCID-2010 Original Issuance Permit to Construct/Operate May 28, 2010 10409 Permit Amendment, Expansion August 7, 2015 24484 Permit Amendment, Renewal February 9, 2021 151661 List of Documents for Approved Plan Note—Documents referenced in this permit (e.g., DIN/FID 1234567) can be viewed online at the NC Solid Waste Section website in the Documents database 1. Application for LCID Landfill Permit. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 10383. September 2009. 2. Application for LCID Expansion. Prepared by: John H. Harris, P.E. Consulting Engineer, Inc. DIN 24250. March 2015. 3. 2020 Permit Renewal Application Stone LCID Landfill. Prepared by: Smith+Gardner Engineers. Prepared for: ARBD, LLC. FID 1390647. February 2020. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 5 of 9 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT PART I: GENERAL PERMIT CONDITIONS 1. Construction of all solid waste management units within this facility must be in accordance with the pertinent approved plans included in Attachment 1, "List of Documents for the Approved Plan". 2. Modification or revision of any approved plan or changes during construction require approval by the Section and may constitute a permit modification and be subject to a permitting fee. 3. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act NCGS 113A-50, et seq., and rules promulgated under 15A NCAC 4. The facility must furnish a copy of the approved Sedimentation and Erosion Control Plan from the NC Division of Energy, Mineral and Land Resources, Land Quality Section, to the Solid Waste Section. 4. Modifications to the approved sedimentation and erosion control activities require approval by the NC Division of Energy, Mineral and Land Resources, Land Quality Section. The Solid Waste Section must be notified of any modifications. 5. Facility construction must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirement under Sections 401 and 404 of the Clean Water Act, as amended. EROSION AND SEDIMENTATION CONTROL REQUIREMENTS 6. All earth disturbing activities must be conducted in accordance with the Sedimentation Pollution Control Act of 1973 (15 NCAC 4) and consistent with any other local, state or federal requirements. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Modifications to the approved sedimentation and erosion control activities require approval by the North Carolina Land Quality Section. The permittee must notify the Section of any sedimentation and erosion control plan modifications. PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 6 of 9 PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 9. The landfill is permitted for a total gross capacity of 920,721 cubic yards (CY) including 106,149 cubic yards in the existing 4.87-acre landfill. Gross capacity is the measured volume between the bottom of waste and the top of final cover. Development of the landfill is approved as shown in the approved operation plans and drawings listed in Attachment 1 List of Approved Documents (FID 1390647) and summarized below. Phase Development Acreage Capacity (CY) Status Phase 1 2.43 54,305 Existing Phase 2 2.44 51,844 Existing Phase 3 8.14 352,836 Existing Phase 4 5.58 243,936 Existing Phase 5 1 5 217,800 Proposed TOTAL 1 23.6 920,721 10. The facility capacity will be completed when fill reaches the final grades as shown in the approved facility drawings (FID 1390647). Any additional capacity at the facility will require the permittee to complete the application process as required under NC Solid Waste Management Rule 15A NCAC 13B .0563 et seq. 11. The following is required prior to receiving solid waste in the new phase. a. Written certification from a registered professional engineer must be submitted to the Section certifying that the waste disposal unit(s) has been constructed in accordance with the approved plan. b. The disposal unit boundary must be accurately delineated with permanent markers in accordance with 15A NCAC 13B .0201(g). c. A site inspection and pre-operative meeting must be conducted by a representative of the Section. The permittee must notify the Section and make arrangements for the site inspection and pre-operative meeting. PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 7 of 9 ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: GENERAL PERMIT CONDITIONS 1. The facility must be adequately secured by means of gates, chains,berms, fences, or other security measures approved by the Section to prevent unauthorized access. 2. Signs must be posted at the site entrance that state that no hazardous waste or liquid waste can be received at the facility; that provide information on dumping procedures and hours of operation; and that show the permit number, site contact's name and phone number, emergency contact information and the waste types accepted for disposal at the facility. Traffic signs or markers must be provided as necessary to promote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. 3. Access roads shall be of all-weather construction and shall be maintained to allow access by vehicles transporting waste, Department staff, and fire-fighting vehicles. 4. The permanent markers that delineate the waste disposal boundary must be maintained at all times. 5. Copies of this permit, the approved plans, and all records required to be maintained by the permittee must be maintained at the facility and made available to the Section upon request during normal business hours. 6. All sedimentation and erosion control activities must be conducted in accordance with the Sedimentation Control Act, N.C.G.S. 113A-50 et seq., and rules promulgated under 15A NCAC 4. The Section must be notified of any approved modifications to the sedimentation and erosion control plan. 7. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 8. Fire lanes must be established and maintained at all times. The dimensions of the fire lanes must be coordinated with the Fire Marshall having jurisdiction over the site. 9. Open burning of solid waste is prohibited unless approval has been obtained from the Division, the local government, and the Division of Air Quality in accordance with 15A NCAC 02D .1900 prior to any burning activity. 10. The owner or operator shall provide equipment on-site to control fires and make arrangements with the local fire protection agency to provide fire-fighting services. Fires must be reported to the regional waste management specialist with 24 hours or the occurrence, followed by a written notification within 15 calendar days of the occurrence. 11. Financial assurance as required by state rules and statutes must be continuously maintained for the duration of the facility and updated and submitted annually to the Section by the anniversary date of the issuance of this permit. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 8 of 9 PART II: SUBTITLE D/LINED MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S) Not Applicable PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S) Not Applicable PART IV: INDUSTRIAL LANDFILL UNIT(S) Not Applicable PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S) 12. This Permit to Operate expires February 9, 2026 or when the facility capacity reaches the final grades as shown in the approved facility drawings (FID 1390647). Pursuant to 15A NCAC 13B .201(c), the permittee must submit a permit renewal application prepared in accordance with 15A NCAC 13B .0565 and .0566 to the Section no later than August 9, 2025. 13. This Permit to Operate authorizes the continued operation of Phase 1, Phase 2, Phase 3, and Phase 4 of the LCID Landfill as shown in the approved plans and drawings indicated in Attachment 1, List of Documents for Approved Plan 14. This facility is permitted to receive land clearing waste;yard trash;untreated and unpainted wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-294(m). 15. Revisions to the design or operation of the facility require written approval of the Section and may be subject to a permitting fee. 16. Solid waste in the landfill shall be compacted. Slopes shall not exceed a ratio of three horizontal to one vertical (3:1) at any time. 17. An operator must be on duty at all times while the site is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. COVER MATERIAL REQUIREMENTS 18. All waste shall be covered with no less than six inches of soil monthly or when the active area reaches one (1) acre in size, whichever occurs first. More frequent cover may be required when necessary to prevent the site from becoming a nuisance, or to mitigate conditions associated with fire, windblown materials, vectors, or excessive water infiltration. Any soils used for cover at the site shall meet unrestricted use standards for soils as defined in G.S. 130A-310.65. 19. The facility must maintain a supply of cover material adequate to cover the working face in case of an emergency or fire at all times. 20. Areas that will not have additional wastes placed on them for three months or more, but where final termination of disposal operations has not occurred, shall be covered with no DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Facility Permit No: 1909 ARBD LLC d/b/a Stone Company LLP Issuance:February 9,2021 File ID: 1516661 Page 9 of 9 less than one foot of soil cover sloped to direct the flow of surface water from the landfill, and stabilized with vegetative ground cover or other stabilizing material. The Division may require further action to correct any condition that the Division determines may be injurious to the public health, or a nuisance to the community. 21. The owner or operator shall meet the closure and post-closure requirements of 15A NCAC 13B .0567(b) and(c). DRAINAGE CONTROL AND WATER PROTECTION REQUIREMENTS 22. All required sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility. 23. Ground water quality at this facility is subject to the classification and remedial action provisions of 15 NCAC 2L. 24. Solid waste must be placed a minimum of four feet above the seasonal high water table in accordance with Rule 15A NCAC 13B .0564(9). 25. Solid waste shall not be disposed in standing water. Surface water shall be diverted away from the operational area and shall not be impounded over waste. 26. Leachate shall be maintained and managed on-site. RECORDKEEPING AND REPORTING 27. The permittee must maintain a record of the amount of solid waste received at the facility. On or before August 1 annually, the permittee must submit an annual facility report to the Solid Waste Section, on forms prescribed by the Section PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S) Not Applicable PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S) Not Applicable —End of Section— DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF oF�E STATE oF� 73 D� ' y ROY COOPER - v Governor ELIZABETH S.BISER Secretaryfssr coca. MICHAEL SCOTT NORTH CAROLINA Director Environmental Quality May 19, 2022 Sent Via Email - ray.maxwell@gaston ov.com Alan Stone Owner ARBD, LLC 5180-A Big Woods Road Chapel Hill, NC 27517 Subject: Phase 5 - Approval to Operate Stone Landfill LCID Chatham County, Permit# 1909-LCID-2010, File ID 1677023 Dear Alan, The Division of Waste Management, Solid Waste Section (Section) has completed review of the Phase 5 Construction Certification submittal (file ID number 1676421) for the above referenced facility. The document was submitted on your behalf by Smith+Gardner, Inc., and received by the Section on May 11, 2022. The certification document contained the information that was required to be submitted to the Section, by the conditions of the permit to construct and operate, prior to beginning operations in Phase 5 of the landfill. No issues of concern were noted with any of the information provided in the report. Based on the Engineer's Certification, and the review of the report, the Section approves operation of Phase 5. If you should have any questions regarding this matter, please contact me at (919) 707-8229, or by email at jordan.russ@ncdenr.gov . Sincerely, �?A A�-- Jordan Russ Permitting Engineer CC: Stacey Smtih - Smith+Gardner Jesse Li - Smith+Gardner Chuck Kirchner - NC DEQ D E Q�� North Carolina Department of Environmental Quality I Division of Waste Management - 217 West Jones Street 1 1646 Mail Service Center I Raleigh,North Carolina 27699-1646 NORTH CAROLINA N. oeParonemmrnrironmemaiouai� � 919.707.8200 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF E7 1,E7 FILED CHATHAM COUNTY REBA G.THOMAS Chatham County,North Carolina REGISTER OF DEEDS REBA G.THOMAS Register of Deeds The foregoing certificate(s)of FILED Jun 20, 2003 TERESA LOY FARRELL AT 03:47:31 pm BOOK 01030 BOCK t3 15A 0 notary/notaries public START PAGE 0150 is/are certified to be correct. END PAGE 0153 I a INSTRUMENT# 09852 Assistant-Register of Deeds North Carolina Department of Environment and Natural Resources f •r Division of Waste Management Michael F.Easley,Governor NCDENR William G.Ross Jr.,Secretary Dexter R.Mattbe-,vs,Director LAND CLEARING AND INERT DEBRIS LANDFILL NOTIFICATION Pursuant to 15A NCAC 13B .0563(2)(a),the land owner(s) and operator(s) of any Land Clearing and Inert Debris Landfill under two (2) acres in size shall submit this notification form to the Division prior to constructing or operating the landfill. This form must be filed for recordation in the Register of Deeds' Office. The Register of Deeds shall index the notification under the name of the owner(s) of the land in the county or counties in which the land is located. The Register's seal and the date, book, and page number of recording must be included on this form when submitted to the Division.This notification is not valid to authorize operation of a landfill unless complete,accurate,recorded,and submitted to the Division as required by 15A NCAC 13B .0563(2)(b). f 1. Facility Name: 2, Facility location (street address): J� c�k/ City: 0- W 01 A/e- County: N( A- zip: ZVI 3. Directions to Site: 'ru j 4 S 5 M ley 1) eoLlL .lei/ �/• / �firtr..�y 4. The land on which this landfill is located is described in the deed recorded in; deed book: page: �iI county: C A 5. Name of land owner: M) TO1\C- 6. Mailing address of land owner: ,31+8' Awsk CY'edi 40-m City: F tQ Wit State: A(�. zip: M-7 — 7. Telephone number of land owner:) 9l9 ) /���Gg54 (0yj� ) _If^D6i IC qfq_ �)_o9tr If the land is owned by more than one person, attach additional sheets with the name, address, and phone number of all additional land owners. 8. Name of operator: kt-An r`(- 9. Trade or business name of operator. LA) 54bNL G+tGAV irl Ale. 10. Mailing address of_operator: 34f( B,,LS k er-tok Atf- [ City:a t'}fT�t^ 14t(' , _ State: /v� Zip: A ZVI 11. Telephone number of operator: lq If the landfill is operated by more than one person, attach additional sheets with the name, address, and phone number of all additional operators. A 12. Projected use of land after completion of landfill operations: �flRiS —S�{4��� �"r��� 1646 Mail Service Center,Raleigh,North Carolina 27699-1646 Phone: 919-733-0692 \ FAX: 919-733-4810 \ Internet: www.enr.state,nc.us AN EQUAL OPPORTUhIITY\AFFMMATIVE ACTION EMPLOYER-50%RECYCLED/I0%POST CONSUMER PAPER DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 17131 r BOOK 10 t 0 PAUGE 151 The following are the applicability, siting, and operating criteria for Land Clearing and Inert Debris Landfills operating under notification. From: North Carolina Solid Waste Management Rules 15A NCAC 1313: .0101 DEFINITIONS (63) "Land clearing waste"means solid waste which is generated solely from land clearing activities such as stumps,trees,limbs,brush,grass, and other naturally occurring vegetative material. (54) "Land clearing and inert debris landfill" means a facility for the land disposal of land clearing waste,concrete,brick, concrete block, uncontaminated soil,gravel and rock,untreated and unpainted wood,and yard trash. (55) "Yard trash"means solid waste resulting from landscaping and yard maintenance such as brush,grass,tree limbs,and similar vegetative materials. .0563 APPLICABILITY REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS Management of land clearing and inert debris shall be in accordance with the State hierarchy for managing solid waste as provided for under N.C.G.S. §130A-309.04(a).Disposal in a landfill is considered to be the least desirable method of managing land clearing and inert debris.Where landfilling is necessary,the requirements of this Rule apply. (1) An individual permit from the Division of Solid Waste Management is not required for Land Clearing and inert Debris(LCID)landfills that meet all of the following conditions: (a) The facility is to be operated for the disposal of land clearing waste,inert debris,untreated wood,and yard trash.Operations must be consistent and in compliance with the local government solid waste management plan as approved by the Division of Solid Waste Management. (b) The total disposal area is under two acres in size. (c) The facility and practices comply with the siting criteria under Rule.0564,and operational requirements under Rule.0566. (d) The fill activity is not exempt from,and must comply with all other Federal,State,or Local laws,ordinances,Rules,regulations, or orders,including but not limited to zoning restrictions,flood plain restrictions,wetland restrictions,sedimentation and erosion control requirements,and mining regulations. (2) Where an individual permit is not required,the following applies: (a) The owner of the land where the landfill is located must notify the Division on a prescribed form,duly signed,notarized,and recorded as per Rule.0563(2)lb).The operator of the landfill,if different from the(and owner,shall also sign the notification form. (b) The owner must file the prescribed notification form for recordation in the Register of Deeds'Office.The Register of Deeds shall index the notification in the grantor index under the name of the owner of the land in the county or counties in which the land is located-A Copy of the recorded notification,affixed with the Register's seal and the date,book and page number of recording shall be sent to the Division of Solid Waste Management. (c) When the land on which the Land Clearing and Inert Debris Landfill is sold,leased,conveyed,or transferred in any manner,the deed or other instrument of transfer shall contain in the description section in no smaller type than that used in the body of the deed or instrument a statement that the property has been used as a Land Clearing and Inert Debris Landfill and a reference by book and page to the recordation of the notification. .0564 SITING CRITERIA FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS - The following siting criteria shall apply for Land Clearing and Inert Debris(LCID)landfills: (1) Facilities or practices,shall not be located in the 100-year floodplain. - (2) Facilities or practices shall not cause or contribute to the taking of any endangered or threatened species of plants,fish,or wildlife. (3) Facilities or practices shall not result in the destruction or adverse modification of the critical habitat of endangered or threatened species as identified in 50 CFR Part 17 which is hereby incorporated by reference including any subsequent amendments and editions.This material is available for inspection at the Department of Environment,Health,and Natural Resources,Division of Solid Waste Management,401 Oberlin Road,Raleigh,North Carolina 27605 where copies can be obtained at no cost. 14) Facilities or practices shall not damage or destroy an archaeological or historical site. 15) Facilities or practices shall not cause an adverse impact on a state park,recreation or scenic area,or any other lands included in the state nature and historic preserve. 16) Facilities shall not be located in any wetland as defined in the Clean Water Act,Section 404(b). 17) It must be shown that adequate suitable soils are available for cover,either from on or off site. (8) Land Clearing and Inert Debris landfills shall meet the following surface and ground water requirements: la) Facilities or practices shall not cause a discharge of pollutants into waters of the state that is in violation of the requirements of the National Pollutant Discharge Elimination System(NPDES),under Section 402 of the Clean Water Act,as amended. (b) Facilities or practices shall not cause a discharge of dredged materials or fill material into waters of the state that is in violation of the requirements under Section 404 of the Clean Water Act,as amended. (e) Facilities or practices shall not cause non-point source pollution of waters of the state that violates assigned water quality standards. (d) Waste in landfills with a disposal area greater than two acres shall be placed a minimum of four feet above the seasonal high water table,except where an alternative separation is approved by the Division. (a) Waste in landfills with a disposal area less than two acres shall be placed above the seasonal high water table. (9) The facility shall meet the following minimum buffer requirements: (a) 50 feet from the waste boundary to all surface waters of the state as defined in G.S.143.21 2. (b) 100 feet from the disposal area to property lines,residential dwellings,commercial or public buildings,and wells. (c) Buffer requirements may be adjusted as necessary to insure adequate protection of public health and the environment. (10) The facility shall meet all requirements of any applicable zoning ordinance. .0566 OPERATIONAL REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS Land Clearing and Inert Debris(LCID)landfills shall meet the following operational requirements: (1) Operational plans shall be approved and followed as specified for the facility. (2) The facility shall only accept those solid wastes which it is permitted to receive- (3) Solid waste shall be restricted to the smallest area feasible and compacted as densely as practical into cells. (4) Adequate soil cover shall be applied monthly,or when the active area reaches one acre in size,whichever occurs first. 2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 01,L BOOK 10 v i PAGE 15 2 15) 120 calendar days after completion of any phase of disposal operations,or upon revocation of a permit,the disposal area shall be covered with a minimum of one foot of suitable soil cover sloped to allow surface water runoff in a controlled manner.The Division may require further action in order to correct any condition which is or may become injurious to the public health,or a nuisance to the community. 16) Adequate erosion control measures,structures,or devices shall be utilized to prevent silt from leaving the site and to prevent excessive on site erosion.visions(7) Pro for a ground cover sufficient to restrain erosion must be accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill development. (8) The facility shall be adequately secured by means of gates,chains,berms,fences,etc.to prevent unauthorized access except when an operator is on duty.An attendant shall be on duty at all times while the landfill is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. 19) Access roads shall be of all-weather construction and properly maintained. {to) Surface water shall be diverted from the working face and shall not be impounded over waste. (111 Solid waste shall no be disposed of in water. 1121 Open burning of solid waste is prohibited. (13) The concentration of explosive gases generated by the facility shall not exceed: fal Twenty-five percent of the lower explosive limit for the gases in facility structures. fb) The lower explosive limit for the gases at the property boundary. (141 Leachate shall be properly managed on site through the use of current best management practices. (151 Should the Division deem it necessary,ground water or surface water monitoring,or both,may be required as provided for under Rules.0501 and.0602 of this Subchapter. (16) A sign shall be posted at the facility entrance showing the contact name and number in case of an emergency and the permit number.The permit number requirement is not applicable for facilities not requiring an individual permit. Certification by Land Owner: I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this Land Clearing & Inert Debris landfill will comply with the requirements of Sections .0563, .0564 and .0566 of 15A NCAC 1313, North Carolina Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. Where the operator is different from the land owner, I, the land owner, have knowledge of the operator's plans to dispose of solid waste on the land and I specifically grant permission for the operation of the landfill. I understand that both the land owner and operator are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five thousand dollars($5,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may r vised or amended in the future and that the facility siting af�d operations of this landfill will be re r d to ply with all such revisions o am ndments. & Print Name (Owner) Signature (Owner) Date North Carolina CI 1CT17 F�M County I, f``!! a 1—0 Fr_VY_? a Notary Public for said County and State, do hereby certify that ! ) personally appeared before me this day and acknowledged the due ext cltitfcvl,gf the foregoing instrument. J' tne4s rr1 hQ�fcl and offices ial seal, this the eday f 20 0 wf©ffial Sprall } Notary Public ":J�hy bomlpissf l�g-kplr#s 20 My Commission Expires Feb.13,2007. 3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF U-LDJ r ~ Certification by Landfill Operator (if different from Owner): I certify that the information provided by me in this notification is true,accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this Land Clearing & Inert Debris landfill will comply with the requirements of Sections .0563, .0564 and .0566 of 15A NCAC 13B, North Carolina Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. I have informed the land owner of my plans to dispose of solid waste on the land and the land owner has specifically granted permission for the operation of the landfill. I understand that both the operator and land owner are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five thousand dollars ($5,000.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that t facility siting and operations of this landfill will be required to comply witt all such revisions or an, n ments Print Name (Operator) Signature (Operator) Date North Carolina County I, =z 4_o laae t a Notary Public for said County and State, do hereby certify t4, personally appeared before me this day and acknowledged the due exgptrtion„qf the foreping instrument. GY r�' 1 �Y�1li 6ess.rriy d aid official seal,this the ao- day taf 2003 _. (b'fficiitloSaa1) r = '� - c 1 Notary Public �•• � � n �� '.,'My'e4Dmm4 -expires 0 ' r c o�` My Commission Expires 0 For additional land owners and landfill operators, attach separate notarized certifications for each additional land owner and landfill operator. For Corporate land owners and/or operators, use the Corporate Certifications, pages 5 and 6. Contact the Division of Solid Waste Management for proper applicable certifications. INSTRUCTIONS Purpose: Notification of Land Clearing and Inert Debris Landfills under two(2)acres in size is required under 15 NCAC 13B.0563(2)(a). Contact the Solid Waste Section at the address below for further information. Distribution: Mail completed recorded original notification to the following address: Division of Solid Waste Management Solid Waste Section 1 646 Mail Service Center Raleigh,North Carolina 27699.1646 (919)733-0692 Disposition: This form will be transferred to the State Records Center when reference value ends.Records will be held for agency in the State Records Center five(5)additional years and then transferred to the custody of the Archives. 4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0533 FILED CHATHAM COUNTY NC LUNDAY A. RIGGSBEE REGISTER OF DEEDS FILED Nov 16, 2015 AT 04:13:21 pm BOOK 01828 START PAGE 0533 END PAGE 0535 INSTRUMENT# 11214 EXCISE TAX (None) Excise Tax: $ 6 Mail after recording to: Grantee This instrument was prepared by: Paul S. Messick,Jr.,Attorney at Law, Pittsboro,NC If checked,the property includes the primary residence of at least one of the Grantors.(NCGS §105-317.2) NORTH CAROLINA GENERAL WARRANTY DEED THIS DEED, made this day of November 2015 between ALAN H. STONE, unmarried, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTOR; and ARBD, LLC, 5180-A BIG WOODS ROAD, CHAPEL HILL, NC 27517; hereinafter referred to as GRANTEE. The designation Grantor and Grantee as used herein shall include parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH The Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in Chatham County,North Carolina and more particularly described as follows: SEE EXHIBIT A ATTACHED HERETO AND INCORPORATED HEREIN BY REFERENCE. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the lawful claims of all persons whomsoever except for the exceptions hereinafter stated. The property hereinabove described are properties acquired by Grantor by instrument recorded in Book ,Page of the Chatham County Registry. Title to the property hereinabove described is subject to the following exceptions: Easements and restrictions of record. IN WITNESS WHEREOF, the Grantor has hereunto set his hand an a the da and year first above written. (SEAL) ALAN H. STONE, unmarried STATE OF NORTH CAROLINA COUNTY OF OA I, a Notary Public of i4v County and State aforesaid, certify that ALAN ,W!° TOW,, harried, personally appeared before me this day and acknowledged the execution of the foregoing instrumeqk.` F l Witness my hand and official stamp or seal,this day of 20�I Ste`yr M"y Commission Expires: 1 u—( 3 "aU I-7 _ J ALJ'Printed Name:_ Notary Public 90°�+tu+s1110`� DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0534 EXHIBIT A TRACT I: (Tax Parcel No. 77630) ALL of Lot 8 according to a plat entitled "Property of A. Hugh Stone and wife, Helen B. Stone" prepared by Gerald M. White, RLS, dated August 29, 1983 and recorded in Plat Book 37, Page 19, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT II: (Tax Parcel Nos. 87481, 87482, & 76383) ALL that certain tract or parcel of land containing 26.191 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT III: (Tax Parcel No. 68340) ALL that certain tract or parcel of land containing 4.944 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry,reference to which is hereby made for a more particular description. TRACT IV: (Tax Parcel No. 65049) ALL of Lot A containing 3.001 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT V: (Tax Parcel No. 87344) ALL of Lot B containing 3.856 acres, more or less, according to a plat entitled, "Property of Alan Hugh Stone and wife, Cynthia W. Stone," prepared by Gerald M. White, PE, RLS, dated May 21, 1992 and recorded in Plat Slide 92-207, Chatham County Registry, reference to which is hereby made for a more particular description. TRACT VI: (Tax Parcel No. 79314) ALL of Lot 1 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated May 21, 2001 and recorded in Plat Slide 2001-298, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 11 and V above) TRACT VII: (Tax Parcel No. 73915) ALL of Lot 2 containing 2.000 acres, more or less, according to plat entitled "Site Plan for Alan Hugh Stone" prepared by Smith and Smith Surveyors, dated September 11, 2001 and recorded in Plat Slide 2001-448, Chatham County Registry, reference to which is hereby made for a more particular description. (Said lot is a part of Tracts 1I, III, IV, and V above.) SAVE AND EXCEPT: BEGINNING at a point in the northern right of way line of Rock Hill Drive, and running thence North 28 degrees 50 minutes 41 seconds West 154.88 feet from an existing iron pipe, a common corner between Stone lots described by deed recorded in Book 595, Page 291 and Book 524, Page 747, Chatham County Registry; thence North 62 degrees 59 minutes 02 seconds East 302.63 feet to a point in the western right of way line of an existing 60 foot private road; thence along the right of way of said road South 56 degrees 34 minutes 34 seconds East 66.37 feet to a point; thence South 27 degrees 00 minutes 58 seconds East 55.41 feet to a point in the northern right of way line of Rock Hill Drive; thence along said drive South 73 degrees 09 minutes 15 seconds West 35.20 feet to an existing iron pipe; thence further South 62 degrees 59 minutes 02 seconds West 268.91 feet to the point or place of BEGINNING, containing 0.800 acre and denominated as "Well Lots" on the plat entitled "Well Lot Map Alan Hugh Stone" prepared by Smith and Smith Surveyors dated March 26, 2015, a copy of which is attached hereto as Exhibit B and incorporated herein by reference. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BK 1828 PG 0535 EXHIBIT B Mar&U#Kff 9If THIS MAP IS NOT A CER77RED SURVEY AND HAS NOT BEEN RENEWED BY A LOCAL GOVERNMENT AGENCY FOR COMPLIANCE WITH ANY APPUCABLE 84 $ 64 LAND DEVELOPMENT REGULA 11ONS. VAMVJff YAP AD,DNNXS'DEED OW 594 PACE 201 PLAT aw 2001-298 PRICY 7P>Y AALrPfSZ �0"NG 27517 ALL QtSTAMD=S 9AOMN/L7pEOV A�U.S £Y fEET Atl04GWTAL GPOI.AO IL£ASfA�DV7S AWA BY 7W AWL AI W= r � ' ALAN H. STONE 1 ` DA 524 Pa 747 PLAT SLIDE 2WI-296 ALAN H. STONE I ' Ip up RA SLIDE 200-2W � b 2 b 1,0 o MP s �"a ox VP It Ati EI ALAN H. STONE AF �. 00% 6 G. as 594 Pa 291 s oosTWD T suuE 4r\� PUT SiIQE 2001-296 (-SM ,s ue `s- P/N 979-1-06-6670 \\ AKPAR/65049 W Op .01 E ac0ir[ounov) �S 25541 g i wcu HOWE �S 3pi�0 gg 41 �: DP i d NELL LOT � � 1/ i MP a8OO AQW 91 W OR I unury 9�10 ME ZIP W/Pms S cd EP / 1 AR 37, Pa 19 Z N 2239Y•W AP •Wig u'" .00 � I .So TLUTr Q S� � /1\ kio J tlU%j \ P.a 37, Pa 19 1 A. HUGH STONE, ET UX _ PRAT BK. 37, Pa 19 1/ / THIS IS A PRELIMINARY DRAWING AND NOT TO USED AS A SURVEY OR TO TRANSFER ANY PROPERTY SHOWN HEREON. !DO D 50 100 7/7/L7I/QL//L�D�J/7/I/U�7/P/ /���/}/7/�/ LB rim � Ru1.YJL 1L SM vE it- -Edrthp#w,Pot 1N FEMP "S-O-km Poo set 1 inch = 100 ft RRs-o-fi km Stake LWLLUAIS 701M/9/° La'"p"L O&MY,ACRIN CARO MA R�- - TR�r L1r Smith and Smithu LwawMs DLiILQV sr �- -umv Pais r 1Q0 Cc& - surveyors AP-O-NoMrrroUcd Pohl ary L�a1 u'>et Al.t-mat a�-06-6?M EALP-•-D*thy Rakoad P.a AW Nf -m ��• PJKMKT roy J" Arm DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F46F �.,�_�-V/V 1 ! I UI �c. J 1.-.rA 1 I v�STATE State of North Carolina Department of Environment, Health, and Natural Resources 512 North Salisbury Street • Raleigh, North Carolina 27604 Division of Solid Waste Management James B. Hunt, Jr., Governor Solid Waste Section Jonathan B. Howes, Secretary Telephone(919) 733-4996 January 27, 1993 Alan Stone Route 9, Box 474 Chapel Hill, North Carolina 27514 Ref: Land Clearing & Inert Debris Notification Mr. Stone: On January 27, 1993, the Solid Waste Section received your Land Clearing and Inert Debris landfill notification. As long as your disposal activities remain under 2 acres, you may operate under the provisions of this approval. If your landfill disposal activities grow in size to more than 2 acres, please contact the Solid Waste Section for assistance in obtaining an individual permit. If this property is sold, leased, conveyed or transferred, the deed or other instrument of transfer shall contain in the description section, in no smaller type than used in the body of the deed or instrument, a statement that the property has been used as a Land Clearing and Inert Debris landfill. Amendments or revisions to the Solid Waste Management Rules or violation of groundwater standards may necessitate modification of the construction and operation of this facility or closure of this facility. This approval is not transferrable. The Land Clearing and Inert Debris landfill is permitted to receive: a. Land Clearing Waste as provided for in 15A NCAC 13B .0101(72); stumps, trees, limbs, brush, grass, and other naturally occurring vegetative material. b. Inert Debris and untreated wood as provided for in 15A NCAC 13B .0101(73); concrete, brick, concrete block, uncontaminated soil, gravel and rock, untreated and unpainted wood. C. Used asphalt as provided for under North Carolina General Statute §130A- 309.09B(a)(1); used asphalt or used asphalt mixed with dirt, sand, gravel, rock, and concrete; effective till July 1, 1993. Site preparation and construction shall be in accordance with 15A NCAC 13B .0564, Siting Criteria For Land Clearing and Inert Debris (LCID) Landfills. P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-4984 Fax N 919-733-0513 An Equal Opportunity Affirmative Action Employer DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF The facility must be operated in accordance with 15A NCAC 13B .0566, Operational Requirements for Land Clearing and Inert Debris (LCID) Landfills. All sedimentation and erosion control activities shall be conducted in accordance with 15A NCAC 4, Sedimentation Control. Construction and operations involving sedimentation and erosion control activities greater than 1 acre typically require approval from the Land Quality Section. Contact the Land Quality Section to determine if your activities require approval. Ground water quality at this facility is subject to the classification and remedial action provisions of 15A NCAC 2L, Classifications and Water Quality Standards. If you have any questions or if we can be of any other assistance, please do not hesitate to contact the Regional Waste Management Specialist, Mr. Mark Fry at (919) 486-1 191, the Eastern Area Engineer, Mr. Jim Barber at (919) 786-1191, or this office. Thank you, William D. Sessoms, PE Approved: Ja es C. Coffey, Sup rvi or P mitting Branch Solid Waste Section copy: Mark Fry Jim Barber A. Hugh Stone & Helen B. Stone C ASE SSOM SILCIMNOTIMSTO NE DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SfArfo } FILED 'S3 JAN 21 Ail 1133 State of North Carolina Department of Environment, Health, and Natural Resobr6es', '� S -r EEDS Division of Solid Waste Management E P.O. Box 27687-Raleigh,North Carolina 27611-768 Q. '� 00 N.C` James G. Martin, Governor illiam L. e er William W. Cobey, Jr., Secretary BOOK O P Q G E 71993 D it -Ud f. LAND CLEARING AND INERT DEBRIS LANDFILL NOTIFICATIO Pursuant to 15A NCAC 13B .0563(2)(a), the land owner(s) and operator(s) of any Lan d !nert Debris Landfill under two (2) acres in size shall submit this notification form to the Division prior- to constructing or operating the landfill. This form must be filed for recordation in the Register of Deeds' Office. The Register of Deeds shall record the notification under the name of the owner(s) of the land in the county or counties in which the land is located. The Register's seal and the date, book, and page number of recording must be included on this form when submitted to the Division. This notification is not valid to authorize operation of a landfill unless complete. accurate, and recorded as required by 15A NCAC 13B .056312)(b). 1. Facility Name: 2. Facility location (street address): /M�/�. t l�ao/ City: R l i�� County: C,04 0�,. Zip: 2 751Z 3. The land on which this landfill is located is described in the deed r eprded ig: deed book: page: �! county: 4. Name of land owner: /I 7�6� A 4 Ae/G4 e, Soh-e 5. Mailing address f land owner: 14 S 4eyY / City: State: tic . ® Zip: 2 6. Telephone number of land owner:( �//� 1 / 7-1/.7" If the land is owned by more than one person, attach additional sheets with the name, address, and phone number of all additional laird owners. 7. Name of operator: Z;� 5*q r 8. Trade or business name of operator: �1� n 9. Mailing address of operator: _.__1er-2 City: 1" �� State: AA Zip: a7s/l�- 10. Telephone number of operator:( M ) If the landfill is operated by more than one person, attach additional sheets with the name, address, and phone number of all additional operators. 