Loading...
HomeMy WebLinkAbout10_Appendix IX - NCDOT Driveway Permit Figure and Approval Appendix IX — NCDOT Driveway Permit Figure and Approval � � r l� L. i STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY November 10,2022 S&ME (c/o Ty Holderbaum) 2016 Ayrsley Town Blvd,Suite 2-A Charlotte,NC 28273 Location: Mitchell NC-226 Subject: Driveway Permit Approval Subject: DRIVEWAY PERMIT APPROVAL-D131-061-22-00054 (Quartz Corporation USA Reservoir) The Department is furnishing an approved Driveway Permit for the subject drive.If the business is enlarged or reconfigured another review will be required.The agreement is approved subject to the `.../ attached provisions. • On all new Commercial Driveways,the first 50' must be paved to NC Department of Transportation standards. The developer shall construct the driveway to ensure that it falls away from the existing edge of pavement back to the existing ditch or shoulder drop off. • All necessary traffic control devices as required by the Manual of Uniform Traffic Control Devices (MUTCD)must be implemented during the project. All lane closures shall be performed by a certified Traffic Control contractor. • The developer shall be required to ensure adequate sight distance on approaches to the driveway meets minimum MUTCD requirements for stopping sight distance and sight distance requirements set forth in the NCDOT Policy on Street and Driveway Access to North Carolina Highways. • Driveway pipes shall be installed to NC Department of Transportation Standards and Specifications.Improvements shall be constructed,inspected,and approved prior to opening of the business. • Gates or other entry control devices used shall have adequate length of vehicle storage so that entering vehicles do not queue back on the adjacent highway right- of-way. Mailing Address: Telephone:828-803-6100 Location: NC DEPARTMENT OF TRANSPORTATION Fax:828-652-8391 3931 NC 226 SOUTH DIVISION THIRTEEN,DISTRICT ONE Customer Service: 1-877-369 4968 MARION,NC 28752 3931 NC 226 SOUTH MARION,NORTH CAROLINA 28752 Website:nedotgov 1f we can be of further assistance at any time,please do not hesitate to let us know. Please advise �� this office upon completion of the subject drive. You may contact Dustin Riddle dkriddle@ncdot.gov or Jason Butler jbutler5aa,ncdot.gov in the Marion District Office by email or by phone at(828) 803-6100. Cordially, nqDocu.�Sig.ned by: (/Is�dTO H-7 CCBt C7581 B2544E... Christopher A. Guffey District Engineer- Division 13, District 1 CAG/dkr Attachments cc: Mr. Chad Young,Mitchell County Maintenance Engineer STANDARD SPECIAL PROVISIONS FOR DRIVEWAYS Rev. September 2020 The following provisions are considered part of the approved Street and Driveway Access Permit and are considered to be conditions of approval: l. All driveways requiring a driveway pipe shall be graded with a low point that is located directly over the driveway pipe to prevent water from being shed on to the NCDOT maintained roadway. A. The driveway pipe shall be placed in line with the ditch that existed prior to construction. B. The driveway pipe shall have a minimum 12.0"of cover and be made of a material that is in compliance with NCDOT standards. 2. Driveways not requiring a driveway pipe shall be graded in a manner that does not shed water on to the NCDOT maintained roadway. 3. Any work requiring equipment or personnel closer than 5.0' from the outside edge of the travel lane shall require a lane closure in accordance with the latest edition of the MUTCD. No lane closures will be allowed before 8:30 AM or after 4:30 PM or on weekends or State observed holidays or as directed by the District Engineer. 4. Absolutely no materials or equipment storage will be allowed on NCDOT right of way. 5. Any changes to the permit drawing must be submitted in writing to the Engineer for review and comment. Failure to request changes may result in cancellation of the permit and removal of the driveway connection at the property owner's expense. C. Failure to construct the driveway in accordance with the Street and Driveway Access Permit drawings and the current Policy on Street and Driveway Access to NC HijZhways manual may result in cancellation of the permit and removal of the driveway connection at the property owner's expense. 7. All disturbed right of way monuments shall be reset by a NC licensed Surveyor in accordance with NCDOT Roadway Standard Drawings and Standard Specifications for Roads and Structures manuals. 8. Permit expirations: �r A. Regular Commercial and Residential/Subdivision Permits expire one year from the approval date. B. Special Commercial Permits expire one year from the approval date. 9. Traffic control shall be coordinated with the District Engineer and the Division Traffic Engineer,at telephone (828)250-3000,prior to construction. 10. WORK ZONE TRAFFIC CONTROL QUALIFICATIONS AND TRAINING PROGRAM All personnel performing any activity inside the highway right of way are required to be familiar with the NCDOT Maintenance/Utility Traffic Control Guidelines(MUTCG). No specific training course or test is required for qualification in the Maintenance/Utility Traffic Control Guidelines(MUTCG).All flagging, spotting,or operating Automated Flagger Assist Devices(AFAD)inside the highway right of way requires qualified and trained Work Zone Flaggers. Training for this certification is provided by NCDOT approved training resources and by private entities that have been pre-approved to train themselves.All personnel involved with the installation of Work Zone Traffic Control devices inside the highway right of way are required to be qualified and trained Work Zone Installers. Training for this certification is provided by NCDOT approved training resources and by private entities that have been pre-approved to train themselves.All personnel in charge of overseeing work zone Temporary Traffic Control operations and installations inside the highway right of way are required to be qualified and trained Work Zone Supervisors. Training for this certification is provided by NCDOT approved training resources and by private entities that have been pre-approved to train themselves. For questions and/or additional information regarding this training program please refer to hgps://connect.nedot.gov/projects/WZTC/Pages/Training.aspx or call the NCDOT Work Zone Traffic Control Section(919)814-5000. 