HomeMy WebLinkAbout20240122_ADI_Reply uyipanl
January 19, 2024
Mr. Corey Clayton,Assistant State Mining Engineer
{DECEIVED
N. C. Department of Environmental Quality I
Division of Land Resources
Land Quality Section LAND QUALITY SECTION
1612 Mail Service Center
Raleigh, North Carolina 27699-1612
RE: Enka Quarry
Mining Permit No. 11-03
Response to Request for Additional Information Letter Dated January 4, 2024
Dear Mr. Clayton:
The following are our responses to your request for additional information:
1. The location of the concrete plant is shown on the Operations and Reclamation Plan
maps. The proposed culvert to be installed in the existing conveyance channel is
shown on the Operations Plan and Site Plan maps. In addition,a computational report
for this culvert is included and titled Temporary Access Road West Culvert.
2. Construction and maintenance details for the E&SC measures are attached.
3. The Waters of the US report for this proposed additional area is attached.
4. The Threatened and Endangered Species Habitat Assessment report is attached.
Sincerely,
Tony Johnson
Environmental Engineer
cc: David Cade
CHARLOTTE REGIONAL OFFICE—VULCAN CONSTRUCTION MATERIALS, L.L.C.
11020 David Taylor Drive,SUITE 400,CHARLOTTE,NC 28262,TELEPHONE 704-549-1540, FAX 704-549-4137