11. Projected use of land after completion of landfill operations: AJ 91eS'S An EgLW Opportunity Afiimutive Acdon Employer DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BOOK 609PAGE S 3b The following are the applicability, siting, and operating criteria for Land Clearing and Inert Debris Landfills operating under notification. .0563 APPLICABILITY REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS iLCID)LANDFILLS Management of land clearing and Inert debris shall be In accordance with the State hierarchy for managing solid waste as provided for under N.C.G.S. 5 130A-309.04(a).Disposal in a landfill is considered to be the least desirable method of managing land clearing and inert debris.Where landfilling is necessary,the requirements of this Rule apply. (1) An individual permit from the Division of Solid Waste Management Is not required for Land Clearing and Inert Debris(LCID)landfills that most all of the following conditions:. (a) The facility Is to be operated forthe disposal of land clearing waste,inert debris,untreated wood,and yard trash.Operations must be consistent and in compliance with the local government solid waste management plan as approved by the Division of Solid Waste Management. (b) The total disposal area is under two acres in size. (c) The facility and practices comply with the siting criteria under Rule.0564,and operational requirements under Rule.0566. (d) The fill activity is not exempt from, and must comply with all other Federal, State, or Local laws, ordinances,Rules, regulations, or orders, including but not limited to zoning restrictions, flood plain restrictions, wetland restrictions. sedimentation and erosion control requirements,and mining regulations. (2) Where an individual permit is not required,the following applies: (a) The owner of the land where the landfill is located must notify the Division on s prescribed form,duly signed,notarized,and recorded as per Rule.0663(2)(b).The operator of the landfill,if different from the land owner,shall also sign the notification form. (b) The owner must file the prescribed notification form for recordation In the Register of Deeds'Office.The Register of Deeds shall index the notification in the grantor Index undarthe name of the owner of the land in the county or counties in which the land is located.A copy of the recorded notification,affixed with the Registers seal and the date,book and page number of recording shall be sent to the Division of Solid Waste Management. (c► When the land on which the Land Clearing and Inert Debris Landfill is sold,leased,conveyed,or transferred in any manner, the dead or other instrument of transfer shall contain in the description section in no smaller type than that used in the body of the deed or instrument a statement that the property has been used as a Land Clearing and Inert Debris Landfill and a reference by book and page to the recordation of the notification. .0564 SITING CRITERIA FOR LAND CLEARING AND INERT DEBRIS(LCID)LANDFILLS The following siting criteria shall apply for Land Clearing and Inert Debris(LCID)landfills: (1) Facilities or practices,shall not be located in the 100-year floodplain. (2) Facilities or practices shall not cause or contribute to the taking of any endangered or threatened species of plants,fish,or wildlife. (3) Facilities or practices shall not result in the destructionor adverse modification of the critical habitat of endangered orthreatened species as identified in 60 CFR Part 17 which is hereby incorporated by reference including any subsequent amendments and editions.This material is available for inspection at the Department of Environment, Heakh, and Natural Resources, Division of Solid Waste Management,401 Obedin Road,Raleigh,North Carolina 27605 where copies can be obtained at no cost. (4) Facilities or practices shall not damage or destroy an archaeological or historical site. (6) Facilities or practices shall not cause an adverse Impact on a state park,recreation or scenic area,or any other lands included in the state nature and historic preserve. (6) Facilities shall not be located in any wetland as defined In the Clean Water Act,Section 404(b). (71 It must be shown that adequate suitable soils are available for cover,either from on or off slte. (8) Land Clearing and Inert Debris landfills shall meet the following surface and ground water requirements: (a) Facilities or practices shall not cause a discharge of pollutants into waters of the state that is in violation of the requirements of the National Pollutant Discharge Elimination System(NPDES),under Section 402 of the Clean Water Act,as amended. (b) Facilities or practices shall not cause a discharge of dredged materials or fill material into waters of the state that is in vioiation cf the requirements under Section 404 of the Clean Water Act,as amended, (c► Facilities or practices shall not cause non-point source pollution of waters of the state that violates assigned water quality standards. (d) Waste in landfills with a disposal area greaterthan two acres shall be placed a minimum of four feet above the seasonal high water table,except where an alternative separation is approved by the Division. (el Waste in landfills with a disposal area less than two acres shall be placed above the seasonal high water table. (9) The facility shall meet the following minimum buffer requirements: (a1 60 feet from the waste boundary to all surface waters of the state as defined In G,S. 143-212, (bl 100 feet from the disposal area to property lines,residential dwellings,commercial or public buildings,and wells. (c) Buffer requirements may be adjusted as necessary to insure adequate protection of public heafth and the environment. (10) The facility shall meet all requirements of any applicable zoning ordinance. .0666 OPERATIONAL REQUIREMENTS FOR LAND CLEARING AND INERT DEBRIS(LCID►LANDFILLS Land Clearing and Inert Debris(LCID)landfills shall meet the following operational requirements: (1) Operational plans shall be approved and followed as specified for the facility. (21 The facility shall only accept those solid wastes which it is permitted to receive. (3) Solid waste shall be restricted to the smallest area feasible and compacted as densely as practical into calls. (41 Adequate soil cover shall be applied monthly,or when the active area reaches one acre in size,whichever occurs first, 2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF (5) 120 calendar days after completion of any phase$I 46al op[l a ar-Ar revoc�ioTrof a permit,the disposal area shall be covered with a minimum of ono foot of suitable soil,coffer eloped to allow surface water runoff in a controlled manner.The Division may require further action in order to correct any condition which is or may become injurious to the public health,or a nuisance to the community, (6) Adequate erosion control measures,structures,or devices shall be utilized to prevent silt from leaving the site and to prevent excessive an site erosion. (7) Provisions for a ground cover sufficient to restrain erosion must be accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill development. (6) The facility shall be adequately secured by means of gates,chains,berms,fences,etc,to prevent unauthorized access except when an operator is on duty.An attendant shall be on duty at all times while the landfill is open for public use to assure compliance with operational requirements and to prevent acceptance of unauthorized wastes. (9) Access roads shall be of all-weather construction and properly maintained. (10) Surface water shall be diverted from the working face and shall not be impounded over waste. 01) Solid waste shall not be disposed of In water, (12) Open burning of solid waste Is prohibited. (13) The concentration of explosive gases generated by the facility shall not exceed: (a) Twenty-five percent of the lower explosive limit for the gases in facility structures. (b) The lower explosive limit for the gases at the property boundary. 114) Leachate shall be properly managed on site through the use of current best management practices. (16) Should the Division deem it necessary,ground water or surface water monitoring,or both,may be required as provided for under Rules .0601 and,0602 of this Subchapter. (16) A sign shall be posted at the facility entrance showing the contact name and number in case of an emergency and the permit number. The permit number requirement is not applicable for facilities not requiring an individual permit. Certification by Land Owner: I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this landfill will comply with the requirements of sections .0564 and .0566 of the Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. Where the operator is different from the land owner, I, the land owner, have knowledge of the operator's plans to dispose of solid waste on the land and I specifically grant permission for the operation of the landfill. I understand that both the land owner and operator are jointly:and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A-309.27. I further understand that North Carolina General Statute 130A=22,p,roVides for administrative penalties of up to five hundred dollars ($500.00) per day per each violation 61 the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may'b0,revised or amended in the future and that the facility siting and operations of this landfill will a to ired to comply with all such rev- ion o are Print Name'(Owner) Signature (Ow er) Date No h arolina C County 1, 4 Z7 (�c ec_- , a Notary Public for said County and State, do hereby certify that CA S personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the day of !IYG;,9,C , 19 g L (Official Seal) f Notary Putlic My commission expires 5 /� , 19 � 3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF BOOK G d �PAGE 838 Certification by Landfill Operator (if different from Owner): I certify that the information provided by me in this notification is true, accurate, and complete to the best of my knowledge. The facility siting and disposal operations of this landfill will comply with the requirements of sections .0564 and .0566 of the Solid Waste Management Rules. The facility and operations of this landfill will also comply with all applicable Federal, State, and Local laws, rules, regulations, and ordinances. I have informed the land owner of my plans to dispose of solid waste on the land and the land owner has specifically granted permission for the operation of the landfill. I understand that both the operator and land owner are jointly and severally liable for improper operations and proper closure of the landfill as provided for by North Carolina General Statute 130A- 309.27. 1 further understand that North Carolina General Statute 130A-22 provides for administrative penalties of up to five hundred dollars ($500.00) per day per each violation of the Solid Waste Management Rules. I further understand that the Solid Waste Management Rules may be revised or amended in the future and that the facility siti nd operations of this landfill will b required to comply with all such revisions or amendment Print Name (Operator) Signature (Operator) Date/ North Carolina a County I, a Notary Public for said County and State, do hereby certify that 49L&� personally appeared before me this day and acknowledged the due execution of the foregoing instrument. Witness my hand and official seal, this the a y day of , 19� (Official Seal) N66ry Public My commission expires led 19 _. For additional land owners and landfill operators, attach separate notarized certifications for each additional land owner and landfill operator. INSTRUCTIONS Purpose: Notification of Land Clearing and Inert Debris Landfills under two (2) acres in size is required under 15 NCAC 13B .0563(2)(a). Contact the Solid Waste Section at the address below for further information. Distribution: Mail completed recorded original notification to the following address: Division of Solid Waste Management Solid Waste Section PO Box 27687 Raleigh,North Carolina 27611-7687 (919) 733-0692 Disposition: This forth will be transferred to the State Records Center when reference value ends.Records will be held for agency in the State Records Center five(6)additional years and then transferred to the custody of the Archives. 4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of Solid Waste Management Solid Waste Section SOLID WASTE MAMAGEM MT FACILITY EVALUATION REPORT Type of Facility L C I D Permit 6y h►oT W Canty p_ to / Name of Facility �;roN E `J LA N n F i u_ Location koaK N ILL IUD, OF � Date of Last Evaluation I. Permit Caiditions Fottowed Yes No ZN/A A. Specific Condition(s) Violated L-G NI georn54-one sLanAI f Non s II. Operational Requirements Followed ✓ Tes No 15A M.c. Admin.-'Code 13B Section • 0s G10 A. Spetific Violations) by nxaber and letter: �. III. Other Violations of Rule or Law r IV. Evaluator's Camm nts SITE In t�- SHAPE VIC W iLL RE GLqb To hEr=7r w in-t you To D 13 cyn`S o FE iwnc t n ld oe�' Trtt E /uaAm5 To SdAPE S LoPE' FoR Uo5uRE 1; FEEL FRlff-E -ro ctLL . V. Continuation Page Required? Yes v Mo Receiving Signature (MAILEDTO )S Evaluation Date 6� Solid Waste Section _P a, : ,nJ'j �_ DENNR 3793 (Pa I White: Facility Part II Canary: Central Office Part III Pink: Regional Office) Solid Waste Section (Review 7/94) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Purpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instnicticm: Solid Waste Section personnel shall ccuplete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. Dictributicn: Part I mite: facility copy Part II Canary: Raleigh central office file copy Part III Pink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF / NC DEPARTINT OF ENVIRONMENT,HEALTH AND NATURAL RESOURCES / Division of Solid Waste Management JJJ . section SOLID WASTE�IiMANAGEP MTFACILITY EVALWTIOM REPORT �DO� Type of Facility LC ID P'Mi t # Ngn F1GW A Canty i Nance of Facility Lr$N15�5 LANw=ILL Location OFF :59 1-71(a Date of Last Evaluatianj"/" I. Permit Condition Followed Yes No '' ✓ N/A y ' A. Specific Condition(s) Violated Sk .`J / d 11. Operational Requirements Followed Yes `' Mo 8 L 9 c � 1511' PLC Mdido;6 Code 13B Section r 05 Coro � " " A:` ,5 �fic Vnofatia(s) by ritaber and letter. r, t�JtF- A10 I(o meet) 51C t4 SHOWIN& CeWrACE PEKSOM Hkh(E" A ib OUMME -- IN ��A-sue' of EHE'RG�� III. Other Violations of Rule or Law IV. Evaluator's Canoients nn NOT EXTFtJO F(U. A Y FA:MMER .`M SOUTH .; AT CR WITH L 100/ f3U rD ouTWtltllKG t4E/4RBy�: WILL ►JFen Td BE'1rbMK SLOPE" ;5ubz-rAr4-nAL ► rr 3 I SLOPE REeU110Eh x3y . s5�(o5 3� ..1� . ..V. Continuation Page,Required? Yes V Mo Receiving Signature(AAILEC� 1-4 Evaluation Date f0 Solid Waste Section DEHMR 3793 tPart I White: Facility Part II Canary: Central Office Part III Pink: Region five) Solid Waste Section (Review 7/94) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Purpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management lades codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instructions: Solid Waste Section personnel shall complete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. Distribution: Part I White: facility copy Part II Canary: Raleigh central office file cgpy Part III Pink: Regional office file cgyy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF 11-W NC DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCES Division of Solid Waste Management '\ uj solid Waste Section SOLID WASTE MIINAB9M FACILITY EVALUATION REPORT V Type of Facility Law, L kt4b F 1 t L Permit county Nana of Facility 5TON6 LALyOFi1.L Location O.`'1. M, of SR 171(y Date of Last Evaluatim ZIVA I. Permitconditions Followed Yes No A. Specific Conditions) Violated I. Operational Requirements Followed ""`' Yes V No 15A N.C. Adafn. Code 13B Section ® (O' A. Specific Viotation(s)by nnber and letter. �8) FAC4Llt y 5dh Ll. F3E nnEcav6 . jrCEib / RrlVsT yNh VTHoiQlZ9M ACXX'SS (t©) �i�i4P`'he.�' wl�i"'Ef@ ?o sE D�VE�TE� FR,oM lnk.TRl�ln►� f°'/te.s=' �_ tI�) st�N srl/Ell_ B D SHOW IAGt eaMTACe r WAAE! ttMa muM M M 1b) C/c5E OF E'MMRr-Q49.d ITi. Other Violations of Rule or Law 15 t�•�-/�. G. . b 01:5. RlziSd,► F fj3i� c©nl-f1:. Ug F*R Ag-,—nvrrlkm covum#Aa SwF oR N©ram l4rr 4 IV. Evaluator's Comments SITE t g rhL c. nnn *i apr ojEre R LL f�LEhe t°o T `31 .M / i h mVEprr- 5umF,1�0E Fu-M ARC I#JASTE' : roK Imf ► At opt a ,ter l CpNTRoL. PLON PLeAlBe CALL JoNN H©!A:9j Ar. (9[9} 171 y'ton V. Continuation Page Required? Yes l/ No Receiving Signature tj 4jupp T AL4tj Evaluation Date 0� _Solid Waste sections DENNR 3793 ( I White: Facili Part II : Central Office Part III Pink- Regional Office tYY Reg ) Solid Waste Section {Review 7N4) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Puzpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instructions: Solid Waste Section personnel shall omplete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. n;str;hut-;on: Part I mite: facility copy Part II Canary: Raleigh ventral office file copy Part III Pink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF ~NC. DEPARTMENT OF ENVIRONMENT, HEALTH AND NATURAL RESOURCE 1 Division of Solid haste Management A TE s Solid Waste Section FCJ/ SOLID WASTE MANAGEMENT FACILITY EVALUATION REPORT 2 6Y Type of Faci l i ty 1.G I d L-A N b F l LL Permit # (4 oT i F 1�k�1Ca�nty CHAT rill 1 Name of Facility a70ME3 LANDFILL. Location O, ; F S• �'T Date of Last Evaluation /A -r I. Permit Conditions Followed Yes No V N/A A. Specific Condition(s) Violated II. Operational Requirements Followed Yes 15A N.C_ Admin. Code 13B Section A. Specific Violations) by rimer and letter. . (`�) FACtt_ifi � NoT ���avA71�L.� sscut�r� C��� 51GN SHcWtNG CA2MTAc7 PE70,50 l NAME A:"Q PHOLIC /AO, t' r Pc eTF-f; A-r z�N T gA mc� III. other Violations of Rule or Law IV. Evaluator's Comments 5 1rE !S f C—ocq) co(.l1:)1-nCA C-'p7 ov= �htCWS1»�; t-c(C' f��FER.ENc�' V. Continuation Page Required? Yes v No Receiving Signature (LA LK-n TC) MR STOP SE) 4(7 Evaluation Date �� ! Solid Waste Section�07 DEHNR 3793 (Part I White: Facility Part II Canary: Central office Part III Pink- Regional Office) Solid Waste Section (Review 7/94) / r � DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF r Ptnpose: G.S. 130A-294 requires that an evaluation program be established for the operation of solid waste management facilities on a statewide basis. The Solid Waste Management Act and Solid Waste Management Rules codified at 15A NCAC 13B list requirements which must be followed by solid waste facilities. Instructions: Solid Waste Section personnel shall complete the evaluation form each time they conduct official evaluations. The form shall be signed by the person(s) receiving the report. Distribution: Part I Mute: facility copy Part II (miry: Raleigh central office file copy Part III Pink: Regional office file copy Disposition: This form may be retained in accordance with the Record Retention and Disposition Schedule of the Solid Waste Section, Solid Waste Management Division of the Department of Environment, Health and Natural Resources. I Da ,gn E—I.p.ID3AE9F 05614296-6973A51A5CD3F4CF S /S' m 1700 m c� m 4 IF 4 rn llS it m m 'b loos ltl 12 o"l A > cz r G) x 0 pg r, z m QD > .C' ul m tio' z 0 m n m ck o' o ,zt) F m c r-G) mm o z co co so,0" 0 Z> m z o' S kb 0 6i ol� o 6' c s 1 zt, tLl � o I 3i Z z - , _(5 - 3,, Z,92.10 N Z oj z i z z 0 6 01 z z M. C) c� 6 O Ct OJ G)U)r , 10-Io z Co 25 x 0 1 z F , 9 1 NmM ;k p F -4 AN O�u z M o z N.C.GRID 71 0 z 69% I,tOj DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Certificate of Coverage STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL,AND LAND RESOURCES GENERAL PERMIT NO. NCG010000 NC Reference No. NCG01-2019-0103 Certificate of Coverage No. NCC190103 STORMWATER DISCHARGES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1,other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission,and the Federal Water Pollution Control Act,as amended, ARBD, LLC is hereby authorized authorized to discharge stormwater associated with CONSTRUCTION ACTIVITIES to surface waters of North Carolina from a site located at: Stone LCID Landfill 52 Rock Hill Drive Chapel Hill Chatham County in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in N.C. General Permit No. NCG010000. This Certificate of Coverage is affiliated with E&SC Plan Project No.2018-01918 This Certificate of Coverage shall become effective 4/25/2019. This Certificate of Coverage shall remain in effect for the duration of the General Permit or until rescinded. for S. Daniel Smith Interim Director, Division of Energy, Mineral,and Land Resources By the Authority of the Environmental Management Commission DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF WATERSHED PROTECTION DEPARTMENT P.O.Box 548 CHATHAM COUNTY Pittsboro,NC 27312 NORTH C A R O L I N A Website:www.chathamnc.org Soil Erosion and Sedimentation Control LETTER OF APPROVAL—REVISED PLAN June 14,2021 Alan Stone 5180-A Big Woods Road Chapel Hill,NC 27517 Project Name: Stone LCID Landfill Phase 5 Project Number: 2018-01918/WP-21-196 Acres Approved: 28 Submitted by: Smith Gardner,Inc. Date Received: 6/11/2021 To The Above Named Person and Entity, This office has reviewed the subject revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire two (2) years following the date of approval, regardless of whether land-disturbing activity has been undertaken or not. Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Section 10 (1) of the Chatham County Sedimentation and Erosion Control Ordinance requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Self-inspections and monitoring on your behalf are required for all sites receiving a Land-Disturbing Permit. These inspections must occur at a minimum of once a week and within 24 hours of any rainfall of one inch or greater. Copies of all reports must be kept on site and produced to Chatham County upon request. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Chatham County Sedimentation and Erosion Control Ordinance, this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Please notify us when you would like to schedule a preconstruction conference. Notification shall be given at least 7 days prior to initiation of activity. Your cooperation is appreciated. Respectfully, aw;4 Morgan DeWit,PE Environmental Engineer Chatham County Watershed Protection Department Enclosures: New NCG01 Permit Fact Sheet DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF WATERSHED PROTECTION DEPARTMENT 80 East Street CHATHAM COUNTY Pittsboro,NC 27312 NORTH C A R O L I N A Website:chathamcountync.gov Office: (919)545-8344•E-mail:justin.hasenfus*chathamcountync.gov Soil Erosion and Sedimentation Control LETTER OF APPROVAL— REVISED PLANS November 1,2022 Alan Stone 5180-A Big Woods Road Chapel Hill,NC 27517 Project Name: Stone LCID Landfill Phase 5 Project Number: WP-21-196 Acres Approved: 19.0 Submitted by: Smith Gardner,Inc. Date Received: 10/17/2022 Reason for Original design of Sediment Basin A modified due to weathered Revision: rock encountered in field. To The Above Named Person(s) and/or Entity, This office has reviewed the revised erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Erosion and Sedimentation Control Plan: This plan approval shall expire (2) years following the date on this Letter of Approval,unless a Land-Disturbing Permit has been obtained within that initial two-year period and remains in effect as provided in G.S. 164.12 (H). Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Section 164.10 (L) of the Chatham County Sedimentation and Erosion Control Ordinance requires that a copy of the approved erosion control plan be on file at the job site. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Chatham County Sedimentation and Erosion Control Ordinance, this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with county, state and federal water quality laws, regulations and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Inspections: This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Section 164.12 (1) of the Chatham County Sedimentation and Erosion Control Ordinance requires self-inspections and monitoring for all sites receiving a Land Disturbing Permit. These inspections can be done by the Financially Responsible Party, or an agent thereof. These inspections must occur DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF at a minimum of once a week and within 24 hours of any rain event of 0.5 inch or greater. Copies of inspection records and reports must be kept on site and produced to Chatham County upon request. NPDES General Stormwater Permit NCGO10000: Please be aware that your project is covered by the new NPDES General Stormwater Permit NCGO10000 (Construction Activities). If you have already applied for and received coverage, you are required to provide updated information regarding your project to the North Carolina Department of Environmental Quality's Division of Energy, Mineral, and Land Resources by filing a "Modification Form". This can be found at https://deq..nc.gov/NCGO1. Land-Disturbing Permit: Active sites may have the permit renewed by applying for renewal 30 days prior to expiration. Chatham County's Land-Disturbing Permit must be posted at the job site. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Respectfully, Justin Hasenfus,CPESC Senior Watershed Specialist Chatham County Watershed Protection Department DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2019-01857 County: Chatham County U.S.G.S.Quad:Farrington GENERAL PERMIT (REGIONAL AND NATIONWIDE)VERIFICATION Permittee: Alan Stone ARBD LLC Address: 5180A Big Woods Drive Chapel Hill NC,27517 Telephone Number: (919)971-0918 Size(acres) 35(approximately) Nearest Town Chapel Hill Nearest Waterway Haw River River Basin Cape Fear USGS HUC 03030002 Coordinates Latitude: 35.801940 Longitude:-79.032780 Location description: This site is located immediately west of the Dalton Drive,Big Woods Road intersection in Chatham County,North Carolina. Description of projects area and activity: This authorization is for permanent impacts to a single wetland associated with the construction of a stormwater basin for a commercial landfill as follows:Impact Site#1: 0.07 acre of permanent impact to Wetland WA for the construction of a permanent stormwater basin(see attached plans). Applicable Law: ® Section 404(Clean Water Act,33 USC 1344) ❑ Section 10(Rivers and Harbors Act,33 USC 403) Authorization: Regional General Permit Number and/or Nationwide Permit Number:NWP 18 Minor Discharges SEE ATTACHED RGP or NWP GENERAL,REGIONAL AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted application and attached information dated October 18,2019.Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order,a restoration order,a Class I administrative penalty,and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify,suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources(telephone 919-807-6300)to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C.Division of Coastal Management in Morehead City,NC,at(252)808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program,please contact Andrew Williams at(919)554-4884 or Andrew.E.Williams2(ii)usace.army.mil. Date:2019.11.07 Corps Regulatory Official: 16:13:47-05'00' Date: November 7,2019 Expiration Date of Verification: March 18,2022 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF A.Determination of Jurisdiction: 1. ® There are waters,including wetlands, on the above described project area that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403).This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. Please note,if work is authorized by either a general or nationwide permit,and you wish to request an appeal of an approved JD,the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. 3. ❑ There are waters,including wetlands, within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. 4. ❑ A jurisdiction determination was not completed with this request. Therefore,this is not an appealable action. However,you may request an approved JD,which is an appealable action,by contacting the Corps for further instruction. 5. ❑ The aquatic resources within the above described project area have been identified under a previous action. Please reference the approved jurisdictional determination issued . Action ID: SAW- B.Basis For Jurisdictional Determination: N/A.An Approved JD has not been completed. C.Remarks: none D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination from the local office of the Natural Resources Conservation Service,prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and Request for Appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin,Appeal Review Officer 60 Forsyth Street SW,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by January 6,2020. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Date: 2019.1 1.07 Corps Regulatory Official: �� � 16:1 1:17 -05'00' Andrew Williams Date of JD: November 7,2019 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer Satisfaction Survey, located online at http://cop2smgpu.usace.g,M.mil/cm apex/f?p=136:4:0. Copy furnished: Phil May Carolina Ecosystems 3040 NC Highway 42W Clayton,North Carolina 27520 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Action ID Number: SAW-2019-01857 County: Chatham County Permittee: Alan Stone ARBD LLC Project Name: Stone Landfill/ARBD LLC/Chapel Hill NC/Chatham County/ Date Verification Issued: November 7, 2019 Project Manager: Andrew Williams Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Andrew Williams 3331 Heritiage Trade Drive, Suite 105 Wake Forest,North Carolina 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR AP AL Applicant: Alan Stone ARBD LLC File Number: SAW-2019-01857 Date: November 7, 2019 Attached is: See Section below INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission) A PROFFERED PERMIT Standard Permit or Letter ofpermission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I-The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at htip://www.usace.q=.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may: (a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT I REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However,you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, Mr. Philip Shannin,Administrative Appeal Review Officer Attn:Andrew Williams CESAD-PDO 69 Darlington Avenue U.S.Army Corps of Engineers, South Atlantic Division Wilmington,North Carolina 28403 60 Forsyth Street,Room 1OM15 Atlanta,Georgia 30303-8801 Phone: 404)562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the ooportuni to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: Andrew Williams,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn: Mr.Philip Shannin,Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 1OM15,Atlanta,Georgia 30303-8801 Phone: (404)562-5137 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF OUTLET PROTECTION, / TYP. _ -S:-TtAM, _ 27 280 —50 STREAM EWER — — —_— — WETLAND — — — BASIN B , ��0 ti0� 296 EMERGENCY SPILLWAY, TYP. N r S _ 7: 04 0 50' 100' REFERENCES: 1. EXISTING TOPOGRAPHY OF THE FACILITY FROM GIS SURVEY PROVIDED BY CHATHAM COUNTY GIS, ACCESSED FEBRUARY 11, 2019. IMPACTS 2. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION DESCRIPTION DISPLAY QUANTITY Q DATED JULY 2019 BY CAROLINA ECOSYSTEMS. 3. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF WETLANDS 3049 ft2 THE CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PREPARED FOR: PR=PARED BY ARBO, LLC s STONE LCIO LANDFILLco SMITH +GARONER J CHAPEL HILL, NC ° BASIN B WETLAND IMPACTS 14 N.Boylan Avenue,Raleigh uc 27603 919.828.0577 j 1526 Richland St Columbia SC 29201 °m DRAWN: APPROVED: SCALE: DATE: PROJ=CT NO.: FIG-RE NO.: FILE NAME: g L.H.B. N.C.T. AS SHOWN Sep 2019 AReo 19-2 1 A0001 b © 2019 Smith Gardner, Inc. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Appendix B Erosion and Sedimentation Control Calculations Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Erosion and Sedimentation Control Plan Appendix B: Erosion and Sedimentation Control Calculations Table of Contents 1.0 Drainage and E&S Control Calculations - Overview 2.0 Analysis of Design Storms 3.0 Drainage Area and Curve Numbers 4.0 Stormwater Routing (HydroCAD output)* • 10-Year 24-Hour Storm • 25-Year 24-Hour Storm • 100-Year 24-Hour Storm 5.0 Drainage Channel Analysis 6.0 Drop Inlet Analysis 7.0 Sedimentation Basin Analysis 8.0 Culvert Analysis 9.0 Outlet Protection Analysis 10.0 Concrete Pipe Analysis 11.0 Down Pipe Analysis Stone LCID Landfill Erosion and Sedimentation Control Plan February 2023 Appendix B: Table of Contents Page 01 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Drainage&E&SC Cal cs.-Overview JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design stormwater conveyance,detention,and erosion and sedimentation control measures to remove and contain stormwater flow from the design storm. The design of these measures will be based on: • Design storm information for the site; • Peak discharge calculations using the Rational Method and/or USDA-NRCS(SCS)Methods;and • Stormwater routinq using USDA-NRCS(SCS)or other methods. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL. Federal Highway Administration(2001),Urban Drainage Design Manual,Hydraulic Engineering Circular No.22,FHWA NHI-01-021,Second Ed.,U.S.Dept.of Transportation,Washington,D.C. Georgia Soil and Water Conservation Commission(2000),Manual for Erosion and Sediment Control in Georgia,Fifth Edition,Athens,CA. HydroCAD Software Solutions,LLC(2006),HydroCAD Stormwater Modeling System Owner's Manual- Version 8,Chocorua,NH. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. North Carolina Division of Water Quality(July 2005)Updated Draft Manual of Stormwater Best Management Practices,(Public Comment Version),Raleigh,NC. Pennsylvania DEP Bureau of Watershed Protection(2000),Erosion and Sediment Pollution Control Program Manual. USDA-NRCS(1992),Computer Program for Project Formulation Hydrology(TR-20). USDA-NRCS(1986&1999 Update),Urban Hydrologyfor Small Watersheds(TR-55). Virginia Department of Conservation and Recreation(1992),Virginia Erosion&Sediment Control Handbook,Third Edition,Richmond,VA. ANALYSIS: The main design criteria will be to ensure that all stormwater conveyance and detention measures will be able to accommodate the runoff from the design storm. Drainage channels,culverts,etc.were designed based on the peak discharge to each measure. Detention measures were designed based on stormwater routing methods and/or State/local criteria. CALCULATIONS: - Peak Discharge Calculations: USDA-NRCS(SCS)Methods: Use HydroCAD program to determine the peak discharge to each device or structure. HydroCAD is based on the SCS unit hydrograph procedure,which is a principal component of NRCS TR-20. Alternatively spreadsheets can be used to determine flow rates using the procedures detailed in NRCSTR-55. SMITH GARDNER,INC. 01 D&E&SCOVERVIEWSG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Drainage&E&SC Cal cs.-Overview JOB# ARBD-21-1 CHECKED BY SAS Rational Method: Q=CIA (Malcom Eq.I-1) where: G = peak discharge(cfs) G = rational runoff coefficient I = applicable rainfall intensity(in/hr)of storm event(based on time of concentration) A = drainage area(acres) Time of Concentration: The time of concentration for use in determining the peak discharge in the NRCS and/or Rational methods can be determined bythe methods detailed in NRCSTR-55 or other methods. HydroCAD uses the NRCS methods. -Stormwater Routina: Stormwater routing was accomplished using the HydroCAD program,which is based on USDA-NRCS(SCS)methods. Unless otherwise specified,the unit hydrograph method was used. The storm type(i.e.Type 124-hr.,Type II 24-hr., etc.)was selected as appropriate for the project location. SMITH GARDNER SMITH GARDNER,INC. 01 D&E&SCOVERMEWSG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Analysis of Design Storms JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To compile the expected design storm depths and intensities over various return periods. These design storm values will be used in various calculations. REFERENCES: Rainfall data was obtained from thefollowingreferences: Frederick,R.H.,V.A.Myers,and E.P.Anciello(1977),"Five to 60-Minute Precipitation Frequencyfor the Eastern and Central United States," NOAATechnical Memo.NWS HYDR&35,National Weather Service, NOAA,U.S.Dept.Of Commerce,Silver Spring,MD. U.S.Weather Bureau(1961),"Rainfall Frequency Atlas of the United States for Durations from 30 Minutes to 24 Hours and Return Periods from 1 to 100 Years," U.S.Weather Bureau Technical Paper 40. SMITH GARDNER,INC. 02_DESIC-N STORMS SG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2/2 JOB# ARBD-21-1 SUBJECT Analysis of Design Storms DATE 12/22/2022 COMPUTED BY JCL CHECKED BY SAS LOCATION: Chapel Hill,INC RETURN PERIOD 2-YR P 100-YR P SOURCE DURATION (in) (in) 5min 0.48 0.76 NOAAHYDRO.35 15 min 0.97 1.53 NOAA HYDR035 60 min 1.69 3.23 NOAAHYDRO.35 2 hr to 24 hr Rainfall Events= USER INPUT USWB TP-40 DEPTH-DURATION-FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in) (in) (in) (in) (in) (in) 5 min 0.48 0.54 0.58 0.65 0.71 0.76 10 m i n 0.77 0.86 0.93 1.04 1.13 1.22 15 min 0.97 1.08 1.17 1.31 1.42 1.53 30 min 1.32 1.55 1.72 1.97 2.17 2.36 60 min 1.69 2.04 2.29 2.66 2.94 3.23 2 hr 2.00 2.46 2.84 3.30 3.68 4.04 3 hr 2.12 2.62 3.05 3.58 4.02 4.45 6 hr 2.55 3.15 3.66 4.33 4.88 5.44 12 hr 3.54 4.42 5.11 6.06 6.80 7.56 24 hr 3.53 4.42 5.11 6.06 6.80 7.56 I NTENSITY-DURATION-FREQUENCY TABLE: RETURN PERIOD 2-YR 5-YR 10-YR 25-YR 50-YR 100-YR DURATION (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) (in/hr) 5 min 5.81 6.46 6.99 7.82 8.48 9.14 10 m i n 4.64 5.15 5.57 6.24 6.76 7.29 15 min 3.90 4.33 4.68 5.24 5.68 6.12 30 min 2.65 3.10 3.44 3.94 4.33 4.73 60 min 1.69 2.04 2.29 2.66 2.94 3.23 2 hr 1.00 1.23 1.42 1.65 1.84 2.02 3 hr 0.71 0.87 1.02 1.19 1.34 1.48 6 hr 0.43 0.53 0.61 0.72 0.81 0.91 12 hr 0.29 0.37 0.43 0.51 0.57 0.63 24 hr 0.15 0.18 0.21 0.25 0.28 0.32 SMITH GARDNER SMITH GARDNER,INC. 02_DESIC4 STORMS SC DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GARD N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 1 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Drainage&E&SC Calcs.-Overview JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To breakout drainage areas and associated runoff curve numbers for the drainage and erosion control plan(s). Drainage areas and runoff curve numbers will be used to determine the design flow to each stormwater conveyance and/or detention measure. Drainage areas and runoff curve numbers are tabulated on the attached table. Areas were measured by planimeter or AutoCAD on the attached plan drawings. Refer to Drawing S2 for delineated drainage areas. TABLE 1. Drain Areas and Curve Numbers. Area Area SCS CN* Weighted Rational Description* Runoff ID (acres) (CN) CN Coefficient C** Post-Developed Conditions A 13.1 Open Space-Good Grass Cover-HSG B(CN=69) 75 17..12 0.50 B 7.8 Open Space-Good Grass Cover-HSG B(CN=69) 75 10.22 0.50 D 8.2 Open Space-Good Grass Cover-HSG B(CN=69) 75 10.68 0.50 E 28.3 Open Space-Good Grass Cover-HSG B(CN=69) 75 36.98 0.50 Sum=1 57.5 acres 1 Avg.CN= 75 1 0.50 * Descriptions and CN values based on SCS documentation. **Based Malcom's conversion equation: C=0.02 x CN-1. *`*§164.16 requires a minimum rational runoff coefficient of 0.5. ASCSCN of 75 has been applied as the regulatory minimum. SMITH GARDNER SMIFiG1Uq13If_ 03_DRAIN AREAS&CURVE NUMBERS SG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF A -B A O SB-A Area B 2022 O O Area A SB-D Area D O W-W DC-S1 DC-G DC- outh 1 Gabion YJ W-E cg Riprap DC-sw DC-S2 b Southwest Channel �B2 DC-South 2 DC-EI ast Inlet H -I-, --2� i SB- West Inlet SubCa Reach and Link Drainage Diagram for ARBD Expansion 2023 Prepared by{enter your company name here} 2/17/2023 HydroCAD®8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Prepared by{enter your company name here} Page 2 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Area Listing (selected nodes) Area (acres) CN Description (subcats) 55.285 75 Chatham Co. Min (A,B,D,E,W-E,W-W) 55.285 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 3 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A: Area A Runoff Area=571,604 sf Runoff Depth>2.33" Flow Length=865' Tc=8.7 min CN=75 Runoff=53.13 cfs 2.552 of Subcatchment B: Area B 2022 Runoff Area=340,845 sf Runoff Depth>2.33" Flow Length=730' Tc=8.6 min CN=75 Runoff=31.80 cfs 1.522 of Subcatchment D: Area D Runoff Area=356,215 sf Runoff Depth>2.34" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=35.59 cfs 1.592 of Subcatchment E: Runoff Area=14.270 ac Runoff Depth>2.34" Flow Length=670' Tc=5.0 min CN=75 Runoff=65.17 cfs 2.779 of Subcatchment W-E: Runoff Area=1.100 ac Runoff Depth>2.34" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=5.02 cfs 0.214 of Subcatchment W-W: Runoff Area=10.790 ac Runoff Depth>2.34" Flow Length=732' Tc=5.2 min CN=75 Runoff=48.83 cfs 2.101 of Reach DC-El: East Inlet Avg. Depth=0.64' Max Vet=5.81 fps Inflow=63.82 cfs 2.981 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=62.64 cfs 2.979 of Reach DC-G: Gabion Avg. Depth=0.57' Max Vet=12.68 fps Inflow=48.83 cfs 2.101 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=47.70 cfs 2.100 of Reach DC-RR: Riprap Avg. Depth=0.58' Max Vet=7.02 fps Inflow=47.70 cfs 2.100 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=46.87 cfs 2.098 of Reach DC-S1: DC-South 1 Avg. Depth=1.06' Max Vet=7.13 fps Inflow=65.17 cfs 2.779 of n=0.030 L=833.0' S=0.0312'/' Capacity=222.99 cfs Outflow=59.28 cfs 2.768 of Reach DC-S2: DC-South 2 Avg. Depth=0.24' Max Vet=3.43 fps Inflow=5.02 cfs 0.214 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=4.56 cfs 0.213 of Reach DC-SW: Southwest Channel Avg. Depth=0.59' Max Vet=4.61 fps Inflow=46.87 cfs 2.098 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=43.54 cfs 2.088 of Reach DC-WI: West Inlet Avg. Depth=0.39' Max Vet=6.80 fps Inflow=43.54 cfs 2.088 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=42.88 cfs 2.086 of Pond 3P: SB-B Peak Elev=286.35' Storage=35,199 cf Inflow=31.80 cfs 1.522 of Primary=4.48 cfs 0.797 of Secondary=0.00 cfs 0.000 of Outflow=4.48 cfs 0.797 of Pond DI-1: Peak Elev=269.13' Inflow=63.82 cfs 2.981 of Outflow=63.82 cfs 2.981 of DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 4 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: Peak EIev=283.80' Inflow=43.54 cfs 2.088 of Outflow=43.54 cfs 2.088 of Pond SB-A: SB-A Peak EIev=314.20' Storage=68,624 cf Inflow=53.13 cfs 2.552 of Primary=3.81 cfs 1.046 of Secondary=0.00 cfs 0.000 of Outflow=3.81 cfs 1.046 of Pond SB-D: SB-D Peak EIev=252.32' Storage=37,484 cf Inflow=35.59 cfs 1.592 of Primary=3.87 cfs 0.819 of Secondary=0.00 cfs 0.000 of Outflow=3.87 cfs 0.819 of Pond SB-E: Peak EIev=258.23' Storage=143,593 cf Inflow=105.33 cfs 5.065 of Primary=6.01 cfs 1.898 of Secondary=0.00 cfs 0.000 of Outflow=6.01 cfs 1.898 of Total Runoff Area= 55.285 ac Runoff Volume= 10.761 of Average Runoff Depth =2.34" 100.00%Pervious Area= 55.285 ac 0.00%Impervious Area= 0.000 ac DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 5 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment A: Area A Runoff = 53.13 cfs @ 12.00 hrs, Volume= 2.552 af, Depth> 2.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (sf) CN Description 571,604 75 Chatham Co. Min 571,604 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment A: Area A Hydrograph ❑Runoff 55 53.13 cfs Type 11 24-hr 10-YR 50 24-H R 45 Rainfall=5.11 40 Runoff Area=571,604 sf w 35 Runoff Volume=2.552 of 30 Runoff Depth>2.33 LL 25 •' - ,Flow Length=865' 20 Tc=8.7 m i n 15 - CN=75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 6 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment B: Area B 2022 Runoff = 31.80 cfs @ 12.00 hrs, Volume= 1.522 af, Depth> 2.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (sf) CN Description 340,845 75 Chatham Co. Min 340,845 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment B: Area B 2022 Hydrograph 34 ■Runoff 31.80 cfs 32 Type 10-`�(R 30 ... I � r 28 24-W R 26 Rain#all'=5.1'1'' 24 22 Runoff Area=340,845 sf---- w 20 . Runoff Volume=1 522 of 3 16 Runof f depth>2 " 14 - w ngth=730' 12 T --- - - - - - - --------- 10 c nlin - - -CN-75 6 4 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 7 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment D: Area D Runoff = 35.59 cfs @ 11.98 hrs, Volume= 1.592 af, Depth> 2.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (sf) CN Description 356,215 75 Chatham Co. Min 356,215 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment D: Area D Hydrograph - - - - 38 ■Runoff 35.59 cfs 36 34 TYpe, 1124=hr 10 YR 32 -', 24-W R 30 28 - - - - ',Rainfall'=-5-.11" 26 Runoff Area=356'215 sf 24 9 22 R41 Hoff VQI un1e=1'.592 of 3 18 Runoff` 20 Depth>2 34" 16 Flow Length-1,075` 14 - - - - - - - -'- - �+ 12 -- - ' -----Tc-6.5-lln i - 10 - - - CN 75 6 - - - 4 ----' - 2 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 8 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment E: [49] Hint: Tc<2dt may require smaller dt Runoff = 65.17 cfs @ 11.96 hrs, Volume= 2.779 af, Depth> 2.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (ac) CN Description 14.270 75 Chatham Co. Min 14.270 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 45 0.3300 0.47 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 &3.0 '/' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 2.0 670 Total, Increased to minimum Tc = 5.0 min Subcatchment E: Hydrograph 70 ❑Runoff 65.17 cfs 65 Type 11 24-hr,10-YR 60 24-H R 55 50 Rainfall=5.11" 45 Runoff Area=14.270 ac 40 Runoff Volume=2.779 of LL 35 Runoff Depth>2.34•' 30 - Flow Length=670' 25 20 Tc=5.0 min 15 CN=75 10 5 1 L: 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 9 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-E: [49] Hint: Tc<2dt may require smaller dt Runoff = 5.02 cfs @ 11.96 hrs, Volume= 0.214 af, Depth> 2.