No preview available
HomeMy WebLinkAbout20231116_ADI_92-12 �diHESTAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality November 16, 2023 Certified Mail Return Receipt Requested 7022 0410 0003 1130 6949 Phillip Pressley Martin Marietta Materials, Inc. PO Box 30013 Raleigh,NC 27622 RE: Fuquay Quarry Mining Permit No. 92-12 Wake County Cape Fear River Basin Dear Mr. Pressley: We have reviewed the modification request your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Please provide maintenance details for all Erosion and Sediment Control(E&SC)measures. 2. Please provide construction and maintenance details for the permanent sediment basins. 3. Please clearly indicate and label on the mine map all haul roads that will be utilized to access different areas (plant, pit, office, shop, scales, maintenance for berms and basins, etc.). Please clearly indicate and label any and all roads that will remain at the time of reclamation. 4. Please provide construction and maintenance details for the construction entrance off Fletcher Tutor Rd. 5. Please clarify if you intend to maintain the existing entrance. If so,please clearly indicate and label on the mine map that the affected area for the existing entrance road is included in the permit boundary. 6. Please provide a justification why the area near the entrance along Fletcher Tutor Rd. has a 50' undisturbed buffer, where other areas are shown with a 100' or greater undisturbed buffer. Please clarify the activities that will occur in the proposed 50' unexcavated buffer. 7. Please specify, and label on the mine map, the width of the undisturbed buffer around the proposed western expansion. 8. Please provide details for activities around the cemetery located northwest of Tutor Stephens Road. Please clarify if this area will be buffered and access maintained. Please clearly label any roads that will be maintained to this area. 9. Please clarify what activities will occur on the south side of Fletcher Tutor Rd and what type of regular traffic will occur across the road from the plant on the north. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA - oaaa�emaienmronmenmiuuality /`� 919.707.9200 Certified Mail 7022 0410 0003 1130 6949 Mr. Pressley Page 2 10. Please clarify how access to the Kring property will be maintained and how inadvertent access to your operations will be limited. 11. The referenced 401 (DWR:20061887v3)is not a correct project number,as it references unrelated 401 project. Please ensure that the 401 project number is correct. 12. A buffer determination is needed for this project. There are four features depicted on the NRCS Soil Survey, which are not depicted on the maps provided. Please clearly indicate and label on the mine map all wetland and water features. These features may be subject to the riparian buffer rules. In addition,there appears to be surface water impacts from the proposed pit excavation. Please note, this office may request additional information, not included in this letter as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy,Mineral, and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 513.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, Adam Parr,PE�Y�� State Mining Engineer cc: Mr. Bill Denton, PE