E. DETERMINATION OF AFFECTED ACREAGE AND BOND
The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to$5,000
per affected acre)for each permitted mine site based upon the acreage approved by the Department to be affected during the
life of the mining permit. Please insert the approximate acreage, for each aspect of the mining operation, that you intend to affect
during the life of this mining permit(in addition,please insert the appropriate reclamation cost/acre for each category from the
Schedule of Reclamation Costs provided with this application form) OR you can defer to the Department to calculate your bond
for you based upon your maps and standard reclamation costs:
CATEGORY AFFECTED RECLAMATION RECLAMATION
ACREAGE COST/ACRE COST
Tailings/Sediment Ponds Ac. X $ /Ac. = $ 0.00
Stockpiles 0.10 Ac. X $ 1,800 /Ac. = $ 180.00
Waste Piles Ac. X $ /Ac. = $ 0.00
Processing Area/Haul Roads 0.46 Ac. X $ 1,800 /Ac. = $ 828.00
Mine Excavation 18.14 Ac. X $ 500 /Ac. = $ 9,070.00
Other 1.98 Ac. X $ 1,800 /Ac. = $ 3,564.00
TOTAL AFFECTED AC.: 20.68 Ac.
TOTAL PERMITTED AC.: 21.52 Ac.
Temporary&Permanent Sedimentation&Erosion Control Measures:
Divide the TOTAL AFFECTED AC.above into the following two categories:a)affected acres that drain into proposed/existing
excavation and/or b)affected acres that will be graded for positive drainage where measures will be needed to prevent offsite
sedimentation and sedimentation to onsite watercourses and wetlands.
a) Internal Drainage 21.52 Ac.
b) Positive Drainage 0.00 Ac. X $1,500.00 = $ 0.00
SUBTOTAL COST:$ 13,642.00
Inflation Factor:
SUBTOTAL COST LIFE OF MINING OPERATION OR LIFE INFLATION COST
OF LEASE(YEARS)
0.02 X $ 13,642.00 X 10 = $ 2,728.40
Total Reclamation Bond Cost:
TOTAL RECLAMTION BOND COST= SUBTOTAL+INFLATION = $ 16,300.00
Round down to the nearest$100.00
NOTE:The reclamation bond cannot exceed$1 million per GS 74-54