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment W-E: Hydrograph ❑Runoff 5.02 cfs 5 Type II 24-hr 10-YR 24-HR 4 Rainfall=5.11.. Runoff Area=1.100 ac Runoff Volume=0.214 of 3-Runoff Depth>2.34" Flow Length=100' 2 Slop!e=0.3300 7' Tc=5.0 min 1 CN=75 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 10 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-W: [49] Hint: Tc<2dt may require smaller dt Runoff = 48.83 cfs @ 11.96 hrs, Volume= 2.101 af, Depth> 2.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10-YR, 24-HR Rainfall=5.11" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.0 7' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment W-W: Hydrograph ❑Runoff 48.83 cfs 50 Type II 24-hr 10-YR 45 24-H R 40 Rainfall=5.11" 35 Runoff Area=10.790 ac 30 Runoff Volume=2.101 of 0 25 Runoff Depth>2.34" LL 20 Flow Length=732' 15 Tc=5.2 min CN=75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 11 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.64' Inflow Area = 15.370 ac, Inflow Depth > 2.33" for 10-YR, 24-HR event Inflow = 63.82 cfs @ 12.01 hrs, Volume= 2.981 of Outflow = 62.64 cfs @ 12.02 hrs, Volume= 2.979 af, Atten= 2%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.81 fps, Min. Travel Time= 0.3 min Avg. Velocity= 1.53 fps, Avg. Travel Time= 1.3 min Peak Storage= 1,253 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.64' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 115.0' Slope= 0.0522 '/' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach DC-Ell: East Inlet Hydrograph ❑ Inflow 70 63.82 cfs ❑outflow 65 62.64 cfs Inflow Area=15.370 ac 60 Avg. Depth=0.64' 55 Max Vet=5.81 fps 50 45 n=0.040 w 40 L=115.0' 3 35 S=0.0522 '/' LL 30 25 Ca pa 20 pa city=470.96_cfs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 12 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 2.34" for 10-YR, 24-HR event Inflow = 48.83 cfs @ 11.96 hrs, Volume= 2.101 of Outflow = 47.70 cfs @ 11.97 hrs, Volume= 2.100 af, Atten= 2%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 12.68 fps, Min. Travel Time= 0.3 min Avg. Velocity= 3.55 fps, Avg. Travel Time= 1.0 min Peak Storage= 784 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.57' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.07' Top Width= 17.00' Length= 206.0' Slope= 0.1359'/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph ❑ Inflow 48.83 cfs ❑outflow 50 47.70 cfs Inflow Area=10.790 ac 45 Avg. Depth=0.57' 40 Max Vet=12.68 fps 35 n=0.025 30 L=206.0' LL 25 S=0.1359 '/' 20 Capacity=558.40 cfs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 13 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-RR: Ri prap [61] Hint: Submerged 2% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 2.34" for 10-YR, 24-HR event Inflow = 47.70 cfs @ 11.97 hrs, Volume= 2.100 of Outflow = 46.87 cfs @ 11.98 hrs, Volume= 2.098 af, Atten= 2%, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.02 fps, Min. Travel Time= 0.5 min Avg. Velocity= 1.86 fps, Avg. Travel Time= 2.0 min Peak Storage= 1,505 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.58' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.07' Top Width= 22.00' Length= 223.0' Slope= 0.0717 '/' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Ri prap Hydrograph ❑ Inflow 47.70 cfs ❑outflow 50 46.87 cfs Inflow Area=10.790 ac 45 Avg. Depth=0.58' 40 Max Vet=7.02 fps 35 n=0.035 30 L=223.0' c 25 LL S=0.0717 T 20 15 Capacity=458.22 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 14 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S1: DC-South 1 Inflow Area = 14.270 ac, Inflow Depth > 2.34" for 10-YR, 24-HR event Inflow = 65.17 cfs @ 11.96 hrs, Volume= 2.779 of Outflow = 59.28 cfs @ 12.01 hrs, Volume= 2.768 af, Atten= 9%, Lag= 3.3 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.13 fps, Min. Travel Time= 1.9 min Avg. Velocity= 2.15 fps, Avg. Travel Time= 6.4 min Peak Storage= 7,236 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.06' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.99 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 833.0' Slope= 0.0312 '/' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph ❑ Inflow 70 ' 65.17 cfs ❑outflow j Inflow Area=14.270 ac 65 59.28 cfs 60 Avg. Depth=1 .06' 55 Max Vet=7.13 fps 50 45 n=0.030 14 40 - - - - 1=833.0' 0 35 LL 30 ------'; ----- ',- S=0.0312 T 25 Capacity=222.99 cfs 20 i I I 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 15 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 2.34" for 10-YR, 24-HR event Inflow = 5.02 cfs @ 11.96 hrs, Volume= 0.214 of Outflow = 4.56 cfs @ 12.02 hrs, Volume= 0.213 af, Atten= 9%, Lag= 3.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.43 fps, Min. Travel Time= 2.3 min Avg. Velocity= 0.96 fps, Avg. Travel Time= 8.2 min Peak Storage= 651 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.24' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 5.02 cfs ❑outflow 5 Inflow Area=1 .100 ac 4.56 cfs Avg. Depth=0.24' 4 Max Vet=3.43 fps n=0.030 3 3 L=470.0' 0 LL S=0.0383 T 2 Capacity=247.01 cfs 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 16 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-SW: Southwest Channel [61] Hint: Submerged 4% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 2.33" for 10-YR, 24-HR event Inflow = 46.87 cfs @ 11.98 hrs, Volume= 2.098 of Outflow = 43.54 cfs @ 12.03 hrs, Volume= 2.088 af, Atten= 7%, Lag= 2.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.61 fps, Min. Travel Time= 1.8 min Avg. Velocity= 1.19 fps, Avg. Travel Time= 6.9 min Peak Storage= 4,842 cf @ 12.00 hrs, Average Depth at Peak Storage= 0.59' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 27.00' Length= 491.0' Slope= 0.0204 '/' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW: Southwest Channel Hydrograph ❑ Inflow 46.87 cfs ❑outflow 50 Inflow Area=10.790 ac a5 43.54 cfs Avg. Depth=0.59' 40 Max Vet=4.61 fps 35 n=0.030 w 30 L=491 .0' 2 LL5 S=0.0204 '/' 20 15 Capacity=392.33 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 17 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.39' Inflow Area = 10.790 ac, Inflow Depth > 2.32" for 10-YR, 24-HR event Inflow = 43.54 cfs @ 12.03 hrs, Volume= 2.088 of Outflow = 42.88 cfs @ 12.04 hrs, Volume= 2.086 af, Atten= 2%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.80 fps, Min. Travel Time= 0.4 min Avg. Velocity= 1.80 fps, Avg. Travel Time= 1.6 min Peak Storage= 1,085 cf @ 12.04 hrs, Average Depth at Peak Storage= 0.39' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 170.0' Slope= 0.1294 '/' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach DC-WI: West Inlet Hydrograph ❑ Inflow 43.54 cfs ❑outflow 45 42.88 cfs Inflow Area=10.790 ac 40 Avg. Depth=0.39' 35 Max Vet=6.80 fps 30 l n=0.040 25 L=170.0' 3 LL 20 S=0.1294 '/' 15 , Capacity=741 .72 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 18 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Inflow Area = 7.825 ac, Inflow Depth > 2.33" for 10-YR, 24-HR event Inflow = 31.80 cfs @ 12.00 hrs, Volume= 1.522 of Outflow = 4.48 cfs @ 12.36 hrs, Volume= 0.797 af, Atten= 86%, Lag= 21.6 min Primary = 4.48 cfs @ 12.36 hrs, Volume= 0.797 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 286.35' @ 12.36 hrs Surf.Area= 12,324 sf Storage= 35,199 cf Plug-Flow detention time= 165.0 min calculated for 0.797 of(52% of inflow) Center-of-Mass det. time= 85.2 min ( 875.4- 790.2 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.44 cfs @ 12.36 hrs HW=286.35' (Free Discharge) L1=Culvert (Passes 4.44 cfs of 7.71 cfs potential flow) t2=Skimmer (Custom Controls 0.11 cfs) 3=Orifice/Grate (Weir Controls 4.33 cfs @ 1.95 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=283.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 19 HydroCAD®8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Hydrograph 1.80 cfs Inflow 3 ■Outflow 'A 5 �D ■S Primary w __r�a�l Secondary 32 "34 Peak E':feV6. �-- 30 St ge=35,1 26 - - - - - - - - - - - 24 - - - - - - - - - - - - - - - - - - - - - - - 22 u 20 3 18 . U. 16 14 12 10 fs 8 .- 4.48 cfs ---- --------- 4 " 0.00 cfs o , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 20 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-1: [57] Hint: Peaked at 269.13' (Flood elevation advised) [61] Hint: Submerged 4% of Reach DC-S1 bottom [61] Hint: Submerged 17% of Reach DC-S2 bottom Inflow Area = 15.370 ac, Inflow Depth > 2.33" for 10-YR, 24-HR event Inflow = 63.82 cfs @ 12.01 hrs, Volume= 2.981 of Outflow = 63.82 cfs @ 12.01 hrs, Volume= 2.981 af, Atten= 0%, Lag= 0.0 min Primary = 63.82 cfs @ 12.01 hrs, Volume= 2.981 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 269.13' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=62.12 cfs @ 12.01 hrs HW=269.12' (Free Discharge) L1=Culvert (Passes 62.12 cfs of 129.03 cfs potential flow) L2=Orifice/Grate (Orifice Controls 62.12 cfs @ 2.71 fps) Pond DI-1: Hydrograph ❑Inflow 70 S - _ ❑Primary 63.82 cfs Inflow Area=15.370 ac 65 60 Peak Elev=269.13' 55 ," , 50 45 . 40 . 3 35 . 0 25 . 20 r 15 r r 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 21 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: [57] Hint: Peaked at 283.80' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 2.32" for 10-YR, 24-HR event Inflow = 43.54 cfs @ 12.03 hrs, Volume= 2.088 of Outflow = 43.54 cfs @ 12.03 hrs, Volume= 2.088 af, Atten= 0%, Lag= 0.0 min Primary = 43.54 cfs @ 12.03 hrs, Volume= 2.088 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.80' @ 12.03 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.04627' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=42.17 cfs @ 12.03 hrs HW=283.80' (Free Discharge) L1=Culvert (Passes 42.17 cfs of 109.04 cfs potential flow) L2=Orifice/Grate (Weir Controls 42.17 cfs @ 1.78 fps) Pond DI-2: Hydrograph ❑Inflow 43.5 S ❑Primary 45 43.54 cfs Inflow Area=1'0.790 ac 40 Peak Elev=283.80' 35 30 25 3 0 LL 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 22 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Inflow Area = 13.122 ac, Inflow Depth > 2.33" for 10-YR, 24-HR event Inflow = 53.13 cfs @ 12.00 hrs, Volume= 2.552 of Outflow = 3.81 cfs @ 12.84 hrs, Volume= 1.046 af, Atten= 93%, Lag= 50.5 min Primary = 3.81 cfs @ 12.84 hrs, Volume= 1.046 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 314.20' @ 12.84 hrs Surf.Area= 20,689 sf Storage= 68,624 cf Plug-Flow detention time= 203.7 min calculated for 1.042 of(41% of inflow) Center-of-Mass det. time= 120.6 min ( 910.9 - 790.3 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.08137' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.75 cfs @ 12.84 hrs HW=314.20' (Free Discharge) L1=Culvert (Passes 3.75 cfs of 9.85 cfs potential flow) t2=Skimmer (Custom Controls 0.23 cfs) 3=Orifice/Grate (Weir Controls 3.52 cfs @ 1.46 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=310.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 23 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Hydrograph 53.13 c ■ Inflow fs ■Outflow qq ac ■ Primary f'��,nflow Are 13.1 L ■Secondary 55 .- - Peak Elegy= 'I4.20' -50- Storag e=V8,L1 24 , 45 40 w 35 3 30 0 IL 25- 20 15 3.81 cfs 10 3.81 cfs 0.00 cf.s o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 24 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Inflow Area = 8.178 ac, Inflow Depth > 2.34" for 10-YR, 24-HR event Inflow = 35.59 cfs @ 11.98 hrs, Volume= 1.592 of Outflow = 3.87 cfs @ 12.43 hrs, Volume= 0.819 af, Atten= 89%, Lag= 26.8 min Primary = 3.87 cfs @ 12.43 hrs, Volume= 0.819 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 252.32' @ 12.43 hrs Surf.Area= 14,918 sf Storage= 37,484 cf Plug-Flow detention time= 168.1 min calculated for 0.816 of(51% of inflow) Center-of-Mass det. time= 88.7 min ( 877.3- 788.6 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.02007' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.84 cfs @ 12.43 hrs HW=252.32' (Free Discharge) L1=Culvert (Passes 3.84 cfs of 7.66 cfs potential flow) t2=Skimmer (Custom Controls 0.10 cfs) 3=Orifice/Grate (Weir Controls 3.74 cfs @ 1.85 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=249.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 25 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Hydrograph 3 5.59 cfs Inflow ■Outflow - - - --- - - - -$,��8 �C il..�a ■ Prima {� J`V Primary " ■Secondary Cn ovy Freak E'�ev252-3' 38 _ 36 S#© 84 30 ' ' d- 32 � Pi �� 4 28 26 — 24 - - - - - - - - cyi 22 - - - - - - i 3 20 -------------------- -------------- 0 18 U. 16 - 14 ' . 12 10 S $ 3.87 cfs 6 4 0.00 cfs o , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 26 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: [61] Hint: Submerged 70% of Reach DC-El bottom [61] Hint: Submerged 19% of Reach DC-WI bottom Inflow Area = 26.160 ac, Inflow Depth > 2.32" for 10-YR, 24-HR event Inflow = 105.33 cfs @ 12.03 hrs, Volume= 5.065 of Outflow = 6.01 cfs @ 13.26 hrs, Volume= 1.898 af, Atten= 94%, Lag= 73.5 min Primary = 6.01 cfs @ 13.26 hrs, Volume= 1.898 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 258.23' @ 13.26 hrs Surf.Area= 39,900 sf Storage= 143,593 cf Plug-Flow detention time= 220.8 min calculated for 1.892 of(37% of inflow) Center-of-Mass det. time= 136.3 min ( 929.9- 793.7 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.01677' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=5.92 cfs @ 13.26 hrs HW=258.23' (Free Discharge) L1=Culvert (Passes 5.92 cfs of 21.46 cfs potential flow) t2=5-in Skimmer (Custom Controls 0.23 cfs) 3=Orifice/Grate (Weir Controls 5.69 cfs @ 1.56 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=254.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 10-YR, 24-HR Rainfall=5.11" Prepared by{enter your company name here} Page 27 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: Hydrograph 105.33 LInflow " cfs w Infi OW _ �C ry /�ArQa �.1:60 dary 110 Peak-IElev=2 8.23' 1006 --Stor a a=143, 93 ,cf 90 " 80 -, 70 60 " o 50 40 " 30 " 20 g 6.01 cfs 6.01 cfs 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 28 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A: Area A Runoff Area=571,604 sf Runoff Depth>3.08" Flow Length=865' Tc=8.7 min CN=75 Runoff=69.49 cfs 3.367 of Subcatchment B: Area B 2022 Runoff Area=340,845 sf Runoff Depth>3.08" Flow Length=730' Tc=8.6 min CN=75 Runoff=41.58 cfs 2.008 of Subcatchment D: Area D Runoff Area=356,215 sf Runoff Depth>3.08" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=46.43 cfs 2.100 of Subcatchment E: Runoff Area=14.270 ac Runoff Depth>3.08" Flow Length=670' Tc=5.0 min CN=75 Runoff=85.06 cfs 3.666 of Subcatchment W-E: Runoff Area=1.100 ac Runoff Depth>3.08" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=6.56 cfs 0.283 of Subcatchment W-W: Runoff Area=10.790 ac Runoff Depth>3.08" Flow Length=732' Tc=5.2 min CN=75 Runoff=63.74 cfs 2.772 of Reach DC-El: East Inlet Avg. Depth=0.75' Max Vet=6.41 fps Inflow=83.81 cfs 3.934 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=82.37 cfs 3.932 of Reach DC-G: Gabion Avg. Depth=0.66' Max Vet=13.77 fps Inflow=63.74 cfs 2.772 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=62.39 cfs 2.770 of Reach DC-RR: Riprap Avg. Depth=0.67' Max Vet=7.67 fps Inflow=62.39 cfs 2.770 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=61.32 cfs 2.767 of Reach DC-S1: DC-South 1 Avg. Depth=1.22' Max Vet=7.68 fps Inflow=85.06 cfs 3.666 of n=0.030 L=833.0' S=0.0312'/' Capacity=222.99 cfs Outflow=77.83 cfs 3.653 of Reach DC-S2: DC-South 2 Avg. Depth=0.28' Max Vet=3.76 fps Inflow=6.56 cfs 0.283 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=5.98 cfs 0.281 of Reach DC-SW: Southwest Channel Avg. Depth=0.69' Max Vet=5.08 fps Inflow=61.32 cfs 2.767 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=56.85 cfs 2.757 of Reach DC-WI: West Inlet Avg. Depth=0.46' Max Vet=7.47 fps Inflow=56.85 cfs 2.757 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=56.34 cfs 2.755 of Pond 3P: SB-B Peak Elev=286.97' Storage=42,977 cf Inflow=41.58 cfs 2.008 of Primary=8.53 cfs 1.279 of Secondary=0.00 cfs 0.000 of Outflow=8.53 cfs 1.279 of Pond DI-1: Peak Elev=269.32' Inflow=83.81 cfs 3.934 of Outflow=83.81 cfs 3.934 of DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 29 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: Peak Elev=283.86' Inflow=56.85 cfs 2.757 of Outflow=56.85 cfs 2.757 of Pond SB-A: SB-A Peak Elev=314.64' Storage=77,968 cf Inflow=69.49 cfs 3.367 of Primary=10.82 cfs 1.854 of Secondary=0.00 cfs 0.000 of Outflow=10.82 cfs 1.854 of Pond SB-D: SB-D Peak Elev=252.85' Storage=45,527 cf Inflow=46.43 cfs 2.100 of Primary=8.38 cfs 1.322 of Secondary=0.00 cfs 0.000 of Outflow=8.38 cfs 1.322 of Pond SB-E: Peak Elev=258.55' Storage=156,762 cf Inflow=137.69 cfs 6.686 of Primary=20.70 cfs 3.505 of Secondary=0.00 cfs 0.000 of Outflow=20.70 cfs 3.505 of Total Runoff Area= 55.285 ac Runoff Volume= 14.194 of Average Runoff Depth =3.08" 100.00%Pervious Area= 55.285 ac 0.00%Impervious Area= 0.000 ac DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 30 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment A: Area A Runoff = 69.49 cfs @ 12.00 hrs, Volume= 3.367 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 571,604 75 Chatham Co. Min 571,604 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment A: Area A Hydrograph ------------------------- 75 ■Runoff 69.49 cfs 70 Type: II 24-hr, 25-YR 65 60 24-W R ,Rai 55 , .., nfall',=6.06.. 50 Runoff AI'ea-571 '604;sf y 45 Runoff Volume=3' - Ru' 367 of 40 3 Runoff epth> 35 3 08" LL ' Flow_Le g = 30 n th 865_ 25 TC=8.7 min 20 C1—75 15 10 5 0 . . . . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 31 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment B: Area B 2022 Runoff = 41.58 cfs @ 12.00 hrs, Volume= 2.008 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 340,845 75 Chatham Co. Min 340,845 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment B: Area B 2022 Hydrograph 46 ■Runoff 44 '.-', - - - 41.58 cfs 42 -- ype,_IL24-hr' 25-YR 40 38 24=W R 36 r r - - - - ': - , 34 ' ' , , lilt- Rainfa11_6.V 32 - - - - ' - - - - 30 Runoff Area-340 845=Sf 28 w 26 unoff-Voalume=2' of -' 24 F LL 22 20 - Runoff' epth>3 08" 18 Io w Length=730' 16 - - - 14 - - ------ -----Te 8.6 min 12 10 - -75 8 6 - 4 2 0 , 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 32 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment D: Area D Runoff = 46.43 cfs @ 11.98 hrs, Volume= 2.100 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (sf) CN Description 356,215 75 Chatham Co. Min 356,215 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment D: Area D Hydrograph 50 ■Runoff 46.43 cfs T e 45 yp II 2 -hr!, 25-YR 40 24--H R Rainfal1=6.06" 35 Runoff Area=356 215;sf 30 Runoff Volume=2.100' of 0 25 Runoff Depth>3.08" LL 20 Flow ',Len'9th=1,075' 15- Tc=6.5 min C N--75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 33 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment E: [49] Hint: Tc<2dt may require smaller dt Runoff = 85.06 cfs @ 11.96 hrs, Volume= 3.666 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (ac) CN Description 14.270 75 Chatham Co. Min 14.270 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 45 0.3300 0.47 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 &3.0 '/' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 2.0 670 Total, Increased to minimum Tc = 5.0 min Subcatchment E: Hydrograph 95 ❑Runoff 90 85.06 cfs 85 Type II 24-hr 25-YR 80 - 75 ! 24-H R 70 Rainfall=6.06" 65 60 '..' - - - - ' Runoff Area=14.270 ac n 55 Runoff Volume=3.666 of 50 45 Runoff Depth>3.08" a 40 35 Flow_Length=670' 30 Tc=5.0 min 25 20 CN=75 15 - - - - 'r 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 34 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-E: [49] Hint: Tc<2dt may require smaller dt Runoff = 6.56 cfs @ 11.96 hrs, Volume= 0.283 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment W-E: Hydrograph 7 ❑Runoff 6.56 cfs Type II 24-hr 25-YR 6 24-HR Rainfall=6.06"5-Runoff Area=1.100 ac 4 Runoff Volume=0.283 of Runoff Depth>3.08" LL 3 Flow Length=100' Slope=0.3300 '/' 2 Tc=5.0 min CN=75 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 35 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-W: [49] Hint: Tc<2dt may require smaller dt Runoff = 63.74 cfs @ 11.96 hrs, Volume= 2.772 af, Depth> 3.08" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-YR, 24-HR Rainfall=6.06" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment W-W: Hydrograph 70 ❑Runoff 63.74 cfs 65 T H 2 - ype 60 25-`�(R - �-hr', 55 24-1;l R 50Rainfall=6.06" - Runoff Area-: 45 790 ac w !---- Runoff Vo-Ium'e=2!.772 of 40 30- Runoff Depth>30 8" LL ` 25 Flow Length--732 20 ---- c=5.2IMin_ - 'I 15 CN-75 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 36 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.75' Inflow Area = 15.370 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 83.81 cfs @ 12.01 hrs, Volume= 3.934 of Outflow = 82.37 cfs @ 12.02 hrs, Volume= 3.932 af, Atten= 2%, Lag= 0.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 6.41 fps, Min. Travel Time= 0.3 min Avg. Velocity= 1.63 fps, Avg. Travel Time= 1.2 min Peak Storage= 1,496 cf @ 12.01 hrs, Average Depth at Peak Storage= 0.75' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 115.0' Slope= 0.0522 '/' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach DC-Ell: East Inlet Hydrograph ■ Inflow 83.81 cfs ❑outflow 90 85 82.37 cfs Inflow Area=15.370 ac 80 - Avg. ,Depth=0.75' 75 70 65 Max Vet=6.41 fps 60 n=0.040 55 w , 50 ,1=115:0' 3 45 LL 40 S=0.0522 T 35 30 Capacity=470.96 cfs 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 37 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 63.74 cfs @ 11.96 hrs, Volume= 2.772 of Outflow = 62.39 cfs @ 11.97 hrs, Volume= 2.770 af, Atten= 2%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 13.77 fps, Min. Travel Time= 0.2 min Avg. Velocity= 3.77 fps, Avg. Travel Time= 0.9 min Peak Storage= 944 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.66' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.07' Top Width= 17.00' Length= 206.0' Slope= 0.1359'/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph ❑ Inflow 70 63.74 cfs ❑outflow 65 62.39 cfs Inflow Area=10.790 ac 60 Avg. Depth=0.66' 55 50 Max Vet=13.77 fps 45 n=0.025 w 40 3 35 L=206.0' LL 30 S=0.1359 T 25 Capacity=558.40 cfs 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 38 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-RR: Ri prap [61] Hint: Submerged 2% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 62.39 cfs @ 11.97 hrs, Volume= 2.770 of Outflow = 61.32 cfs @ 11.98 hrs, Volume= 2.767 af, Atten= 2%, Lag= 0.9 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.67 fps, Min. Travel Time= 0.5 min Avg. Velocity= 1.98 fps, Avg. Travel Time= 1.9 min Peak Storage= 1,782 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.67' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.07' Top Width= 22.00' Length= 223.0' Slope= 0.0717 '/' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Ri prap Hydrograph ❑ Inflow 62.39 cfs ❑outflow 65 61.32 cfs Inflow Area=10.790 ac 60 55 Avg, ,Depth=0.67' 50 Max Vet=7.67 fps 45 n=0.035 w 40 3 35 L=223.0' LL 30 5=0.0717 T 25 Capacity=458.22 cfs 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 39 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S1: DC-South 1 Inflow Area = 14.270 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 85.06 cfs @ 11.96 hrs, Volume= 3.666 of Outflow = 77.83 cfs @ 12.01 hrs, Volume= 3.653 af, Atten= 8%, Lag= 3.0 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.68 fps, Min. Travel Time= 1.8 min Avg. Velocity= 2.28 fps, Avg. Travel Time= 6.1 min Peak Storage= 8,793 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.22' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.99 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 17.00' Length= 833.0' Slope= 0.0312 7' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph 8 ■ Inflow 95 a �4.27© ' ■Outflow 5.06 cfs 90 Inflow 85 80 77.83 cfs V th: . 2 AG. Dep 75 ' I I I I r I 70 Max Velf 7.68 fps 65 60 n= .O 55 50 _0 45 �+ j� a 40 5?_ ,SI,� 12 35 apacity 222 99 C �7,- C 30 — = r 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 40 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 6.56 cfs @ 11.96 hrs, Volume= 0.283 of Outflow = 5.98 cfs @ 12.01 hrs, Volume= 0.281 af, Atten= 9%, Lag= 3.5 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 3.76 fps, Min. Travel Time= 2.1 min Avg. Velocity= 1.02 fps, Avg. Travel Time= 7.7 min Peak Storage= 778 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.28' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 7 6.56 cfs ❑outflow Inflow Area=1 .100 ac 5.98 cfs 6 Avg. Depth=0.28' 5 Max Vet=3.76 fps n=0.030 4 L=470.0' 3 0 3 S=0.0383 '/' 2 Capacity=247.01 cfs 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 41 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-SW: Southwest Channel [61] Hint: Submerged 4% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 61.32 cfs @ 11.98 hrs, Volume= 2.767 of Outflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 af, Atten= 7%, Lag= 2.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.08 fps, Min. Travel Time= 1.6 min Avg. Velocity= 1.27 fps, Avg. Travel Time= 6.4 min Peak Storage= 5,789 cf @ 12.00 hrs, Average Depth at Peak Storage= 0.69' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 27.00' Length= 491.0' Slope= 0.0204 '/' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW: Southwest Channel Hydrograph ❑ Inflow 61.32 cfs ❑outflow 65 Inflow Area=10.790 ac 60 56.85 cfs Avg. Depth=0.69' 55 50 Max Vet=5.08 fps 45 - w - - - - n=0.030 40 w 35 L=491 .0' FL 30 S=0.0204 '/' Ca a 25 p 20 clty=392.33---cfs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 42 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.46' Inflow Area = 10.790 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Outflow = 56.34 cfs @ 12.03 hrs, Volume= 2.755 af, Atten= 1%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.47 fps, Min. Travel Time= 0.4 min Avg. Velocity= 1.92 fps, Avg. Travel Time= 1.5 min Peak Storage= 1,289 cf @ 12.03 hrs, Average Depth at Peak Storage= 0.46' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 170.0' Slope= 0.1294 '/' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach DC-WI: West Inlet Hydrograph ❑ Inflow 56.85 cfs ❑outflow 60 56.34 cfs Inflow Area=10.790 ac 55 50 Avg. Depth=0.46' 45 Max Vet=7.47 fps 40 n=0.040 35 ` LL30 25 _ - - S=0.1294 T 20 ---- -Capacity=741 .72 cfs 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 43 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Inflow Area = 7.825 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 41.58 cfs @ 12.00 hrs, Volume= 2.008 of Outflow = 8.53 cfs @ 12.23 hrs, Volume= 1.279 af, Atten= 79%, Lag= 13.7 min Primary = 8.53 cfs @ 12.23 hrs, Volume= 1.279 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 286.97' @ 12.23 hrs Surf.Area= 12,942 sf Storage= 42,977 cf Plug-Flow detention time= 132.9 min calculated for 1.275 of(63% of inflow) Center-of-Mass det. time= 61.3 min ( 845.6- 784.3 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.53 cfs @ 12.23 hrs HW=286.97' (Free Discharge) L1=Culvert (Inlet Controls 8.53 cfs @ 6.95 fps) 2=Skimmer (Passes < 0.11 cfs potential flow) t3=Orifice/Grate (Passes < 14.88 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=283.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 44 HydroCAD®8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Hydrograph 4 ■ Inflow 1.58 cfs ■Outflow n --25 ac ■ Primary low 'Ar�a 7.8 45 ■Secondary � � � �� Peak El 288.97" 40 --- -: - fora - 77 2,9, - ---- c 35 30 w ° 25 0 M 20 15 8.53 cfs 8.53 cfs 10 5 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 45 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-1: [57] Hint: Peaked at 269.32' (Flood elevation advised) [61] Hint: Submerged 5% of Reach DC-S1 bottom [61] Hint: Submerged 18% of Reach DC-S2 bottom Inflow Area = 15.370 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 83.81 cfs @ 12.01 hrs, Volume= 3.934 of Outflow = 83.81 cfs @ 12.01 hrs, Volume= 3.934 af, Atten= 0%, Lag= 0.0 min Primary = 83.81 cfs @ 12.01 hrs, Volume= 3.934 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 269.32' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=82.40 cfs @ 12.01 hrs HW=269.31' (Free Discharge) L1=Culvert (Passes 82.40 cfs of 131.69 cfs potential flow) L2=Orifice/Grate (Orifice Controls 82.40 cfs @ 3.43 fps) Pond DI-1: Hydrograph • Inf 83. 1 fs ❑Primary ow 81 cfs 90 Inflow Area=15.370 ac 85 ;'' 80 75 Peak Elev=269.32' 70 65 60 55 50 ., 0 45 40 35 30 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 46 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: [57] Hint: Peaked at 283.86' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Outflow = 56.85 cfs @ 12.02 hrs, Volume= 2.757 af, Atten= 0%, Lag= 0.0 min Primary = 56.85 cfs @ 12.02 hrs, Volume= 2.757 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.86' @ 12.02 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.04627' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=55.29 cfs @ 12.02 hrs HW=283.85' (Free Discharge) L1=Culvert (Passes 55.29 cfs of 110.01 cfs potential flow) L2=Orifice/Grate (Weir Controls 55.29 cfs @ 1.95 fps) Pond DI-2: Hydrograph ❑Inflow ❑Primary60 56.85 cfs S Inflow Are'.a=1.0.790 ac 55 50 - Peak Ele : 283.86 45 40 35 0 30 LL 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 47 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Inflow Area = 13.122 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 69.49 cfs @ 12.00 hrs, Volume= 3.367 of Outflow = 10.82 cfs @ 12.31 hrs, Volume= 1.854 af, Atten= 84%, Lag= 18.5 min Primary = 10.82 cfs @ 12.31 hrs, Volume= 1.854 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 314.64' @ 12.31 hrs Surf.Area= 21,517 sf Storage= 77,968 cf Plug-Flow detention time= 154.4 min calculated for 1.854 of(55% of inflow) Center-of-Mass det. time= 77.5 min ( 861.9- 784.4 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.08137' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=10.82 cfs @ 12.31 hrs HW=314.64' (Free Discharge) L1=Culvert (Inlet Controls 10.82 cfs @ 6.12 fps) 2=Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 20.20 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=310.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 48 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Hydrograph 6 9.49 cfs ■ Inflow ■Outflow 22 ac _ Primary ak_��eV-31_4._6 ■Secondary �o " ' � � Pe re n 4 65 Sto rage=77-968-'cf- 60 55 50 w 45 40 -----�' -----r- ---------- -----�r---------- ----- ----- 3 0 35 ---------- ---------- ----- ----- ----- u 30 - 25 ----- --'- -- ----- ----- 10.82 c20 fs 10.82 cfs 15 10 0.00 cfs o 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 49 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Inflow Area = 8.178 ac, Inflow Depth > 3.08" for 25-YR, 24-HR event Inflow = 46.43 cfs @ 11.98 hrs, Volume= 2.100 of Outflow = 8.38 cfs @ 12.19 hrs, Volume= 1.322 af, Atten= 82%, Lag= 12.6 min Primary = 8.38 cfs @ 12.19 hrs, Volume= 1.322 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 252.85' @ 12.19 hrs Surf.Area= 15,604 sf Storage= 45,527 cf Plug-Flow detention time= 136.6 min calculated for 1.322 of(63% of inflow) Center-of-Mass det. time= 63.2 min ( 845.8- 782.6 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.02007' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.37 cfs @ 12.19 hrs HW=252.85' (Free Discharge) L1=Culvert (Inlet Controls 8.37 cfs @ 6.82 fps) 2=Skimmer (Passes < 0.10 cfs potential flow) t3=Orifice/Grate (Passes < 13.92 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=249.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 50 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Hydrograph 4 ■ Inflow 6.43 cfs ■outflow o - - - - - - - - - - - '. 8.178 ac ■ Primary — Secondary 50 n I� -W Area Peak Elev=252.8'5' 45 - 40 Storage=45,527 cf 35 w 30 o ' I 0 25 U. 20 =, 15 8.38fs 8.38 cfs 10 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type // 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 51 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: [61] Hint: Submerged 76% of Reach DC-El bottom [61] Hint: Submerged 21% of Reach DC-WI bottom Inflow Area = 26.160 ac, Inflow Depth > 3.07" for 25-YR, 24-HR event Inflow = 137.69 cfs @ 12.02 hrs, Volume= 6.686 of Outflow = 20.70 cfs @ 12.33 hrs, Volume= 3.505 af, Atten= 85%, Lag= 18.5 min Primary = 20.70 cfs @ 12.33 hrs, Volume= 3.505 of Secondary= 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 258.55' @ 12.33 hrs Surf.Area= 41,183 sf Storage= 156,762 cf Plug-Flow detention time= 162.8 min calculated for 3.505 of(52% of inflow) Center-of-Mass det. time= 84.7 min ( 872.0- 787.3 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.01677' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=21.68 cfs @ 12.33 hrs HW=258.55' (Free Discharge) L1=Culvert (Passes 21.68 cfs of 22.51 cfs potential flow) t2=5-in Skimmer (Custom Controls 0.23 cfs) 3=Orifice/Grate (Weir Controls 21.45 cfs @ 2.43 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=254.00' (Free Discharge) t-4=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type/1 24-hr 25-YR, 24-HR Rainfall=6.06" Prepared by{enter your company name here} Page 52 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: Hydrograph -- 137.69 cfs ----- j1pn flow utflow150 � -�� + -� � ----- - - -60 aC rimary In �owAr�a-�6 1' econdary -Peak le-' =2- 8.- 5'- 30 Storage �FSf,7f2 ':d 120 = - - - - - - - - - - - - -+- - - - 110 -----+----- --- ----�'�----+ -----�'�----,- ------ ----- ----- 100 -----r ---- ', ---�'r----- ---- ----- ---- ----- 90 -- , - ----- --- ----- --- ----- ----- 80 -----�',-----i----- ---'�----�',---- ', ---- ----- ----- ----- ----- 70 -----r ----- - -- ----- -----r---- -----r----- U. 60 50 - - --- - - - - - - - 40 ,. 2 .7 fs 20.70 cfs 30 20 0.00 cfs 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 53 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment A: Area A Runoff Area=571,604 sf Runoff Depth>4.31" Flow Length=865' Tc=8.7 min CN=75 Runoff=95.98 cfs 4.717 of Subcatchment B: Area B 2022 Runoff Area=340,845 sf Runoff Depth>4.31" Flow Length=730' Tc=8.6 min CN=75 Runoff=57.43 cfs 2.813 of Subcatchment D: Area D Runoff Area=356,215 sf Runoff Depth>4.32" Flow Length=1,075' Tc=6.5 min CN=75 Runoff=63.96 cfs 2.942 of Subcatchment E: Runoff Area=14.270 ac Runoff Depth>4.32" Flow Length=670' Tc=5.0 min CN=75 Runoff=117.21 cfs 5.136 of Subcatchment W-E: Runoff Area=1.100 ac Runoff Depth>4.32" Flow Length=100' Slope=0.3300'/' Tc=5.0 min CN=75 Runoff=9.04 cfs 0.396 of Subcatchment W-W: Runoff Area=10.790 ac Runoff Depth>4.32" Flow Length=732' Tc=5.2 min CN=75 Runoff=87.87 cfs 3.883 of Reach DC-El: East Inlet Avg. Depth=0.91' Max Vet=7.18 fps Inflow=116.29 cfs 5.515 of n=0.040 L=115.0' S=0.0522'/' Capacity=470.96 cfs Outflow=114.57 cfs 5.512 of Reach DC-G: Gabion Avg. Depth=0.78' Max Vet=15.17 fps Inflow=87.87 cfs 3.883 of n=0.025 L=206.0' S=0.1359'/' Capacity=558.40 cfs Outflow=86.18 cfs 3.882 of Reach DC-RR: Riprap Avg. Depth=0.80' Max Vet=8.55 fps Inflow=86.18 cfs 3.882 of n=0.035 L=223.0' S=0.0717'/' Capacity=458.22 cfs Outflow=84.70 cfs 3.878 of Reach DC-S1: DC-South 1 Avg. Depth=1.44' Max Vet=8.37 fps Inflow=117.21 cfs 5.136 of n=0.030 L=833.0' S=0.0312'/' Capacity=222.99 cfs Outflow=107.99 cfs 5.121 of Reach DC-S2: DC-South 2 Avg. Depth=0.34' Max Vet=4.18 fps Inflow=9.04 cfs 0.396 of n=0.030 L=470.0' S=0.0383'/' Capacity=247.01 cfs Outflow=8.30 cfs 0.394 of Reach DC-SW: Southwest Channel Avg. Depth=0.84' Max Vet=5.68 fps Inflow=84.70 cfs 3.878 of n=0.030 L=491.0' S=0.0204'/' Capacity=392.33 cfs Outflow=79.28 cfs 3.866 of Reach DC-WI: West Inlet Avg. Depth=0.56' Max Vet=8.42 fps Inflow=79.28 cfs 3.866 of n=0.040 L=170.0' S=0.1294'/' Capacity=741.72 cfs Outflow=77.94 cfs 3.863 of Pond 3P: SB-B Peak Elev=287.59' Storage=51,209 cf Inflow=57.43 cfs 2.813 of Primary=9.29 cfs 1.669 of Secondary=27.04 cfs 0.409 of Outflow=36.33 cfs 2.078 of Pond DI-1: Peak Elev=269.80' Inflow=116.29 cfs 5.515 of Outflow=116.29 cfs 5.515 of DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 54 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: Peak Elev=283.95' Inflow=79.28 cfs 3.866 of Outflow=79.28 cfs 3.866 of Pond SB-A: SB-A Peak Elev=315.58' Storage=98,904 cf Inflow=95.98 cfs 4.717 of Primary=12.62 cfs 2.665 of Secondary=26.14 cfs 0.533 of Outflow=38.75 cfs 3.197 of Pond SB-D: SB-D Peak Elev=253.57' Storage=57,095 cf Inflow=63.96 cfs 2.942 of Primary=9.26 cfs 1.777 of Secondary=25.05 cfs 0.380 of Outflow=34.32 cfs 2.157 of Pond SB-E: Peak Elev=259.65' Storage=204,504 cf Inflow=192.03 cfs 9.375 of Primary=25.76 cfs 5.378 of Secondary=31.23 cfs 0.798 of Outflow=57.00 cfs 6.176 of Total Runoff Area= 55.285 ac Runoff Volume= 19.887 of Average Runoff Depth =4.32" 100.00%Pervious Area= 55.285 ac 0.00%Impervious Area= 0.000 ac DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 55 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment A: Area A Runoff = 95.98 cfs @ 12.00 hrs, Volume= 4.717 af, Depth> 4.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 571,604 75 Chatham Co. Min 571,604 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.7 200 0.3300 0.43 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 150 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 150 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 365 0.0250 8.31 132.90 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.7 865 Total Subcatchment A: Area A Hydrograph 105 ■Runoff 100 95.98 cfs 95 -- - Type-F -?4-h r 1,00-YR 90 --- - -- ----. r 85 ' .'� ----- --- - �:24 R- 80 ` 75 Rainfall_ . .. 70 Area=571a 604 sfRu of 65 Runoff Volume=47 7 ofw 60 55 LL R p >4 31.. 3 45 f �e #�, — 0 50 UIIOf 40 .-' -----' --- -' W L@11gt -8 5 35 30 T 877-min CN-75 25 20 15 - - - - - - 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 56 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment B: Area B 2022 Runoff = 57.43 cfs @ 12.00 hrs, Volume= 2.813 af, Depth> 4.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 340,845 75 Chatham Co. Min 340,845 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.0 210 0.3300 0.44 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.3 160 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 180 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.2 180 0.1100 17.42 278.77 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 8.6 730 Total Subcatchment B: Area B 2022 Hydrograph ■Runoff 60 ,.., 57.43 cfs r rye 55 p 124-1�r 100-YR 50 24=W R Rai ,nfall 7.5 45 ' Runoff Area340'845, 40 Ru n o - sf 35 Runoff Vo a=2' Ium w ' R ' - .813 of 30 Runoff D epth>4 31"25 Flow Le:ngth=730' 20 Tc=8.6 min 15 ---->-- - - - -CN C 10 5 0 /O�oA . . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 57 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment D: Area D Runoff = 63.96 cfs @ 11.98 hrs, Volume= 2.942 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (sf) CN Description 356,215 75 Chatham Co. Min 356,215 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.5 130 0.3300 0.40 Sheet Flow, Grass: Dense n= 0.240 P2= 3.53" 0.2 120 0.0500 10.52 105.22 Channel Flow, Area= 10.0 sf Perim= 10.8' r= 0.93' n= 0.030 Earth, grassed &winding 0.1 280 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 0.7 545 0.0660 13.50 215.94 Trap/Vee/Rect Channel Flow, Bot.W=2.00' D=2.00' Z= 3.0 '/' Top.W=14.00' n= 0.030 Earth, grassed &winding 6.5 1,075 Total Subcatchment D: Area D Hydrograph 70 - > ■Runoff 63.96 cfs 65 Type- l 24 F hr 100 YR 60- 24-W R 55 50 .,.., Rainfall',=7.56" ff A 45 Runo rea~356,215 sf w 40 Runoff Volume=2 942 of 30 R 2" LL 35 Runoff DF'pth>4.3 Flow Len:'gth : 1,075' 0 25 20 TC 6.5IMin_ 15 CN-,75 10 5 0 . . . . . . . . . . . . . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 58 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment E: [49] Hint: Tc<2dt may require smaller dt Runoff = 117.21 cfs @ 11.96 hrs, Volume= 5.136 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (ac) CN Description 14.270 75 Chatham Co. Min 14.270 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.6 45 0.3300 0.47 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.2 114 0.0400 9.41 94.13 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 2.0 &3.0 '/' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 511 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 2.0 670 Total, Increased to minimum Tc = 5.0 min Subcatchment E: Hydrograph 130 ❑Runoff 117.21 cfs 120 Type II 24-hr 100-YR 110 24-H R 100 Rainfall=7.56" 90 80 Runoff Area=14.270 ac 70 Runoff Volume=5.136 of .2 60 Runoff Depth>4.32" 50 Flow Length=670' 40 Tc=5.0 min 30 CN=75 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 59 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-E: [49] Hint: Tc<2dt may require smaller dt Runoff = 9.04 cfs @ 11.96 hrs, Volume= 0.396 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (ac) CN Description 1.100 75 Chatham Co. Min 1.100 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 3.0 100 0.3300 0.55 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 3.0 100 Total, Increased to minimum Tc = 5.0 min Subcatchment W-E: Hydrograph 10 ❑Runoff 9.04 cfs 9 Type II 24-hr 100-YR $ 24-H R Rainfall=7.56" 7 Runoff Area=1.100 ac 6-Runoff Volume=0.396 of 3 5 Runoff Depth>4.32" LL 4 _ . Flow Length=100' Slope=0.3300 '/' 3 Tc=5.0 min 2 CN=75 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 60 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Subcatchment W-W: [49] Hint: Tc<2dt may require smaller dt Runoff = 87.87 cfs @ 11.96 hrs, Volume= 3.883 af, Depth> 4.32" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-YR, 24-HR Rainfall=7.56" Area (ac) CN Description 10.790 75 Chatham Co. Min 10.790 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 4.9 181 0.3300 0.62 Sheet Flow, Grass: Short n= 0.150 P2= 3.53" 0.1 65 0.0300 8.15 81.52 Trap/Vee/Rect Channel Flow, Bot.W=0.00' D=2.00' Z= 3.0 &2.07' Top.W=10.00' n= 0.030 Earth, grassed &winding 0.2 486 0.3300 34.15 60.34 Circular Channel (pipe), Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Corrugated PE, smooth interior 5.2 732 Total Subcatchment W-W: Hydrograph 95 ❑Runoff 87.87 cfs 90 ! 85 - - Type-1,1-24-hr- 00- YR 80 --', ----', 24-W R- 75 Rainfall Rain#all=7 56" 65 60 Runoff Area-_�Q 79D ac 55 Runoff Valume=3.883 of 50 2 45 Runoff De: pth>4.32" LL 40 35 ow engt =7 30 Tc 5.2 rhin 25 - - - - - - - - - - - - - - - - - - - - - - - - 2o CN--;7 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 61 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-El: East Inlet [79] Warning: Submerged Pond DI-1 Primary device# 1 OUTLET by 0.91' Inflow Area = 15.370 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 116.29 cfs @ 12.00 hrs, Volume= 5.515 of Outflow = 114.57 cfs @ 12.01 hrs, Volume= 5.512 af, Atten= 1%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 7.18 fps, Min. Travel Time= 0.3 min Avg. Velocity= 1.77 fps, Avg. Travel Time= 1.1 min Peak Storage= 1,858 cf @ 12.01 hrs, Average Depth at Peak Storage= 0.91' Bank-Full Depth= 2.00', Capacity at Bank-Full= 470.96 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.07' Top Width= 27.00' Length= 115.0' Slope= 0.0522 '/' Inlet Invert= 260.00', Outlet Invert= 254.00' Reach DC-Ell: East Inlet Hydrograph 130 ❑ Inflow 116.29 cfs 10 outflow 120 114.57 cfs I of law :Area=15.3'.70 ac 110 Avg. ',Depth=0.91' 100 90 Max Vet=7.18 fps 80 n=0.040 0 70 L=115.0' 3 LL 60 S=0.0522 '/' 40 Cap50 acity=470.96_cfs 30 - 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 62 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-G: Gabion Inflow Area = 10.790 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 87.87 cfs @ 11.96 hrs, Volume= 3.883 of Outflow = 86.18 cfs @ 11.96 hrs, Volume= 3.882 af, Atten= 2%, Lag= 0.4 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 15.17 fps, Min. Travel Time= 0.2 min Avg. Velocity = 4.07 fps, Avg. Travel Time= 0.8 min Peak Storage= 1,184 cf @ 11.96 hrs, Average Depth at Peak Storage= 0.78' Bank-Full Depth= 2.00', Capacity at Bank-Full= 558.40 cfs 5.00' x 2.00' deep channel, n= 0.025 Rubble masonry, cemented Side Slope Z-value= 3.0 '/' Top Width= 17.00' Length= 206.0' Slope= 0.1359 '/' Inlet Invert= 338.00', Outlet Invert= 310.00' Reach DC-G: Gabion Hydrograph 7.87 c ■ Inflow 8 fs ❑outflow 95 90 ,'------ 86.18 cs Inflow Area-- 10-F 79--0- - ----- ac 85 80 V g Q@lt�l0. 