Loading...
HomeMy WebLinkAbout20231205_ADI_10-A05 �diHESTAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality December 5, 2023 Certified Mail Return Receipt Requested 7022 0410 0003 1130 7786 Jon Vincent Acquisition NC,LLC 1015 Ashes Drive, Suite 202 Wilmington,NC 28405 RE: Hooper Hill Mine Brunswick County Cape Fear River Basin Dear Mr. Vinent: We have reviewed the application your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Your application states there will be no dewatering or mining below the water table, however your reclamation plan is to reclaim to a lake. Please clarify how you intend to reclaim to a lake if you will not be mining below the water table. 2. Your application states that there will be an initial sediment basin utilized during the beginning of the construction of the mine excavation, however no details were provided for the construction, maintenance,or location of the basin. Please provide construction and maintenance details of the initial basin and clearly label and indicate on the mine map the location of the basin. 3. DWR is concerned that potential wetlands are located on the property in the northeast corner. Please provide a wetlands delineation from a wetland specialist and concurrence from the USACE or a PJD from the USACE. 4. The name of the applicant in the application and on the mine maps does not match the name of the company on the Secretary of State website. Please correct the spelling of the applicant's name in the application and on the mine maps. 5. The affected acreage table on the mine map does not match the affected acreage table provided in the application. Please verify which is correct and correct whichever table has an error. 6. Please provide proof, such as copy of the signed return receipts from certified mail, that all adjoining landowners and chief administrative officer of each county and municipality have been properly notified. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA - oaaa�emaienmronmenmiuuality /`� 919.707.9200 Certified Mail 7022 0410 0003 1130 7786 Mr. Vincent Page 2 Please note, this office may request additional information, not included in this letter, as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy,Mineral, and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 513.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, A-t� Adam Parr State Mining Engineer cc: Mr. Dan Sams,PE