Loading...
HomeMy WebLinkAboutRaleigh Mine Mod EC Calcs 1-15-21 110- WithersRavenet NoOur People. Your Success. EROSION CONTROL CALCULATIONS HANSON RALEIGH QUARRY Raleigh, NC Prepared For: Hanson Aggregates Southeast, LLC 3825 Barrett Dr. Suite 300 Raleigh, NC 27609 (919)380-2746 ATTN: Jack Garvey Prepared By: WithersRavenel 137 S.Wilmington St., Suite 200 Raleigh, NC 27601 (919)469-3340 License No. C-0832 January2021 WR No.09200040.00 CA o •�ESSio. � 2. SE 9756 GIN /V 5111150\\\\ 1/15/2021 Ryan Fisher, PE SEDIMENT TRAP CALCULATIONS Hanson Raleigh Quarry WR No. 09200040.00 Erosion Control Calculations January 2021 Q25 yr SEDIMENT TRAP DESIGN -HANSON AGGREGATES-RALEIGH QUARRY If Rock Baffles Used: Drainage Denuded Volume of Remaining Area(ac) Area(ac) Storage Volume Req'd(cf) Surface Area Req'd(sf) Length Width Depth Storage Volume Provided Surface Area Weir Length Weir Length Rock Baffle Storage Basin# (Da) (Du) (3600 cf/ac Denuded Acre) (Q25)(435 sf/cfs) (ft) (ft) (ft) (cf) Provided(sf) Req'd(ft) Provided(ft) (cf) Volume(cf) A-11 2.26 2.26 8136 2342 70 35 4 9800 2450 6.00 10 525 9275 A-7 3.00 3.00 10800 3109 80 40 4 12800 3200 7.00 10 600 12200 Note:1'of freeboard is provided for each Basin(4.0'Total max depth).Cleanout Basin when 1/2 full. 125= 7.94 in/hr Surface Area Required based on Q25 flows(C=0.30;Tc=5min; 125=7.94 in/hr);Rainfall Data based on Neuse 2 NE(31-6091)location data. Weir length based on Q25 flows(C=0.30;Tc=5min;125=7.94 in/hr)