8` 75 �' -- V- '70 -- M eI '151,7-fps- 60 ! ! n 0 075 w 55 - 50 L- -206,0` `7 --�V�}.1 -5�7(� LL 1 /' 40 35 Cpa city—558 40 �;f 5 30 - 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 63 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-RR: Riprap [61] Hint: Submerged 3% of Reach DC-G bottom Inflow Area = 10.790 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 86.18 cfs @ 11.96 hrs, Volume= 3.882 of Outflow = 84.70 cfs @ 11.98 hrs, Volume= 3.878 af, Atten= 2%, Lag= 0.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.55 fps, Min. Travel Time= 0.4 min Avg. Velocity = 2.15 fps, Avg. Travel Time= 1.7 min Peak Storage= 2,214 cf @ 11.97 hrs, Average Depth at Peak Storage= 0.80' Bank-Full Depth= 2.00', Capacity at Bank-Full= 458.22 cfs 10.00' x 2.00' deep channel, n= 0.035 Earth, dense weeds Side Slope Z-value= 3.0 '/' Top Width= 22.00' Length= 223.0' Slope= 0.0717 '/' Inlet Invert= 310.00', Outlet Invert= 294.00' Reach DC-RR: Riprap Hydrograph ■ Inflow 95 I 86.18 cfs 10 Outflow ©. r 90 84.70 cfs - - -Inflow Area=1' 7 90- ac- 85 75 g Depth=0. 4' 80 AV- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 705 fps- Max 65 n -t 60 n - - D- - - 55 50 - - - -" 0 45 Or _ ----------- 40 35 30 Capacity---458.2 Cfs 25 20 - 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 64 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S1: DC-South 1 Inflow Area = 14.270 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 117.21 cfs @ 11.96 hrs, Volume= 5.136 of Outflow = 107.99 cfs @ 12.00 hrs, Volume= 5.121 af, Atten= 8%, Lag= 2.8 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.37 fps, Min. Travel Time= 1.7 min Avg. Velocity= 2.46 fps, Avg. Travel Time= 5.6 min Peak Storage= 11,129 cf @ 11.98 hrs, Average Depth at Peak Storage= 1.44' Bank-Full Depth= 2.00', Capacity at Bank-Full= 222.99 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 833.0' Slope= 0.0312 '/' Inlet Invert= 294.00', Outlet Invert= 268.00' Reach DC-S1: DC-South 1 Hydrograph 130 ❑ Inflow 117.21 cfs 10 Outflow 120 Inflow'Area=14.270 ac 107.99 cfs 110 Avg. 'Depth=1 .44' 100 90 Max Vet=8.37_fps 80 n-!0.030 70 L=8330' S-0.0312 7' 50 40 Capacity=222.99_cfs 30 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 65 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-S2: DC-South 2 Inflow Area = 1.100 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 9.04 cfs @ 11.96 hrs, Volume= 0.396 of Outflow = 8.30 cfs @ 12.01 hrs, Volume= 0.394 af, Atten= 8%, Lag= 3.1 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 4.18 fps, Min. Travel Time= 1.9 min Avg. Velocity= 1.10 fps, Avg. Travel Time= 7.1 min Peak Storage= 967 cf @ 11.98 hrs, Average Depth at Peak Storage= 0.34' Bank-Full Depth= 2.00', Capacity at Bank-Full= 247.01 cfs 5.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.07' Top Width= 17.00' Length= 470.0' Slope= 0.0383 '/' Inlet Invert= 284.00', Outlet Invert= 266.00' Reach DC-S2: DC-South 2 Hydrograph ❑ Inflow 10 _ 9.04 cfs _ _ ❑outflow 9 Inflow Area=1 .100 ac 8.30 cfs 8 Avg. Depth=0.34' 7 Max Vet=4.18 fps w 6 n=0.030 3 5 L=470.0' 0 4 S=0.0383 T 3 Capacity=247.01 cfs 2 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 11 24-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 66 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-SW: Southwest Channel [61] Hint: Submerged 5% of Reach DC-RR bottom Inflow Area = 10.790 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 84.70 cfs @ 11.98 hrs, Volume= 3.878 of Outflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 af, Atten= 6%, Lag= 2.2 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 5.68 fps, Min. Travel Time= 1.4 min Avg. Velocity = 1.38 fps, Avg. Travel Time= 5.9 min Peak Storage= 7,186 cf @ 11.99 hrs, Average Depth at Peak Storage= 0.84' Bank-Full Depth= 2.00', Capacity at Bank-Full= 392.33 cfs 15.00' x 2.00' deep channel, n= 0.030 Earth, grassed &winding Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 491.0' Slope= 0.0204 7' Inlet Invert= 294.00', Outlet Invert= 284.00' Reach DC-SW: Southwest Channel Hydrograph ■ Inflow 4.70 c 10 Outflow 90 fs - fnff dw Are O-790- ac- 79. 8 85 ".. 28 cfs ' - a�� A , 80 0.84'- vg Depth= 75 70 Maxax Vet-5.68 fps 65 60 n= .0 55 -- - - -'- - - - - 50 ------ _ S- o _j� /� LL 40 �'0,204: T- 3 45 35 30 " " = g=Z=.=3 - - apac ty- 3-Cfs D 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 67 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Reach DC-WI: West Inlet [79] Warning: Submerged Pond DI-2 Primary device# 1 OUTLET by 0.56' Inflow Area = 10.790 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Outflow = 77.94 cfs @ 12.02 hrs, Volume= 3.863 af, Atten= 2%, Lag= 0.6 min Routing by Stor-Ind+Trans method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Max. Velocity= 8.42 fps, Min. Travel Time= 0.3 min Avg. Velocity= 2.08 fps, Avg. Travel Time= 1.4 min Peak Storage= 1,589 cf @ 12.02 hrs, Average Depth at Peak Storage= 0.56' Bank-Full Depth= 2.00', Capacity at Bank-Full= 741.72 cfs 15.00' x 2.00' deep channel, n= 0.040 Earth, cobble bottom, clean sides Side Slope Z-value= 3.0 7' Top Width= 27.00' Length= 170.0' Slope= 0.1294 7' Inlet Invert= 276.00', Outlet Invert= 254.00' Reach DC-WI: West Inlet Hydrograph ❑ Inflow 79.28 cfs ❑outflow 85 Inflow Aria=10.790 ac 80 77.94 cfs Avg. Depth=0.56' 75 ; 70 65 ' Max Vet=8.42 fps 60 55 n=0.040 L ,� 50 3 45 =170.0'�,' LL S=0.1294 '/' 0 40 . 35 30 Capacity=741 .72 cfs 25 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 68 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Inflow Area = 7.825 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 57.43 cfs @ 12.00 hrs, Volume= 2.813 of Outflow = 36.33 cfs @ 12.10 hrs, Volume= 2.078 af, Atten= 37%, Lag= 6.0 min Primary = 9.29 cfs @ 12.10 hrs, Volume= 1.669 of Secondary= 27.04 cfs @ 12.10 hrs, Volume= 0.409 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 287.59' @ 12.10 hrs Surf.Area= 13,565 sf Storage= 51,209 cf Plug-Flow detention time= 107.2 min calculated for 2.072 of(74% of inflow) Center-of-Mass det. time= 45.4 min ( 822.2- 776.8 ) Volume Invert Avail.Storage Storage Description #1 283.00' 56,831 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 283.00 7,600 0 0 284.00 10,080 8,840 8,840 286.00 11,968 22,048 30,888 288.00 13,975 25,943 56,831 Device Routing Invert Outlet Devices #1 Primary 283.00' 15.0" x 40.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 280.00' S= 0.0750 7' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 283.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.110 0.110 #3 Device 1 286.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 287.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=9.29 cfs @ 12.10 hrs HW=287.59' (Free Discharge) L1=Culvert (Inlet Controls 9.29 cfs @ 7.57 fps) 2=Skimmer (Passes < 0.11 cfs potential flow) t3=Orifice/Grate (Passes < 19.07 cfs potential flow) Secondary OutFlow Max=26.83 cfs @ 12.10 hrs HW=287.59' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 26.83 cfs @ 2.07 fps) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 69 HydroCAD®8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond 3P: SB-B Hydrograph 57.43 c fs ■ Inflow ■Outflow r OW _ ■ Primary nfl A ria 7.$25C ■Secondary Pea lev"287-.5'9' - 60 ,- k E', ; ; r 55 Stofagie=51-,209 Cf 50 45- 36.33 cfs 40 %i 35 r., 30U. 27.04 cfs 0 25 20 ----, 15 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 70 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-1: [57] Hint: Peaked at 269.80' (Flood elevation advised) [61] Hint: Submerged 7% of Reach DC-S1 bottom [61] Hint: Submerged 21% of Reach DC-S2 bottom Inflow Area = 15.370 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 116.29 cfs @ 12.00 hrs, Volume= 5.515 of Outflow = 116.29 cfs @ 12.00 hrs, Volume= 5.515 af, Atten= 0%, Lag= 0.0 min Primary = 116.29 cfs @ 12.00 hrs, Volume= 5.515 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 269.80' @ 12.00 hrs Device Routing Invert Outlet Devices #1 Primary 263.00' 36.0" x 60.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 260.00' S= 0.05007' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 268.40' 4.00'W x 0.75' H Vert. Orifice/Grate X 8.00 C= 0.600 Primary OutFlow Max=115.73 cfs @ 12.00 hrs HW=269.79' (Free Discharge) L1=Culvert (Passes 115.73 cfs of 138.14 cfs potential flow) L2=Orifice/Grate (Orifice Controls 115.73 cfs @ 4.82 fps) Pond DI-1: Hydrograph 130 ❑Inflow S ❑Primary 120 116.29 cfs Inflow Area=15.370 ac 110 Peak Elev=269.80' 100 90 80 w u 70 0 60 LL 50 40 30 20 10 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 71 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond DI-2: [57] Hint: Peaked at 283.95' (Flood elevation advised) Inflow Area = 10.790 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Outflow = 79.28 cfs @ 12.01 hrs, Volume= 3.866 af, Atten= 0%, Lag= 0.0 min Primary = 79.28 cfs @ 12.01 hrs, Volume= 3.866 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 283.95' @ 12.01 hrs Device Routing Invert Outlet Devices #1 Primary 279.00' 36.0" x 65.0' long Culvert X 2.00 RCP, mitered to conform to fill, Ke= 0.700 Outlet Invert= 276.00' S= 0.0462 7' Cc= 0.900 n= 0.011 Concrete pipe, straight&clean #2 Device 1 283.50' 4.00' x 1.00' Horiz. Orifice/Grate X 8.00 Limited to weir flow C= 0.600 Primary OutFlow Max=77.37 cfs @ 12.01 hrs HW=283.94' (Free Discharge) L1=Culvert (Passes 77.37 cfs of 111.46 cfs potential flow) L2=Orifice/Grate (Weir Controls 77.37 cfs @ 2.18 fps) Pond DI-2: Hydrograph ,flow g ❑Primary 85 79.28 cfs Inflow Areia=10. 90 �c 80 75 Peak Elev=2$3.95' 70 65 60 55 w 50 . u 3 45 LL 40 35 30 25 20 15 r 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 72 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Inflow Area = 13.122 ac, Inflow Depth > 4.31" for 100-YR, 24-HR event Inflow = 95.98 cfs @ 12.00 hrs, Volume= 4.717 of Outflow = 38.75 cfs @ 12.14 hrs, Volume= 3.197 af, Atten= 60%, Lag= 8.7 min Primary = 12.62 cfs @ 12.14 hrs, Volume= 2.665 of Secondary= 26.14 cfs @ 12.14 hrs, Volume= 0.533 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 315.58' @ 12.14 hrs Surf.Area= 23,265 sf Storage= 98,904 cf Plug-Flow detention time= 125.0 min calculated for 3.187 of(68% of inflow) Center-of-Mass det. time= 57.9 min ( 834.8- 776.9 ) Volume Invert Avail.Storage Storage Description #1 310.00' 108,881 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 310.00 11,000 0 0 312.00 16,600 27,600 27,600 314.00 20,314 36,914 64,514 316.00 24,053 44,367 108,881 Device Routing Invert Outlet Devices #1 Primary 311.30' 18.0" x 80.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 304.80' S= 0.08137' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 311.30' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.230 0.230 #3 Device 1 314.00' 3.00' x 3.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 315.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=12.61 cfs @ 12.14 hrs HW=315.57' (Free Discharge) L1=Culvert (Inlet Controls 12.61 cfs @ 7.13 fps) 2=Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 54.34 cfs potential flow) Secondary OutFlow Max=25.75 cfs @ 12.14 hrs HW=315.57' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 25.75 cfs @ 2.04 fps) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 73 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-A: SB-A Hydrograph IMInflow utflow' �� ac105 -lnflow',Ar�a— 3.1' rimary econdary 100 -Peak Elev=315.5$1- - 95 + - - ---,- - - - -St aragE=9 85 .' ----------------------- 8,904',cf 80 -----r---------- -----r----------r----- 75 70 - -------- ---------------- ----------r----- 65 - - - , - - - - - - - - - - - - 60 - - --- - - c50 75 cfs 55 38. - - { - - - - - -', 45 40 + + 35 30 26.14 cfs 25 r---;---- -- 1 cfs 20 15 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 74 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Inflow Area = 8.178 ac, Inflow Depth > 4.32" for 100-YR, 24-HR event Inflow = 63.96 cfs @ 11.98 hrs, Volume= 2.942 of Outflow = 34.32 cfs @ 12.07 hrs, Volume= 2.157 af, Atten= 46%, Lag= 5.9 min Primary = 9.26 cfs @ 12.07 hrs, Volume= 1.777 of Secondary= 25.05 cfs @ 12.07 hrs, Volume= 0.380 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 253.57' @ 12.07 hrs Surf.Area= 16,539 sf Storage= 57,095 cf Plug-Flow detention time= 110.6 min calculated for 2.150 of(73% of inflow) Center-of-Mass det. time= 47.9 min ( 823.1 - 775.2 ) Volume Invert Avail.Storage Storage Description #1 249.00' 64,350 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 249.00 500 0 0 250.00 12,000 6,250 6,250 252.00 14,500 26,500 32,750 254.00 17,100 31,600 64,350 Device Routing Invert Outlet Devices #1 Primary 249.00' 15.0" x 50.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 248.00' S= 0.02007' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 249.10' Skimmer Head (feet) 0.00 0.10 10.00 Disch. (cfs) 0.000 0.100 0.100 #3 Device 1 252.00' 24.0" Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 253.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=9.22 cfs @ 12.07 hrs HW=253.53' (Free Discharge) L1=Culvert (Inlet Controls 9.22 cfs @ 7.51 fps) 2=Skimmer (Passes < 0.10 cfs potential flow) t3=Orifice/Grate (Passes < 18.71 cfs potential flow) Secondary OutFlow Max=22.89 cfs @ 12.07 hrs HW=253.53' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 22.89 cfs @ 1.96 fps) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 75 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-D: SB-D Hydrograph 63.96 cfs ■ Inflow ■Outflow p I� �s 70 Area=8.-17 ac Primary Inflow ■ Prim ■Secondary 65, Peak Ellev 253-.57' - 60 55 Storage= 7,095 d 50 45 34.32 cfs 40 -- --- ---------- -----�r---------- ----- ----- g35 --- ----- ---- -- ---- --- --- --- --- --- --- u. 30 ----- 25.05 cfs 25 20 15 cfs 10 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 76 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: [61] Hint: Submerged 94% of Reach DC-El bottom [61] Hint: Submerged 26% of Reach DC-WI bottom Inflow Area = 26.160 ac, Inflow Depth > 4.30" for 100-YR, 24-HR event Inflow = 192.03 cfs @ 12.01 hrs, Volume= 9.375 of Outflow = 57.00 cfs @ 12.19 hrs, Volume= 6.176 af, Atten= 70%, Lag= 10.3 min Primary = 25.76 cfs @ 12.19 hrs, Volume= 5.378 of Secondary= 31.23 cfs @ 12.19 hrs, Volume= 0.798 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 259.65' @ 12.19 hrs Surf.Area= 45,533 sf Storage= 204,504 cf Plug-Flow detention time= 130.3 min calculated for 6.156 of(66% of inflow) Center-of-Mass det. time= 61.6 min ( 841.0- 779.3 ) Volume Invert Avail.Storage Storage Description #1 254.00' 220,500 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 254.00 28,400 0 0 256.00 33,600 62,000 62,000 258.00 39,000 72,600 134,600 260.00 46,900 85,900 220,500 Device Routing Invert Outlet Devices #1 Primary 254.00' 24.0" x 60.0' long Culvert CPP, projecting, no headwall, Ke= 0.900 Outlet Invert= 253.00' S= 0.01677' Cc= 0.900 n= 0.018 Corrugated PE, corrugated interior #2 Device 1 254.50' 5-in Skimmer Head (feet) 0.00 0.01 0.10 1.00 10.00 Disch. (cfs) 0.000 0.230 0.230 0.230 0.230 #3 Device 1 258.00' 4.00' x 4.00' Horiz. Orifice/Grate Limited to weir flow C= 0.600 #4 Secondary 259.00' 22.0' long x 20.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=25.74 cfs @ 12.19 hrs HW=259.65' (Free Discharge) L1=Culvert (Inlet Controls 25.74 cfs @ 8.19 fps) 2=5-in Skimmer (Passes < 0.23 cfs potential flow) t3=Orifice/Grate (Passes < 98.84 cfs potential flow) Secondary OutFlow Max=30.70 cfs @ 12.19 hrs HW=259.65' (Free Discharge) t-4=Broad-Crested Rectangular Weir (Weir Controls 30.70 cfs @ 2.16 fps) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Expansion 2023 ARBD Expansion 2023 Type 1124-hr 100-YR, 24-HR Rainfall=7.56" Prepared by{enter your company name here} Page 77 HydroCADO 8.00 s/n 004004 ©2006 HydroCAD Software Solutions LLC 2/17/2023 Pond SB-E: Hydrograph fl192.03 cfs ❑ Inflow ❑Outflow Inflow Area=26.160 ac ❑ Primary ❑Secondary 200 Peak Elev=259.65' 180 Storage=204,504 cf 160 140 120 0 100 57.00 cfs 80 60 40 31.23 cfs s 20 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design drainage channels,ditches,etc.to handle stormwater flow from the design storm(s). The main design criteria will be to ensure that all drainage channels,ditches,etc.will be able to accommodate the peak discharge from the design storm without overtopping and without exceeding the allowable shear stress and/or velocity of the selected channel lining. REFERENCES: Federal Highway Administration(2001),Urban Drainage Design Manual,Hydraulic Engineering Circular No.22,FHWA NHI-01-021,Second Ed.,U.S.Dept.of Transportation,Washington,D.C. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. Pennsylvania DEP Bureau of Watershed Protection(2000),Erosion and Sediment Pollution Control Program Manual. ANALYSIS: The following approach is used in the design of drainage channels: 1- Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). For permanent linings(Grass,TRM,rip rap,gabions,etc.)use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. For grass lined channels,a smaller design storm(2-Yr 24-Hr- unless otherwise specified)is used to evaluate temporary linings. 2- Input other design parameters(bottom width;side slopes;minimum freeboard,min./max. slopes;and channel lining). 3. Based on the design parameters calculate normal depth of flow,velocity,Froude number,and maximum shear stress for both max./min.slopes. Also determine the critical slope and corresponding normal depth. 4. Compare the velocity and/or shear stress to allowable values(the maximum slope val ues will control). If val ues are exceeded,revise design parameters as required. 5. Based on normal depth values and required freeboard(generally use the greater of 6 inches or 25%of the flow depth),determine the minimum channel depth and top width for both max./min. slopes(the minimum slope values will control). 6. If the channel has a significant curved reach,evaluate the shear stress and superelevation of the water surface in the bend. CALCULATIONS: Manning's Equation: 1.49AR2'3S"2 AV (HEC-22 Eq.5-5) Q= = n where: Q = discharge(cfs) n = Manning's roughness coefficient(See Below) A = cross sectional area of flow(ft2) R = hydraulic radius(ft)=A/P P = wetted perimeter S = slope of channel(ft/ft) V = average channel velocity(ft/sec) SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Maximum Shear Stress(Tractive Force Method zd = ),d,S' (HEC-22 Eq.5-13) where: ro = maximum shear stress on channel lining(psf) y = unit weight of water(62.4 pcf) d = maximum depth of flow(ft) S = channel slope(ft/ft) Froude Number: v Fr= TTA where: F, = Froude number(dimensionless) v = flow velocity(ft/sec) g = acceleration of gravity (32.2 ft/sec`) A = cross-sectional area of flow(ft`) T = top width of flow(ft) Note that A/T=the hydraul is depth(D).For Fr>1.0,flow is supercritical;Fr<1.0,flow is subcritical;Fr=1.0,flow is critical. Critical Slope: The critical slope(Sj is the slope at which Fr=1.0. When the slope is between 0.7S.and 1.3S.,unstable flow may occur as small flow disturbances can initiate a change in the flow state. If slopes are within this range,consider additional freeboard. Manning's Roughness Coefficient(nl: Gr ass: R ve n= (HEC-22 Eq.5-6-5-10) [K+ 19.971og(R'4So.4)] where: R = hydraulic radius(ft) K = vegetative coefficient(depending on retardance class) =15.8(Class A) =23.0(CA ass B) =30.2(G ass C) =34.6(CA ass D) =37.7(G ass E) S = slope of channel(ft/ft) Rip Rap: 1/6 n= Y (PA DEP Manual Fig.3) 21.6 log(d 5 + 14 o where: y = depth of flow(ft) 050 = median size of rip rap(ft) SMITH GARDNER SMITH GARDNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 3 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Curved Channels(Where Applicable Shear Stress in Bend: zh = Khzd (HEC-22 Eq.5-15) where: r o = bend shear stress(psf) Kb = function of Rc/B(use HEC-22 Chart 21) ro = maximum shear stress on channel lining(psf) Fc = radius to the centerl ine of the channel (ft) B = bottom width of channel (ft) Superelevation at Outside of Bend: T, T Z (HEC-22 Eq.5-11 modified) A d= 0.5 gR,. where: A 0 = superelevation of water surface between the outer channel bank and the centerline of the channel (avg.water surface before bend)(ft) V = average channel velocity(ft/sec) T = top width of flow(ft) g = acceleration of gravity (32.2 ft/sec2) A, = radius to the centerl ine of the channel (ft) Allowable Shear Stress/Velocity: Grass-Lined Channels: For grass-lined channels,an allowable velocity approach is applicable for slopes flatter than 10%. For slopes of 10%and steeper appropriate permanent linings should be used. For use in the evaluation of curved channels,the following allowable shear stress values(lb/ftz)can be assumed based on retardance cl ass: Gass A: 3.7 Gass B: 2.1 G ass C: 1 Gass D: 0.6 CA ass E: 0.35 Rip Rap-Lined Channels: For rip rap-lined channels,an allowable velocity approach is applicable for slopes flatter than 10%(see table below). For slopes of 10%or steeper,use the following equation: zaz/'_ = 4 x dso (HEC-22 Eq.5-17) where: ra„ow = allowable shear stress(psf) 050 = median size of rip rap(ft) SMITH GARDNER SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 4 OF 9 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drainage Channel Analysis JOB# ARBD-21-1 CHECKED BY SAS Riprap Gradation, Filter Blanket Requirements,Maximum Velocities Graded Rock Size in Filter Blanket Re uirements** Placement Vmax NSA No. Max. deo* Min. Size NSA No. Thickness (ftlsec R-1 1.5 .75 No FS-1 NIA 2.5 R-2 3 1.5 1 FS-1 NIA 4.5 R-3 6 3 2 FS-1 3 6.5 RA 12 6 3 FS-2 4 9.0 R-5 18 9 5 FS-2 6 11.5 R-6 24 12 7 FS-3 8 13.0 R-7 30 15 12 FS-3 10 14.5 The d5o stone size is the size exceeded by 50%of the total weight of the tonnage shipped(i.e. 50% by weight shall consist of pieces larger than the d5o stone size"). ** This is a general standard. Soil conditions at each site should be analyzed to determine actual filter size. A suitable woven or non-woven geotextile underlayment, used according to manufacturer's recommendations,may be substituted for the filter stone. Ref• PA DEPManua)Table 5 Reno Mattress or Gabion-Lined Channels: For Reno mattress or gabion-lined channels,use allowable velocityfor slopes flatter than 10%and allowable shear stress for slopes of 10%or steeper(see table below). Maximum Permissible Velocities for Reno Mattress &Gabions Permissible* Permissible** Thickness Rock Fill Shear Stress Type n Inches Gradation in Velocity(fps) Iblft2 025-.030 6 3-6 6.0 8.35 Reno .025-.030 6-10 3-6 12.0 8.35 Mattress 025-.030 10-12 3-6 15.0 8.35 025-.030 1 12-18 1 4-6 1 18.0 1 8.35 Gabion .027 1 >18 1 5-9 22.0 8.35 * Permissible velocities may be increased by the introduction of sand mastic grout. Refer to manufacturer's recommendations/specifications for permissible velocities and for recommendations regarding filters or geotextile fabric underlayment when using Reno mattresses or gabions for channel linings. **Based on vegetation completely grown. Ref. PA DEPManua/Table 95 SMITH GARDNER SMITH GARNER,INC. DRAINAGE CHANNEL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF d o } 3 Q N 3 3 3 3 3 t 3 0 O O O T 3 m N T z 3 u u v 3 3 W Q m m fD m 3 a a o y� o N N OI 0' A V Ut O U �p'�p1 D O CO u T N �I o u a T N N m N O O 5 A m V >• = � ry £ w � E y y c m m z � � 3 3 n a N 43 c g o 01 O o 0 �° m � w 3. w o m o W W P w z N ^ ~ 3 w A N N o (NO m o N fT O C O N O K W z 3 - Q o y 0 N — N 2 m Co G W W o 00 W ~ N w G ~ T O O N 3 � � _ Q ti = ti m a S. 0 N r N EF � II II OC £II II II 11 O C W m m EF E\ N < z m 3 0 J V \ O N T 3 Z T N N O 3 3 � n a w co in yl 3 - Ic V Q m C C y mT 0 0 o yj n. O R 2 SQj n w Iv y 3 < G N m ^ z O T m 4 m m o £ TV g z 6oy$Mm £n n n II �mr7r xM z O O n N O N 3 m 3 » T T 0 m m 7QC 7C 7C 3 c O 0 z n A g z m 0 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF _ d o f} Q 3 3 3 3 c t 3 o N c c c 3 rn a ^ ° 2 b o cLi 2 � � o 3 o o o o T 3 m N � m ° m fD m 3 a a o y� o N m w » Pi w w vt R ? ° �o �p'I SL 3< .Z7 DA o u T N �I iD N a T N N m N O O S m O _ co £ w f y y Q m m z r 3 3 @ a N N W R o C w w P 8 Y 5 3 J M W G O N O C O Q o y pp �yO o P m _ _ N o N 2 m cc 00 J KV Y S A ~ S O O ^ W OJ O N N N C C 3 � � _ Q R ti o ti m a P = u IN � II II OC £II II II 11 O m f m f c o W m m EF m T 3 Z T NN x 3 O V - Ic V Q m w Iv y Q � z o £ TV g m m z �oy$Mm £n n n II �mr7r xM z - 3 ° �• Z o 0 3 .t 7C 7C 3 0 z n g z o 0 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF R 3 3 0 J c o c 3 Pg < B, c 3 N n 9 J O N C O O N C > > X 3 co o s 3 m y m o o rfDn ICL 3 3 r 7 J s . m O J 3 0 c V) SQ 3 m m 3 J A O O i M f/) 7 m m f F co y o ? m m 3 a w tb Z 3 > > — N V J W N 0 O W W ()1 N m J D: J m � 3 A A ID ID pJ m J iv ti � o N 1 m J 0 0 O y > y N y N J A A J M J i � r A ^. o N O m o — 4. ^ J m o m u u n u S N N W O S �p o_ N c m < c T N o T c w �? 2 m m o fD ovy$M wmmu� z - � � d m O O 3 P 0 S" a 0 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Eg R 3 3 0 o c o c 3 Pg < B, c 3 N n 9 (D O N C O O N C > > X r 7 3 � 3 ' o c V 3 'Oo a° m r m e f F y y o m m 5 m m 3 a w tb Z 3 > > io — � v � o o N 'O � A 70N N E N O� o N N N W a G O. T C i d o tk Q 3 °c o a P c c w m o fD ovy$ wmmu� z - � � d m O O 3 P 0 S" a 0 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF o f} Q 3 3 3 3 3 3 m a O� O O , N � ^ w Vt R ° y �p'�pI O O 5 m Q o H - - < < m m N C C 3 � � R o < R o < � II II OC £II II II 11 O 4NN� W m m m T � 3 - Ic V £n n n II �mr7r x� D o Q - 3 T N » � x 7Qc x x 3 0 z n g z m 0 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 3 DATE 12/5/2022 COMPUTED BY JCL SUBJECT Drop Inlet Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design drop inlets to handle stormwater flow from the design storm(s). The main design criteria wil I be to ensure that all drop inlets will be able to accommodate the peak rate of run off from the design storm without exceeding the allowable headwater depth. REFERENCE: Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. ANALYSIS: The following approach is used in the design of drop Inlets: 1. Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). Use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. 2. As appropriate,analyze the inlet structure as a weir-type inlet and/or grated inlet. 3. Analyze the outlet structure separately by evaluating its behavior as a culvert. CALCULATIONS: Weir-Type Inlet=>Use the Weir Equation: Q= CW LH312 (Malcom Eq.1-6) where: Q = peak discharge(cfs) Ca = weir coefficient(=3.0 for free overfal l) L = length of weir(ft) H = driving head(ft) (=allowable headwater above crest of weir) Grated Inlet=>Use the Orifice Equation: Q= Cd A 2gh (Malcom Eq.1-7) where: G = peak discharge(cfs) Cd = coefficient of discharge(0.6=typical value) A = cross-sectional area of flow at orifice entrance(ft) 9 = acceleration of gravity(32.2 ft/seC2) h = driving head(ft)(=allowable headwater above grate) SMITH GARNER,INC. DROP INLET SG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2/3 JOB# ARBD-21-1 SUBJECT Drop Inlet Analysis DATE 12/5/2022 COMPUTED BY JCL CHECKED BY SAS Drop Inlet No.: DI-1(x2) Peak Discharges PEAK DISCHARGE,Q25(cfs)= 83.8 Source: HydroCAD 25-Yr 24-Hr Drop Inlet Parameters: Weir Coefficient= 3.0 Coefficient of Discharge(Orifice)= 0.6 Allowable Driving Head(ft)= 1.5 Weir-Tyne Inlet: L(ft)= 32 Q(cfs)= 176.4 SMITH GARDNER SMITH GARNER,INC. Di-1 DROP INLET SG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 3/3 JOB# ARBD-21-1 SUBJECT Drop Inlet Analysis DATE 12/5/2022 COMPUTED BY JCL CHECKED BY SAS Drop Inlet No.: 13I-2(x2) Peak Discharges PEAK DISCHARGE,Q25(cfs)= 56.9 Source: HydroCAD 25-Yr 24-Hr Drop Inlet Parameters: Weir Coefficient= 3.0 Coefficient of Discharge(Orifice)= 0.6 Allowable Driving Head(ft)= 1.5 Weir-Tyne Inlet: L(ft)= 32 Q(cfs)= 176.4 SMITH GARDNER SMITH GARNER,INC. Di-2 DROP INLET SG DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 18 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design a sediment basin(s)to satisfy erosion and sediment control requirements and to handle the flow from the design storm. REFERENCES: American Concrete Pipe Association(1996),"Design Data 41 - Manhole Floatation",ACPA,Irving,TX. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NC State Univ., Raleigh,NC. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,NC. Virginia Department of Conservation and Recreation(1992),Virginia Erosion&Sediment Control Handbook,Third Edition,Richmond,VA. ANALYSIS: The following approach is used to properly size and evaluate each sediment basin: 1. Design for Wet(If Applicable)and Dry Storage. 2. Route Design Storm. 3. Design Outlet Structures(Design Riser/Barrel Structures and Perform Riser Base Calculations, Anti-Seepage Collar Calculations,&Emergency Spillway Calculations). CALCULATIONS: Design for Wet(If Applicable)and Dry Storage: Determine required wet(if applicable)and dry storage volumes based on applicable erosion and sedimentation control requirements. If applicable,calculate the desired surface area at the principal spillway. For some locations: A= 0.01Qf, where: A = desired surface area(acres) G F = peak discharge from design storm(cfs) (NC- Use 10-yr 24-hr storm;C4- Use 2-yr 24-hr storm) Set up a stage-storage relationship for the proposed basin as shown below. Based on this relationship and the required volume(s)and/or desired surface area,determine the required wet storage(if applicable)and dry storage elevations. Alternatively the elevation(s)can be determined from a graphical stage-storage relationship. S= KZ' (Malcom Eq.III-7) where: 5 = storaqe volume(ft) K b = linear regression constants describing the stage-storage relationship z = stage referenced to the bottom elevation included in the analysis(ft) Set sediment basin cleanout elevation. SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2 OF 18 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Size the outlet device to release the dry storage volume(WON/)over the desired drawdown period(typical ly this is a minimum of 24 hours). Use the following equation: As 2h (from Original Edition of NCE&SCP&DM) A TCd(20,428) where: A, = surface area of dewaterinq hole(s)(ft) A s = surface area of basin(at principal spillway)(ft) h = average head of water above hole(_(elev.of principal spillway-elev.of wet storage or(if not applicable)bottom of basin)/2)(ft) C o = coefficient of contraction(=0.60) 7 = detention time(hrs.)(vary over recommended limits) Select a standard pipe size and number of holes. Verifythat the projected drawdown period is within the recommended limits. Where desired,size a drain for the basin for maintenance. The drain should dewater the basin(to principal spillway)within 24 hours. Use the above equation to determine Ao of the basin drain. The inlet of the drain should be protected from the sediment storage zone. Evaluate basin shape. Compare with the recommended length to width ratio. If this ratio is not achieved,the basin should be modified or baffles should be added as required. Route Design Storm: Route the design storm through the basin and determine the maximum pool elevation and the peak discharge(via HydroCAD,spreadsheet methods,or other). Depending on local requirements,multiple design storms may need to be considered and the peak discharge may need to be compared with the pre-development value. Based on the peak stage of the design storm,check settling efficiency of the design particle. The design particle is typically40 microns(0.04 mm)(within silt size criteria). Settling Velocity of Design Particle V = g �(S S _ 1)]d2 (Malcom Eq.IV-3) 18 v J where: �� = settling velocity(ft/s) -convert from(m/s) 9 = gravitational acceleration(m/s2) 55 = specific gravity of design particle V = kinematic viscosity ofthefluid(m2/s) (=1.14 x 10-6 mz/s(a�15C- Ref.Streeter,1975) a = diameter of design particle(m) Surface Area As = WsZ(b-1) (Malcom Eq.IV-7) where: A, = surface area at given stage(Z)(ft) Ks,b = linear regression constants describing the stage-storage relationship SMITH GARDNER SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 3 OF 18 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Settling Efficiency E= 1- L1+ VOAS1 N (Malcom Eq.IV-1) NQ J where: E = settling efficiency(decimal fraction-convert to%) A a = surface area at given stage(Z)(ft) N = number of effective cells(N=2 with forebay) G = discharge at given stage(Z)(cfs) -Design of Outlet Structures: Design riser/barrel structures based on information used in routing the design storm. Design base for riser structure to resist design uplift force. Base must have a buoyant weight of at least the design uplift force. If a concrete riser structure is used,the buoyant weight of the riser can be accounted for in the calculations. Design Uplift Force(otQ T — WTop — Wsott — Rsotr (from VAE&SCH Spec.3.14) F= (FS)V, ,,-,,, — WRfser where: TF = design uplift force(I bs) FS = factor of safety(use 1.25) VRiser = interior volume of the riser(ft2)(base elevation to principal spillwayelevation) VH2c = density of water(62.4 pcf) WRiser buoyant weight of riser(not including base or top)(Ibs) WTop = buoyant weight of riser top(Ibs) Wso;i = buoyant weight of soil backfill around riser(above base projection)(Ibs) Rso;i = sliding resistance of soil backfill around riser(Ibs)' See American Concrete Pipe Association Design Data 41 for more information. Volume of Concrete for Base V on = T F T F (from VAE&SCH Spec.3.14) W,_,, (150- 62.4) where: t' volume of concrete(ft) W coic6 = buoyant weight of concrete(150-62.4=87.6 I bs) Anti-Seepage Col lar(s) Determine anti-seepage collar requirements based on the following equation. Alternatively,a filter diaphragm maybe designed. LS = y z+ 4)1 1+ 0.25- s�IJ (VA E&SC Handbook p.1II-102) where: L, = length of pipe in the saturated zone(ft) y = distance from barrel invert to riser crest(ft) 2 = slope of upstream embankment(zH:1V) s = pipe slope(ft/ft) SMITH GARDNER SMITH GARNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 4 OF 18 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Sediment Basin Analysis JOB# ARBD-21-1 CHECKED BY SAS Determine Ls and use design chart to determine anti-seepage collar requirements. If more than one col lar is used, the spacing between collars should be 14 times the projection(P)of the collar above the barrel. The first collar should beset at 2P from the riser or a minimum length to bury collar in slope. Emergency Spillway Design crest length of emergency spillway to handle flow from the design storm using the following equation. Determine peak flow from stormwater routing program. If applicable,design outlet channel as a drainage channel or rock chute. QP = CIILH312 (Malcom Eq.1-6) where: C F = peak discharge from design storm(cfs) C w = weir coefficient(=3.0 for free overfal I) L = length of weir(ft) h = driving head(ft) (=allowable headwater above crest of weir or calculated value from stormwater routing program) SMITH GARDNER SMITH GARDNER,INC. SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 5/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY SAS Basin No.: DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAOE: Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 13.1 Total= 13.1 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft3/Ac.) 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0.0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity(ft3/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 47,232 Multipier(X)for Desired Surface Area(OP x X) 0.01 Al(rest of Principal Spillway Peak Discharge into Basin(Op)(cfs)=� 53.1 From HydroCAD-10-Yr,24-Hr.Storm Desired Surface Area(Ac)= 0.53 Desired Surface Area(ft')= 23,143 Determine Staae-Slorage Function: Contour Area Area Incremental Curl Stage InS InZ Zest (ft2) (acres) Vol ume(ft) Volume(ft') (ft) 311 11,000 0.25 0 0.0 312 16,600 0.38 20,700 20,700 1.5 9.94 0.41 1.50 314 20,314 0.47 36,914 57,614 3.5 10.96 1.25 3.47 316 24,053 0.55 44,367 101,981 5.5 11.53 1.70 5.53 Linear Regression Constants: Ks= 12,551 Storage=12551 e1.22 b= 122 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 317 317 316 316 315 315 314 314 C K a 313 a 313 N N 312 312 311 311 310 310 0 5,000 10,000 15,000 20,000 25,000 30,000 0 20,000 40,003 60,000 60,000 10o0o0 120,000 surface Area(sf) storage(cf) SMITH GARDNER SMITH GARDNER,ING Basin A SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 6/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY SAS Basin Design Devations• EI ev.of Bottom of Basin(ft)= 311.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 311.0 Selected Elev.of Wet Storage(Permanent Pool)= 311.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 47,232=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 314.0 Selected Bev.of Principal Spillway(ft)= 314.1 O.K. Actual Total Storage Volume(ft')= 50,181 O.K. Desired Surface Area(ft')= 23,143 Actual Surface Area at Principal Spillway(ft')= 19,828 No Good.Increase Surface Area at Permanent Pool If Possible. aeanout: Cleanout Requirement(%of Wet Storage)= 50 Enter"0"if Not Applicable Geanout Requirement(%of Total Storage)= Basin Cleanout Volume(ft')= 0 Based on 50%of Wet Storage Volume Basin Geanout Elevation(ft)= 311.0 Dewstering of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 50,181=Volume at Principal Spillway Required Orifice Diameter(in)= 4.0 From www.fsirclothskimmer.00m Based on 5 Day Drawdown Basin Shape• Length of Basin(ft)= 200 Measured at Principal Spillway Elevation Width of Basin(ft)= 100 Measured at Principal Spillway Elevation Desired Length to Width Ratio(X1)= 2 Actual Length to Width Patio(X1)= 2.0 O.K. SMITH GARDNER SMITH GARDNER,INI1 basin A SED BASIN-GENERPL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill SHEET 7/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY SAS ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:10-Yr,24-Hr Design Storm Rainfall(in)=5.11 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 314.2 Surface Area at Maximum Pool(ft')= 19,970 Peak Discharge(ds)= 3.8 Check Settling Efficiency Particle Data: Diam.(microns)= 40 Specific Gravity= 2.65 Settl ing Val oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cal Is= 3 Settling Efficiency(%)= 99.80.K. DESIGN OUTLETSTRUCTURES• Design Riser/Barrel Structures, Riser Desicm Type of Riser:Concrete-Rectangular Top of Riser Base Elevation(ft)= 310.0 Elev.of Principal Spillway(ft)= 314.1 Riser Top Elevation(ft)= 314.0 Riser Height(ft)= 4.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Size:3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 312.1 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:3.0'x 3.0' Invert Elevation: 312.0 Concrete Riser Wall Thickness(in)= 6.0 2.5 Riser Inside Length(ft)= 3.0 Riser Inside Width(ft)= 3.0 Approx.Red.Concrete Riser Interior Volume(cf)= 37 Approx.Red.Concrete Riser Vol.of Concrete(d)= 29 Barrel Desicm Type of Barrel: HOPE Diameter(in)= 18 Inv.In Elevation(ft)= 311.3 Inv.Out Elevation(ft)= 304.8 Length(ft)= 80.0 Slope(ft/ft)= 0.081 SMITH GARDNER SMITH GARDNER,ING Basin A SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 8/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY SAS Poser Base Calculations, Design Uplift Force Factor of Safety= 1.25 F(unadjusted)(lbs)= 2,878 0 Approx.Rect.Concrete Riser Buoyant Wt.(I bs)= 2,011 Factors in 80%of the Buoyant Weight of the Concrete Riser to Account for Outlets. 0 0 Buoyant WI.of Riser Top(I bs)= 0 Buoyant Wt.of Surrounding Soil Acting on Ext.Base(I bs)= 0 Sliding Resistance of Surrounding Soil(I bs)= 0 F(adj usted)(I bs)= 867 Concrete Base: Required Volume of Concrete(ft')= 9.9 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 0.5(includes Concrete III Inside of Box) Actual Volume of Concrete(ft')= 12.5 OK. Anti-Seepage Collar Calculations:(Alternatively-Design Flltar Dia hr m Slope of Upstream Embankment(zHAV)= 3 Slope of Outlet Pipe(ft/ft)= 0.081 L.(ft)= 41 Number of Collars: 2 Length of Fach Collar(ft)= 4.5 From Design Chart Based on L.and No.of Collars Width of Each Collar(ft)= 4.5 From Design Chart Based on L.and No.of Collars Collar Projection,P(ft)= 1.5 Spacing of Subsequent Anti-Seep Collars(ft)= 21=14P Emergency Spillway Calculations, Crest Elev.(ft)= 315.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 316.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 1(1 24-Hr.Storm;Assume 20 ofs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin A Bev.of Bottom of Basin(ft)= 311.0 Cl eanout FJ ev.(ft)= 311.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 314.1 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 315.0 Top of Bar m El ev.(ft)= 316.0 Top of Berm Width(ft)=- Barrel Diameter(in)= 18 Barrel Slope(%)= 8.1 SMITH GARDNER SMITH GARDNER,ING Basin A MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill SHEET 9/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 7/13/2022 COMPUTED BY JCL CHECKED BY SAS Basin No.:�B DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAOE: Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 7.8 Total= 7.8 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.)= 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 28,170 Multipier(X)for Desired Surface Area(OP x 1)= 0 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)=� 31.8 From HI-10-Yr,24-Hr.Storm - Desired Surface Area(Ac)= 0.32 Desired Surface Area(ft')= 13,852 Determine Stage-Storage Function: Contour Area Area Incremental GLmulffi!ye Stage InS InZ Zest (ft') (acres) Vol ume(ft) Volume(ft) (ft) 283.0 7,600 0.17 0 0.0 284 10,080 0.23 8,840 8,840 1.0 9.09 0.00 1.00 286 11,968 0.27 22,048 30,888 3.0 10.34 1.10 2.97 288 13,975 0.32 25,943 56,831 5.0 10.95 1.61 5.04 Linear Regression Constants Ks= 8,806 Storage=8806 a 1.15 b= 115 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 289 289 288 288 287 287 286 286 C i a 285 9 285 a w 284 284 283 283 282 282 0 5,000 10,000 15,000 0 10,000 20,000 30,000 40,000 50,000 60,000 Surface Area(en Storage(cf( SMITH GARDNER SMITH GARDNER,ING Basin B MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 10/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 7/13/2022 COMPUTED BY JCL CHECKED BY SAS Basin Design Devations• EI ev.of Bottom of Basin(ft)= 283.