12. The Applicant shall employ traffic control measures that are in accordance with the prevailing federal,state, '✓ local,and NCDOT policies,standards,and procedures.These policies, standards,and procedures include, but are not limited to the following: 2 of 2 STANDARD SPECIAL PROVISIONS FOR DRIVEWAYS Rev. September 2020 a. Manual on Uniform Traffic Control Devices(MUTCD)—North Carolina has adopted the MUTCD to provide basic principles and guidelines for traffic control device design,application, installation,and maintenance.North Carolina uses the MUTCD as a minimum requirement where higher supplemental standards specific to North Carolina are not established. Use fundamental principles and best practices of MUTCD(Part 6,Temporary Traffic Control). b. NCDOT Maintenance/Utility Traffic Control Guidelines—This document enhances the fundamental principles and best practices established in MUTCD Part 6,Temporary Traffic Control,incorporating NCDOT-specific standards and details. It also covers important safety knowledge for a wide range of work zone job responsibilities. PROJECT SPECIAL PROVISIONS 1. No signs or other obstructions shall be erected or maintained on existing or proposed NCDOT right of way. 2. Notify NCDOT prior to beginning any work. 3. The developer shall be required to ensure adequate sight distance of both approaches to the driveway meets minimum MUTCD requirements for stopping distances. 4. The developer shall provide and install all signs and pavement markings within this project. 5. All signs and pavement markings provided and installed by the developer on State maintained roadways,within State maintained intersections,and on any private driveway approach to a State maintained roadway shall be manufactured and installed in accordance to the Department's standard specifications. This includes the Manual on Uniform Traffic Control Devices,traffic signal plans,roadway plans,and approved developer plans. 6. The developer's pavement marking contractor shall be pre-approved to perform work for the Department and must submit a copy of their certification card to the District office. 7. The developer's signing contractor shall be pre-approved to perform work for the Department. 8. The developer's traffic signal designer and contractor shall be pre-approved to perform work for the Department. 9. Traffic Impact Analyses(TIA)shall be performed by private engineering firms pre-approved to perform work for the Department. TIAs shall be performed in accordance with NCDOT guidelines found on the NCDOT website. 10. The developer will be responsible for all costs associated with required traffic signal upgrades and will be required to enter into a reimbursable agreement with the Department to accomplish the necessary work. The reimbursable agreement will also allow NCDOT to review the design and inspect the work. 11. Please contact the Division Traffic Engineer at 250-3000 to facilitate this agreement. 12. All auxiliary-turning lanes required shall have tapers designed and built in accordance with the MUTCD and NCDOT standards. 13. The driveway pipe shall be graded with a low point that is located directly over the driveway pipe to prevent water from being shed on to the NCDOT maintained roadway if required. 14. Road shall be resurfaced full width of roadway after completion of turn lanes and any other construction which the Engineer deems necessary. 15. Any damages to the roadway during construction shall be the responsibility of the owner/developer. Repairs shall be performed to the satisfactory of the Department of Transportation.The Engineer will decide all questions which may arise as to the quality and acceptability of work performed and as to the rate of progress of the work; all questions which may arise as to the interpretation of the permit;and all questions as to the acceptable fulfillment of the permit on the part of the developer. 16. The relocation of any overhead or underground fiber optic components within NCDOT's fiber optic system will be the responsibility of the developer when they are impacted by the development. This relocation shall be completed by a contractor that is qualified with the NCDOT to complete this work. Materials for this work must be approved by NCDOT prior to installation. When fiber splicing occurs, any splicing would need to be completed the same day to ensure that NCDOT retains communication with the traffic signal system,traffic cameras,overhead message signs,and dynamic trailblazing signs. At no time can the fiber be disconnected/cut and left. Once any cut has been made,the re-splicing should occur immediately. When splicing is necessary, fusion splices will be required and the OTDR report will need to be provided to the Department. No mechanical splices will be permitted. Where extra fiber is required,it will be the responsibility of the Developer to provide the extra fiber. NCDOT's current splice enclosures/cans must be maintained and cannot be impacted by the Development. If they are impacted,they must be moved and replaced. Any costs associated with NCDOT's fiber relocation will be the responsibility of the development. The Developer shall contact the Deputy Division Traffic Engineer at(828)298-0094 to coordinate any fiber optic relocations prior to construction. 2 of 2 APPLICATION IDENTIFICATION N.0 DEPAtTAO ORMMONE1 � riveway D1310612200054 ate of 10/11/2022 STR &A"ZRIYEWAXACCIE Permit No. JApplication - un : MITCHELL COUNTY PER�IiiflT�►PPLICA`I'tON Development Name: QUARTZ CORP USA RESERVOIR LOCAMONVIF PROPERTY;Route/Road: NC-226 Exact Distance 1,500 ❑ Miles N S E W ® Feet ❑ ❑ ❑ From the Intersection of Route No. SR-1117 and Route No. NC-226 Toward ELLIS STREET Property Wit Be Used For: ❑ Residential/SubdMslon ® Commercial ❑ Educational Facilities ❑ TND ❑ Emergency Servkm ