Loading...
HomeMy WebLinkAbout20240123_ADI_Received Martin Marietta Charlotte Quarry 2023 Mine Permit ADI Resubmittal — January 20, 2024 • ADI Resubmittal Cover Letter • Revised Mine Plan & Erosion Control Detail Engineering Calculations JAii 2 311114 • Revised Culvert Calculations `';'ivWG PROG1?AM • Revised Culvert Rip Rap Calculations Martin Marietta Materials, Inc. 8701 Red Oak Blvd. Suite 540 Charlotte, NC 28217 704-407-1475 /AMartin lay Nivens Mcirlettc Regional Manager Environmental Services East Division January 20, 2024 FedEx Delivery Mr.Adam Parr, P.E. State Mining Engineer NC DEQ Division of Energy, Mining and Land Resources 512 North Salisbury Street Raleigh, NC 27699-1612 RE: Martin Marietta Charlotte Quarry—Mine Permit#60-02 Modification Resubmittal Dear Mr. Parr: This letter is providing additional information as requested in the letter received from your office dated January 10,2024,for the modification of the mine permit#60-02 for the Charlotte Quarry. The following items have been addressed: • There is a haul road on the east side of the operation that is drawn across an existing berm. Please clarify the use or proposed construction of this haul road. • This approved, proposed road has been removed. • The north arrow on the Erosion and Sediment Control(E&SC) map is not correct. Please correct the direction of the north arrow. • The north arrow orientation has been corrected. • The name of the skimmer basin appears as Skimmer Basin #I on the E&SC map and Skimmer Basin #2 on the mine map and in the E&SC Calculation document. Please clarify the name ofthe skimmer basin and correctly label the basin on all maps. • The proposed skimmer basin will be Skimmer Basin#2. This has been reflected on all sheets. • The name of the culvert and apron in the E&SC calculations appears as "Culvert A"in the title and "Culvert#2" in the table. Please clam the name of the culvert. Please clearly identify and label on the map the location of this culvert. • The label had been corrected and shown as Pipe#2 on all information. • The mine map shows a pipe named "Pipe #2"under the proposed berm; however, this pipe does not appear on the E&SC map. Please clarify the purpose of this pipe and clearly indicate and label the pipe on the E&SC map. Please provide construction and maintenance details for this pipe. • Pipe #2 will be installed after initial erosion control measures are installed and prior to developing the proposed overburden berm south across the existing Carolina Regional Office 8701 Red Oak Blvd.Suite 540,Charlotte,NC 28217 t.(704)409-1475 m.(980)613-9009 e.jay.nivens@martinmarietta.com w .martinmarietta.com May 14, 2020 Page 2 drainage divide. This pipe is provided to prevent stormwater runoff from pending on the west side of the overburden berm. This pipe will be installed with a rock pipe inlet protection(Std. 6.55)on the inlet side of the pipe to prevent sediment from accumulating within the pipe. This pipe has been added to the S&EC plan for clarification. • There are concerns that the proposed silt fencing down slope of the new proposed skimmer basin along the creek buffer may notfunction as required. Please verb that additional rows or alternate siltfencing will be installed as needed. • The current proposed silt fence is specified as silt fencing with wire fence supporting the fabric installed with steel posts per NC SECDM Std. 6.62. An additional row of silt fence has been provided along the stream buffer to provide extra protection. Should you have any questions or need any additional information, please contact me at 704-409- 1475 or via e-mail at iay.nivens(&martinmarietta.com Sincerely, Engineering Calculations • Culvert Calculations • Culvert Rip Rap Calculations /A Martin Marietta Culvert Sizing Calculations Date: January 15,2024 Drainage Area Runoff 25 Year Proposed Required Provided Pipe Outlet Velocity Structure (acres) Coefficient Intensity Q25 Pipe Slope Pipe Size Size (fps) Pipe#2 9.5 0.3 645 18.3825 MOO 13,98 18 8 Culvert Rip Rap Apron Sizing Calculations NC Sediment and Erosion Control Manual NYDOT Method (Appendix 8.06.5) Outlet Rip Rap Minimum Minimum Structure Pi Size(in) Val city (fps) Zone Stone Size De th Length ft Width(ft Pipe#2 1 18 8 1 6" 12" 6 4.5