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 283.0 Selected Elev.of Wet Storage(Permanent Pool)= 283.0 O.K. Actual Wet Storage Volume(ft')= 0 O.K. Dry Storage, Required Storage Capacity(ft')= 28,170=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 285.7 Selected Bev.of Principal Spillway(ft)= 286.0 O.K. Actual Total Storage Volume(ft)= 31,267 OK. Desired Surface Area(ft')= 13,852 Actual Surface Area at Principal Spillway(ft')= 12,021 Increase Surface Area at Permanent Pool if Possible. Oeanout: Oeanout Requirement(%of Wet Storage)= 0 Enter"0"if Not Applicable Oeanout Requirement(%of Total Storage)= 50 Basin Cleanout Volume(ft')= 15,634 Based on 50%of Total Storage Volume Basin Cleanout Elevation(ft)= 284.6 Dewatering of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 31,267=Volumsat Principal Spillway Required Orifice Diameter(in)= 4.0 From www.fairclothskimmer.com Based on 5 Day Drawdown ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:10-Yr,24-Hr Design Storm Rainfall(in)=5.11 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 286.4 Surface Area at Maximum Pool(ft')= 12,226 Peak Discharge(GIs)= 4.5 Check Settling Efficiency, Particle Data: Dian,(microns)= 40 Specific Gravity= 2.65 Settl ing Vel oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 1 Settling Efficiency(%)= 91.9 OK. SMITH GARDNER SMITH GARDNER,ING Basin B MD BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 11/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 7/13/2022 COMPUTED BY JCL CHECKED BY SAS DESIGN OUTLETSTRUCTURES• Design Poser/Barrel Structures, Riser Deal= Typeof Riser:HDPE-Circular Topof Riser Base Elevation(ft)=. 280.0 Elev.of Principal Spillway(ft)= 286.0 Riser Top Elevation(ft)= 282.5 Riser Height(ft)= 2.5 Outlets: Outlet No.1(for Dewatering Dry Storage): Si—3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 283.1 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:24"Diam.Orifice Invert Elevation: 286.0 Riser Inside Diameter(ft)=0 2.0 Approx.are.Riser Interior Volume(cf)= 19 Barrel Design, Type of Barrel: HOPE Diameter(in)= 15 Inv.In Elevation(ft)= 283.0 Inv.Out Elevation(ft)= 280.0 Length(ft)= 40.0 Slope(ft/ft)= 0.075 Poser Base Calculations, Design Uplift Force, Factor of Safety= 1.25 F(unadjusted)(Ibs)= 1,470 0 0 0 HOPE Riser Buoyant Weight(Ibs)= 0 Buoyant WI.of Riser Top(I bat= 0 T x T x 0.6 x Buoyant Wt.of Concrete(87.6 per) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.5')x Buoyant Wt.of Soil(40 pcf) Sl iding Resistance of Surrounding Soil(Ibs)= 0 F(adj usted)(I bat= 1,470 Concrete Base: Required Volume of Concrete(ft')= 16.8 Length Width ' Width(ft)= Thickness(ft)_ Actual Volume of Concrete(ft)= 25.0 OK. Emergency Spillway Calculations, Crest Elev.(ft)= 287.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 288.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 100-W,24-Hr.Storm;Assume 20 cfs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin B Bev.of Bottom of Basin(ft)= 283.0 Cl eanout FJ ev.(ft)= 284.6 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 286.0 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 287.0 Top of Bar m El ev.(ft)= 288.0 Topof Berm Wldth(ft)=_ 10 Barrel Diameter(in)= 15 Barrel Sl ope(%)=' 7.5 SMITH GARDNER SMITH GARDNER,ING Basin B MD BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill SHEET 12/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY sas Basin No.: DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAOE Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 8.2 Total= 8.2 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.)= 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 3,600 To Crest of Principal Spillway Required Storage Capacity(ft')= 29,448 Multipier(X)for Desired Surface Area(Op x 1)= 0 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)=� 35.6 From HI-10-Yr,24-Hr.Storm - Desired Surface Area(Ac)= 0.36 Desired Surface Area(ft')= 15,503 Determine Stage-Storage Function: Contour Area Area Incremental GLmulffi!ye Stage InS InZ Zest (ft') (acres) Vol uma(ft) Volume(ft) (ft) 249.0 500 0.01 0 0.0 250 12,000 0.28 6,250 6,250 1.0 8.74 0.00 0.99 252 14,500 0.33 26,500 32,750 3.0 10.40 1.10 3.09 254 17,100 0.39 31,600 64,350 5.0 11.07 1.61 4.90 Linear Regression Constants' Ks= 6,332 Storage=6332 a 1.46 b= 146 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 255 255 254 254 253 253 252 252 C i ° 251 9 251 N N 250 250 249 249 248 248 0 5,000 10,000 15,000 20,000 0 20,000 40,600 60,000 80,000 Surface Area(sr) Storsge(cf( SMITH GARDNER SMITH GARDNER,ING Basin D MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 13/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JOL CHECKED BY sas Basin Design Devations• EI ev.of Bottom of Basin(ft)= 249.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Elev.of Wet Storage(Permanent Pool)= 249.0 Selected Elev.of Wet Storage(Permanent Pool)= 249.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 29,448=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 251.9 Selected Bev.of Principal Spillway(ft)= 252.2 O.K. Actual Total Storage Volume(ft)= 34,527 O.K. Desired Surface Area(ft')= 15,503 Actual Surface Area at Principal Spillway(ft')= 15,7330.K. aeon"(: Cleanout Requirement(%of Wet Storage)= 0 Enter"0"if Not Applicable Geanout Requirement(%of Total Storage)= 50 Basin Cleanout Volume(ft')= 17,264 Based on 50%of Total Storage Volume Basin Cleanout Elevation(ft)= 251.0 DewAltring of Dry Storage, Option,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 34,527=Volume at Principal Spillway Required Orifice Diameter(in)= 3.0 From www.fairclothskimmer.com Based on 5 Day Drawdown ROUTE DESIGN STORM: Use HydroCAD or Cther Method. Design Parameters, Design Storm:10-Yr,24-Hr Design Storm Rainfall(in)=5.11 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 252.3 Surface Area at Maximum Pool(ft')= 16,001 Peak Discharge(GIs)= 3.9 Check Settling Efficiency, Particle Data: Dian,(microns)= 40 Specific Gravity= 2.65 Settl ing Vel oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 1 Settling Efficiency(%)= 94.5 OK. SMITH GARDNER SMITH GARDNER,ING Basin D MD BASIN-gENERPI ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill SHEET 14/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 5/16/2022 COMPUTED BY JCL CHECKED BY sea DESIGN OUTLETSTRUCTURES• Design Poser/Barrel Structures, Riser Deal= Typeof Riser:HDPE-Circular Topof Riser Base Elevation(ft)=. 250.0 Elev.of Principal Spillway(ft)= 2522 Riser Top Elevation(ft)= 252.0 Riser Height(ft)= 2.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Si—3"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 250.0 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:24"Diam.Orifice Invert Elevation: 252.0 Riser Inside Diameter(ft)=0 2.0 Approx.are.Riser Interior Volume(cf)= 7 Barrel Design, Type of Barrel: HOPE Diameter(in)= 18 Inv.In Elevation(ft)= 249.0 Inv.Out Elevation(ft)= 248.0 Length(ft)= 50.0 Slope(ft/ft)= 0.020 Poser Base Calculations, Design Uplift Force, Factor of Safety= 1.25 F(unadjusted)(Ibs)= 539 0 0 0 HOPE Riser Buoyant Weight(Ibs)= 0 Buoyant WI.of Riser Top(I bat= 0 T x T x 0.6 x Buoyant Wt.of Concrete(87.6 per) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.5')x Buoyant Wt.of Soil(40 pcf) Sl iding Resistance of Surrounding Soil(Ibs)= 0 F(adj usted)(I bat= 539 Concrete Base: Required Volume of Concrete(ft')= 6.2 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 1.0 Actual Volume of Concrete(ft)= 25.0 OK. Emergency Spillway Calculations, Crest Elev.(ft)= 253.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 254.0 Required Capacity(cfs)= 20.0 From HydroCAD-No Outflow from 100-W,24-Hr.Storm;Assume 20 cfs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin D Bev.of Bottom of Basin(ft)= 249.0 Cl eanout FJ ev.(ft)= 251.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 252.2 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 253.0 Top of Bar m El ev.(ft)= 254.0 Top of Berm Wldth(ft)=— 10 Barrel Diameter(in)= 18 Barrel SI ope(%)=�1111111111111.0 SMITH GARDNER SMITH GARDNER,ING Basin D MD BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill Expansion SHEET 15/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS Basin No.:�E DESIGN FOR WET(IF APPLICABLE)AND DRYSTCRAGE Areas Draining Into Basin: Area Drainage Area (acres) Drainage Area 26.2 Total= 26.2 Acres Basin Requirements: Wet Storage, Required Storage Capacity(ft'/Ac.)= 0 Enter"0"if Not Applicable. Required Storage Capacity(ft')= 0 Required Depth of Wet Storage(ft)= 0.0 Enter"0"if Not Applicable. Dry Storage, Required Storage Capacity((('/Ac.)= 1,800 To Crest of Principal Spillway Required Storage Capacity(ft')= 47,088 Multipier(X)for Desired Surface Area(OP x 1)= 0.01 Al(rest of Principal Spillway Peak Discharge into Basin(Cp)(cfs)=� 105.3 From HI-10-Yr,24-Hr.Storm Desired Surface Area(Ac)= 1.05 Desired Surface Area(ft')= 45,882 Determine Stage-Storage Function: Contour Area Area Incremental GLmulffi!ye Stage InS InZ Zest (ft') (acres) Vol ume(ft) Volume(ft') (ft) 254 28,400 0.65 0 0.0 256 33,600 0.77 62,000 62,000 2.0 11.03 0.69 2.01 258 39,000 0.90 72,600 134,600 4.0 11.81 1.39 3.94 260 46,900 1.08 85,900 220,500 6.0 12.30 1.79 6.05 Linear Regression Constants: Ks= 27,751 Storage=27751 el.15 b= 115 'CAUTION:CHECK INPUT FOR REGRESSION ANALYSIS! Stage-Surface Area Relationship Stage-Storage Relationship 261 261 260 260 — 259 259 258 258 257 257 w 256 a 256 255 4: 255 254 254 253 253 0 10,000 20,000 30,000 40,000 50,000 a 50,000 100,000 151 200,000 250,000 Surface Area(sf) Storage(cf( SMITH GARDNER SMITH GARDNER,ING Basin E SED BASIN-GENERAL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill Expansion SHEET 16/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS Basin Design Sevations• EI e,of Bottom of Basin(ft)= 254.0 Wet Storage, Required Storage Capacity(ft')= 0 Min.Bay.of Wet Storage(Permanent Pool)= 254.0 Selected Elev.of Wet Storage(Permanent Pool)= 254.0 OK. Actual Wet Storage Volume(ft')= 0 OK. Dry Storage, Required Storage Capacity(ft')= 47,088=Required Dry Storage+Actual Wet Storage Min.Bev.of Principal Spillway(ft)= 255.6 Selected Bev.of Principal Spillway(ft)= 258.0 O.K. Actual Total Storage Volume(ft)= 136,840 O.K. Desired Surface Area(ft')= 45,882 Actual Surface Area at Principal Spillway(ft')= 39,374 No Good.Increase Surface Area at Permanent Pool If Possible. ■ DewAtiring of Dry Storage, Lotion,Faircloth Skimmer Actual Total Storage Volume to Dewater(ft')= 136,840=Volume at Principal Spillway Required Orifice Diameter(in)= 5.0 From www.fairclothskimmer.com Based on 5 Day Drawdown Basin Shape• Length of Basin(ft)= 520 Measured at Principal Spillway Elevation Width of Basin(ft)= 140 Measured at Principal Spillway Elevation Desired Length to Width Ratio(X1)= 2 Actual Length to Width Patio(X1)= 3.7 O.K. SMITH GARDNER SMITH GARDNER,INI1 6asln E SED BASIN-GENERPL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill Expansion SHEET 17/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS ROUTE DESIGN STORM: Use HydroCAD or Other Method. Design Parameters, Design Storm:10-Yr,24-Hr Design Storm Rainfall(in)=5.11 Rainfall Distribution:Type II Runoff Method:SCSTR-20 Results: Maximum Pool Elevation= 258.3 Surface Area at Maximum Pool(ft')= 39,736 Peak Discharge(ds)= 6.0 Check Settling Efficiency Particle Data: Diam.(microns)= 40 Specific Gravity= 2.65 Settl ing Val oc.(ft/s)= 0.004140 Reynolds No.(W.5)= 0.044284 OK. Efficiency Data, Desired Efficiency(%)= 80 No.of Effective Cells= 1 Settling Efficiency(%)= 96.5 O.K. DESIGN OUTLETSTRUCTURES• Design Riser/Barrel Structures, Riser Desicm Type of Riser:Concrete-Rectangular Top of Riser Base Elevation(ft)= 254.0 Elev.of Principal Spillway(ft)= 258.0 Riser Top Elevation(ft)= 258.0 Riser Height(ft)= 4.0 Outlets: Outlet No.1(for Dewatering Dry Storage): Size:5"Diam.For Skimmer From Above-Dewatering of Dry Storage Invert Elevation: 254.5 May Vary For Multiple Holes Outlet No.2(Principal Spillway): Size:4'x4'Box Invert Elevation: 258.0 Concrete Riser Wall Thickness(in)= 6.0 Riser Inside Length(ft)= 3.0 Riser Inside Wdth(ft)= 3.0 Approx.Red.Concrete Riser Interior Volume(cf)= 36(Top of Base to Principal Spillway) Approx.Red.Concrete Riser Vol.of Concrete(d)= 28 Barrel Design, Type of Barrel: Concrete Diameter(in)= 24 Inv.In Elevation(ft)= 254.0 Inv.Out Elevation(ft)= 253.0 Length(ft)= 60.0 Slope(ft/ft)= 0.017 SMITH GARDNER SMITH GARDNER,ING Basin E SED BASIN-DENERPL ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LGD Landfill Expansion SHEET 18/18 JOB# ARBD-21-1 SUBJECT Sediment Basin Analysis DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS Poser Base Calculations, Design Uplift Force Factor of Safety= 1.25 F(unadjusted)(lbs)= 2,808 0 Approx.Rect.Concrete Riser Buoyant Wt.(Ibs)= 1,962 Factors in 80%of the Buoyant Weight of the Concrete Riser to Account for Outlets. 0 0 Buoyant WI.of Riser Top(Ibs)= 0 7'x T x 0.5'x Buoyant Wt.of Concrete(87.6 pct) Buoyant Wt.of Surrounding Soil Acting on Ext.Base(Ibs)= 0 V Min.Depth x Outside Perimeter(24')x Base Protrusion(0.5')x Buoyant Wt.of Soil(40 pct) Sliding Resistance of Surrounding Soil(Ibs)= 0 F(adjusted)(lbs)= 846 Concrete Base: Required Volume of Concrete(ft')= 9.7 Length(ft)= 5.0 Width(ft)= 5.0 Thickness(ft)= 1.0(includes Concrete III Inside of Box) Actual Volume of Concrete(ft')= 25.0 OK. Anti-Seepage Collar Calculations:(Alternatively-Design Flltar Dia hr m Slope of Upstream Embankment(zHAV)= 3 Slope of Outlet Pipe(ft/ft)= 0.017 L.(ft)= 30 Number of Collars: 2 Length of Fach Collar(ft)= 3.8 From Design Chart Based on L.and No.of Collars Width of Each Collar(ft)= 3.8 From Design Chart Based on L.and No.of Collars Collar Projection,P(ft)= 0.875 Spacing of Subsequent Anti-Seep C011ars(ft)= 12=14P Emergency Spillway Calculations, Crest Elev.(ft)= 259.0 Required Freeboard(ft)= 1.0 Top of Bar m El ev.(ft)= 260.0 Required Capacity(cts)= 20.0 From HydroCAD-No Outflow from 1(1 24-Hr.Storm;Assume 20 ofs Capacity Driving Head(ft)= 0.5 Assumed Weir Coefficient= 3.0 Length of Crest(ft)= 18.9 Determine by Weir Equation" Design Crest Length(ft)= 20 Length=20 ft minimum. SUMMARYDATA: Basin No.: Basin E Bev.of Bottom of Basin(ft)= 254.0 Cl eanout El ev.(ft)= 0.0 Elev.of Wet Storage(Permanent Pool)(ft)= NA Elev.of Principal Spillway(ft)= 258.0 See Above for Riser and Other Design Information. Emergency Spillway Elev.(ft)= 259.0 Top of Bar m El ev.(ft)= 260.0 Top of Berm Wdth(ft)=_ 10 Barrel Diameter(in)= 24 Barrel Slope(%)= 1.7 SMITH GARDNER SMITH GARDNER,ING BasinE SEED BA N-DENERPLP DExpansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PROJECT ARBD Stone LCID Landfill Expansion SHEET 1 OF 3 DATE 11/18/2022 COMPUTED BY JCL SUBJECT Culvert Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design culverts to handle stormwater flow from the design storm(s). The main design criteria will be to ensure that al I culverts will be able to accommodate the peak discharge from the design storm without exceeding the allowable headwater depth. REFERENCE: Debo,T.N.,and Reese,A.J.,Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL,1995, p.333. ANALYSIS: The following approach is used in the design of culverts(after Debo and Reese): 1. Determine the peak discharge from the design storm(s)(from HydroCAD or spreadsheet methods). Use the peak discharge from the 25-Yr 24-Hr storm unless otherwise specified. 2. Input Culvert Parameters: HW, = allowable headwater depth(ft) h = number of pipes used G P,PE = peak discharge/N (cfs) E = culvert diameter(in) Type of Culvert(i.e.,Concrete,CMP,etc.) L = culvert length(ft) s = culvert slope(ft/ft) n = Manning's number k E = entrance loss coefficient a C = critical depth(use critical depth figures)(ft) CALCULATIONS: Inlet Control: A. Enter Inlet Control Nomograph with D& QplpE and find HW/D for the proper entrance type. B. Compute HW. If HWexceeds HWA,try larger culvert. Outlet Control: A. Enter outlet control nomograph with L,KE,&D. B. To compute HW,connect the length scale for the type of entrance condition and culvert diameter scale with a straight line,pivot on the turning line,and draw a straight line from the design discharge through the turning point to the head loss scale H. Compute HW from the following equation: HW= H+h,-LS + D�where: ho — d'2 or tailwater depth,whichever is greater. C. If HWexceeds HWA ,try larger culvert. SMITH GARNER,INC. CULVERT ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT ARBD Stone LGD Landfill Expansion SHEET 2/3 JOB# ARBD-21-1 SUBJECT Culvert Analysis DATE 11/18/2022 COMPUTED BY JCL CHECKED BY SAS Culvert No.: G1 Peak Discharge; PEAK DISCHARGE,Q25 Ids)= 83.8 Source: HydroCAD 25-Yr 24-Hr Culvert Parameters: Allowable HW Depth(ft)= 5 Number of Pipes,N= 2 (;pipe(cfs)= 41.9 Culvert Diameter,D(in)= 36 Type of Culvert= RCP Invert In Elev.(ft)= 263.0 Invert Out Elev.(ft)= 260.0 Culvert Length,L(ft)= 60 Culvert Slope,S(ft/ft)= 0.05 Manning's Number,n= 0.013 Entrance Loss Coef.,ke= 0.5 Critical Depth(ft)= 1.7 Tailwater Depth(ft)= 1.0 Case 1: Inlet Control HW/D= 1.2(From Inlet Control Nomograph) HW(ft)=F 3.5 INLET CONTROL GOVERNS! 0 SMITH GARDNER SMITH GARGNER,INC. G1 CULVERTARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT ARBD Stone LGD Landfill Expansion SHEET 3/3 JOB# ARBD-21-1 SUBJECT Culvert Analysis DATE 11/18/2022 COMPUTED BY JCL CHECKED BY SAS Culvert No.: C-2 Peak Discharge: PEAK DISCHARGE,XJ(cfs)= 56.9 Source: HydroCAD 25-Yr 24-Hr Culvert Parameters: Allowable HW Depth(ft)= 5 Number of Pipes,N= 2 Opipe(cfs)= 28.4 Culvert Diameter,D(in)= 36 Type of Culvert= RCP Invert In Elev.(ft)= 279.0 Invert Out Elev.(ft)= 276.0 Culvert Length,L(ft)= 65 Culvert Slope,S(ft/ft)= 0.0462 Manning's Number,n= 0.013 Entrance Loss Coef.,ke= 0.5 Critical Depth(ft)= 1.7 Tailwater Depth(ft)= 1.0 Case 1: Inlet Control HW/D= 0.9(From Inlet Control Nomograph) HW(ft)= 2.6 INLET CONTROL GOVERNS! 0 SMITH GARDNER SM ITH GARDN ER,I NC. C-2 CULVERT ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF CHART 1 B Q 180 10,000 I66 8,000 EXAMPLE I3) 158 6 000 0.42 inches (33 fast) 6' 6. s�odo 0•1ZO ate s 144 B 5 4,000 Nw 132 D hat 4, 3,000 (1) 2.5 6.0 3 4. 120 7.4 2,000 4• Id8 3• "D in toot 3' 86 1,000 ' 800 84 Soo // 2. 2` 500 72 400 / 2. = 300 x 1,5 1.5 Z N Z 60 200 F 1.5 _ Z W 54 / a a W46 �0 100 > / cC 80 a 0 � 60 a 1.0 1.0 A2 W 0 5 D SCALE E TYPECE 0 Ir 1.0 W III yy 9 Speara edge with C C-2 4! 33 a a G Qa (2) Groove sad with 30 headwall z 6 6 131 Groove sod •8 27 projecting 10 .7 T- Y4 8 .7 6 To-its seal*(2)or(3)project 2 1 5 horlxontaUr to scats(1),then 4 use straight ieciinad line through 0 and O scales,or reverse as .6 3 illustrated. t3 •6 18 2 I5 .5 .5 1.0 .5 f2 HEADWATER DEPTH FOR HEADWATER SCALES 2a3 CONCRETE PIPE CULVERTS REVISED MAY1964 WITH INLET CONTROL BUREAU OF PUBLIC ROADS JAN.194" DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF CHART 4B 0 3 2 3. do CANNOT EXCEED TOP OF PIPE I i 2. L5' L0 la, 00 10 20 30 40 50 60 70 80 90 100 DISCHARGE-Q-CFS 6 8 5 7 H w6. LLJ 159 9' W u 4 6 v 9' 7' ' v H B = 4 3 do CANNOT EXCEED TOP OF PIPE 5 � p 7 W 6' I ❑ Q U DIA, Q 20 100 200 300 400 500 600 700 BOO 900 1000 DISCHARGE-0-CFS t U U 14 12 10 8 6 I do CANNOT EXCEED TOP OF PIPE 3' I l' 9'DIA. 40 1000 2000 3000 4000 DISCHARGE-Q -CFS BUREAU OF PUBLIC ROADS JAN. 1964 CRITICAL DEPTH CIRCULAR PIPE DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleiqh,NC27603 919.828.0577 www.smithoardnerinc.com PROJECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 11/2/2022 COMPUTED BY JCL SUBJECT Outlet Protection Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design outlet protection for culverts and/or drainage channels based on the maximum flow from the design storm. Rip rap aprons are appl icable when the Froude Number(Fr)is less than or equal to 2.5 (Debo and Reese). For higher Froude Numbers,rip rap outlet basins,baffled outlets,and/or other methods are more appropriate. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton, FL,Section 8.11 - pp.289-290;Section 12.6-pp.523-526. Federal Highway Administration(2000),Hydraulic Design of Energy Dissipators for Culverts and Channels, Hydraulic Engineering Circular No. 14,FHWA EPD-86-110,Metric Ed.,U.S.Dept.of Transportation, Washington,D.C. North Carolina Division of Land Resources(2013 Updates),North Carolina Erosion&Sediment Control Planning&Design Manual,Raleigh,INC. ANALYSIS: For each outlet,determine the Froude Number(Fr)based on the pipe Manning's number,diameter,slope, and design discharge. Use the methods described in Section 8.11 of Debo and Reese. Select the method of outlet protection,as appropriate,and perform design calculations. Rip Rap Aprons: If Fr<2.5,a rip rap apron may be used. The following design approach is based on Section 12.6 of Debo and Reese and Section 8.06 of the NC Erosion&Sediment Control Planning and Design Manual: 1. Determine the tailwater condition and select the appropriate design chart. 2• Using the appropriate design chart,determine the d5o rip-rap size and minimum apron length (La)based on the maximum design flow(Q),flow depth(d),and/or velocity(v)(depending on whether the pipe is flowing full or partiallyfull). 3. Using the same chart,determine apron dimensions. 4. Determine the maximum stone diameter: dmax=1.5 x d50 5. Determine the apron thickness: Thickness=1.5 x dmax(No Filter Geotextile) Thickness=1.5 x d5o(With Filter Geotextile) Other Methods: If Fr>2.5,consider the use of a rip rap basin,baffled outlet,or other device. Design method according to FHA guidelines using HY8-Energy program(or other documented source). SMITH GARDNER,INC. OUTLET PROTECTION ARBD Expansion DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 212 JOB# ARBD-21-1 SUBJECT Outlet Protection Analysis-Rip Rap Aprons(Circular Pipe) DATE 11/2/2022 COMPUTED BY JCL CHECKED BY SAS Rip Rap Aprons: Outlet Sediment Basin D Sediment Basin E Pipe Type: CPP CPP Manning's Coefficient: 0.018 0.018 Diameter(Dc)(in)= 15 18 Slope(%)= 4.3 1.7 Design Discharge(cfs)= 8.4 20.7 Source of Discharge Data: HydroCAD 25-Yr 24-Hr HydroCAD 25-Yr 24-Hr K= 0.270 0.658 0(degrees)= 229 265 Flow Depth(d)(in)= 10.6 15.1 Flow Area(ft)= 0.9 1.6 Flow Vel ocity(v)(ft/sec)= 9.0 13.1 Froude Number= 1.69 2.06 Rip Rap Aprons Applicable? Yes Yes Tailwater Condition(Low or High)*: Low Low d�(ft)**= 0.50 0.50 dm.(ft)= 0.75 0.75 Apron Thickness(X)(ft): ----- ----- No Geotexti I e: 1.13 1.13 With Geotextile: 0.75 0.75 Apron Dimensions(ft): ----- ----- Length(La)**= 11 12 Width(Vv)= 12.3 13.5 *Tailwater Conditions: Low: Tw<0.5Dc; High: Tw>0.5Dc **Value from Chart. SMITH GARDNER SMITH GARRNFR,INC. Rip Rap Aprons(Circular Pipe) CUTLET PROTECTION ARBD Expansion 000uoign Envelope ID: EoA3AseF-0561-4294-8e73-A51A5oo3F4oF Appendices pipe diannete 50 4[ 4 I It 20 Hff Fj It Outlet a il!111i, I W o ��) i iT �111 ill V 20 4-All I 10 � Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition(T°<0.5 diameter). u,noms 0.06.3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF i 3Do Outlet W = Do + 0.4La 12pipe diameter (Do) L _� ff a 110 Ti - a lwa r 0.5D 1 ' ik _ _ _ o } I if 11- Jill 100 90 U 1 80 } cv n n QQ,� 70 " 4 n I ! CO �Zt, 60 n a l } � I/, { r f 50 tj _ 3 f 30 I, C !' + I } } - v 2 l��A!! 20 m N Nr (A 10 `A4I o i L I 1 ii a IIIIV 25 v=20 a a o I iti a 1,l `o 2 v= 15 �Il. 1 1, 0 3 5 10 20 50 100 200 500 1000 � Discharge ft 3/sec Curves may not be extrapolated. Figure 8.06b Design of outlet protection from a round pipe flowing full,maximum tailwater condition(Tw>-0.5 diameter). 8.06.4 Rev.12/93 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GA R D N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PRQIECT Stone LCID Landfill Expansion SHEET 1 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To determine the loads acting on each concrete pipe and evaluate the required pipe strength. Select the appropriate class of pipe to satisfy the strength requirement. REFERENCES: American Concrete Pipe Association(2011),Concrete Pipe Design Manual,ACPA,Vienna,VA. American Society for Testing and Materials,"ASTM C 76-Standard Specification for Reinforced Concrete Culvert,Storm Drain,&Sewer Pipe",ASTM,Philadelphia. ANALYSIS: The analysis is based on the following procedure recommended bythe American Concrete Pipe Association(ACPA). Note that the design parameters will vary depending on what condition the pipe is installed(trench,positive projecting embankment,negative projecting embankment,or jacked/tunneled). 1. Determination of Earth Load,WF: Based on the assumed concrete pipe parameters(size,backfill,etc.)use the tables and figures in the Concrete Pipe Design Manual(CPDM)to determine the earth load acting on the pipe or the following equations. Note that the values determined in the tables and figures are based on a backfill unit weight of 100 Ibs/ft3. This value must be adjusted for the anticipated backfill unit weight. Also,for a negative projecting embankment condition,values for projection ratio,p'(vertical distance between the top of the pipe and natural ground divided by the trench width),and settlement ratio,rsd,must be determined in order to use the figures. Table 40 of the CPDM gives suggested values for rsd based on the value of p'. Positive Projecting Embankment Soil Load: W, =VAFxPL (CPDM Eqn.4.1) PL=ys[H+DO(4—;T) Do (CPDM Egn.4.2) a where: WE = earth load,(Ibs/LF) VAF = vertical arching factor(CPDM Illustration 4.7) PL = prism load,(Ibs/LF) ys = average unit weight of soil cover(Ibs/ft') h = height of backfill over top of pipe(ft) G c = outside diameter of pipe(ft)(given in CPDM Table 42). Trench Soil Load: z Doi�4 Wd — CeYsBd + 8 Ys (CPDM Egn.4.3) —2 Kl,'H B 1—e ., (CPDM Eqn.4.4) Cd 2K�c where: VYo = fill load for trench condition,(Ibs/LF) 6, = trench load coefficient ys = average unit weight of soil cover(Ibs/ft') 5, = width of trench(ft) G c = outside diameter of pipe(ft)(given in CPDM Table 42). h = height of backfill over top of pipe(ft) K = ratio of active lateral unit pressure to vertical unit pressure k = tan�',coefficient of friction between fill material and sides of trench SMITH GARNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 2 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS Per the CPDM: K'U = 0.1924 max.for granular materials without cohesion KP = 0.165 max.for sand and gravel Ku = 0.150 max.for saturated top soil K'U = 0.130 max.for ordinary clay Ku = 0.110 max.for saturated clay 2. Determination of Live Load,W : Based on the concrete pipe parameters(size,backfil I,etc.)use the tables in the CPDM to determine the live load acting on the pipe. Note that the values for backfill heights of 10 feet or more and considered insignificant to the design of the pipe. 3. Selection of Installation Tyne: Select the Standard Installation based on the guidance given in the CPDM. Note that a Type 1 Standard Installation requires the highest construction qualityand degree of inspection while a Type 4 Standard Installation requires virtually no construction qualityor inspection. 4. Determination of Bedding Factors: Determine the bedding factors based on the guidance given in the CPDM. For embankment installations, the bedding factor,Bfe,is found from Illustration 4.22 of the CPDM depending on the selected Standard Installation. For trench installations the bedding factor is based on the following equation: B7 — f —((Bt�Bd\—Bj+Bf (CPDM Eqn.4.22) `B,—Bc J where: B, = variable bedding factor,trench 5, = bedding factor,embankment(CPDM Illustration 4.22) 6' = minimum bedding factor,trench(CPDM Illustration 4.23) 5, = trench width at top of pipe(ft) 5, = outside horizontal span of pipe(ft) 6' = transition width at top of pipe(ft)(given in CPDM Tables 13-39). Use CPDM Illustration 4.25 to determine the live load bedding factor,BfLL- 5. Application of Factor of Safety.FS: According to the ACPA,a factor of safety of 1.0 should be applied if the 0.01-inch crack strength is used as the design criterion rather than the ultimate strength. 6. Selection of Pipe Strength/Class: The required three-edge bearing strength of circular reinforced concrete pipe is expressed as Djoad in the following equation: —[WLE+WEW ] FSDL-d + +—B f B,.J D (CPDM Eqn.4.24) where: VYE = earth load on pipe(Ibs/linear ft) VYF = fluidIoadonpipe(Ibs/Ii near ft)(=yH,xAp1pe=62.41bs/ft'xTV/4) W' = live load on pipe(Ibs/linear ft) 5, = bedding factor = Bfefor embankment installations = Bf�for trench installations 5fLL = live load bedding factor FS = factor of safety G = pipe diameter(ft) SMITH GARDNER SMITH GARDNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 3 OF 4 DATE 12/22/2022 COMPUTED BY JCL SUBJECT Concrete Pipe Strength Analysis JOB# ARBD-21-1 CHECKED BY SAS Note that if BfLL is greater than Bfe for embankment installations or Bf,for trench installations,use Bfe or Bf,in place of BfLL. Select class of reinforced concrete pipe based on the following ASTM C-76 guidelines: Maximum CL-11 For 0.01-inch Crack Pipe Gass (Ib/If/ft of diameter I 800 11 1,000 III 1,350 IV 2,000 V 3,000 SMITH GARDNER SMITH GARNER,INC. CONCRETE PIPE SGV2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PROJECT Stone LCID Landfill Expansion SHEET 4/4 JOB# ARBD-21-1 SUBJECT Concrete Pipe Strength Analysis DATE 12/22/2022 (Trench Condition) COMPUTED BY JCL CHECKED BV SAS Culvert No.: C-1 &C-2 Concrete Pipe Parameters: Type of Pipe= Circular,Concrete Pipe Diameter,G(in)= 36 Outside Horizontal Span,Bc(ft)(=G c)= 3.67(From CPDM Table 42) Height of Backfill,h(ft)= 2.0 Backfill Type= Sand&Gravel Backfill Unit Wt.(Ibs/ft3)= 110 Standard Instal lation= Type 4 Trench Width,Bo(ft)= 6.0 Must be<transition width. Ct°herwise,treat as Embankment Installation. Transition Width,6�,(ft)= 7.7(From CPDM- Table23) Ku' 0.150(conservative for sand&gravel backfill) Determine Earth and Fluid Loads: Co (Ibs/LF)= 0.32 VP, (Ibs/LF)= 1,415 WF (Ibs/LF)= 441 Determine Live Load: WL(Ibs/LF)= 750(From CPDM Table 42) Determine Bedding Factors: Embankment Bedding Factor,6 f= 2.3(From CPDM III ustration 4.22) Min.Trench Bedding Factor,5 r= 1.7(From CPDM III ustration 4.23) Variable Trench Bedding Factor,Bh= 2.0 Live Load Bedding Factor,5f«= 2.2(From CPDM III ustration 4.25) Factor of Safety: Factor of Safety,FS= 1.00(Use 1.0 for Reinforced;1.25 to 1.5 for Non-Reinforced) Selection of Required Pipe Strength/Class: GL—(I bs/LF/ft)=1 424 Pipe Class Max.D-Load 1 800 Use Class I RCP 11 1,000 111 1,350 IV 2,000 V 3,000 (Table per ASTM C 76) SMITH GARDNER SMITH GARNER,INC. Trench(G1) CONCRETE PIPE SGV2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ADDRESS TEL WEB SMITH GARD N E R 14 N.Boylan Avenue,Raleigh,NC27603 919.828.0577 www.smithgardnerinc.com PRQIECT Stone LCID Landfill Expansion SHEET 1 OF 2 DATE 11/9/2022 COMPUTED BY JCL SUBJECT Down Pipe Analysis JOB# ARBD-21-1 CHECKED BY SAS OBJECTIVE: To design down pipes to handle the peak discharge from the design storm. REFERENCES: Debo,T.N.,and Reese,A.J.(1995),Municipal Storm Water Management,Lewis Publishers,Boca Raton,FL. Malcom,H.Rooney(1989&2003 Supplement),Elements of Urban Stormwater Design,NCState Univ.,Raleigh,NC. ANALYSIS: The following approach is used in the design of rain gutters and down pipes: 1. Determine the peak discharge from the design storm(s). Use the Rational Method. 2. For each pipe size,determine the maximum area(A),to handle the predicted peak discharge(Q)with an added factor of safety. Analyze rain gutters and down pipes based on partial flow to determine flow depth and velocity then compare the full flow capacity of each pipe size with the calculated peak flow rate to verify the desired factor of safety. Analyze down pipe inlets as a culvert under inlet control. CALCULATIONS: Down Pipe Inlets(Inlet Control Determine O„ -. For ZSG: Qmax = 0.372CdD(Z)3/2 (Malcolm Equation III-13) For Z>S: / D\i/z Qmax = 0.0437CdD2 I Z-24 I (Malcolm Equation III-13) where: Cmax = flow capacity of inlet(cfs) 2 = height of water above pipe invert(ft) allowable headwater depth(HW) C d = coefficient of discharge C = inside diameter of pipe(in) Determine Factor of Factor of Safety FS= Qmax Q Iterate the drainage area(A)to each drainage structure that Cmax/Q%the desired factor of safety. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF PRQIECT Stone LCID Landfill Expansion SHEET 2 OF 2 DATE 11/9/2022 COMPUTED BY JCL SUBJECT Down Pipe Analysis JOB# ARBD-21-1 CHECKED BY SAS Down Pipes: Determine Flow Capacity of Pipe: O.463"813S72 Q,,,ax __ (D&REquation 8.24) n where: 6 max = flow capacity of pipe(cfs) G = inside diameter of pipe(ft) 5 = pipe slope(ft/ft) n = Manning's roughness coefficient Determine Factor off��Safety_(FSL FS Iterate the drainage area(A)to each drainage structure that Cmm/Q a the desired factor of safety. Determine Flow Depth: h = 2 1 cos 8)),D (D&R Equation 8.29) where: h = flow depth(inches) 0 = central angle(degrees) ITv2 v2 1/2 (D&REquation 8.28) B 2 �1— (1—(�cK) K = constant K— 0.673QnD-8/3S-1/2 (D&REquation 8.27) Determine Flow Velocity: QD2 (0— sing) (D&REquation 8.30for"A") 8 where: l/ = f I ow vel oci ty(ft/sec) A = cross-sectional area of flow(ft) SMITH GARDNER DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Appendix C Erosion and Sedimentation Control Technical Specifications Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Technical Specifications Stone LCID Landfill Chatham County, North Carolina Prepared for: ARBO, LLC Chapel Hill, NC February 2023 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 O 2023 Smith Gardner,Inc. This document is intended for the sole use of the client for which it was prepared and for the purpose agreed upon by the client and Smith Gardner,Inc. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Technical Specifications Stone LCID Landfill Chatham County, North Carolina Prepared For. ARBD, LLC Chapel Hill, NC S+G Project No.ARBD-21-1 `\\ ���►NsCiA DocuSigned by: SEAL — Ej c�,sc 054367 3g1/2023 CSECC95C937E4a, ,. Jesse C. Li -,, Project Engineer '� SSEG;�, *#�'LaiLuIIJPr#'# EDocuSigned by: +�# � � ♦rt st" Q. w1t{�i, SEAL _ 3 1/2023 Stacey A.Smith, P.E. 4Z Senior Engineer *�,�'• ?'! � :• ` ,# •A_ . February 2023 SMITH GARDNER 14 N.Boylan Avenue,Raleigh NC 27603 1 919.828.0577 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Stone LCID Landfill Chatham County Technical Specifications Table of Contents Section Specification 02110 Site Preparation 02222 Excavation 02223 Embankment 02240 Geotextiles 02270 Erosion and Sedimentation Control 02271 Rip Rap 02275 Rolled Erosion Control Products 02608 Precast Concrete Structures 02720 Stormwater Systems 02930 Revegetation Stone LCID Landfill Technical Specifications February 2023 Table of Contents Page i DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02110 SITE PREPARATION Site Preparation: Site Preparation includes clearing, grubbing, and stripping operations which precede the proposed construction. A. Description 1. General: a. The Contractor shall furnish all labor, material, and equipment to complete Site Preparation in accordance with the Contract Drawings and these Specifications. b. Principal items of work include: 1. Notifying all authorities owning utility lines running to or on the property. Protect and maintain all utility lines to remain and cap those that are not required in accordance with instructions of the Utility Companies, and all other authorities having jurisdiction. 2. Clearing the site within the clearing limits, including removal of grass, brush, shrubs, trees, loose debris, and other encumbrances except for trees to remain. 3. Boxing and protecting all areas to be preserved. 4. Removing all topsoil from designated areas and stockpiling on site where directed by the Engineer for future use. 5. Disposing from the site all debris resulting from work under this Section. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 B. Materials Not Used. C. Submittals Not Used. D. Construction Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 1. Clearing of the Site: a. Clearing limits, as shown on the Contract Drawings, shall be established by the Owner's Surveyor. Once established, the clearing limits shall be inspected and approved by the Engineer prior to clearing the affected areas. b. Before removal of topsoil, and start of excavation and grading operations, the areas within the clearing Limits shown on the Contract Drawings shall be cleared and grubbed. C. Clearing shall consist of cutting, removal, and satisfactory disposal of aLL trees, fallen timber, brush, bushes, rubbish, fencing, and other perishable and objectionable material. Should it become necessary to remove a tree, bush, brush, or other plants outside the clearing limits, the Contractor shall do so only after permission has been granted by the Engineer. d. Excavation resulting from the removal of trees, roots, and the Like shall be filled with suitable material, as approved by the Engineer, and thoroughly compacted per the requirements contained in Section 02223, Embankment, of these Specifications. e. In temporary construction easement locations, only those trees and shrubs shall be removed which are in actual interference with excavation or grading work under this Contract, and removal shall be subject to approval by the Engineer. However, the Engineer reserves the right to order additional trees and shrubs removed at no additional cost to the Owner, if such, in their opinion, they are too close to the work to be maintained or have become damaged due to the Contractor's operations. 2. Stripping and Stockpiling Existing Topsoil: a. Existing topsoil and sod on the site within areas designated on the Contract Drawings shall be stripped to whatever depth it may occur, and stored in Locations directed by the Engineer. b. The topsoil shall be free of stones, roots, brush, rubbish, or other unsuitable materials before stockpiling. C. Care shall be taken not to contaminate the stockpiled topsoil with any unsuitable materials. 3. Grubbing: a. Grubbing shall consist of the removal and disposal of all stumps, roots, logs, sticks, and other perishable materials to a depth of at least 6 inches below ground surfaces. Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF b. Large stumps located in areas to be excavated may be removed during grading operations, subject to the approval of the Engineer. 4. Disposal of Cleared and Grubbed Material: No open burning of clearing debris will be allowed on this project. The Contractor may grind woody materials into wood mulch and either remove from the site or stockpile on-site in the Location(s) approved by the Owner. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Site Preparation Page 02110-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02222 EXCAVATION Excavation: Excavation includes excavating, sealing, hauling, scraping, undercutting, removal of accumulated surface water or ground water, stockpiling, and all necessary and incidental items as required for bringing the landfill and related structures to the specified lines and grades. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment required to complete Excavation of the project area in accordance with the Contract Drawings and these Specifications, except as noted below: a. Clearing and grubbing and removal of topsoil is addressed in Section 02110, Site Preparation, of these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Site Preparation 02110 Embankment 02223 Erosion and Sedimentation Control 02270 3. Definitions: a. Excavation: shall consist of the removal and satisfactory disposal and/or stockpiling of all materials (borrow and/or unsuitable materials included) located with the limits of construction including widening cuts and shaping of slopes necessary for the preparation of roadbeds, slope areas,cutting of any ditches, channels,waterways, entrances, and other work incidental thereto. b. Borrow: shall consist of approved on-site material required for the construction of embankments/fills or for other portions of the work. C. Unsuitable Material: is any in-place or excavated material which contains undesirable materials or is in a state which is not appropriate, in the opinion of the Engineer, for the intended use or support of planned structures, embankment, or excavation. This may include but not be limited to organic material,waste/refuse, soft, or wet material not meeting required specifications, etc. d. Unsuitable Material Overexcavation: shall consist of the removal and satisfactory disposal of all unsuitable material located within the limits of Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF construction and below subgrade elevations shown or indicated on the Contract Drawings. Where excavation to the subgrade elevations results in a subgrade or slopes of unsuitable material, the Contractor shall overexcavate such material to below the grades shown or indicated on the Contract Drawings or as otherwise directed by the Engineer. B. Materials Excavation shall include the removal of all soil,weathered rock, boulders, conduits, pipe, unsuitable material, and all other obstacles encountered and shown or indicated on the Contract Drawings and/or specified herein. D. Construction 1. The Contractor shall conduct Excavation activities in such a manner that erosion of disturbed areas and off-site sedimentation is absolutely minimized as outlined in Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. The Contractor shall excavate to the lines and grades shown on the Contract Drawings and stockpile all suitable excavated materials. As the excavation is made, the materials will be examined and identified to the Engineer. The Contractor will perform all surveys necessary to establish and verify lines and grades for all Excavation, including pipe excavations, soil overexcavation, and anchor trenches. 3. Stockpiling: Stockpiles shall be properly sloped and the surfaces sealed by the Contractor at the end of each working day, or during the day in the event of heavy rain, to the satisfaction of the Engineer. 4. The Contractor shall protect all existing facilities and structures including, but not limited to, existing utilities, monitoring wells, signs, grade stakes, etc. during the grading and stockpiling operations. 5. All excavations shall be made in the dry and in such a manner and to such widths as will give ample room for properly constructing and inspecting the structures and/or piping they are to contain and for such sheeting, timbering, pumping, and drainage as may be required. 6. The Contractor shall be responsible for the control of surface and subsurface water when necessary. Except for certain erosion and sedimentation control measures and other areas designated to impound water, all areas shall be graded to drain. 7. Excavation slopes shall be flat enough to avoid sloughs and slides that will cause disturbance of the subgrade or damage of adjacent areas. Slides and overbreaks which occur due to negligence, carelessness, or improper construction techniques on the part of the Contractor shall be removed and disposed of by the Contractor as directed by the Engineer at no additional cost to the Owner. Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 8. The intersection of slopes with natural ground surfaces, including the beginning and ending of cut slopes, shall be uniformly rounded. All protruding roots and other vegetation shall be removed from slopes. 9. The bottom of all excavations for structures and pipes shall be examined by the Engineer for bearing value and the presence of unsuitable material. If, in the opinion of the Engineer, additional Excavation is required due to the low bearing value of the subgrade material, or if the in-place materials are soft,yielding, pumping and wet, the Contractor shall remove such material to the required width and depth and replace it with thoroughly compacted structural fill, or material directed by the Engineer. No payment will be made for subgrade disturbance caused by inadequate Dewatering or improper construction methods. 10. Any areas excavated below design subgrade elevations by the Contractor, unless directed by the Engineer, shall be brought back to design elevations at no cost to the Owner. The Contractor shall place and compact such material in accordance with Section 02223, Embankment, of these Specifications. 11. The Contractor shall dispose of excess or unsuitable excavation materials on-site at locations) approved by the Owner. 12. The Contractor shall properly level-off bottoms of all excavations. Proof-rolling shall be conducted with appropriate equipment. 13. Upon reaching subgrade elevations shown in excavation areas, the Contractor shall scarify subgrade soils to a minimum depth of 6" and obtain the Engineer's approval of quality. If unsuitable materials are encountered at the subgrade elevation, perform additional excavations as approved by the Engineer to remove unsuitable materials. 14. Overexcavation and Backfill: a. Where subgrade materials are determined to be unsuitable, such materials shall be removed by the Contractor to the lengths,widths, and depths approved by the Engineer in advance and backfilled with compacted Embankment in accordance with Section 02223, Embankment, of these Specifications. b. No additional payment will be made for such overexcavation and backfill 1 foot or less than the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade) as this is considered superficial. C. Where overexcavation of unsuitable material is greater than 1 foot beneath the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade), payment shall be made on a unit price basis for overexcavation and backfill and the measured quantity shall include the entire excavation quantity below the finished subgrade (or pre-existing grades where pre-existing grades are lower than finished subgrade) elevations. The unit price for overexcavation and backfill shall include disposal of unsuitable materials. Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 15. All cuts shall be brought to the grade and cross section shown or indicated on the Contract Drawings, or established by the Engineer, prior to final inspection. 16. The Contractor shall protect finished lines and grades of completed excavation against excessive erosion, damage from trafficking, or other causes and shall repair any damage at no additional cost to the Owner. 17. Trench Excavation: a. All pipe Excavation and trenching shall be done in strict accordance with these Specifications, all applicable parts of the OSHA Regulations, 29 CFR 1926, Subpart P, and other applicable regulations. In the event of any conflicts in this information, safe working conditions as established by the appropriate OSHA guidelines shall govern. b. The minimum trench widths shall be as indicated on the Contract Drawings. Enlargements of the trench shall be made as needed to give ample space for operations at pipe joints. The width of the trench shall be limited to the maximum dimensions shown on the Contract Drawings, except where a wider trench is needed for the installation of and work within sheeting and bracing. C. Except where otherwise specified, excavation slopes shall be flat enough to avoid slides which will cause disturbance of the subgrade, damage to adjacent areas, or endanger the lives or safety of persons in the vicinity. d. Hand excavation shall be employed wherever, in the opinion of the Engineer, it is necessary for the protection of existing utilities, poles, trees, pavements, obstructions, or structures. e. No greater length of trench in any location shall be left open, in advance of pipe laying, than shall be authorized or directed by the Engineer and, in general, such Length shall be limited to approximately one hundred (100) feet. f. Pipe Bedding: All pipe bedding shall be as shown on the Contract Drawings, unless otherwise specified herein, or shall be approved by the Engineer. 18. Sheeting and Bracing_ a. The Contractor shall furnish, place, and maintain such sheeting and bracing which may be required to support sides of Excavation or to protect pipes and structures from possible damage and to provide safe working conditions in accordance with current OSHA requirements. If the Engineer is of the opinion that at any point sufficient or proper supports have not been provided, he may order additional supports put in at the sole expense of the Contractor. The Contractor shall be responsible for the adequacy of all sheeting and bracing used and for all damage resulting from sheeting and bracing failure or from placing, maintaining, and removing it. b. The Contractor shall exercise caution in the installation and removal of sheeting to ensure that excessive or unusual loadings are not transmitted to any new or Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF existing structure. The Contractor shall promptly repair at their expense any and all damage that can be reasonably attributed to sheeting installation or removal. C. All sheeting and bracing shall be removed upon completion of the work. 19. If grading operations are suspended for any reason whatsoever, partially completed cut and fill slopes shall be brought to the required slope and the work of seeding and mulching or other required erosion and sedimentation control operations shall be performed at the Contractor's sole expense. 20. Surveying: Upon completion of the landfill subgrade, the subgrade shall be surveyed on 100-foot centers and at slope breaks (including all tops and toes of slope, points of grade change, etc.) to ensure the top of the subgrade meets the grades specified on the Contract Drawings. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Excavation Page 02222-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02223 EMBANKMENT Embankment: Embankment is the on-site compacted fill that provides the foundation and the berms for the containment area, the subgrade for some access roadways and structures, and backfill around structures and piping. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete Embankment including borrowing, hauling, screening, discing, drying, compaction, control of surface and subsurface water, final grading, sealing, and all necessary and incidental items as detailed or required to complete the Embankment, all in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these Specifications. ASTM D 698 Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). ASTM D 1556 Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. ASTM D 2167 Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method. ASTM D 2216 Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. ASTM D 2487 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System). ASTM D 2488 Standard Practice for Description and Identification of Soils (Visual-Manual Procedure). Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ASTM D 2937 Standard Test Method for Density of Soil in Place by the Drive Cylinder Method. ASTM D 4643 Standard Test Method for Determination of Water(Moisture) Content of Soil by the Microwave Oven Method. ASTM D 4959 Standard Test Method for Determination of Water(Moisture) Content of Soil by Direct Heating Method. ASTM D 6938 Standard Test Methods for In-Place Density and Water Content of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 4. Quality Assurance: Quality Assurance during placement of Embankment will be provided by the Owner. 5. Definitions: a Embankment: Shall include construction of all site earthwork including roadways, subgrade, perimeter berm embankments, including preparation of the areas upon which materials are to be placed. Embankment may also be referred to as structural and/or controlled fill. All Embankment materials may be either (off-site) Select Borrow or(on-site) Borrow unless otherwise noted on Contract Drawings or specified by the Engineer. b. Prepared Subgrade: The ground surface after clearing, grubbing, stripping, excavation, scarification, and/or compaction, and/or proof rolling to the satisfaction of the Engineer. C. Well-Graded: A mixture of particle sizes that has no specific concentration or lack thereof of one or more sizes. Well-graded does not define any numerical value that must be placed on the coefficient of uniformity, coefficient of curvature, or other specific grain size distribution parameters. Well-graded is used to define a material type that,when compacted, produces a strong and relatively incompressible soil mass free from detrimental voids. d. Unclassified Fill: The nature of materials to be used is not identified or described herein but must be approved by the Engineer prior to use. B. Materials 1. Embankment materials shall consist of clean well-graded natural soil classified as SP, SW, SM, SC, ML, or CL (ASTM D 2487) containing no topsoil or other deleterious material. Other material classifications may be approved by the Engineer. Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 2. Stones or rock fragments shall not exceed one half the maximum lift thickness as compacted in any dimension. Isolated rocks shall be a maximum of 24-inches in any dimension. C. Construction 1. The Contractor shall conduct Embankment activities in such a manner that erosion of disturbed areas and off-site sedimentation is absolutely minimized as outlined in Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. All placement and compaction of Embankment shall be performed only when the Engineer is informed by the Contractor of intent to perform such work. 3. Embankment shall be placed and compacted to the lines and grades shown on the Contract Drawings. Placement of Embankment outside the construction limits shall occur only as directed and approved by the Engineer. The Contractor will perform all surveys necessary to establish and verify lines and grades for all Embankment. 4. The Contractor shall protect all existing facilities including, but not limited to, utilities and monitoring wells. 5. Subgrade Preparation: a. The Engineer shall inspect the exposed subgrade prior to placement of Embankment to assure that all rocks, topsoil,vegetation, roots, debris, or other deleterious materials have been removed. b. Prior to placement of Embankment, the exposed subgrade shall be proofrolled using a static smooth-drum roller, loaded tandem axle dump truck, or other suitable equipment in the presence of the Engineer. Any soft or unsuitable materials revealed before or during the in-place compaction shall be removed as directed by the Engineer and replaced with suitable Embankment. 6. Surfaces on which Embankment is to be placed, shall be scarified or stepped in a manner which will permit bonding of the Embankment with the existing surface. 7. The Contractor shall be responsible for preparing the materials for the Embankment, including but not limited to, in-place drying or wetting of the soil necessary to achieve the compaction criteria of these Specifications. 8. Embankment materials shall be placed in a manner permitting drainage and in continuous, approximately horizontal layers. 9. Compaction Requirements: Stone LCIO Landfill Technical Specifications February 2023 Embankment Page 02223-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF a. The Contractor shall compact Embankment in accordance with the requirements shown in Table 1 of this section. If Embankment does not meet the specified requirements, the Contractor shall rework the material, as may be necessary and continue compaction to achieve these requirements, or remove and replace the material to achieve the specified requirements, at Contractor's expense. b. Each lift shall be compacted prior to placement of succeeding lifts. In confined areas, mechanical equipment, suitable for small areas and capable of achieving the density requirements, shall be required. C. Lift compaction shall be performed with an appropriately heavy, properly ballasted, penetrating-foot or smooth-drum vibratory compactor depending on soil type. Compaction equipment shall be subject to approval by the Engineer. 10. Embankment that becomes excessively eroded, soft, or otherwise unsuitable shall be removed or repaired by the Contractor as directed by the Engineer, at no cost to the Owner. 11. The exposed surface of Embankment shall be rolled with a smooth-drum roller at the end of each work day to protect from adverse weather conditions. 12. Where Embankment is to be placed and compacted on slopes that are steeper than 3H:1V, the subgrade shall be benched to a minimum depth of 6 inches and the Embankment shall be placed in horizontal lifts. 13. Backfilling for Structures and Piping_ a. All structures, including manholes and pipes shall be backfilled with Embankment as shown in the Contract Drawings and as described in these Specifications. b. Where sheeting is used, the Contractor shall take all reasonable measures to prevent loss of support beneath and adjacent to pipes and existing structures when sheeting is removed. If significant volumes of soil cannot be prevented from clinging to the extracted sheets, the voids shall be continuously backfilled as rapidly as possible. The Contractor shall thereafter limit the depth below subgrade that sheeting will be driven in similar soil conditions or employ other appropriate means to prevent loss of support. C. When backfilling around structures, do not backfill until concrete has sufficiently cured (as determined by the Engineer) and is properly supported. Place backfill in a manner to avoid displacement or damage of structures. 14. Surveying: Upon completion of the landfill subgrade, the subgrade shall be surveyed on 100 foot centers and at slope breaks (including all tops and toes of slope, points of grade change, etc.) to ensure the top of the subgrade meets the grades specified on the Contract Drawings. Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Table 1: Required Embankment Properties Required % Maximum Lift Item Standard Required Moisture Thickness Proctor Content' (Compacted) (ASTM D698)2 (inches) Embankment Beneath 98 2% of Optimum 8 Structures and Roads' (std. Proctor) Embankment 95 8 Backfill Around Structures 95 As Required for 8 Compaction Backfill in Pipe Trenches 95 6 Unclassified Fill N/A N/A N/A Notes: 1. Embankment beneath structures shall be considered to include a zone 10 feet out from the foundation of the structure extending down to the natural ground on a 45'slope. Embankment beneath roads shall be considered to include all embankment placed within 3 vertical feet of the final wearing surface and shall also include shoulders. 2. Determine field density using ASTM D 6938, ASTM D 1556, ASTM D 2167, or ASTM D 2937. 3. Determine field moisture content using ASTM D 6938,ASTM D 2216,ASTM D 4643, or ASTM D 4959. 4. The Engineer may allow exceptions to the above criteria for areas outside of the containment area which are not subject to significant long-term loads. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Embankment Page 02223-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02240 GEOTEXTILES Geotextiles: For the proposed construction, a Type GT-S (Separator/Filter) is specified. The Type GT-S Geotextile will be placed in the between soil subgrade and aggregate in access roads, and in some erosion control and drainage applications. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Geotextiles including all necessary and incidental items as detailed or required for the Contractor to complete the installation in accordance with the Contract Drawings and these Specifications, except as noted below: a. Geotextiles used as a Silt Fence is covered under Section 02270, Erosion and Sedimentation Control, of these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) and the American Association of State Highway and Transportation Officials (AASHTO) are hereby made a part of these specifications. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles by Exposure to Light, Moisture, and Heat in a Xenon-Arc Type Apparatus. ASTM D 4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity. ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextiles. ASTM D 4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. ASTM D 4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ASTM D 5261 Standard Test Method for Measuring Mass per Unit Area of Geotextiles. ASTM D 6241 Standard Test Method for the Static Puncture Strength of Geotextiles and Geotextile Related Products Using a 50 mm Probe. AASHTO M 288 Standard Specification for Geotextiles. 4. Quality Assurance: Quality Assurance during installation of Geotextiles will be provided by the Owner. B. Materials 1. General: The materials supplied under these Specifications shall consist of new, first-quality products designed and manufactured specifically for the purpose of this work, which shall have been satisfactorily demonstrated, by prior use, to be suitable and durable for such purposes. Labels on each roll of Geotextile shall identify the length, width, lot and roll numbers, and name of Manufacturer. 2. The Type GT-S Geotextile shall be a nonwoven spunbonded or nonwoven needlepunched synthetic fabric consisting of polyester or polypropylene manufactured in a manner approved by the Engineer. Woven fabrics may be used in certain applications if approved in advance by the Engineer. 3. All Geotextiles shall conform to the properties listed in Table 1 of this section. C. Submittals Prior to the installation of Geotextiles, the Contractor shall submit the following to the CQA Engineer: 1. Mill Certificate and Sample: Prior to shipping to the site, the Contractor shall submit a mill certificate or affidavit signed by a legally authorized official of the Manufacturer for each type of Geotextile attesting that the Geotextiles meet the physical and manufacturing requirements stated in these Specifications. The Contractor shall also submit a sample of each Geotextile to be used. The samples shall be labeled with the product name and be accompanied by the Manufacturer's specifications. 2. Shipping, Handling, and Storage Instructions: The Manufacturer's plan for shipping, handling, and storage shall be submitted for review. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 3. Seaming Procedures: Submit proposed seaming procedures including proposed method and equipment. 4. Quality Control Certificates: For Geotextiles delivered to the site, quality control certificates, signed by the Manufacturer's quality assurance manager shall be provided which represent every roll of each type of Geotextile supplied. Each certificate shall have the roll identification number(s), test methods, frequency, and test results. At a minimum, the test results and frequency of testing shall be as shown in TabLe 2 of this section. 5. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into the construction. D. Construction 1. Shipping, Handling, and Storage: ALL Geotextiles shall be shipped, handled, and stored in strict accordance with the Manufacturer's recommendations. 2. Failing CQA Material Control Tests: Geotextiles that are rejected upon testing shall be removed from the project site and replaced at Contractor's cost. Sampling and CQA testing of Geotextiles supplied as replacement for rejected material shall be performed by the Engineer at Contractor's cost. 3. Installation: a. The surface receiving the Geotextiles shall be prepared to a relatively smooth condition, free of obstructions, standing water, excessive depressions, debris, and very soft, excessively wet, and/or loose pockets of soil. This surface shall be approved by the Engineer prior to Geotextile placement. b. Geotextiles shall be placed to the Lines and grades shown on the Contract Drawings. At the time of installation, Geotextiles shall be rejected by the Engineer if they have defects, rips, holes, flaws, evidence of deterioration, or other damage. C. The Geotextiles shall be placed smooth and free of excessive wrinkles. d. On slopes, Geotextiles shall be anchored at the top and unrolled down the slope. In the presence of wind, all Geotextiles shall be weighted with sandbags or other material as appropriate. Geotextiles uplifted by wind may be reused upon approval by the Engineer. 4. Seams: Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF a. All Geotextile seams shall be continuously sewn or heat bonded with methods approved by the Engineer. Overlapping of seams may also be allowed if approved in advance by the Engineer. All seams must be approved by the Engineer. b. On slopes of 6H:1V or steeper, all seams shall be oriented parallel to (in the direction of)the slope unless otherwise approved by the Engineer. C. Seams to be sewn shall be sewn using a Type 401 stitch. One or two rows of stitching may be used. Each row of stitching shall consist of 4 to 7 stitches per inch. The minimum distance from the geotextile edge to the stitch line nearest to that edge (seam allowance) shall be 1.5 inches if a Type SSa (prayer or flat) seam is used. The minimum seam allowance for all other seam types shall be 1.0 inches. d. Seams to be heat bonded shall be bonded using hot plate, hot knife, ultrasonic, or other approved devices. 5. Repair Procedures: a. Any Geotextile that is torn, punctured, or otherwise damaged shall be repaired or replaced, as directed by the Engineer, by the Contractor at no additional cost to the Owner. The repair shall consist of a patch of the same type of Geotextile placed over the failed areas and shall overlap the existing Geotextile a minimum of 18 inches from any point of the rupture. Patches shall be spot sewn or heat bonded so as not to shift during cover placement. b. Slopes Flatter Than 6H:1V: Damaged areas of a size exceeding 10 percent of the roll width shall be removed and replaced across the entire roll width with new material. Damaged areas of a size less than 10 percent of the roll width may be patched. C. Slopes of 6H:1V or Steeper: Geotextile panels which require repair shall be removed and replaced with new material. Replacement material shall be sewn as previously described in this specification. 6. Cover Placement: a. Except when designed to remain exposed, Geotextiles shall be covered in a timely manner to limit potential UV damage. Unless otherwise approved by the Engineer, covering shall occur within 30 days of installation. Extension of this time may be considered by the Engineer based on weather conditions (i.e. prolonged cloud cover during 30 day period) or technical information provided by the Manufacturer that would justify an extension. (1) The Engineer may conduct sampling and testing of any Geotextiles exposed for a period longer than allowed to verify the material properties. The cost associated with this testing and the subsequent repair(s) shall be borne solely by the Contractor regardless of the test results. In no case will the maximum length of exposure be greater than 60 days without verification of material properties. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF b. Placement of cover over Geotextiles shall be performed in a manner as to ensure that the Geotextiles or underlying materials are not damaged. Cover material shall be placed such that excess tensile stress is not mobilized in the Geotextile. Table 1: Required Geotextile Properties Value' Property Test Method Units Type GT-S Geotextile Construction NWz or W3 (NW = Nonwoven) ----- ----- (W=Woven) Mass per Unit Area (Unit ASTM D 5261 oz/ydz N/A Weight) UV Resistance (500 hrs) ASTM D 4355 % 70 Strength Class' AASHTO M 288 Class 2 Tensile Properties: ASTM D 4632 Grab Strength lbs 160 (NW) 250 (W) Grab Elongation % > 50 (NW) < 50 (W) Puncture Resistance ASTM D 6241 lbs 410 (NW) 950 (W) Trapezoidal Tear Strength ASTM D 4533 lbs 55 (NW) 90 (W) Apparent Opening Size ASTM D 4751 U.S. 70+ (AOS) Sieve Permittivity ASTM D 4491 sec-' 1.0 Notes: 1. Minimum Average Roll Value (MARV). 2. Nonwoven geotextiles that have been heat calendered are not acceptable, unless approved by the Engineer in advance. 3. Woven geotextiles shall be approved in advance by the Engineer. Woven geotextiles formed exclusively with slit film fibers are not acceptable. 4. AASHTO M 288 criteria include the above listed requirements for: Tensile Properties, Puncture Resistance, Trapezoidal Tear Strength, and Burst Strength. Stone LCID Landfill Technical Specifications February 2023 Geotextiles Page 02240-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Table 2: Required Manufacturer Quality Control Tests Property Test Method7 Minimum Test Frequency Mass per Unit Area (Unit Weight) ASTM D 5261 200,000 ft2 Ultraviolet Resistance (500 hrs) ASTM D 4355 Periodic Tensile Properties ASTM D 4632 200,000 ft2 Apparent Opening Size (AOS) ASTM D 4751 Periodic Permittivity ASTM D 4491 Periodic Puncture Resistance ASTM D 6241 200,000 ft2 Trapezoidal Tear Strength ASTM D 4533 200,000 ft2 END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Geatextiles Page 02240-6 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02270 EROSION AND SEDIMENTATION CONTROL Erosion and Sedimentation Control: Erosion and Sedimentation Control is a system of construction and engineered measures (devices, structures, practices, etc.) which act to minimize surface water induced erosion of disturbed areas and the resulting off-site sedimentation. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of and maintain Erosion and Sedimentation Control measures and related work in accordance with the Contract Drawings and these Specifications. All Erosion and Sedimentation Control work shall be in accordance with the latest edition of the North Carolina Erosion and Sediment Control Planning and Design Manual as well as applicable regulations. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Rip Rap 02271 Rolled Erosion Control Products 02275 Stormwater Systems 02720 Revegetation 02930 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these specifications. ASTM D 3786 Test Method for Hydraulic Bursting Strength of Knitted Goods and Nonwoven Fabrics: Diaphragm Bursting Strength Tester Method. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water(Xenon-Arc Type Apparatus). ASTM D 4491 Standard Test Methods for Water Permeability of Geotextiles by Permittivity. ASTM D 4533 Standard Test Method for Trapezoid Tearing Strength of Geotextiles. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF ASTM D 4632 Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. ASTM D 4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. ASTM D 4833 Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes, and Related Products. B. Materials 1. Permanent Sediment or Detention Basins: Permanent sediment or detention basins shall be constructed as shown on the Contract Drawings. 2. Permanent Drainage Channels, Diversions, Swales, and Ditches: Permanent drainage channels, diversions, swales, and ditches shall be constructed as shown on the Contract Drawings. 3. Silt Fence: Silt fences shall be constructed as shown on the Contract Drawings and as needed, based on the Contractor's discretion and Engineer's approval. The silt fence is a permeable barrier erected within and downgradient of small disturbed areas to capture sediment from sheet flow. It is made of filter fabric buried at the bottom, stretched, and supported by posts and wire mesh backing. Silt fence shall conform to the following properties: a. Posts: Posts shall be 1.33 lb/linear foot steel (preferred) or wood with a minimum length of 5 feet. Steel posts shall be "U" or"7-type. Wood posts shall have a minimum diameter of 4-inches. b. Filter Fabric: Filter fabric shall be a woven geotextile made specifically for sediment control. Filter fabric shall conform to the properties listed in Table 1 of this section. 4. Rip Ram Rip Rap shall conform to the requirements of Section 02271, Rip Rap, of these Specifications. 5. Rolled Erosion Control Products (RECPs): Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Rolled Erosion Control Products (RECPs) shall conform to the requirements of Section 02275, Rolled Erosion Control Products, of these Specifications. 6. Other Work: In addition to the Erosion and Sedimentation Control measures shown on the Contract Drawings, the Contractor shall provide adequate means to prevent any sediment from entering any storm drains, drop inlets, ditches, streams, or bodies of water downstream of any area disturbed by construction. Excavation materials shall be placed upstream of any trench or other excavation to prevent sedimentation of off-site areas. In areas where a natural buffer area exists between the work area and the closest stream or water course, this area shall not be disturbed. All paved areas shall be scraped and swept as necessary to prevent the accumulation of dirt and debris. Work associated with this provision shall be considered incidental to the project and no separate payment will be made. 7. Temporary and Permanent Ground Cover: The Contractor shall provide temporary or permanent ground cover(or other acceptable measure(s)) adequate to restrain erosion on erodible slopes or other areas within 21 calendar days following completion of any phase of grading. The Contractor shall provide permanent ground cover for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following the completion of construction. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results, prior to installation, that all Erosion and Sedimentation Control materials manufactured for the project have been produced in accordance with these Specifications. 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. Establishment of Erosion and Sedimentation Control Measures: a. All Erosion and Sedimentation Control measures will be constructed according to the Contract Drawings and these Specifications. b. Due to the nature of the work required by this Contract, it is anticipated that the location and nature of the Erosion and Sedimentation Control measures may need to be adjusted to reflect the current phase of construction. C. Erosion and Sedimentation Control measures shall be established prior to the work in a given area. Where such practice is not feasible, the Erosion and Sedimentation Control measure(s) shall be established immediately following completion of the clearing operation. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF d. The construction schedule adopted by the Contractor will impact the placement and need for specific measures required for the control of erosion. The Contractor shall develop and implement such additional techniques as may be required to minimize erosion and prevent or correct the discharge of sediment outside the limits of construction (unless controlled by other on-site measure(s)). e. The location and extent of Erosion and Sedimentation Control measures shall be revised at each phase of construction that results in a change in either the quantity or direction of surface runoff from construction areas. All deviations from the control provisions shown on the Contract Drawings shall have the prior approval of the Engineer. 2. Inspection and Maintenance of Erosion and Sedimentation Control Measures: a. The Contractor shall furnish the labor, material, and equipment required for the inspection and maintenance of all Erosion and Sedimentation Control measures. Maintenance shall be scheduled as required for a particular measure to maintain the removal efficiency and intent of the measure. b. All Erosion and Sedimentation Control measures shall be inspected at least once every seven calendar days and within 24 hours after any storm event of greater than 0.5 inches of rain per 24 hour period and appropriate maintenance conducted. A rain gauge shall be maintained on the site and a record of the rainfall amounts and dates shall be kept properly. C. Maintenance shall include, but not be limited to: (1) The removal and satisfactory disposal of trapped or deposited sediments from basins, traps, barriers, filters, and/or drainage features/devices; (2) Replacement of filter fabrics used for silt fences upon loss of efficiency; and (3) Replacement of any other components which are damaged or cannot serve the intended use. d. The Contractor shall accept and maintain any existing sediments that are included in existing sediment basins and traps that accept or will accept stormwater flow and or sediment accumulation from all areas within the Contractor's limits of construction. All of these sediment basins and/or traps shall be cleaned of sediments accumulated during the performance of this pro lect. e. Sediments removed from Erosion and Sedimentation Control measures shall be disposed of in locations that will not result in off-site sedimentation as approved by the Engineer. f. All Erosion and Sedimentation Control measures shall be maintained to the satisfaction of the Engineer until the site has been stabilized. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 3. Graded Slopes and Fills: The angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetated cover or other adequate measures. 4. Finish Grading: All disturbed areas shall be uniformly graded to the lines, grades, and elevations shown on the Contract Drawings. Except for certain erosion and sedimentation control measures and other areas designated to impound water, all areas shall be graded to drain. Finished surfaces shall be reasonably smooth, compacted, and free from irregular surface changes. Unless otherwise specified, the degree of finish shall be that ordinarily obtainable from either blade or scraper operations. Areas shall be finished to a smoothness suitable for application of topsoil. 5. Revegetation: Revegetation shall conform to the requirements of Section 02930, Revegetation, of these Specifications. 6. Cleanup: a. The Contractor shall remove from the site all debris from their work including, but not limited to, branches, paper, and rubbish in all landscape areas, and remove temporary barricades as the work proceeds. b. All areas shall be kept in a neat, orderly condition at all times. Prior to final acceptance, the Contractor shall clean up the entire landscaped area to the satisfaction of the Engineer. Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Table 1: Required Silt Fence Filter Fabric Properties Property Test Method FUnits Value' Grab Tensile Strength ASTM D 4632 lbs 90 x 90 Grab Elongation ASTM D 4632 % 20 (Max.) Ultraviolet Resistance (500 hrs) ASTM D 4355 % 80 Apparent Opening Size (AOS) ASTM D 4751 U.S. Sieve 30+ Permittivity ASTM D 4491 sec-' 0.05 Notes: 1. Minimum Average Roll Value (MARV). 2. Values for machine and cross machine direction (MD x XD), respectively. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Erosion and Sedimentation Control Page 02270-6 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02271 RIP RAP Rip Rai This section includes all rip rap aprons and channel protection. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Rip Rap for protection of earthen slopes against erosion as indicated, including all necessary and incidental items, in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Geotextiles 02240 Erosion and Sedimentation Control 02270 3. Reference Standards: The latest revision of the following standards of the North Carolina Department of Transportation (NCDOT) are hereby made a part of these Specifications. NCDOT Standard Specifications for Roads and Structures. B. Materials 1. Rip Ram Rip Rap shall be of the size indicated on the Contract Drawings and shall conform to NCDOT Section 1042, Rip Rap Materials. 2. Geotextiles: Geotextiles shall conform to the requirements outlined in Section 02240, Geotextiles, of these Specifications. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results prior to installation, that all Rip Rap has been produced in accordance with these Specifications. Stone LCID Landfill Technical Specifications February 2023 Rip Rap Page 02271-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. Surface Preparation: a. Trim and dress all areas to conform to the Contract Drawings as indicated with tolerance of 2 inches from theoretical slope lines and grades. b. Bring areas that are below allowable minimum tolerance limit to grade by filling with compacted Embankment material similar to adjacent material. C. Geotextiles shall be placed as shown on the Contract Drawings and in accordance with Section 02240, Geotextiles, of these Specifications. d. Do not place any stone material on the prepared surface prior to inspection and approval to proceed from the Engineer. 2. Placing Rip Rai Rip Rap shall be placed in accordance with NCDOT Section 876, Rip Rap. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Rip Rap Page 02271-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02275 ROLLED EROSION CONTROL PRODUCTS Rolled Erosion Control Products: Rolled Erosion Control Products (RECPs) include erosion control blankets (ECB) and turf reinforcement mats (TRM) pLaced in channels and on slopes. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of all RECPs in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Erosion and Sedimentation Control 02270 Revegetation 02930 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these specifications. ASTM D 4355 Standard Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water(Xenon-Arc Type Apparatus). ASTM D 6475 Standard Test Method for Measuring Mass per Unit Area of Erosion Control Blankets. ASTM D 6524 Standard Test Method for Measuring the Resiliency of Turf Reinforcement Mats. ASTM D 6525 Standard Test Method for Measuring Nominal Thickness of Permanent Erosion Control Products. ASTM D 6566 Standard Test Method for Measuring Mass per Unit Area of Turf Reinforcement Mats. ASTM D 6818 Standard Test Method for Ultimate Tensile Properties of Turf Reinforcement Mats. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF B. Materials 1. General: The materials supplied under these Specifications shall consist of new, first-quality products designed and manufactured specifically for the purpose of this work, which shall have been satisfactorily demonstrated, by prior use, to be suitable and durable for such purposes. Labels on each RECP shall identify the length, width, product name, and name of Manufacturer. 2. Erosion Control Blanket (ECB) (Single Net): ECB (single net) shall consist of a machine-produced mat of straw or wood excelsior fiber covered on the top side with a photodegradable extruded plastic or woven biodegradable netting and sewn togetherwith degradable thread. ECB (single net) shall also conform to the properties listed in Table 1 of this section. ECB (single net) shall be EroNet S75, as manufactured by North American Green, CURLEX I, as manufactured by American Excelsior Company, LANDLOK S1, as manufactured by Propex GeoSolutions, or approved equal. Flexterra Flexible Growth Media (FGM), as manufactured by Profile Products, applied at a minimum rate of 3,500 lbs/acre (or equal product/application rate) is an acceptable substitute for ECB to be placed on 2H:1V slopes (a minimum rate of 3,000 lbs/acre shall be used on 3H:1V slopes). 3. Turf Reinforcement Mat (TRM): TRM (Type 1) shall consist of a dense web of crimped and interlocking polypropylene fibers positioned between two biaxially oriented nets and mechanically bound together by parallel stitching with polypropylene thread. TRM shall be designed to accelerate seedling emergence, exhibit high resiliency, and possess strength and elongation properties to limit stretching in a saturated condition. TRM shall be stabilized against chemical and UV degradation which are normally found in a natural soil environment and shall have no biodegradable components. TRM shall also conform to the properties listed in Table 1 of this section. TRM shall be LANDLOK 435, as manufactured by Propex GeoSolutions, or approved equal. 4. Anchors: Anchors for RECPs shall consist of machine made staples of No. 8 gauge new steel wire formed into a "U" shape. The size when formed shall be not less that 8 inches in length with a throat of not less than 1 inch in width. Longer anchors may be required for loose soils. Other anchors, such as metal pins or plastic pegs, may also be used if approved in advance by the Engineer. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF C. Submittals The Contractor shall submit the following to the Engineer: 1. Mill Certificate and Sample: Prior to shipping to the site, the Contractor shall submit a mill certificate or affidavit signed by a legally authorized official of the Manufacturer for each RECP attesting that each RECP meets the physical and manufacturing requirements stated in these Specifications. The Contractor shall also submit a sample of each RECP to be used. The sample shall be labeled with the product name and be accompanied by the Manufacturer's specifications. 2. Installation Guidelines/Instructions: The Manufacturer's guidelines/instructions for installation shall be submitted for review. 3. Furnish copies of delivery tickets or other approved receipts as evidence for materials received that will be incorporated into the construction. D. Construction 1. Shipping, Handling, and Storage: All RECPs shall be shipped, handled, and stored in strict accordance with the Manufacturer's recommendations. 2. Installation - General: a. Placing of RECPs shall be done immediately following seeding. Seeding shall be performed in accordance with Section 02930, Revegetation, of these Specifications. b. RECPs shall be placed to the lines and grades shown on the Contract Drawings. The earth surface shall be smooth and free from stones, clods, or debris which will prevent the contact of the RECP with the soil. Care shall be taken to preserve the required line, grade, and cross section of the area. C. RECPs shall be unrolled in the direction of the flow of water and shall be applied without stretching so that it will lie smoothly but loosely on the soil surface. d. At the time of installation, RECPs shall be rejected, if they have defects, rips, holes, flaws, evidence of deterioration, or other damage. e. The Engineer may require adjustments in the installation requirements to fit individual conditions. 3. Installation - Channels: RECPs installed in channels shall be unrolled parallel to the direction of water flow. The first roll shall be centered longitudinally in the channel and anchored with staples. Subsequent rolls shall be installed outward to the edges of the channel and be lapped to allow installation of a common row of anchors. RECP ends shall be overlapped with the Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF upstream ends on top ("shingled"). Refer to the Contract Drawings and/or the Manufacturer's installation guidelines/instructions for installation details. 4. Installation - Slopes: RECPs installed on slopes shall be oriented in vertical strips and anchored. Subsequent rolls shall be installed outward to the edge(s) of the original roll and be lapped to allow installation of a common row of anchors. RECP ends shall be shingled. Refer to the Contract Drawings and/or the Manufacturer's installation guidelines/instructions for installation details. 5. Maintenance: Maintenance of RECPs shall be in accordance with Section 02270, Erosion and Sedimentation Control, of these Specifications. Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A5lA5CD3F4CF Table 1: Required Rolled Erosion Control Product Properties Property Test Method Units Value' Erosion Control Blanket (ECB) (Single Net) 0.5+ 10% Mass per Unit Area ASTM D 6475 lbs/yd2 (Straw) 0.7+ 10% (Excelsior) Tensile Strength ASTM D 6818 lbs/ft 50 x 65 Tensile Elongation ASTM D 6818 % 20 Maximum Permissible Shear ----- lbs/ftz 1.55 Stress (Un-Vegetated) Functional Longevity ----- months 12 Turf Reinforcement Mat(TRM) Mass per Unit Area ASTM D 6566 oz/ydz 8 Thickness ASTM D 6525 inches 0.35 Tensile Strength ASTM D 6818 lbs/ft 225 x 175 Tensile Elongation ASTM D 6818 % 50 (max.) Resiliency ASTM D 6524 % 80 UV Resistance (1,000 Hours) ASTM D 4355 % 80 Maximum Permissible Shear Large Scale lbs/ftz 5 Stress (Long-Term Vegetated) Notes: 1. Typical for ECB. 2. Values for machine and cross machine direction NO x XD), respectively. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Rolled Erosion Control Products Page 02275-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02608 PRECAST CONCRETE STRUCTURES Precast Concrete Structures: Precast Concrete Structures are used in the stormwater systems. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete installation of Precast Concrete Structures in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Stormwater Systems 02720 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM) are hereby made a part of these Specifications. ASTM A 615 Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. ASTM C 443 Standard Specification for Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets. ASTM C 478 Standard Specification for Precast Reinforced Concrete Manhole Sections. ASTM C 497 Standard Test Methods for Concrete Pipe, Manhole Sections, or Tile. ASTM C 990 Standard Specification for Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants. ASTM C 1433 Standard Specification for Precast Reinforced Concrete Box Sections for Culverts, Strom Drains, and Sewers. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF B. Materials 1. Precast Concrete Boxes: All precast concrete boxes shall be constructed from non- shrink, 4,000 psi compressive strength concrete in conformance with ASTM C 1433 and as detailed on the Contract Drawings. 2. Joints: Alljoints shall be sealed with preformed plastic gaskets in conformance with ASTM C 990 or rubber gaskets in conformance with ASTM C 443. 3. Steps: ALL steps shall be constructed of 0.5 inch reinforcing rod completely encased in corrosion-resistant rubber or plastic. The upper surfaces of each step shall have a traction tread of self cleaning rubber cleats and guide lugs on both sides to prevent slippage. 4. Frames and Covers: Frames and covers shall consist of cast iron frames and covers (Vulcan Foundry, or equal) equipped with steel handles and shall be of the opening size as indicated on the Contract Drawings. Markings on the covers shall indicate the intended use of the structure and shall be acceptable to the Owner. 5. Markings: All Precast Concrete Structures shall include markings clearly identifying the date of manufacture, the name of the manufacturer, and any other pertinent information. C. Submittals The Contractor shall submit the following to the Engineer: 1. The Contractor shall submit shop drawings for Precast Concrete Structures for approval at least 4 weeks prior to construction. Shop drawings shall show complete design, installation, and construction information in such detail as to enable the Engineer to determine the adequacy of the proposed units for the intended purpose. Details of steel reinforcement size and placement shall be included. The shop drawings shall include a schedule which will list the size and type of precast structure at each location where the precast structures are to be used. 2. Submit a certification and summary of all required test results, prior to installation, that all Precast Concrete Structures have been produced in accordance with these Specifications. D. Construction 1. The Precast Concrete Structures shall be installed at the locations and to the elevations indicated on the Contract Drawings. The Contractor shall give the Engineer sufficient notice so they may observe the field Location and installation activities. 2. The Precast Concrete Structures will be bedded and backfilled as indicated on the Contract Drawings. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 3. Precast Concrete Structures which are damaged or become damaged will be rejected or shall be repaired in a manner approved by the Engineer at the Contractor's sole expense. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. Stone LCID Landfill Technical Specifications February 2023 Precast Concrete Structures Page 02608-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02720 STORMWATER SYSTEMS Stormwater Systems: Stormwater Systems shall include all piping, pipe fittings, headwalls, flared end sections, drop inlets, manholes, and other appurtenances designated to convey stormwater. A. Description 1. General: The contractor shall furnish all labor, material, and equipment to complete installation of Stormwater Systems in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Rip Rap 02271 3. Reference Standards: The latest revision of the following standards of the American Society of Testing and Materials (ASTM), the American Association of State Highway and Transportation Officials (AASHTO), and the North Carolina Department of Transportation (NCDOT) are hereby made a part of these specifications. ASTM C 76 Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. ASTM C 150 Standard Specification for Portland Cement. ASTM D 1248 Standard Specification for Polyethylene Plastics Molding and Extrusion Materials For Wire and Cable. ASTM D 2321 Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications. ASTM D 3350 Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. AASHTO M 36 Specification for Corrugated Steel Pipe. Stone LCID Landfill Technical Specifications February 2023 Starmwater Systems Page 02720-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF AASHTO M 252 Specification for Corrugated Polyethylene Drainage Tubing, 3 to 10 Inch Diameter. AASHTO M 294 Specification for Corrugated Polyethylene Pipe, 12 to 36 Inch Diameter. NCDOT Standard Specifications for Roads and Structures and Roadway Standard Drawings. B. Materials 1. Corrugated Polyethylene (CPE) Pipe: CPE pipe and fittings shall be of the sizes and type shown on the Contract Drawings and shall conform to every aspect of AASHTO M 252 (3 to 10 inch diameters) or AASHTO M 294 (12 to 36 inch diameters). All Type S CPE pipe shall have watertight joints. 2. Flared End Sections: Flared end sections shall be reinforced and shall be fabricated from the same materials meeting the same requirements as the pipe to which they are connected. All reinforced concrete and corrugated metal flared end sections shall meet the requirements of the NCDOT. Corrugated polyethylene flared end sections shall be as recommended by the pipe manufacturer. C. Submittals The Contractor shall submit the following to the Engineer: 1. Submit a certification and summary of all required test results, prior to installation, that all Stormwater Systems have been produced in accordance with these Specifications. 2. Furnish copies of the delivery tickets or other approved receipts as evidence for materials received that will be incorporated into construction. D. Construction 1. All piping shall be installed by skilled workmen and in accordance with the best standards for piping installation. Proper tools and appliances for the safe and convenient handling and installation of the pipe and fittings shall be used. 2. All pieces shall be carefully examined for defects, and no piece shall be installed which is known to be defective. If any defective piece should be discovered after having been installed, it shall be removed and replaced at the Contractor's expense. 3. Prior to installation, the Contractor is responsible for checking the fit of design elevations for Stormwater Systems with existing conditions (i.e. conflicts with other structures, fit within existing drainage channels/features, ability to have minimum cover, etc.). The Stone LCID Landfill Technical Specifications February 2023 Stormwater Systems Page 02720-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Contractor shall notify the Engineer of any conflicts and/or necessary field adjustments prior to installation for resolution or concurrence. 4. Excavation and backfilling of pipe trenches shall be as described in Section 02222, Excavation and Section 02223, Embankment, respectively, of these Specifications. 5. Following proper preparation of the trench subgrade, pipe and fittings shall be carefully lowered into the trench so as to prevent dirt and other foreign substances from gaining entrance into the pipe and fittings. Proper facilities shall be provided for lowering sections of pipe into trenches. No materials shall be dropped or dumped into the trench. 6. Water shall be kept out of the trench until jointing and backfilling are completed. When work is not in progress, open ends of pipe, fittings, and valves shall be securely closed so that no water, earth, or other substance will enter the pipes, fittings, or valves. Pipe ends Left for future connections shall be valved, plugged, or capped, and anchored as required. 7. All Stormwater Systems shall be installed to accurate lines and grades with no abrupt changes in line or grade. 8. The full length of each section of pipe shall rest solidly upon the bed of the trench, with recesses excavated to accommodate bells, couplings,joints, and fittings. Before joints are made, each pipe shall be well bedded on a solid foundation. No pipe shall be brought into position until the preceding length has been thoroughly bedded and secured in place. Pipe that has the grade orjoint disturbed after laying shall be taken up and re-laid by the Contractor at their own expense. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Starmwater Systems Page 02720-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page left intentionally blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF SECTION 02930 REVEGETATION Revegetation: Revegetation includes permanent Revegetation of all site areas disturbed by the Contractor whether inside the Contract Limits or not. A. Description 1. General: The Contractor shall furnish all labor, material, and equipment to complete Revegetation in accordance with the Contract Drawings and these Specifications. 2. Related Work: Related Contract Work is described in the following sections of the Specifications: Work Section Excavation 02222 Embankment 02223 Erosion and Sedimentation Control 02270 Rolled Erosion Control Products 02275 3. Correction Period: The Contractor shall be responsible for the satisfactory establishment and growth of a permanent stand of vegetation as judged by the Engineer. During this period, the Contractor shall be responsible for the maintenance items described in Paragraph D.4 (Maintenance) of this Specification. B. Materials 1. Limestone: Unless otherwise defined by specific soil tests, supply agricultural grade ground limestone conforming to the current "Rules, Regulations, and Standards of the Fertilizer Board of Control." 2. Fertilizer: Unless otherwise defined by specific soil tests, supply commercial fertilizer meeting applicable requirements of State and Federal law. Do not use cyanamic compounds of hydrated time. Deliver fertilizer in original containers labeled with content analysis. 3. Grass Seed: Supply fresh, clean, new-crop seed. Do not use seed which is wet, moldy, or otherwise damaged. Deliver seed in standard sealed containers labeled with producer's name and seed analysis, and in accord with US Department of Agriculture Rules and Regulations under Federal Seed Act. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-1 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF 4. Mulch: Supply clean, seed-free, threshed straw of oats,wheat, barley, rye, beans, or other locally available mulch material. a. Do not use mulch containing a quantity of matured, noxious weed seeds or other species that will be detrimental to seeding, or provide a menace to surrounding Land. b. Do not use mulch material which is fresh or excessively brittle, or which is decomposed and will smother or retard growth of grass. 5. Binder: Supply emulsified asphalt or synthetic binder. 6. Water: Supply potable, free of substances harmful to growth. 7. Application rates, seed types, and other requirements shall be in accordance with Table 1 of this section. C. Submittals The Contractor shall submit the following to the Engineer: 1. Results of soil tests performed and proposed modifications, if any, to the specified requirements. 2. Certificates for each grass seed mixture, stating botanical and common name, percentage by weight, and percentages of purity, germination, and weed seed. Certify that each container of seed delivered is fully labeled in accordance with Federal Seed Act and equals or exceeds specification requirements. 3. Copies of invoices for fertilizer, showing grade furnished and total quantity applied. D. Construction 1. The Contractor shall establish a smooth, healthy, uniform, close stand of grass from the specified seed. Prior to Revegetation, the Contractor shall adequately test the soils to be revegetated to ensure the adequacy of the specified requirements. Any modifications to these requirements deemed necessary after the review of soil test results, shall be at the Contractor's sole expense. The Engineer will perform the observations to determine when successful Revegetation is achieved. 2. Soil Preparation: a. Limit preparation to areas which will be planted soon after preparation. b. Loosen surface to minimum depth of four (4) inches. C. Remove stones, sticks, roots, rubbish and other extraneous matter over three (3) inches in any dimension. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-2 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF d. Spread time uniformly over designated areas at the rate specified in Table 1 of this section. e. After application of time, prior to applying fertilizer, loosen areas to be seeded with double disc or other suitable device if soil has become hard or compacted. Correct any surface irregularities in order to prevent pocket or low areas which will allow water to stand. f. Distribute fertilizer uniformly over areas to be seeded at the rate specified in Table 1 of this section. (1) Use suitable distributor. (2) Incorporate fertilizer into soil to depth of at least two (2) inches. (3) Remove stones or other substances which will interfere with turf development or subsequent mowing. g. Grade seeded areas to smooth, even surface with loose, uniformly fine texture. (1) Roll and rake, remove ridges and fill depressions, as required to meet finish grades. (2) Fine grade just prior to planting. 3. Seeding: a. Use approved mechanical power driven drills or seeders, mechanical hand seeders, or other approved equipment. b. Distribute seed evenly over entire area at the rate specified in Table 1 of this section. C. Stop work when work extends beyond most favorable planting season for species designated, or when satisfactory results cannot be obtained because of drought, high winds, excessive moisture, or other factors. d. Resume work only when favorable condition develops, or as directed by the Engineer. e. Lightly rake seed into soil followed by light rolling or cultipacking. f. Immediately protect seeded areas against erosion by mulching or placing Rolled Erosion Control Products in accordance with Section 02275 of these Specifications,where applicable. (1) Spread mulch in a continuous blanket at the rate specified in Table 1 of this section. Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-3 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF (2) Immediately following spreading mulch, secure with evenly distributed binder at the rate specified in Table 1 of this section. (3) For slopes not steeper than 3H:1V and as an option to using binder to secure mulch, use a mulch anchoring tool operated along the contour of the slope. 4. Maintenance: The Contractor shall be responsible for maintaining all seeded areas through the end of their warranty period. The Contractor shall provide, at their expense, protection of all seeded areas against damage at all times until acceptance of the work. Maintenance shall include, but not be limited to, the following items: a. Regrade and revegetate all eroded areas until adequately stabilized by grass. b. Remulch with new mulch in areas where mulch has been disturbed by wind or maintenance operations sufficiently to nullify its purpose. Anchor as required to prevent displacement. C. Replant bare areas using same materials specified. d. Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Table 1: Seeding Schedule Material Seed Type Application Rate (See Note 11 Lime ----- 4,000 lbs/acre Fertilizer(10-20-20) ----- 500 lbs/acre Seed: Tall Fescue 50 lbs/acre Centipede 5 lbs/acre Permanent: Bermudagrass3 35 lbs/acre Sericea Lespedeza 20 lbs/acre Seasonal Nurse Crop See Note 2 Temporary: Seasonal Nurse Crop See Note 2 Mulch ----- 4,000 - 5,000 lbs/acre Binder ----- 400 gallons/acre Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-4 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Notes: 1. Application rates and/or chemical analysis shall be confirmed or established by a soil test(s). 2. Use seasonal nurse crop in accordance with seeding dates as stated below: May 1 -August 15 40 lbs/acre German Millet January 1 — May 1 120 lbs/acre Rye (grain) August 15 — December 31 120 lbs/acre Rye (grain)\ Annual Lespedoza (Kobe) 50 lbs/acre 3. From September 10 — February 28, use unhulled Bermudagrass. From March 1 —August 31, use hulled Bermudagrass. END OF SECTION Stone LCID Landfill Technical Specifications February 2023 Revegetation Page 02930-5 DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF Appendix Erosion and Sedimentation Control Plans and Details Erosion and Sedimentation Control Plan Stone LCIB Landfill Chatham County, North Carolina DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. Drawings and details provided in Appendix D of mining permit application. DocuSign Envelope ID: EOA3AE9F-0561-4294-8973-A51A5CD3F4CF This page intentionally left blank. Appendix D Mine Drawings Mining Permit Application ARBD, LLC— Stone LCID Landfill R Mine Chapel Hill, North Carolina This page intentionally left blank. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 SEAL ,,,,��p�uu�U�',,i DocuSigned n'`,O�, �SC 0�Z�i�ARB0 LLC I,,,' 27B482DF A09438_. SEAL ' 023002 ENGINE'- 6� . /2024 CHATHAM COUNTY NORTH CAROLINA 88881112111" I fog 7 SEAL 0111 11 11 8 8�,,, DocuSigned,,Yy '.'� SS QO�/�/,j•�, C5BCC950137B4AC._ SEAL 054367 4GINEE��� SE C; t /2o24 REV. DATE DESCRIPTION PERMIT DRAWINGS °AM°e�R MARCH 2024 Electronic files are instruments of service provided by Smith Gardner,Inc.for the convenience of the intended recipient(s),and IAIIAI RTE no warranty is either expressed or implied. Any reuse or " of redistribution of this document in whole or part without the E aP? ^ written authorization of Smith Gardner,Inc.,will be at the sole ° risk of the recipient. If there is a discrepancy between the w^ N electronic files and the signed and sealed hard copies,the hard s A ,o „ °"°'`�<,T copies shall govern. Use of any electronic files generated or provided by Smith Gardner,Inc.,constitutes an acceptance of W ® E SHEET NO. DRAWING NO. DRAWING TITLE REVISION NO. these terms and conditions. "Icol for Ru S 1 -- TITLE - COVER SHEET �^ fo ° E"°E °�E4. co SPy� oe[5 2 S1 MINE MAP (EXISTING CONDITIONS) owu 4 3 S2 MINE EXCAVATION GRADING PLAN .� s 4 S3 MINE RECLAMATION PLAN STANDARD SECTION LOCATION CALLO LIT (SHEET AND DETAIL) 5 X 1 ENGINEERING CROSS SECTIONS (SHEET 1 OF 2) t 6 X2 ENGINEERING CROSS SECTIONS (SHEET 2 OF 2) AA 7 7 EC1 EROSION AND SEDIMENTATION CONTROL DETAILS SHEET 1 OF 4 s� 8 EC2 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 2 OF 4) SECTION REFERENCED �., SHEET WHERE SECTION IS PRESENTED �au+ FaR�?•ti'�rOVRQ 9 EC3 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 3 OF 4) 10 EC4 EROSION AND SEDIMENTATION CONTROL DETAILS (SHEET 4 OF 4) s r r - y r = STANDARD DETAIL CALLOUT - - _..- 11 D1 MINING DETAILS DETAIL REFERENCED -� [� O'•�� �J`�} 9t �rf�i f \, _ a --... o r i r�l'T1I�UIZ=�w. 1 .r�_. -- _ SHEET WHERE DETAIL IS PRESENTED STANDARD DETAIL LABEL AND CALLOUT SITE LOCATION - ' DETAIL TITLE DETAIL REFERENCED py DETAIL 1 ' S SCALE AS SHOWN S1 SHEET WHERE DETAIL IS PRESENTED JM'dariLake I- a C, ; ' _ STANDARD REVISION CALLOUT (SHEETAND DETAIL) �f SITE LOCATION MAP NOT TO SCALE SHEET SET REVISION NUMBER a 0 0 PERMIT ISSUE NOT FOR CONSTRUCTION 3 a v N O O ❑ co N NC LIC. NO. F-1370 (ENGINEERING) co SC COA NO. C01488 N m g a J U STONE LCID LANDFILLAND 41NE 41NE 4AP AND RECLA 4ATION PLAN m 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 Q 1526 Richland St., Columbia SC 29201 `' © 2024 Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB47OBC860 0 0 0 0 00 00 o PREPARED FOR: MAP NM PARCEL NO. PIN OWN EIR PHYSICAL ADDRESS � rn CD CD `� o � CD 1 19591 9794-00-05-37511 STONE HELEN 8 SMBIG WOODS RD 00_ 00_ 2 65049 9794-OD-06-66701 ARBD LLC ROCK HILL DR w w w w w w A R B D, L L C 3 68340 9791-00.06-5834i ARBD LLC ROCK HILL DR N 748500 N 748500 4 71710 9794-00-0&4069 STON E MARLON K 394 ROCK HI LL DR PERMIT ISSUE 5 71711 9786-OD-W40691 STONE HELEN B 465 ROCK HI LL DR STONE LCID LANDFILL 6 77630 9794-00.07.7340 ARBD LLC ROCK HILL DR N NOT FOR CONSTRUCTION 7 77630 9794-OI}06-2I32 ARBD LLC 263 ROCK HILL DR8 79314 9794.0&01-6956, ARBD LLC BIG WOODS RD52 ROCK HILL DRIVE 9 79315 9794-00.06-8964 ARBD LLC BIG WOODS RD W ® E 10 87334 9794-00-16-1724 ARBD LLC ROCK HILL DR 11 87481 9794-OD-96-9735 ARBD LLC ROCK HILL DR 40 CHAPEL HILL, N C 12 87482 9794-o0-o6_-A 701 ARBD LLC ROCK HILL DR S 13 91533 9794-00.06-7335i STONE HELEN B 155 ROCK HILL DR 49 14 91537 9794-00-16- 542: STONE HELEN B 26 RODNEY LN 41 15 91538 9794-OD-16-02081 STONE HELEN B 64RODNEY W 16 91539 9794-00-06-8170 STONE HELEN B US CABIN LN 17 11540 9714-00-05-7905 STONE HELEN B 140 CABIN LN 18 91541 9794-00-05-3876' STONE HELEN B CABIN LN 19 91542 9794-00-05-65111 STONE DALTON JOON 240CABM LN N 748000 N 748000 PREPARED BY: 20 91W 9794-M06-5204 STONE HELEN B 221 ROCK HILL DR 39 NC LIC.NO.F-1370(ENGINEERING) 21 91W 9794-OD-01fi-9414 STONE HELEN B 115 ROCK HILL DR SC COA NO.CO1488 22 91545 9784-OD-96-70641 STONE HELEN B 424 ROCK HILL DR 42 4H 23 91546 9784.00-96-50 9 7 1 STONE HELEN B 452 ROCK HILL DR 24 91547 9784-OD-96-32823•. STONE HELEN B 500ROCK HILL DR 25 915SO 9781-00-95-3963. STONE HELEN B 467 ROCK HILL DR ' 26 91W 9784-00-96-138 1 1 STONE HELEN B ROCK HILL DR 3SMIT H 8 _ -� 27 91549 9784-OC-95-314 STONE HELEN B 564 ROCK HILL DR - 28 91-554 9784-00.8&8157 STONE HELEN B ROCK HILL OR ,' r 29 91553 9784-OD-86-7015 STONE HELEN B 648 ROCK HILL DR 30 91552 9784 00 85-9878' STONE HELEN 8 663 ROCK HILL DR GARDNER LMICHAEL&THE1L SHARON 348 BUSH CREEK LN E AP ROXIMA TE RECLAIMED 31 915 33 76958 9794-00.95-3278 TH 51 9784-00-95-1958 STONE HELEN B 541 ROCK HILL DR 32 63627 97W00-85-2113 TIANO MARGARET 188 HAWTHORN PL 7/NG /L��/►IL�7� ENGINEERS THEXISTIAND REA LIMITS (11.3 AC) 34 76976 9794-00-00-51211 NEGLEYGERALD H BUSH CREEK LN 35 79379 9794-00-04-74411 NEGLEYGERALD H 188 BUSH CREEK LN ZIP 1\7 Q�"� 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 36 77726 9792-OD-03-57201 UNITEDSTATES OF AMERICA 600 MA RTHA S CHA PE L R D N ] 500 - �\ 6° N 747500 1526 Richland St.,Columbia SC 29201 37 79489 9794-OD-97-3581 BIG WOODS PROPERTIES LLC 507 DALTON DR j 38 799DD 9794-OD-07-9871 BIG WOODS PROPERTIES LLC 5089 SIG WOODS RD 39 76549 9794-OD-08-9011 STONE MARLON K 5217 BIG WOODS RD 37 40 2018D 9794-DD-08-4207 AMELL RAN DY J.&HOLLY L 5219 BIG WOODS RD EXISTING SEDIMENT TRAP LEGEND SEAL 41 77629 9794-00-18-3255t STONE ALAN HUGH 5180A BIG WOODS RD CA ♦, 42 19595 9794-00-17-3962 BIG WOODS PROPERTIES LLC DYLAN DR '"• P�`�_ FUTURE WETLAND PACTS 300 EX/SUNG 10 CONTOUR (SEE REFERENCE 1) DocuSigned �.•��FESS o0��'�♦ 43 68341 9794-00.1E-9773 BIG WOODS PROPERTIES LLC 4908 BIG WOODS RD Eta" 44 64420 9784-OD-75-7589 GRA13OWSKI EUTABETH 640TANAGER W (SEE NOTE 2) - - - - - EXISTING 2' CONTOUR (SEE REFERENCE 1) 27B482DF9::09438_Q 9< 45 64612 9794-00-86-1067 GOODE RICKI D.&CUN NI N GHAM JOAN M. 644TANAGER W APPROXIMA SEAL 46 67707 9784-011768 ANDERSON GARY M.&SUSAN E. 920JORDAN HILLS DR Y - RIGHT OF WA Y(OTHERS) 0 023002 47 67706 9784-00-97-3049 HOL1J5 BRUCE W.&KELLYA.S. 960JflRDAN HILLS DR TEMPORARY SED ENT P ND �' 48 71709 9794-00.17-39621 BIG WOODS PROPERTIES LLC DYLAN DR • • 49 60174 9794-CID-98-43081 BIG WOODS PROPERTIES LLC BIG WOODS RD - - PROPERTY L/NE (LANDFILL PROPERTIES) q (0.2 AC (SEE REFERENCE 2) �'•.,,��Y q., '/2024 00 ` 9 SEAL pN�uu„p, N 747000 00 0 TING CID LAffifft PROPERTY N 747000 PARCEL BOUNDARY(SEE REFERENCE 2) %% FARO•.,♦♦�, '1' 47 (BOUNDA Y SEE NO 6) - APPROX/MATE PERENNIAL STREAM LOCATION Docu Signede;,yW�O� AP ROXIMA TE EXISTING 3 O (SEE REFERENCE 3) C. * 00 C5ECC95 �37E4AC SEAL < LIMITS OF WASTE 0 0 0 0 43 054367 SEDIMENT POND (SEE REFERENCE �M/TTENT STREAM FiY�INEE� N � '♦IFS S E C•� •'�, (0.8 AC w ; 0 20'ZONE 1 UNDISTURBED BUFFER � �0/2 024 jA „m n►N 46 APPROXIMATE MINE EXCA VA RON N (SEE REFERENCE 4) E .. �) LIMITS (1.5 AC) `:`= �.�.�� 3O'ZONE 2 UND/STUBBED BUFFER REV. DATE DESCRIPTION SITE ENTRANCE (SEE REFERENCE 4) O2 N 746500 APPROXIMA TE EROSION & SED/MENTA 110N N 746500 MINE EXCAVATION ` CONTROL YEAS I TS (2 AC) p \ SEDIMENT PONDS 200 R PROCESS AREA/HAUL ROAD '27 RECLAIMED AREA 26 t ► EROSION & SED/MENTA 77ON CONTROL MEASURES T EX/SUNG WETLAND (SEE REFERENCE 3) -c1 24 L u 45 28 RIPARIAN BUFFER ZONE 2 AREA a1-14111111 29 I OVERHEAD UTILITY(SEE REFERENCE 2) N 746000 N 746000 31 EX/STING 100' WASTE BUFFER APPROXIMATE EXIS77NG LIMITS OF WASTE 30 Q-25 r PROPOSED MINING FACILITY BOUNDARY 50' UNEXCAVATED MINE BUFFER Electronic files are instruments of service provided by Smith .) Gardner,Inc.for the convenience of the intended recipient(s),and STRUCTURES - 1000' MINING BOUNDARY RADIUS no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner,Inc.,will be at the sole PROPOSED 100' SOLID WASTE BUFFER risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies,the hard 44 \K copies shall govern. Use of any electronic files generated or LCID NOTIFICATION SITE provided by Smith Gardner,Inc.,constitutes an acceptance of these terms and conditions. N 745500 N 145500 NOTIFIED PARCELS J PROJECT TITLE: 6] 1.NOTES THIS PROPERTY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARD AREA. ILITY 2. WETLAND IMPACT CONCURRENCE PROVIDED FROM NCDENR DWR UNDER STONE LAN D FI LL AN D MINE 3 PROJECT NUMBER 20191299 VER 2. 3) 3. EXPANDED FACILITY BOUNDARY COINCIDES WITH THE HEAVY INDUSTRIAL PERMIT DRAWINGS ZONING LIMITS OF CHATHAM COUNTY. 4. SEDIMENT BASIN B IMPACTS ARE APPROVED UNDER USACOE NATIONWIDE y PERMIT NO. 18, ACTION ID SAW-2019-01857. 32 PROPOSED 100' SOLID WASTE BUFFER 5. WELL ABANDONED ON 6/16/22 BY PIEDMONT INDUSTRIAL SYSTEMS, INC. 34 35 (SEE NOTE 6) 6. EXISTING LCID LANDFILL OPERATES UNDER NC SOLID WASTE PERMIT N0. 19-09. A PERMIT EXPANSION APPLICATION OF THE LCID LANDFILL WAS N 745000 745000 SUBMITTED IN FEBRUARY 2023. 0 0 CD 0 2 00 00 REFERENCES: DRAWING TITLE: co LP w 1. AERIAL IMAGERY FROM NC ONEMAP DATED 2021 AND FROM ENGINEERING SURVEY FROM MAY 4, 2022 BY SMITH GARDNER, INC. 2. FACILITY PROPERTY LINE FROM A SITE PLAN FOR ALAN HUGH STONE N MINE EXCAVATION TABLE PREPARED BY SMITH & SMITH SURVEYORS, PA, DATED AUGUST 29, 2005. MINE MAP co CATEGORY AFFECTED ACREAGE NOTES ADJACENT PARCEL BOUNDARIES FROM CHATHAM COUNTY GIS DEPARTMENT. (EXISTING CONDITIONS) ► 3. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION AND TAILING/SEDIMENT PONDS 1.6 SKETCHES ON 2/28/2018 AND 9/14/2022 BY CAROLINA ECOSYSTEMS, CN STOCKPILES - INC. LOCATIONS MAY BE SUBJECT TO CHANGE BASED ON MORE DETAILED CD CD LOCATION DATA. THESE FEATURES ARE IDENTIFIED AS POTENTIAL WATERS ❑ WASTE PILES - m OF THE US BUT HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF PROCESSING/HAUL ROADS 7.1 ENGINEERS. MINE EXCAVATION 1.5 74 500 N 44500 4. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF THE N CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PROVIDED BY co AREA (OTHER) 11.3 LCID LANDFILL CAROLINA ECOSYSTEMS, INC., DATED FEBRUARY 28, 2018. DESIGNED: PROJECT N0: ❑ EROSION AND Q SEDIMENTATION CONTROL 2 SOIL BERMS, DRAINAGE CHANNELS, J.C.L. ARBD 23-1 DRAWN: SCALE: MEASURES (OTHER) UNDEVELOPED AREAS APPROVEDF C.T.J. DATE. AS SHOWN C�IDS MAR. 2024 o TOTAL AFFECTED ACREAGE 23.5 FILENAME, TOTAL PERMITTED ACREAGE 60.6 0 200 400' 600' ARBD-D0025 SHEET NUMBER: DRAWING NUMBER: m o o O o p p CD CD cl /A 1 O L o U O O ` S ■ ❑ 00 00 M Q rn rn rn rn b © 2024 Smith Gardner, Inc. I w L�I LLJ ,yJ ,LJ DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 o Ln 00 PREPARED FOR: rn w \�\ \ \ \\\ \ w PERMITISSUEAR B O, LLC STONE LCID LANDFILL �'•'e'.'i'�' \ \ \\ \ \ 1 \ r Zao \ \\ I I NOT FOR CONSTRUCTION 52 ROCK HILL DRIVE °O $' ; _�\\ \\\ \\ \ \ \ \ \ \\ , ► , I CHAPEL HILL, NC 256 TEST PIT SCHEDULE o\� \\ \ \ \\ \ \ \ 252 $$ - ,��\ \ \\ \�\\ \\ \ c } FU RE WETLAND IMPACTS / rn\ \\ \\ \ \ \\ \\ \ I I , ` SURFACE ELEV. GROUNDWATER (S N0/C 2) TEST PIT I❑ (APPROX.) DEPTH(FEET) PRESENT TP-1 346 8 PWR* NO PREPARED BY. / \ TP-2 336 i5 NO NC LIC.N0.F 1370(ENGINEERING) TP-3 318 15 NO SC COA N0.C01488 \ \\\\ 1\\ \II III I J +'A , \ TP-4 301 5.S(PWR) NO I 1111 \ \\ \\\ \ \\ \\ \ I\II TP-5 305 15 NO II I► III I I 1\ I 1 \ \ \ TP-6 309 15 NO U I \ \ \ \ \\ II I I 1 I} I I I \ \J TP-7 311 15 NO SMIT H + TP-$ 355 15 NO I\IIII IIII \ \\ \\\ \ 11 II I II II \\\\ \I\\ \ 1 I \ \ \ N 747000 s•� U I 1 I 1 \ \11 11\\ \I \I \\\ \\ 1 Il \ I \ � \ N 747000 TP-9 336 15 NO TP-10 334 6(PWR) NO 1\ \ \\ III II I \ \\\ TP-11 274 15 NO�I II I o \ o\ I \ \ \ \ \ I I o I \\ \\ \\ \\ \ \ \\\\N� \ \ "`PARTIALLY WEATHERED RACK f c> I I I \\ \\ 111 111 \ \ \\o\ \o\\\\ \ LEGEND ENGINEERS \ \\ \\ \\\ \\ 1 \ \ \ \\\\ LCID LANbFIL 14 N. Boylan Avenue Raleigh NC 27603 919.828.0577 —30o EXISTING 10' CONTOUR (SEE REFERENCE 1) 1 2 Richlandt. Columbiag 292 1 I I 1 \\ \ \ \ \\ \ \ \\\\\\\ 2 BOUNDA Y 5 bs , SC o EXIS77NG 2' CONTOUR SEE REFERENCE 1 VI RIGHT OF WA Y(OTHERS) SEAL wu \ I \\ I 1 \\ \ \ \ \ \\ \\ \ DocuSigned by'♦ \X PROPERTY LINE (LANDFILL PROPERTIES) ` ROB J '•.,� ssio ti 0j11 (SEE REFERENCE 2) j fFE tiV y AVEL C NSTRUCTION 27B482DF109435_Q SEAL < PARCEL BOUNDARY(SEE REFERENCE 2) . . ui E / - �� / , // / ► \ TRANCE TYP. 023002 ( ft APPROX/MATE PERENNIAL STREAM LOCA77ON s'T "cNGINEE��� (SEE REFERENCE 3) A.•. �CF S�\ ►� APPROX/MA TE INTERMITTENT STREAM SEAL , (SEE REFERENCE 3) ,����o��N CAROB/•,,�, , DocuSigned; O f Sc/O 4zo 20 ZONE 1 UNDISTURBED BUFFER LJ44fW C. ` J tiy� ♦ / l / // / r / IIII// / / / /i / / l// l l / / / / ///// \ \ i/ I I I \ SEE REFERENCE 4 csEccssc�s�Eaac SEAL /� /// / (///// /IIII/ j IIII/ //j/� //�l 11IIII/// //// / //// / \ I I \ \ \ 1 ( ) I / // /// ) \ + \ = 054367 30 ZONE 2 UNDISTURBED BUFFER \ (SEE REFERENCE 4 NGINEE SB—A �// / i // (IIIII I/ // o L� ���// IIII// / / >� // // / / III//// / / 1\\\ I ( / I ary /�� j / / I/// // //// /// //// / 1 \ E o ♦ j 11` N 746500 N 746500 FSS E C •', HAUL ROAD � '•.,,��������" 10/2024 // /// // �'/ ✓ 1 / / II(/111111 I / / \\��„�� / /%/� J / ///j IIII IIII I 11 \ /� / 0 1 / l / / �'�;' \ \ EX/SUNG WETLAND (SEE REFERENCE 3) REV. DATE DESCRIPTION RIPARIAN BUFFER ZONE 2 AREA � Y// l / / // / �\ ( / 7 n l ( ? L.� OVERHEAD U77LITY(SEE REFERENCE 2) � z uJ � � � .� N. \ ■,� \ \ 1\ \ J ( // /o ( � I I \ I ( I I \ / cb J j/ // /f/ / o ! �u \\ EXIS77NG 100 WASTE BUFFER — — APPROX/MATE EXIS77NG LIMITS OF WASTE SITE ENTRANCE \ } \ ,1 /• o I 1 / f TP 5 / \ / °° I.� 00 IJNE AVATE INFO PROPOSED MINING FACILITY BOUNDARY s � n�\\\ I I \\\ \ II 1 / " i / / 1 I )I I l i / / f l / f 1 J 1-s� l\\ f il f C♦ � � ) � w o �:k \ ` / III I 1 0 / \ I I ) / ( / / / f ♦♦ J f BI�fFE /A /µ 50' UNEXCAVATED MINE BUFFER ■� \ I III I I l \ r ♦ v r 1 > I \\ \ _� \ \ \� \ \ \ / ; �� r� f / / r`/ ( /TP-2 / // I I f ( ° /� r ♦ 3 ,6 b�OUTH -DRAINAGE PROPOSED 100' SOLID WASTE BUFFER ■ \ \ 1 \ \ ?o \ \ l \ \ , , 1 r / s 7 z �,/` / ♦ ECG )ECJ 1 Kl ,tHANN�L C3 \ \ \\\ \ o // o J / J/°� °' /(° PROPOSED EXPANDED LIMITS OF DEBRIS .r �- \ ,\ \\ \\\ \ \o \ I \ �s J ti�\ /� ^� j / o / / f � { 1♦ n/10° )• / ..� -� del o f / -------- �>sl°/ 300 PROPOSED 10' CONTOUR ' III ` \ /^�//� Z i f 1 yo, J �,� // �o ✓ / / \` r ♦ [ , 5 / PROPOSED 2 CONTOUR �� ■ I 320 I I I I 1 1 I \ �/ f�/� ,� / / / / �/r / l J r / s^ ■ �� � ,33p- \ \ / �` — � / / E TP-1 � f/ ,' ,yo° / �o / / \o � j L 1l �� ? � r a SILT FENCE 340 _ �/ 4� ��-= � � rf l� r, �f/ -�\�'J r�� � ti��' �3 �� ���. `� N" CULVERT kill-, e �. Electronic files are instruments of service provided by Smith N 746000 \ ■' ,' J ` 1 " SILT FENCE OUTLETo ( 7, ,G \ ) ♦ ROP�SED AEXPANDE°d LIMITS OFF 1 N 746000 Gardner,Inc.for the convenience of the intended recipient(s),and P ■ ° `S 4 w p �v / >s� no warranty is either expressed or implied. Any reuse or f I I\ l � f '/ { LCID NOTIFICATION SITE redistribution of this document in whole or part without the �s �/ E \ f \\\ \\J 1 r lr e} ( S ,(� written authorization of Smith Gardner,Inc.,will be at the sole \ .,� � �� ✓ � '� J r'S.'� `J �t l f �-7 / � .� � J risk of the recipient. If there is a discrepancy between the r , \ z \ ti Z p \ , \ ! // /// r ♦ / t J \ electronic files and the signed and sealed hard copies,the hard , e �`, > -� � INFERRED POTEN110ME1R/C SURFACE CONTOUR //1 / ■` \ \ \ \ II( �� I / / I / d ♦♦• PROPOSED'IAING FACII�� f / copies shall govern. Use of any electronic files generated or ■ \ 1 t — 360 / \ \ \ `Z /(/��r`\(e\�/ /J r /♦ �- ✓ ° J C provided by Smith Gardner,Inc.,constitutes an acceptance of ■ — — _ \ I j R ( �/ ° S APPROX/MATE TEST PIT LOCA70N these terms and conditions. \ \ 330 ■. `` \ \\ l Y - — — J . \ �,` (SEE SCHEDULE, THIS SHEET) ( \\ 5 e PROJECT TITLE: \�`� �� ,,�\ \ TP-11'° !' r5R DOSE LID WASTE BUFFER 1 NOTES \ — \�3 \\\� 3 \tiny g \ \ \\�\\` \/ J t \ 320 J L — \�\\1 Z L \ k \\\\\\ \��l\�\ r r s ♦� �l ti/ I S \ 1 1. THIS PROPERTY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARD AREA. \ L \ ° \-��\\\ \ �`j j O V o ti\II \\ \ / (SEE V�QT� 6) ( 1\}// \ \ \\ �\ / 2. WETLAND IMPACT CONCURRENCE PROVIDED FROM NCDENR DWR UNDER •J i -r PROJECT NUMBER 20191299 VER 2. STONE LANDFILLAND MINE \�310 //� I�` \ � ° r, � \\\ ,� --''� �� �� —.'.�--•.•.•-.`_,,� � I ` _ � \� F I\I I II�)1}1 \\\\\o\ / s �� I 3. EXPANDED FACILITY BOUNDARY COINCIDES WITH THE HEAVY INDUSTRIAL SIT'F�NC 'O�TL�T 1 1 ( ZONING LIMITS OF CHATHAM COUNTY. GABIO \ 1 — \ _ —_ -1 °��� \�`\\� A> y�J }//l�)/Il \1 \�l 1\ll� ` l / EC ✓f �' '� �� 4. SEDIMENT BASIN B IMPACTS ARE APPROVED UNDER USACOE NATIONWIDE PERMIT DRAWINGS fL PERMIT NO. 18, ACTION ID SAW-2019-01857. \ 5. WELL ABANDONED ON 6/16/22 BY PIEDMONT INDUSTRIAL SYSTEMS, INC. PRO P INLET o ti'o° ° 6. EXISTING LCID LANDFILL OPERATES UNDER UNDER NC SOLID WASTE PERMIT NO. 19-09. A PERMIT EXPANSION APPLICATION OF THE LCID LANDFILL WAS SUBMITTED IN FEBRUARY 2023. / r �� —�\�■ '') \ �� _ - `\ � / / IIII/ / o ♦ j �I /f � v r o o c o REFERENCES: 2 � �.�.r !- r / l�^'� . � � � ♦ 1 � VERT }� l/ \ I� r�. ^� / rn DRAWING TITLE: a J r J — f C r 1 / 11J 1. EXISTING TOPOGRAPHY WITHIN THE FACILITY PROPERTY LINE FROM AERIAL RIPRAf Cf' r� `` ' ' \ SURVEY DATED JUNE 14, 2019 PREPARED BY GEODATA CORPORATION, — ♦ M �� ZEBULON, NC. TOPOGRAPHY IN ACTIVE AREAS FROM ENGINEERING SURVEY Q /�` — r` MINE EXCAVATION TABLE DATED MAY 4, 2022 BY SMITH GARDNER, INC. TOPOGRAPHY IN N ' — =~ =tom `+ , V ` ,.i/ /ice���`��%�`�w�`•` f.`' �`5 SURROUNDING AREAS FROM LIDAR DATA DATED 2015 PROVIDED BY NC M I N E EXCAVATI O N Y= L� J��;�� P: p D/�2 / /�\ _ CATEGORY AFFECTED ACREAGE NOTES SPATIAL DATA DOWNLOAD. N 745500 _ / r o T,� �� N 745500 2. FACILITY PROPERTY LINE FROM A SITE PLAN FOR ALAN HUGH STONE GRADING PLAN — — ;��v °. ' 1. ,-?r � v-�f� ��4 w-� TAILING SEDIMENT PONDS 3.1 N _ — v _ _ s �o ♦CV G J a ls� i n \\w J - PREPARED BY SMITH & SMITH SURVEYORS, PA, DATED AUGUST 29, 2005. `% SOUTHWEST CHANNEL 3 V� 28o zoo IIII )f % STOCKPILES ADJACENT PARCEL BOUNDARIES FROM CHATHAM COUNTY GIS DEPARTMENT. o \ ` ` _ 260 / — ` E ILT FENCE (TV.) 3. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION AND EC1 1 \ l-� WASTE PILES - SKETCHES ON 2 28 2018 AND 9 14 2022 BY CAROLINA ECOSYSTEMS (GRASSED) j,/ //, = �\ / / / / , g = �� r a // ��' \�\ \ �Z l� S PROCESSING/HAUL ROADS 1.7 INC. LOCATIONS MAY BE SUBJECT TO CHANGE BASED ON MORE DETAILED M " I = \\ LOCATION DATA. THESE FEATURES ARE IDENTIFIED AS POTENTIAL WATERS t 260 / I r MINE EXCAVATION 26 OF THE US BUT HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF ENGINEERS. M 3 a \ \\\ \ 1 RECLAIMED AREA (OTHER) 25 LCID LANDFILL DESIGNED: PROJECT N0: 4. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF THE J.C.L. ARBD 23-1 m ;^ 5 //// / _ \� �\\\� �\ �` — SOIL BERMS DRAINAGE CHANNELS y // \ \\ \\ \� \ ` OTHER EXPLAIN 4.8 CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PROVIDED BY DRAWN: SCALE: RIP RAP CHANNEL �,, / � _, �_ � EC3 ' -�i///// /r — ^ \ \ \ _ ( ) UNDEVELOPED AREAS AND BUFFERS C.T.J. AS SHOWN / �\\ \\ �\\\\ I CAROLINA ECOSYSTEMS, INC., DATED FEBRUARY 28, 2018. APPROVED DATE: wmmpa J j �\ w /�/// `\ \\ \\\\ i \ TOTAL AFFECTED ACREAGE 60.6 JCS MAR. 2024 o �/ L\�\\\\\\�\� \ `��r / TOTAL PERMITTED ACREAGE 60.6 FILENAME: 0 100' 200' 300' ARBD-DO026 SHEET NUMBER: DRAWING NUMBER: II < 3 S2 © 2024 Smith Gardner, In DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 o o PREPARED FOR: 00 w ?S0 PERMIT ISSUE ARBD, LLC � STONE LCID LANDFILL NOT FOR CONSTRUCTION 52 ROCK HILL DRIVE W—3E) E �$$; :, ��$ 3,° \ \ \ \\\ \\ , ► , I I CHAPEL HILL, NC Wo 320 1 \ \\ 256 •�%�7 SB—B as ° ` 252 FURJRE WETLAND IMPACTS LEGEND (SEE NOTE 2) 300 EXIS77NG 10' CONTOUR SEE REFERENCE 1 PREPARED BY: EXISTING 2' CONTOUR (SEE REFERENCE 1) NC LIC.NO.F-1370 IENGINEERINGI SC COA NO.CO1488 RIGHT OF WAY(OTHERS) PROPERTY LINE (LANDFILL PROPERTIES) (SEE REFERENCE 2) IT H + y2o 3g0 w PARCEL BOUNDARY SEE REFERENCE 2 N 747000 � w � wo � \ � \ N 747000 ( ) ego 40o w rn o � APPROX/MA TE PERENNIAL STREAM L OCA 77ON GARDNER (SEE REFERENCE 3) ENGINEERS APPROX/MATE INTERMITTENT STREAM (SEE REFERENCE 3) 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 260 \\ � ` \ L,ROAD 1526 Richland St.,Columbia SC 29201 ° 20'ZONE 1 UNDISTURBED BUFFER (SEE REFERENCE 4) 30'ZONE 2 UNDISTURBED BUFFER SEAL ♦♦♦o••"""•••v.,� (SEE REFERENCE 4) DocuSigned b ���♦♦�-N CAR, 7 .,,��, 1 HAUL ROAD I \ \ \\\ 1 RAVEL C NSTRUCTION IS2713482DF1�9435_ Q SEAL < 1 'o EX/STING WETLAND (SEE REFERENCE 3) TRANCE (TYP.) 023002 \ \ I RIPARIAN BUFFER ZONE 2 AREA �'.�`rT9C NGINEE����.•�� / ♦ _ _ _ � _ , — — /i I I OVERHEAD UTILITY(SEE REFERENCE 2) SEAL ♦♦♦��iuuu•••�� ) \ 1 I EXIS77NG 100' WASTE BUFFER I ♦ //// —//)//�/\/ �I ° I I \ \ \\+ \ I DocuSigned,�♦♦ � CAR N �N O< LJ4., C : 4, oFESS/O-, < Y / PROPOSED MINING FACILITY BOUNDARY Q, CSECC95Q37E4AC SEAL d. 50' UNEXCAVATED MINE BUFFER 054367 / SB—A /// / / / `�\�� ��o ♦ / fl f` — PROPOSED 100 SOLID WASTE BUFFER '',�FSSE C3y"♦o24 N 746500 / do ��o � \ N 746500 '••gnnn.•••` ^� �° J — PROPOSED EXPANDED LIMITS OF DEBRIS 300 '\ �\ \\ / / �,� �° kgo f\\ ��! ✓2� ♦ f PROPOSED 10 CONTOUR REV. DATE DESCRIPTION PROPOSED 2 CONTOUR SILT FENCE \ \ \\ ♦`� �yo / f S ram{ �� f< 7 �� e \. iii iii \ SITE ENTRANCE CULVERT SILT FENCE OUTLET 5,0 ,dN AVATE IN� ^ �\` �� "moo ��° moo /J�`j f f f ♦♦ S�J/ \f(BI1F w 1M o DOWN PIPE Ilk r� — `�\f r ♦♦ J 3 b�OUTH IORAINAGE — L L L L FINAL COVER SIDE SLOPE SWALE 500 7 ♦ E CA J)ECJ 1 1�C1 HANN L o �� r 1�/ ♦ f� �° � �' �� C3 490 j ♦ �/ / ^� ✓ o , NOTES �� 1. THIS PROPERTY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARD AREA. f 480 t,y�� �� 7 ry 2� o r?�� 1.14 2. WETLAND IMPACT CONCURRENCE PROVIDED FROM NCDENR DWR UNDER J ! l ( r PROJECT NUMBER 20191299 VER 2. I 4/0 ` f� /r♦♦ ti/ f1/ ( �5 f 3. EXPANDED FACILITY BOUNDARY COINCIDES WITH THE HEAVY INDUSTRIAL ZONING LIMITS OF CHATHAM COUNTY. 4. SEDIMENT BASIN B IMPACTS ARE APPROVED UNDER USACOE NATIONWIDE 450 cjY' a r d j )o PERMIT NO. 18, ACTION ID SAW-2019-01857. 5. EXISTING LCID LANDFILL OPERATES UNDER NC SOLID WASTE PERMIT NO. J��•. f'o `l�N' 19-09. A PERMIT EXPANSION APPLICATION OF THE LCID LANDFILL WAS r \� 44o s ]♦ 7 G OPOSW�EXPANDEQ,LIMIT OF BRI ,�, SUBMITTED IN FEBRUARY 2023. Electronic files are instruments of service provided by Smith N 746000 \ �' 430 ) ♦♦� 2�0 v SR" F ` 1 N 746000 Gardner,Inc.for the convenience of the intended recipient(s),and no warranty is either expressed or implied. Any reuse or 1 ' redistribution of this document in whole or part without the written authorization of Smith Gardner,Inc.,will be at the sole REFERENCES: risk of the recipient. If there is a discrepancy between the f ! ♦ J 1. EXISTING TOPOGRAPHY WITHIN THE FACILITY PROPERTY LINE FROM AERIAL electronic files and the signed and sealed hard copies,the hard r // 410 ♦ J' r =^ti o� f copies shall govern. Use of any electronic files generated or FINAL 1 d ( SURVEY DATED DUNE 14, 2019 PREPARED BY GEODATA CORPORATION, g \ `■ \ , � •S ,o C � provided by Smith Gardner,Inc.,constitutes an acceptance of 40o L� ♦ �OWN�PIPE TYP. J// ZEBULON, NC. TOPOGRAPHY IN ACTIVE AREAS FROM ENGINEERING SURVEY these terms and conditions. ` y f♦� �.f o ( la ` DATED MAY 4, 2022 BY SMITH GARDNER, INC. TOPOGRAPHY IN SLOPE S ALEs('TYPO- 330 f *♦♦ �. _ Y�'� r< b /i 1 SURROUNDING AREAS FROM LIDAR DATA DATED 2015 PROVIDED BY NC 1 L y / , ♦ 15 eo�� � � �� l J� / SPATIAL DATA DOWNLOAD. PROJECT TITLE: R FrOSED�IINING FACILITY— 1 2. FACILITY PROPERTY LINE FROM A SITE PLAN FOR ALAN HUGH STONE �\ 320 ✓ s°�` jBOUW RY / o /' s� ` (� PREPARED BY SMITH & SMITH SURVEYORS, PA, DATED AUGUST 29, 2005. /� f 37p ADJACENT PARCEL BOUNDARIES FROM CHATHAM COUNTY GIS DEPARTMENT. . � 1^dam--�' ��1.,'1 r { 3. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION AND \ 3I0 ♦♦ l�' �/ f; SKETCHES ON 2/28/2018 AND 9/14/2022 BY CAROLINA ECOSYSTEMS, STONE LAN D FI LL AN D MINE ♦ / PR� OSEJ ti tOOtiSOkIQ WASTJF BUF--FEIR�' ( INC. LOCATIONS MAY BE SUBJECT TO CHANGE BASED ON MORE DETAILED PERMIT DRAWINGS GABIOA�� — / -,(SEE KOT -5� LOCATION DATA. THESE FEATURES ARE IDENTIFIED AS POTENTIAL WATERS N OF THE US BUT HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF ENGINEERS. 17 4. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF THE (TYP �Y� 4 CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PROVIDED BY f / r �? �-_ = o ♦ � EC % SILT FENCE CAROLINA ECOSYSTEMS, INC., DATED FEBRUARY 28, 2018. �280y J ' a' ``"` 30 �` ♦♦ ; / r J { 'tea r ria s \ <�f C o a �r� _ J / f , DRAWING TITLE: DROP IN MINE EXCAVATION TABLE RIPRAP� � r � V� l��`�. � ; � � � � � r 1 —1 N ~�_= ` — \_� " r"` ��! r• 5 (�f / r CATEGORY AFFECTED ACREAGE NOTES CD - MINE RECLAMATION PLAN = \= t= , `�.� � / / �~'�'� ��� 5 y a �/ i i ' TAILING/SEDIMENT PONDS 3.1 � � � � �C J r P� rr M N 745500 — _ = =���' a __ 4 �L�2 a / /� �� 0 1,. `_ ti J i N 745500 STOCKPILES CD — — — _ oo ♦ / a/ zs n (TYP.) WASTE PILESa SOUTHWEST CHANNEL 3 c, Z,° o f / / _ — 4�,"10-',\,F�NCE EJr PROCESSING/HAUL ROADS 1.7 Lam / ��� ,-- - (GRASSED) EC1 24 =_ 0 MINE EXCAVATION — CD — — ' ,\ �r` I I 5 \ o J' f r j/ram%i %% RECLAIMED AREA (OTHER) 51 LCID LANDFILL N `` . Z / \\ r i J i /// f ' DESIGNED: PROJECT N0: J � ��� /� SOIL BERMS DRAINAGE CHANNELS o - r/ �/ OTHER (EXPLAIN) 4.8 J.C.L. ARBD 23-1 / /' AND BUFFERS — � \ \ \ -- � �� � � 2i ,� �� � / �ii DRAWN: C.T.J. SCALE: AS SHOWN RIP RAP CHANNEL EC3 y _ /�� ,, _ \ \�� , , , r/ f TOTAL AFFECTED ACREAGE 60.6 APPROVED: IDS DATE: • /� \ \ \ _ f TOTAL PERMITTED ACREAGE 60.6 MAR. 4 ❑ ( / �i / \� \\\\\\\\\� \ r //// j' i i / j i �� cc FILENAME: 0 100 200 300 ARBD-D0026 ❑ O f - ( 2 \ \ \\ \ / //// j / / ///// ��� / /�/ SHEET NUMBER: DRAWING NUMBER: Ln 4 S3 0 © 2024 Smith Gardner, In / /i/ `� \ \ \ ) 1 1 \—�// / / r \ \\ Z \ 1 \ / / / / / LLJ DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 f PREPARED FOR: i sun � , , AR B D, LLC N as �� °s- ' ti �320; 256_ I 330 STONE LCID LANDFILL 2ga \ LJ2 .i� W 50 + 3 s6° 52 ROCK HILL DRIVE -3ao WW:_�0� 3g �� CHAPEL HILL' NC �� �00000� o 440.00 440.00 �1 `j o a i i h r O 400.00 ( 400.00 J ����� PREPARED BY:SE REFERENCE 1) LC/D NO SITE o f °ak6 0 NC LIC.NO.F-1370(ENGINEERING) � 0 ti o ,� �. o i .; � SCCOA NO.C01488 Q s.} ° o �o��h�o�p��ho�0 0 0 360.00 SMITH W � � J-ti„ �- � 360.00 �, , o o N o m I / ti ' (MINE RECLAMA ON) �o , _ < o I I / ti ^o cn I a W 500 L� Wj + ^¢ w low IH ¢ �� r 480 of m D iY m I I \ I X W O W I Z ■Z Q �� 4 460 Z O W m uu O �I / _ ^ - Q W OI I I U O ■� 0 320.00 `� GARDNER m m _ o a N Z 320.00 PP 30 a C) LLJ :� °° �,� 2° ENGINEERS � � a O ¢ �..: O IO �oz ■ate t0 W 0 Q Z N \ C I �O M ■O = W .�. 4 0 J N 3 f'r a ■ J _ y, 3s 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 W y 9 to l \ ,- - ✓` ` I I ` s'o° 1526 Richland St.,Columbia SC 29201 ti \-31 280.00 _ 280.00 � s� 3°12 3 p 1 320 to � � z SEAL I FERRED POTENT/0 ETR/C __ �'' 300 1 �.`� „CAROo(��''. SURFACE C TOUR 3 SAFETY BERM DocuSigned, SS/0 �'� D1 �,1 -_ PROPOSED SUBGRAD �` �� 2 _ by v ; 240.00 4 240.00 ,4 276482DF09438 Q SEAL < EXCAVATED LOPE SAFETY v � Fry 023002 f o `S'j FNGINEE�6� gCFY A.' ,O$ 024 IN \axiol 200.00 200.00 „ SEAL " CA•���'''o 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+0o CROSS»SECTION LOCATION MAP Docu3igned by,,� �N Ro �, . SCALE: 1 =300 Off' ESS/p ti SECTION BB 1j:ECC95CZ7F4AC �SEAL... Z SCALE: AS SHOWN 054367 FNGINEE� SE ,024 PERMIT ISSUE- I NOT FOR CONSTRUCTION REV. DATE DESCRIPTION 560.00 560.00 520.00 520.00 PROPOSED FINAL COVER (MINE RECLAMATION)480.00 480.00 LEGEND EXIS77NG GROUND SURFACE (SEE REFERENCE 1) - - INFERRED P07EN770ME7R/C SURFACE CONTOUR 440.00 440.00 PROPOSED FINISHED GRADE EX/SRN GROUND SURFACE NOTESElectronic files are instruments of service provided by Smith SEE REFERENCE Gardner,Inc.for the convenience of the intended recipient(s),and 0-1 Ej F-: 400.00 ¢ m 400.00 1. THIS PROPERTY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARD AREA. no warranty is either expressed or implied. Any reuse or C-DZ ■ Z I I W redistribution of this document in whole or part without the o 2. WETLANDS WITHIN LIMITS OF DISTURBANCE WILL BE PERMITTED. written authorization of smith Gardner,Inc.,will be at the sole Z ■ U O LL - - - - - - - - - risk of the recipient. If there is a discrepancy between the z _■ ix m I I o _ _ - - - - - _ - _ o z 3. WELL ABANDONED ON 6/16/22 BY PIEDMONT INDUSTRIAL SYSTEMS, INC. electronic filespand the signed and sealed hard copies,the hard mc.D I I / - z W copies shall govern. Use of any electronic files generated or LJ ci7 ■ Z W provided by Smith Gardner,Inc.,constitutes an acceptance of 55 d ■ Z I I // \ Q��- these terms and conditions. ,J 360.00 I - m 360.00 REFERENCES: \ o m o L 1. EXISTING TOPOGRAPHY WITHIN THE FACILITY PROPERTY LINE FROM AERIAL PROJECT TITLE: I \ Q o o U o SURVEY DATED JUNE 14, 2019 PREPARED BY GEODATA CORPORATION, ROPOSED SUBGR DE ,X U-C�l o m o z >- ZEBULON, NC. TOPOGRAPHY IN ACTIVE AREAS FROM ENGINEERING SURVEY o NI o Q m Z o DATED MAY 4, 2022 BY SMITH GARDNER, INC. TOPOGRAPHY IN 320.00 - / - _ - - _ Z 320.00 SURROUNDING AREAS FROM LIDAR DATA DATED 2015 PROVIDED BY NC STONE LAN D FI LL AN D MINE 0 0 ■ m SPATIAL DATA DOWNLOAD. I ;� 2 PREPARED RB PE SMITH0- . FACILITY PORTYLI&ESMITH SURVEYORS,FROM A SITE PLANPA�DATED AUGUST 29N 2005. PERMIT DRAWINGS ADJACENT PARCEL BOUNDARIES FROM CHATHAM COUNTY GIS DEPARTMENT. 3. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION AND - ■ SKETCHES ON 2/28/2018 AND 9/14/2022 BY CAROLINA ECOSYSTEMS, 280.00 280.00 INC. LOCATIONS MAY BE SUBJECT TO CHANGE BASED ON MORE DETAILED 3 SAFETY ERM D1 \ LOCATION DATA. THESE FEATURES ARE IDENTIFIED AS POTENTIAL WATERS INFE RED PO7FN770ME /C \ OF THE US BUT HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF SURFACE CONTOUR EXCAVATED SLOPE SAFETY 4 D1 4. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF THE DRAWING TITLE: a 240.00 240.00 CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PROVIDED BY LP 0 CAROLINA ECOSYSTEMS, INC., DATED FEBRUARY 28, 2018. CD ENGINEERING CROSS SECTIONS 3 200.00 200.00 120' (SHEET 10 F 2) 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 N O O ❑ SECTION rA A m SCALE: AS SHOWN 80' C,I DESIGNED: PROJECT NO: o J.C.L. ARBD 23-1 m DRAWN: SCALE: Ir Q 40' C.T.J. AS SHOWN a APPROVE UA L J dC� MAR. 2024 J 0 100' 200' 300' ARBD-DO026 SHEET NUMBER: DRAWING NUMBER: m ° 5 xi `' © 2024 Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 f PREPARED FOR: � r+ ARBD, LLC IN STONE LCID LANDFILL 35 560.00 560.00 S. 3,° N 52 ROCK HILL DRIVE CHAPEL HILL NC O �$o 520.00 520.00Ao i PREPARED BY: NC LIC.NO.F-1370(ENGINEERING) s 0 ���^°�a�ho�^o o °�90 -- 480.00 480.00 SC COA NO.CO1488S M ITH =lz � � �000 �o0 00 0 0 y\ �a 5 h e°j yha�h`�hhO�o �• i Mhho r, 500 440.00 49 EXISTING GR UND SURFACE 440.00 480 (SEE REFERENCE 1) 4 ;��. 70 460so � GARDNER PERRIT70 FINAL COIER � Zo ENGINEERS MONITOR FORSETTLEMENT PROPO ED FINAL COVER io F-: 400.00 400.00 ago 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 607 0 1526 Richland St.,Columbia SC 29201 C) \ o ROLL O3CK 4p ' DRIVE o N F= 33) _ t 330i0°o , SEAL J WA TE BUFFER wPR POSED 100' SOLID I 360.00 360.00 ��,••,un�. •.,,. [DocuSigned by,.�♦♦���`�, FESS/G �I SEAL Z w 023002 320.00 �' �� (M 320.00 �� `' - = s F4131WE� � ' o z i. o ., 9CF' � ♦. w m o ��' �G �o� � o '�i, A. ��►�'2024 o I b z SEAL ,Nu�uu,, o PROPOSED SUBG ADE I � M CROSS SECTION LOCATION MAP ,•••' CAR'''••., 280.00 _ - - - - - - I 280.00 SCALE: 1"=300' DocuSignede;♦yW` �o ESS/p��ti��''.: J�u C. ft 4z y� ■ 00 C5ECC95117E4AC._ SEAL Z INFERRED P07ZN70METRIC - - _ _ 054367 SURFACE CONTOUR 3 FNGINEE� D1 SAFETY BERM SE C 3 X2024 240.00 240.00 •.,,,,,���,,,,,. 4 EXCAVINTED SLOPE SAFE FY D1 REV. DATE DESCRIPTION ISSUE- 200.00 1 200.00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 NOT FOR CONSTRUCTION SECTION DD SCALE: AS SHOWN X2 560.00 560.00 LEGEND - - - - - - - - EXISTING GROUND SURFACE (SEE REFERENCE 1) INFERRED P07EN770ME7RIC SURFACE CONTOUR 520.00 520.00 PROPOSED FINISHED GRADE NOTES 480.00 480.00 1. THIS PROPERTY DOES NOT LIE WITHIN A SPECIAL FLOOD HAZARD AREA. Electronic files are instruments of service provided by smith 2. WETLANDS WITHIN LIMITS OF DISTURBANCE WILL BE PERMITTED. Gardner,Inc.for the convenience of the intended recipientlsl,and 3. WELL ABANDONED ON 6/16/22 BY PIEDMONT INDUSTRIAL SYSTEMS, INC. no warranty is either expressed or implied. Any reuse or LC/D N077F/CATION S/ redistribution of this document in whole or part without the written authorization of Smith Gardner,Inc.,will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies,the hard EX/SlIN GROUND SURFA copies shall govern. Use of any electronic files generated or 440.00 440.00 REFERENCES. provided by Smith Gardner,Inc.,constitutes an acceptance of (SEE REFERENCE ) PERM/TTE FINAL COVER (MINE RECLAMATION these terms and conditions. 1. EXISTING TOPOGRAPHY WITHIN THE FACILITY PROPERTY LINE FROM AERIAL ROCK SURVEY DATED JUNE 14, 2019 PREPARED BY GEODATA CORPORATION, - - HILL ^ Ct II ZEBULON, NC. TOPOGRAPHY IN ACTIVE AREAS FROM ENGINEERING SURVEY PROJECT TITLE: RIVE DATED MAY 4, 2022 BY SMITH GARDNER, INC. TOPOGRAPHY IN 400.00 \ 40000 SURROUNDING AREAS FROM LIDAR DATA DATED 2015 PROVIDED BY NC • Q SPATIAL DATA DOWNLOAD. 2. FACILITY PROPERTY LINE FROM A SITE PLAN FOR ALAN HUGH STONE STONE LA N D F I LL A N D MINE _ PREPARED BY SMITH & SMITH SURVEYORS, PA, DATED AUGUST 29, 2005. � I � ADJACENT PARCEL BOUNDARIES FROM CHATHAM COUNTY GIS DEPARTMENT. PERMIT DRAWINGS 3. APPROXIMATE WETLAND AND STREAM LIMITS FROM FIELD LOCATION AND J j i 50' U EXCAVATED J SKETCHES ON 2/28/2018 AND 9/14/2022 BY CAROLINA ECOSYSTEMS, ,�, 360.00 _ - _ _ _ _ _ 360.00 W INC. LOCATIONS MAY BE SUBJECT TO CHANGE BASED ON MORE DETAILED PROPOSED SUB RADE ^ - 1 I o �, LOCATION DATA. THESE FEATURES ARE IDENTIFIED AS POTENTIAL WATERS o OF THE US BUT HAVE NOT BEEN VERIFIED BY THE US ARMY CORPS OF o ENGINEERS. N X w 4. RIPARIAN STREAM BUFFERS PURSUANT WITH SECTION 304 (J) OF THE CD CC/ w o 320.00 CHATHAM COUNTY WATERSHED PROTECTION ORDINANCE. PROVIDED BY a / \ I o I j ¢ CAROLINA ECOSYSTEMS, INC., DATED FEBRUARY 28, 2018. DRAWING TITLE: LP m o I m Z Im CD CD 280.00 - - _ o j I �N 280.00 ENGINEERING CROSS SECTIONS co INFERRED PO N770ME1R/C - - _ - ■ w 120' SURFA E CONTOUR - I (SHEET 2 OF 2) _ _ � � ■ N O CD120 _ 240.00 240.00 80' C,I DESIGNED: PROJECT NO: o J.C.L. ARBD 23-1 DRAWN: SCALE: Ir g 200.00 200.00 40' C.T.J. AS SHOWN 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 APPROVED ub DAL J JCt MAR. 2024 SECTION rC CFILENAMEA 0 100' 200' 300' ARBD-D0026 oSCALE: AS SHOWN X2 SHEET NUMBER: DRAWING NUMBER: m 6 X2 © 2024 Smith Gardner, Inc. 0 DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 PREPARED FOR: 8'-0" MAXIMUM 'r VAR€,ABLE AS DIRECTED BY THE ENGINEER STEEL POST FILTER 4F 1 INCH DIAMETER o T[I57 WASHED STONE a � � EROSION & SEDIMENTATION CONTROL MAINTENANCE NOTES: ARBD, LLC ° d o o � n P8 S _n q O p r— D°t o e Q G Io 1. SILT FENCE: STONE LCI D LANDFILL SILT FE�#CE FABRIC TO OVERLAP ° 4 � 0 4 ° A. INSPECT SILT FENCES AT LEAST ONCE A WEEK AND AFTER EACH 0.5 INCH RAINFALL. SILT FENCE FABRIC HARDWARE CLOTH BY 12 INCHES °a¢ 6 o oa ° a°p °4 4 00 MAKE ANY REQUIRED REQPAIRS IMMEDIATELY. LINE WI 10 GAUGE INSTALLED O SECOND MINIMUM 12y2 GAUGE � ° ° p B. SHOULD THE FABIC OF A SILT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME 5 2 ROCK HILL DRIVE LINE WILES WIRE F# D�1 TOP 1 INEFFECTIVE; REPLACE IT PROMPTLY. INTERMEDIATE MIRE'S STET_ FENCE POST \ C. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME WIRE FENCE HARDWARE GLOT�, x-STEEL FENCE POST FOR THE NEXT RAIN EVENT AN REDUCE PRESSURE ON THE FENCES. TAKE CARE TO CHAPEL HILL, NC ti SILT FENCE FABRIC ON WIRE FENCE AVOID UNDERMINING THE FENCE DURING CLEANOUT. GRADE ON WIRE FENCE 1 HARDWARE CLOTH D. REMOVE ALL RENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE — ri FILTER bF 1 INCH DIAMETER PLAN VIES NOTE: AREA TO GRADE AT STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE HAS BEEN F 5F WASHED STONE USE SILT FENCE OUTLETS ONLY WHEN PROPERLY STABILIZED. DRAINAGE AREA DOES NOT EXCEED 1/4 FRONT VIEW ACRE AND THERE IS A LOW AREA. USE FLOW DIRECTION 18,. AS A REPAIR OF S-ILT FENCE FAILURES. 2. DRAINAGE CHANNELS: A. DURING THE ESTABLISHMENT PERIOD, CHECK GRASS—LINED CHANNELS AFTER EVERY PREPARED BY: — GRADE STEEL FENCE POST SET RAINFALL. NC LIC.NO.F-1370(ENGINEERING) FIARDyyAR£ CLOTH MAXIMUM 2 FEET APAR WIRE FENCE B. AFTER GRASS IS ESTABLISHED, INSPECT DRAINAGE CHANNELS AT LEAST ONCE A WEEK SC COA NO.CO1488 STEEL POST ii r s" AND AFTER EACH 0.5 INCH RAINFALL. MAKE ANY REPAIRS IMMEDIATELY. 1.1 WOVEN WIRE FABRIC 10 I C. INSPECT THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND SILT FENCE FABRICIQE VFW I I EVIDENCE OF PIPING OR SCOUR HOLES. NO-TES= C D. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED 1) USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES _ Li z SILT FENCE CARRYING CAPACITY. NOT EXCEED 1/4 ACRE PER 100 fL OF FENCE AND �j � SMITH FABRIC RLAP o f�p E. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF NEVER IN AREAS OF CONCENTRATED FLOW, ' 12 12 1 1 1 APIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. -+ Off.• : INCHE IN 2) OVERLAP 12 INCHES WHEN SPLICING FABRIC. H F. KEEP THE GRASS IN A HEALTY, VIGOROUS CONDITION AT ALL TIMES. GARDNER � ��:.;.�� 3) FOR REPAIR OF SILT FENCE FAILURES USE c��� r;s: GRADE DETAIL 04000.23- _.,.,;,_; -: . 3. DRAINAGE CHANNEL MATTING: ENGINEERS - A. INSPECT ROLLED EROSION CONTROL PRODUCTS (MATTING) ONCE A WEEK AND AFTER COf�iPACTED FILL ryy _ _ — I R I EACH 0.5 INCH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 6" MINIMUM COVER OVER SKIRT L i•i B. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT 1526 Richland St.,Columbia SC 29201 CD 1.1 I OCCUR BENEATH THE MATTING. ANCHa $+tIRT AS bIREOTEdY ENGINEER i u NOTE: Li C. ANY AREAS OF THE MATTING THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH BURY WIRE FENCE. HARDWARE CLOTH. THE GROUND SHALL BE REPAIRED AND STAPLED. SIDE VIEW FRONT VIEW AND SILT FENCE FABRIC 6 INCHES INTD D. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE SEAL •,,,, THE TRENCH N•• ��h, FIXED AND THE ERODED AREA PROTECTED. •`��• CA CHATHAM COUNTY CHATHAM COUNTY DocuSigned by, N RT 11 C:i R{11-,N n NORTH C,�Ao i,N n _ E. MONITOR AND REPAIR MATTING AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. ��. �� .," a�ska uwsBl�a DEsn[Lt4u �I�+cx Est" �� � FESS/p/ ti� . STANDARD SILT FENCE ' � STANDARD SILT FENCE OUTLET 2 4. ROCK CHECK DAM: 278482DF�09438_Q 9< EC1 ��Tpig EC1 °��-p1 A. INSPECT CHECK DAMS AS WELL AS THE CHANNELS FOR DAMAGE ONCE A WEEK AND S�EALr� wnit. 1-1-rRnT�r7. SfIhI:T 1 �,f 1 'whTFItAHY1lNlkaifx,'T1sS74A6<r{R7'.Nh:NT SiIFET 1 of 023002 i AFTER EACH 0.5 INCH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 10 e q4_ A.5f�,W2o24 SEAL �•••••u„Wp,•�i DocuSigned by4�`,^ `` CA'`Q DRAINAGE CHANNEL SCHEDULE [J4",tt e ��•' ° oFEssiotiq`'�� CHANNEL I.D. B (FT) D (FT) +_ C5ECC95Cz7E4AC..e SEAL < NORTH 2 2 r 054367 SOUTH 5 2 f GINEE� •'�� SOUTHWEST 15 2 ': ,�''•••nnn••q��6•r�2024 REV. DATE DESCRIPTION B 1 p 1 � -- IN1 CILiNNELS,ROU,OUT STRIPS OF NL'•T NG Po1Rr1LLI:I.TO THF, I]IItf�C1•TUNI OF FLOW AND[]IFL'R'I H PRG CEC7IVE MULCH. NOTES: 1. EROSION STOPS PLACED AT EVERY 25 LINEAR FEET. 4 ROLLED EROSION CONTROL PRODUCT (RECP) I, 2. FOR ANCHORAGE OF RECP, SEE DETAIL EC1 (SEE NOTE 1) ( ) k`: �+ 3. RECP SHALL BE LANDLOK 435, AS MANUFACTURED I I I .�t�. ,_. � \���i ..., � AN(:H{]R[V1:TTiNIG Iitii- BY PROPEX GEOSOLUTIONS, OR APPROVED EQUAL. A I:-1n�CxTlti;�v(;H RECP AND GRASS LINED CHANNELS 12-jnct overlap JOIN STRPS 13Y ANCH0RFNG AND OVTRLAPPFLIJG DRAINAGE CHANNEL DETAIL 3 NOT TO SCALE EC1 CHAT14AM COUNTY N0RT19 CAA111.I NA DEI AIL NUMBE R STANDARD MATTING INSTALLATION 4 zoaa-nin Electronic files are instruments of service provided by Smith EC151 IF:I:T 1 of I Gardner,Inc.for the convenience of the intended recipient(s),and uthTY;RRH}15 Pk{}7y8L:T10N 1,F.FARTMF;tiT no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner,Inc.,will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies,the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner,Inc.,constitutes an acceptance of these terms and conditions. _ TdP ELEVATION 6F STQRMWATER_ _ 0.5'-1' I ` I #57 WASHED STONE = T(MAX. PROJECT TITLE: VARIES S1.0PE SURFACF. SI I A I Jf BFE SMOOTII $EFOR1 a IF THE- E IS A BERM AT THE TOP OF SI_DPE, ANCHOR UPSLOPE OF THE BERIVrI. EXISTINO SLOPE P1,ACE�lE.1\iT l�(}l� PR(All F,R S[]II., CONTACT. , RIP-RA STONE LANDFILLAND MINE _ VARIES •• - ANCHOR IN 6" X G M CH IN. TREN S'1'APLINGPArrERN AS OVFR1.,Ap SIDE VIEW PERMIT DRAWINGS AND STAPLE AT 12 INTERVALS. EXlSnNG of PER MAIVZTFACTURERS SLOPE RECOMME � SLOPE ilJc � SLOPE f MIN. 6" OVERLAP. VARIES DESIGN OF SPILLWAYS •'. •'-' �• __ -- STAPLE OVERLAPS MAX. 5" SPACING. G-5'-1' QRAINA(ACRES}REA WEIR FTNGTHi KEYED RIP RAP 4.0 DRAWING TITLE: VARIES r 2 6.0 00 3 8.0 LP BRING ARTERIAL D0Vv1N TO A LE-N7EL I r s 112-0 0.0 N D0 RIOT STR I ITCH B LAN KI-ITS/MATTIN6 AREA, TURN THE END UNDER 4"AND P7 WASHED STONE 1 0lMENSd4NS 5E IOWII ARE MINIMUM CD TIGl IT-A 1,1.c7vtr TI I>F R0I,1-1;TO CONFORM TO ANY STAPLE AT 12" INTERVAL. . EROSION AND SEDIMENTATION m rG ±LAxTz .S. FRONT VIEW CONTROL DETAILS f,1I1• k, t-l~:RTILI,GE,AND SEED BFFORE 1NSTM.I,AnON. MATTING I L=THE DISTANCE SUCH THAT POINTS FOP S1,0PFS I.F,SS TI t,-1N 3H:IV', R01.L.S NtAY HT STA$11JVATION A AND B ARE OF EQUAL ELEVATION N , PLANTING OF SNRLBS,TRE:I 5, ITC. Sl OtJLD OCCUR (SHEET 1 OF 4) 0 1 T, CF.D IN IIC RX7[ NTAT. STi IPS' AFTER INSTAI,I.ATION. � oao°n°T. pA a A B � �liJJ�tf�]��JIF�f�fl� L `f f I�� G4enp�o r+_ +f O Agd�4n N f Jlf��fl ��f7�jfff ,I DESIGNED: PROJECT NO: N PROFILE VIEW J.C.L. ARBD 23-1 m DRAWN: SCALE: CHATHAM COUNTY CHATHAM COUNTY L.H.B. AS SHOWN NORTH CAµO,-I N& NORTH CAROJA N JL PERMIT ISSUEAPPROVED DATE: I}t'E'uL PilTMHER DETAIL Pil1hIBER jCt MAR. 2024 STANDARD MATTING INSTALLATION (SLOPES) 5 21}1$-UII}A � STANDARD ROCK CHECK DAM s 201$-00z FILENAME EC1 SHEET I of 1 EC1 .SI lUf'sT 1 of I ARBD-D0027 M'h,F.RAFl-I---uF.rM1NT.N}.NT �F'h,1P.IkAH):e5 pp.MhkT.N h:NT NOT FOR CONSTRUCTION SHEET NUMBER: DRAWING NUMBER: a 7 ECI `' © 2024 Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 PREPARED FOR: RAFFLES W17H METAL T—POST, WOVEN 1MRE NOTES: FABRIC BACKING AND CUR FIMR NETTING 1. DRIVE STEEL FENCE POST AT LEAST 1S EROSION & SEDIMENTATION CONTROL MAINTENANCE NOTES: ARBD LLC INCHES INTO SOLID GROUND. �'-0 BAFFLES WITH METAL T—POST, SEE BAFFLE DETAIL 2. WOOD POST ARE NOT ACCEPTABLE. TOP ROPE—RETRI SKIMMER WOVEN WIRE FABRIC BACKING STONE � � (THIS SHEET) ° � 3- DIRECT WATER TQ TOP OF 13ASIN USING �F a� (SEE DETAIL 04t}GO-18) AND OOIR FIBER NETTING 1. SKIMMER AND SEDIMENT BASINS: STO N E LCI D LANDFILL t° STABILIZED DITCH, SLOPE pRAifJ PIPE ftR (SEE SHEET 7 of z) A. INSPECT SEDIMENT BASINS AT LEAST WEEKLY OR AFTER EACH 0.5 INCH RAINFALL BOTTOM ANCHORED OR OTHER APPROVED METHOD. 1s� EVENT AND REPAIR IMMEDIATELY. WITH STAPLES PROTECT WEIR WITH FILTER 5 2 ROCK HILL DRIVE K'ABRIC AND RIPRAF �;` z � B. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT SKIMMER WITH RETRIEVAL ROPE FILTER FABRIC to I ACCUMULATES TO ONE—HALF THE DESIGN DEPTH. (SEE DETAIL 04000.18) — — —— — f C. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND CHAPEL HILL, N C 4" OR 6" PVC — — INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY TOP OF `— — REPAIRS IMMEDIATELY. DAM V-0" _ D. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. f'� r MANENTLY STBILIZD; E 6" $T'N REMOVE THE ESDTRUCTURE OAND IALL. AFTER ALL SIMENT—PRDUCNGAUN TAB EV SEDIMENT. SMOOTH THE AAREAETTO fT WTH FILTER FABRIC LENGTH LENGTH BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. BAFFLE .DETAIL NOTES: SKIMMER BASIN CROSS SECTION 2. OUTLET PROTECTION: PREPARED BY: - 1, USE FOR DRAINAGE AREAS NOT EXCEEDING FIVE ACRES, 2, EARTH BERM SHALL BE STABILIZED w/SEEDING ACCORDING A. INSPECT OUTLET PROTECTION ONCE A WEEK AND AFTER EACH 0.5 INCHE RAINFALL TO NC LIC.NO.F-1370 IENGINEERINGI TO TOWN SPECIFICATIONS. SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE, OR IF SC COA NO.CO1488 I CORR FIBER MATTING STONES HAVE BEEN DISLOGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT i SECURE MTH NYLON LINE WEIR WITH RIPRAP + ZIP TIES, TOP O I}AM TOP OF DAM FURTHER DAMAGE. DESIGN OF SPILLWAYS WEIR DRAINAGE AREA WEIR LENGTH 1 WEIR 36' (ACRES} (FT) r LENGTH SMIT H + STOKE APRON Ulm. WITH FILTER FABRIC � ZIP TIES 2 6.0 FILTER FABRIC DITCH AND BURY FILTER FABRIC EDGE S R'a (MIN. 12" OF FABRIC) FLOW DIRECTION GARDNER STAPLES 5 12.0 PVC GROUND 1 DIMENSIONS SHOWN ARE MINIMUM PIPE ENGINEERS Tl elf �IILI lil—I I— I IBM WEIR CROSS SECTION 14 N. Boylan Avenue,Raleigh NC 27603 � 919.828.0577 11�-I ,. PERSPECTIVE VIEW WOVEN WIRE FABRIC. MIN_ 1526 Richland St.,Columbia SC 29201 SECURE WITH NYLON 21P TIES, �I III 1L UW- 1L ' T—POST SEAL CHATHAM COUN 1'Y CHATHAM COUNTY DocuSigned by:��0, (� CARD �'�.♦i 1 I3£I'11LNU BEk I3£I'llLhU�1BEk Est" /���(RQ� STANDARD SKIMMER BASIN EC2 �v1a_�,,; STANDARD SKIMMER BASIN Ec2 2013-016 27B482DF1�9438 Q SEAL 9< - SHEET 1 [,f 3 S11F.P T 2[,f 3 R'h�F.RAHYJ!1'IkPTit'll PPI'Nz1lk T w'hTP.IUl-1'IkPT 'tl uPrN—T 023002 ''•. `S'T FNGINEE� �� . •. F1' A.�/�X(024 SEAL 0 ,�Np�n�4.,,�i DocuSigned b .,*,,�'`C` �~'`�//'�♦j♦, NOTES. SEDIMENT BASIN SCHEDULE �Sc 'E4�°�oFESs/°ti9ti� '''' SKIMMER IS TO BE A SURFACE DEWATERING DEVICE A B C D E F G H = SEAL SUCH AS OMP SKIMMER OR APPROVED DEVICE. BASIN (FT) (FT) (FT) (FT) (IN) (IN) (%) (FT) 054367 2. SKIMMER SHOULD RISE TO LEVEL OF WEIR HEIGHT IN VENT SCREEN ACCESSIBLE A 311 314 315 316 36 18 8.1 80 ''•♦ FNGINEE� \ .`" THROUGH DOOR ,♦ FSSE G31�j*2024 TEMPORARY' BASIN OR TO RISER INLET- B 283 286 287 288 24 15 7.5 40 ��'�.,,����������� 7. ROPE ATTACHED TO SKIMMER TO HELP KEEP CLEAN. D 252 254 255 256 24 15 2 50 SKIMMER SIZE E 254 258 259 260 36 18 1.7 60 REV. DATE DESCRIPTION BASIN SIZE (IN) PRINCIPAL SPILLWAY 10' A 4 B 3 D 3 TOP OF BERM EL. _ (D) E 4 2 SCHEDULE 40 PVC 1 F STRUCTURAL FILL RIGID FLEXIBLE JOINT FLOAT EMERGENCY SPILLWAY EL. _ (C) OUTLET END: CONNECTION RETRIEVAL ROPE PRINCIPAL SPILLWAY EL. _ (B) �\ FILTER DIAPHRAGM (WIDTH = 14') TO OUTLET PIPE OR RISER 3 (SEE NOTE 1) CPP BARREL co 0 _ (F) SLOPE _ (G) LENGTH = (H) BARREL3 3 PIPE LONGER THAN SHOWN. SKIMMER C NOT INCLUDED WITH SKIMMER SUPPLIED BY USER. BASE EL. _ (A) TO OUTLET N � 1 2' N CHATHAM COUN qY 44' RIPRAP SKIMMER PIT NORTH f h R n 1.1 N 1 CUT—OFF TRENCH p v Z7�'A[L NUMBER Electronic files are instruments of service provided b Smith r 3 8 OZ/SY NONWOVEN GEOTEXTILE (SEE NOTE 2) NOTE: Gardner,Inc.for the convenience of the intended recipient(s),and — STANDARD RD SKIMMER T�Iif E R BASIN /� SI T S��I�h J�ER 2018-01� re warranty is either expressed or implied. Any reuse or 1 1i �['� J.��+,� ..C�. 1�l ��+�11'� EC2 1. CONSTRUCT FILTER DIAPHRAGM OF ASTM C-33 FINE AGGREGATE. redistribution of this document in whole or part without the _err RRTEX�go'W"0N0EF 7V+NT SHFF'T 3 of ALTERNATIVELY, OWNER MAY USE ANTI—SEEPAGE COLLARS IN LIEU OF A written authorization of Smith Gardner,Inc.,will be at the sole risk of the recipient. If there is a discrepancy between the 5'x5'x1' CONCRETE FILTER DIAPHRAM. electronic files and the signed and sealed hard copies,the hard ANTI—FLOTATION BLOCK copies shall govern. Use of any electronic files generated or provided by Smith Gardner,Inc.,constitutes an acceptance of 2. CUT—OFF TRENCH SHALL BE CONSTRUCTED OF LOW—PERMEABILITY SOIL. these terms and conditions. SEDIMENT BASIN CROSS SECTION PROJECT TITLE: DETAIL 4 A A NOT TO SCALE 3 TIMES INNER EC2 t _ _ _ _ _ _ — f � STONE LANDFILLAND MINE 1.D.QIAMETERI.O.) PIPE � PERMIT DRAWINGS RIP RAP APRON PLAN VIEW DRAWING TITLE: 00 NOTES: C14 1)CD L THE LENT" of THE RIPRAP APR°N, EROSION AND SEDIMENTATION N M 2) d 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT � LESS THAN 6" (inches). CONTROL DETAILS 3 — J '`— 3) A FILTER BLANKET OR FILTER FABRIC SHOULD BE (SHEET 2 O F 4) o L INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. o PIPE CD m JI Nf I ! -IY —1 �I' DESIGNED: PROJECT NO: III J.C.L. ARBD 23-1 c FILTER DRAWN: SCALE: s SECTrON 'A-A' FABRIC L.H.B. AS SHOWN APPROVED DATECHA : dC�a _m PERMIT ISSUE COUNTY isE k,4IL ittl4illh!i MAR. 2024 J NOR-YK ChROLI� h FILENAME 0 ARBD-DO027 ❑ STANDARD PIPE OUTLET (ISO DEFINED CHANNET.) 5 ?018_006 Ir EC2 SHEFT 1 „r I NOT FOR CONSTRUCTION SHEET NUMBER: DRAWING NUMBER8 : Q N'lT F.I[SH'.k I•Hf11}a:l k[]�I sF.s'xi['I 1,k:1'I Q EC2 b` © 2024 Smith Gardner, Inc. c� DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 PREPARED FOR: SEEDING SPECIFICATIONS: ARBD, LLC TOP RIM 1. GENERAL OF DITCH THE CONTRACTOR SHALL ESTABLISH A SMOOTH, HEALTHY, UNIFORM, CLOST STAND OF GRASS STONE LCI D LANDFILL 70'--C" MINIMUM 2'-Q" MIN- FROM THE SPECIFIED SEED. PRIOR TO REVEGETATION THE CONTRACTOR SHALL ADEQUATELY BUTSEDIMENCIENT T ON TO KEEP NOTES: — TEST THE SOILS TO BE REVEGETATED TO ENSURE THE ADEQUACY OF THE SPECIFIED 52 ROCK HILL DRIVE GRAVEL r-OOST-RUCTION ENTRANCE S"LL BE I I I I I�" REQUIREMENTS. ANY MODIFICATIONS TO THESE REQUIREMENTS DEEMED NECESARRY AFTER THE MAINTAINED ROUTINELY TO AVOID SEDIXMT STEEP CUT OR FILL SLOPE r 8' ' i•FAVING, PROJECT. -�l REVIEW OF SOIL TEST RESULTS, SHALL BE AT THE CONTRACTORS SOLE EXPENSE. THE CHAPEL HILL, N C SEDIMLNT WTSRING 10ADMY FRPM ?ROJECT R ENGINEER WILL PERFORM THE OBSERVATIONS TO DETERMINE WHEN SUCCESSFUL REVEGETATION SHALL HE REMOVED IMMEDIATELY. —r 3:15LOPE (MAXIMUM) IS ACHIEVED. 25-rT OR WIDTH OF 2. SOIL PREPARATION: £xISTING 2"-3" STONE TO 6E USED PROPOSED STREET, A. LIMIT PREPARATION TO AREAS WHICH WILL BE PLANTED SOON AFTER PREPARATION. ROADWAY (SURGE STONE OR RAILROAD BALLAST) VMICHEVER I5 CROSS SECTION A—A NOTE: GREATER. STABILIZE DIVERSION UITCH WITH TEMPORARY B. LOOSEN SURFACE TO MINIMUM DEPTH OF FOUR (4) INCHES. SEEDING AND EROSION CONTROL MATTING. C. REMOVE STONES, STICKS, ROOTS, RUBBISH AND OTHER EXTRANEOUS MATTER OVER PREPARED BY: THREE (3) INCHES IN ANY DIMENSION. NC LIC.NO.F-1370(ENGINEERING) D. SPREAD LIME UNIFORMLY OVER DESIGNATED AREAS AT THE RATE SPECIFIED IN TABLE 1 OF THESE DRAWINGS. SC COA N0.C01488 UPSLOPE TOE A E. AFTER APPLICATION OF LIME, PRIOR TO APPLYING FERTILIZER, LOOSEN AREAS TO BE PLAN MEW POSITIVE GRADE 1.0% MAXIMUM SEEDED WITH DOUBLE DISC OR OTHER SUITABLE DEVISE IF SOIL HAS BECOME HARD OR COMPACTED. CORRECT ANY SURFACE IRREGULARITIES IN ORDER TO PREVENT ' POCKETS OR LOW AREAS OF STANDING WATER. F. DISTRIBUTE FERTILIZER UNIFORMLY OVER AREAS TO BE SEEDED AT THE RATE NEW � SPECIFIED IN TABLE 1 OF THESE DRAWINGS; CONSTRUCTION SIDE SLOPES TOP RIM i. USE SUITABLE DISTRIBUTOR. SMITH 0'-C' MINIMUM 3:� MAXIMUM TOP RIM OF DITCH 2'-0" MINIMUM ii. INCORPORATE FERTILIZER INTO SOIL TO A DEPTH OF AT LEAST TWO 2 EXISl1NG ROADWAYGARDNER { } ( ) INCHES. iii. REMOVE STONES OR OTHER SUBSTANCES WHICH WILL INTERFERE WITH ENGINEERS TURF DEVELOPMENT OR SUBSEQUENT MOWING. G. GRADE SEEDED AREAS TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE 14 N. Boylan Avenue,Raleigh NC 27603 919.828.0577 STEEP CUT OR FILL SLOPE TEXTURE. 1526 Richland St.,Columbia SC 29201 6" MaN. L� i. ROLL AND RAKE, REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED �FILTER FABRIC UNDER STONE TO MEET FINISH GRADES. ii. FINE GRADE JUST PRIOR TO PLANTING. CROSS SECTION SEAL 3. SEEDING: oocus 9ned :by N CARp�'''.,� . PLAN VIEW A. USE APPROVED MECHANICAL POWER DRIVEN DRILLS OR SEEDERS, MECHANICAL HAND 5f" .• Q�FESS/O /'Ir�'•,� SEEDERS, OR OTHER APPROVED EQUIPMENT. z7BF, 9435 Q 9< 00 CHATHAM COUN l N' CMA'r1-1ANi COUNTY B. DISTRIBUTE SEED EVENLY OVER ENTIRE AREA AT THE RATE SPECIFIED IN ON THE SEAL N nR7la 1' 1 k I I NnItTµ Ceµn I-IVA DETAIL NUMBER DETAIL NUMBER SEEDING SCHEDULE OF THESE DRAWINGS. ' 023002 C. STOP WORK WHEN WORK EXTENDS BEYOND MOST FAVORABLE PLANTING SEASON FOR ► + STANDARD GRAVEL CONSTRUCTION ENTRANCE Ec3 ac'i$-ll�� STANDARD TEMPORARY DIVERSION DITCH EC3 � SPECIES DESIGNATED, OR WHEN SATISFACTORY RESULTS CANNONT BE OBTAINED `S'T FNGINEE�4h pf.MART.N p.ti� .•�� srir�.T i of 1 µ',lTP.kARY.e1�'R{31}aTIC}y'pf.MART.Np.h;T Si-1HET i of 1 BECAUSE OF DROUGHT, HIGH WINDS, EXCESSIVE MOISTURE, OR OTHER FACTORS. ''�.,�CF- q.S , 2024 µ',lTRk}RY.e1 wR{31},I:n D. RESUME WORK ONLY WHEN FAVORABLE CONDITIONS DEVELOP, OR AS DIRECTED BY ''••••,•„��„�•••` THE ENGINEER. SEAL �••����••••,, E. LIGTHLY RAKE SEED INTO SOIL FOLLOWED BY LIGHT ROLLING OR CULTIPACKING. .•`'��N CARp�'''•. F. IMMEDIATELY PROTECT SEEDED AREAS AGAINST EROSION BY MULCHING. oo`�S 9ned pQ'( ESS/ ��'Ir'�'•, i. SPREAD MULCH IN A CONTINUOUS BLANKET AT THE RATE SPECIFIED IN Jaaa� Otiy 9 THE SEEDING SCHEDULE OF THESE DRAWINGS. cIFISI ecZs�EnAc Q SEAL < ii. IMMEDIATELY FOLLOWING SPREADING MULCH, SECURE WITH EVENLY = 054367 DISTRIBUTED BINDER AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE OF THESE DRAIWGS. FNGINEE� ALL DISTURBED AREAS EROSION & SEDIMENTATION CONTROL MAINTENANCE NOTES: FSSE C,3 j, ►1424 Species Rate lb/acre) Dates March 1 - Atigmt 31 Se teinber 10 - February 28 1. TEMORARY AND PERMANENT SEEDING: A. GENERALLY A STAND OF VEGETATION CANNOT BE DETERMIEND TO BE FULLY 5o# Tall Fescue 5o# Tall Fescue REV. DATE DESCRIPTION R�'E Ydii1) 120 Jai1ll�.i�F 1 - A1a'[T I ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. to# Centipede 10# Centipede B. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND 25# Bermuda Lille Bermuda grass Cunhulledl RE-SEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. Annual les edeza (Kobe) $rass 354 Bermu C. RESEED AND MULCH AREAS WHERE SEEDING EMERGENCE IS POOR, OR WHERE EROSION 5a0# Fertilizer im# Fertilizer OCCURS, AS SOON AS POSSIBLE. DO NOT MOW AND PROTECT FROM TRAFFIC AS German rT3lllel 40 May 1 - August 15 4000## Limestone 4000# Limestone D. AS POSSIBLE. D. FOR AREAS THAT ARE NOT ESTABLISHING GROWTH, CONSULT EROSION CONTROL Rve (grain) 120 August 15 - December ) 1 ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING WASTE AND BORROW AREAS OTHER ALTERNATIVES FOR VEGETATION. THE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING RATE COMBINATIONS MAY BE March 1 - August 31 September 10 - Fel)rl-laEy 28 POSSIBLE. Soil Amendments -5# Tall Fescue 15# Tall Fescue Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural 25# Bertnudagrass (hulled) 254 Perrnudagrass (unhulled) limestone and 750 lb/acre 10-10-10 fertilizer.. 500# Fertilizer 500# Fertilizer SOIL STABILIZATION TIME FRAMES 4000# I..1mestone 4000 + T_iznestone MulchSITE AREA STABILIZATION EXCEPTIONS Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch Note: 50# of Bahiagrass may be substituted for either Centipede or Bermudagrass only upon request. PERIMETER DIKES, SWALES, Anchoring tool. A dist with blades set nearly straight earl be used as a mulch anchoring DITCHES, SLOPES 7 DAYS NONE tool. Orr cut and Fill slopes 2:1 or stecpct Centipede shall be applied at the rate of 5 lb/acre and add 20# of Sericea Lespedeza from]anuary 1 - December 31, HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE Mallitenaiaee IF SLOPES ARE 10 FEET OR LESS Rcfcrv111zc if growth 1s riot fully adequate. Reseed, referti1ize and mulch 1t imediately Fertilizer shall be 10-20-20 analysis. A different analysis of fertilizer may be used provided the 1--2-2 SLOPES STEEPER THAN 3:1 7 DAYS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED. Following erosion. or other damage. ratio is maintained and the rate of application adjusted to provide the same amount of plant food as a Electronic files are instruments of service provided by Smith 1 D ?{l-?[} analysis and as directed, SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER Gardner,Inc.for the convenience of the intended recipient(s),and THAN 50 FEET IN LENGTH• no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the ALL OTHER AREAS WITH SLOPES NONE EXCEPT FOR PERIMETERS written authorization of Smith Gardner,Inc.,will be at the sole FLATTER THAN 4:1 14 DAYS AND HQW ZONES. risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies,the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner,Inc.,constitutes an acceptance of CHATHAM COUNTY Cl1A771AM COUNTY these terms and conditions. K0 RT11 CAµU 1.1 NA NnItTµ CAFLU I.I NA Z 116'I'AILKU 8ER DETAILNUMBER TEMPORARY SEEDING/MULCHING SPECIFICATIONS 3 201$-020 PERMANENT SEEDING/MULCHING SPECIFICATIONS 4 2015-021 PROJECT TITLE: EC3 EC3 R'A7P,Ik8HPS7 FM1TR�'i1D�+RP.MARTM};NT S1117ET i of i R'A7F.RAHPS7--pF.MARTkhNT sHFET i of 1 STONE LANDFILL AND MINE PERMIT DRAWINGS W GABION/RIPRAP CHANNEL SCHEDULE CHANNEL I.D. W (FT) III—III _ IIIIIII � I I GABION 15 III—III—III I—III—III III I DRAWING TITLE: =IIII=III= D=1.5' MIN. =III=I RIPRAP 20 ;IIII—III I I1 I I I I I 11= BASIN E INLETS 30 00 LP _ _ _ III—III-11 = CD 12° I �—III=III=� III=III=III- GABION LINING EROSION AND SEDIMENTATION III=IIII;I ORE RIOPRAPTTRESS 1 I I III III III III III III III III I I I CONTROL DETAILS CN a ' I=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 11=1 I I CD __ _ _ _ _ (SHEET 3OF4) CD —1 I I—I 11=1 I I—III—III—I 11=1 I I—I 11=1 11=' IIIIIIIIIIIIIIIIIIIII—III FILTER FABRIC o —I III III III I m TRAPEZOIDAL C,I DESIGNED: PROJECT NO: o J.C.L. ARBD 23-1 m DRAWN: SCALE: Ir GABION RIPRAP CHANNEL PERMIT ISSUEL.H.B. AS SHOWN APPROVED: DATE: dC� MAR. 2024 DETAIL 5 FILENAME: ARBD-DO027 NOT TO SCALE EC3 NOT FOR CONSTRUCTION SHEET NUMBER: DRAWING NUMBER: m a 9 EC3 `' © 2024 Smith Gardner, Inc. DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 PREPARED FOR: 6" 5'-0" 6" ARBD, LLC CULVERT SCHEDULE STONE LCI D LANDFILL SEE NOTES 1 AND 3 r-I r_1 LENGTH INV. IN INV. OUT SLOPE 52 ROCK HILL DRIVE L J L J NO. SIZE REMARKS (FT) (FEET) (FEET) (%) CHAPEL HILL, N C A A C-1 (2 PIPES) 36"0 RCP (CLASS III) 60 263.0 260.0 5 OVERFILL - - - - - - - C-2 (2 PIPES) 36"0 RCP (CLASS III) 65 279.0 276.0 4.6 H 0 0 STANDARD EMBANKMENT INSTALLATION SOILS AND MINIMUM D /6 (MIN.) Do Do(MIN.) COMPACTION REQUIREMENTS PREPARED BY: HAUNCH-SEE TABLE NC LIC.N0.F-1370IENGINEERING) INSTALLATION TYPE BEDDING THICKNESS HAUNCH AND LOWER SIDE SC COA NO.CO1488 OUTER BEDDING _ _ _ _ SEE NOTES 1 AND 3 LOWER SIDE-SEE TABLE r-I r 1 _ Do/24"(600mm) MINIMUM, 90% SW, SP, GW, GP; 95% I �� L J L J NOT LESS THAN 3"(75mm)' ML, SM, GM OR GC, SC WITH - - SM ITH STEPS TYPE 1 IF ROCK FOUNDATION, USE 95% SW, SP, GW, GP <20% PASSING NO.200 SIEVE; ��? �;���, ,���,���,����,�,,�������,���,� ?��, �'' PLAN (SEE NOTE 5) Do/12"(300mm) MINIMUM, OR 100% CL, MH, SC, GC, CH. BEDDING-SEE TABLE NOT LESS THAN 6 (150mm). D /3 MIDDLE BEDDING: LOOSELY DRAINAGE CHANNEL SEE NOTE 4 Do/24"(600mm) MINIMUM, OUTER BEDDING: MATERIALPLACED (WHERE APPLICABLE) NOT LESS THAN 3"(75mm). 90% SW, SP, GW, GP; OR 85% SW, SP, GW, GP; 90% AND COMPACTION EACH EXCEPT FOR TYPE BEDDING TYPE 2 IF ROCK FOUNDATION, USE 95% ML, SM, GM OR GC, SC ML, SM, GM OR GC, SC WITH SIDE, SAME REQUIREMENTS " WITH <20% PASSING NO.200 <20% PASSING N0.200 SIEVE; AS HAUNCH _ Do/12 (300mm) MINIMUM, FOUNDATION DRAINAGE CHANNEL SIEVE OR 95% CL, MH, SC, GC, CH. PRECAST NOT LESS THAN 6 venue,(150mm). 14 N.Bolan A Ralei h NC 27603 919.828.0577 (WHERE APPLICABLE) CONCRETE (BASED ON AMERICAN CONCRETE PIPE y g TOP ��\/�/\� Do/24"(600mm) MINIMUM, 1526 Richland St.,Columbia SC 29201 1 1 \% o NOT LESS THAN 3 (75mm). 85% SW, SP, GW, GP; 90% 85% SW, SP, GW, GP; 90% ASSOCIATION RECOMMENDATIONS) 2 \ 2 N TYPE 3 IF ROCK FOUNDATION, USE ML, SM, GM OR GC, SC WITH ML, SM, GM OR GC, SC WITH Do/12"(300mm) MINIMUM, <20% PASSING N0.200 SIEVE; <20% PASSING N0.200 SIEVE; OR 95% CL, MH, SC, GC, CH OR 95% CL, MH, SC, GC, CH. NOTES: SEAL \ EL.= D NOT LESS THAN 6"(150mm). 1. COMPACTION AND SOIL SYMBOLS (95% SW) REFER TO SW SOIL MATERIAL (USCS CLASSIFICATION) WITH A MINIMUM •`' a CA \� \ DocuSigned by: •• .CN CARD NO BEDDING REQUIRED, STANDARD PROCTOR COMPACTION (ASTM D 698) OF 95%. O� ESS/p ��ti EXCEPT IF ROCK FOUNDATION, NO COMPACTION REQUIRED, NO COMPACTION REQUIRED, 2. SOIL IN THE OUTER BEDDING, HAUNCH, AND LOWER SIDE ZONES, EXCEPT WITHIN Do/3 FROM THE PIPE SPRINGLINE, 5fa"j.. � tiTYPE 4 " EXCEPT IF CL, MH, SC, GC, EXCEPT IF CL, MH, SC, GC, 2'g'82Da- Q USE Do/12 (300mm) MINIMUM, SHALL BE COMPACTED TO AT LEAST THE SAME COMPACTION AS THE MAJORITY OF THE SOIL IN THE OVERFILL -1 SEAL PRECAST CONCRETE BOX Li ° U NOT LESS THAN 6"(150mm)• CH USE 85%. CH USE 85%. ZONE. 023002 (SEE NOTE 2) INLET PIPE (WHERE APPLICABLE) 3. SUBTRENCHES: (SEE NOTE 1) 3.1. A SUBTRENCH IS DEFINED AS A TRENCH WITH ITS TOP BELOW FINISHED GRADE BY MORE THAN 0.1H OR, '•.,`rT FNGINEE �.•� OUTLET PIPE FOR ROADWAYS, ITS TOP IS AT AN ELEVATION LOWER THAN 1'(0.3m) BELOW THE BOTTOM OF THE �'•.,gOFY A 5*� 024 (SEE NOTE 1) PAVEMENT BASE MATERIAL. '••••mnna••s 3.2. THE MINIMUM WIDTH OF A SUBTRENCH SHALL BE 1.33 Do, OR WIDER IF REQUIRED FOR ADEQUATE SPACE SEAL �.••�����•••.,,� ° ° = TO ATTAIN THE SPECIFIED COMPACTION IN THE HAUNCH AND BEDDING ZONES. DocuSigned®y•,.•`o��N ESS o0 3.3. FOR SUBTRENCHES WITH WALLS OF NATURAL SOIL, ANY PORTION OF THE LOWER SIDE ZONE IN THE �� SUBTRENCH WALL SHALL BE AT LEAST AS FIRM AS AN EQUIVALENT SOIL PLACED TO THE COMPACTION 1j7FCC95Cr7F4AC QF REQUIREMENTS SPECIFIED FOR THE LOWER SIDE ZONE AND AS FIRM AS THE MAJORITY IF THE SOIL IN THE _ SEAL = OVERFILL ZONE, OR SHALL BE REMOVED AND REPLACED WITH SOIL COMPACTED TO THE SPECIFIED LEVEL. 054367 CONCRETE PIPE INSTALLATION EL.= B 024 EL.= A SE ��S ��►�2 o tD _ DETAIL CD 2 REV. DATE DESCRIPTION NOT TO SCALE EC4 CONCRETE FILL (SLOPE TOWARD INVERT OUT) 6" COMPACTED CRUSHED STONE BEDDING SECTION A-A NOTES: BLACK LETTERS 1. PROVIDE WATERTIGHT JOINTS ON ALL PIPING. 2. PRECAST CONCRETE BOXES SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: EDGE OF WASTE MARKER A. CONCRETE: COMPRESSIVE STRENGTH 4000 PSI. o (FIBERGLASS, PLASTIC, OR OTHER WEATHER B. REINFORCING: ASTM A-615, GRADE 60. -H RESISTANT PERMANENT MATERIAL) DROP INLET SCHEDULE C. MEETS H-20 LOADING. LO 3. PIPES MAY BE ORIENTED DIFFERENTLY WITH RESPECT TO THE FINISHED GROUND SURFACE DROP INLET (FEET) (FEBET) (FEET (FEDET) (FEET) THE CHANNEL THAN DISPLAYED HERE. SEE DRAWING EC1 FOR PROPER ORIENTATION. DI-1 (2 INLETS) 262.7 263.0 N/A 268.0 5 4. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FROM SEDIMENTATION FOR ALL DROP INLETS USING STONE FILTER DI-2 (2 INLETS) 278.7 279.0 N/A 284.0 5 FENCE PLACED AROUND PERIMETER. SEE DETAIL EC1 \ \ \ \ \ \ 5. PROVIDE STEPS FOR DROP INLETS WITH H>4.5'. STEPS SHALL 1.5' HAVE A 16" SPACING THE FULL HEIGHT OF THE DROP INLET. START FIRST STEP 6" BELOW TOP. DROP INLET NOTE: Electronic files are instruments of service provided by Smith DETAIL 1. PLACE EDGE OF WASTE MARKERS EVERY 100' ON-CENTER AND Gardner,Inc.for the convenience of the intended rec o nt(sl,and no warranty is either expressed or implied. Any reuse or AT BREAK POINTS, OR OFFSET FROM WASTE LIMITS AS redistribution of this document in whole or part without the NOT TO SCALE EC4 DIRECTED BY OWNER OR OWNER'S REPRESENTATIVE. written authorization of Smith Gardner,Inc.,will be at the sole risk of the recipient. If there is a discrepancy between the 2. PROVIDE OFFSET DISTANCE (AS NEEDED) TO EDGE OF WASTE. electronic files and the signed and sealed hard copies,the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner,Inc.,constitutes an acceptance of these terms and conditions. EDGE OF WASTE MARKER PROJECT TITLE: EDGE 0 MARKER C4 DETAIL 3 5' (TYP.) TOP OF WASTE GRADES _ NOT TO SCALE VARIES VARIES 3 EC4 DRAINAGE CHANNEL NCDOT AGGREGATE _ - STONELANDFILLANDMINE _ 1� - PERMIT DRAWINGS EC1 BASE COURSE I 5 PERIMETER ACCESS ROAD 3 3 J__ %/�\/�\/�\/�\/�\/�\/�\/�\ /\\/\�\� DRAWING TITLE: Q C4 \\ .\\ .\\ .\\ .LP o, VARIES STRUCTURAL GUARDRAIL FILL NONWOVEN GEOTEXTILE CD Z� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - NOTES: 8 OZ./SY OR ENGINEER EROSION AND SEDIMENTATION co _ 1. AGGREGATE BASE COURSE SHALL MEET THE GRADING REQUIREMENTS IN NCDOT APPROVED EQUIVALENT CONTROL DETAILS 3 - SECTION 520 AND BE OBTAINED FROM AN APPROVED NCDOT SOURCE. (SEE NOTE 3) CN 2. AGGREGATE SHALL BE PLACED AND COMPACTED IN 8-INCH THICK (IN-PLACE) (SHEET 4 OF 4) o EXCAVATION GRADE (VARIES) LIFTS TO 100 PERCENT ITS STANDARD PROCTOR MAXIMUM DRY DENSITY. d 3. GEOTEXTILE SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 180 LBS, PERIMETER BERM CROSS SECTION (TYP.) MINIMUM PUNCTURE RESISTANCE OF 75 LBS, TRAPEZOIDAL TEAR OF 75 LBS, AND AOS OF LESS THAN 0.6 MM. DETAIL r4 ALL-WEATHER ACCESS DESIGNED: PROJECT NO: o NOT TO SCALE EC4 J.C.L. ARBD 23-1 m DRAWN: SCALE: PERMIT ISSUE DETAIL 5 C.T.J. AS SHOWN NOT TO SCALE qS4 APPROVED DAIL dCt MAR. 2024 J NOT FOR CONSTRUCTION FILENAME: 0 ARBD-DO027 SHEET NUMBER: DRAWING NUMBER: m a 10 EC4 0 © 2024 Smith Gardner, Inc. b DocuSign Envelope ID:420FB845-FEF9-4FFE-A422-36CB470BC860 PREPARED FOR: ARBD, LLC STONE LCID LANDFILL 52 ROCK HILL DRIVE CHAPEL HILL, NC PREPARED BY: NC LIC.NO.F-1370(ENGINEERING) SC COA NO.CO1488 COMPACTED BLACK LETTERS EMBANKMENT S M ITH + PERIMETER/ACCESS ROAD (REVEGETATED) 1 EDGE OF LINER MARKER (SEE NOTE 1) MINE EXCAVATION (FIBERGLASS, PLASTIC, OR OTHER WEATHER GARDNER {, M RESISTANT PERMANENT MATERIAL) 1 2 �//I //�/� 11 �j�\/�\ '3 5' �\/�\/�\ ENGINEERS FINISHED GROUND SURFACE // �/ // �/1 // // // // R � DA N E R � SLOPE TO DRAIN �� �� �� �� �\ �\ �\ �\ � 14 N. Boylan Avenue,Raleigh NC 27603 � 919.828.0577 G 1526 Richland St.,Columbia SC 29201 MINE BOUNDARY PREPARED SUBGRADE 3 NOTES: �1 SEAL �``,,,,Uu1181" ,• N O TRESPASSING 1. ALTERNATIVELY, BERM MAYBE SUBSTITUTED BY 6' TALL FENCE AND/OR DocuSigned b;,,%���N CARO��•.,�� 1.5 ROCK BOULDERS SO OR LARGER. � EssiO�, �'y '•; MINE PERMIT N O.G8-O4 2. SAFTY7 BERM, OR EQUIVALENT, TO BE UTILIZED UNTIL MINE RECLAMATION 27B482DI=��.•9438_ Q 9< .00 GRADES HAVE BEEN ACHIEVED. SEAL 023002 MINE BOUNDARY LIMIT MARKER SIGNAGE SAFETY BERM '• FY A.Sf�,ef2o24 DETAIL DETAIL 2 DETAIL 3 SEAL , ,,:;::;:;::,,, NOT TO SCALE NOT TO SCALE NOT TO SCALE D� �••` CAR �''• DocuSigned/6�ay� �ESS/ 0 ! , Jwu Q�°F °tiy< CSECC95(a37E4AC._ SEAL 054367 '01•, FNGINEE� .•. FSS E C•3/�,���2024 REV. DATE DESCRIPTION NO TRAFFIC OR _ PROTECTION REQUIRED WITH ACCESS ALLOWED FENCE, BERM, OR BOULDERS 3H 2H H Electronic files are instruments of service provided by Smith Gardner,Inc.for the convenience of the intended recipient(s),and no warranty is either expressed or implied. Any reuse or I� ( III I / / redistribution of this document in whole or part without the j/x written authorization of Smith Gardner,Inc.,will be at the sole —_ risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies,the hard /II copies shall govern. Use of any electronic files generated or / �\\ provided by Smith Gardner,Inc.,constitutes an acceptance of TEMPORARY INTERNAL /�/� //��/ PERMANENT EXTERIOR these terms and conditions. _ 1 V / SLOPES / / �/ / / SLOPES 01 H 20' MAX / 1 H / / / / PROJECT TITLE: 1 V / I I a o o / / 2H / ID / / o / / /� 1V STONE LANDFILLAND MINE 3H PERMIT DRAWINGS 0 0 0 0 0 0 0 0 0 0 0 0 0 — — o / aoaaooaa ooaooaa000° o / DRAWING TITLE: co 0 Cq EXCAVATED SLOPE SAFETY TYP CD CD MINING DETAILS V co DETAIL 4 NOT TO SCALE D� CV O O 0 m g a) CD t IDS ch DESIGNED: f/f/ PROJECT N0: o VI:L ARBD 23-1 ca DRAWN: SCALE: g L.H.B. AS SHOWN APPROVED: DATE: ccPERMIT ISSUEJCl MAR. 2024 0 J ARBD-DO027 m NOT FOR CONSTRUCTION SHEET NUMBER DRAWING NUMBER < 11 D1 0 a 2024 Smith Gardner, Inc. 0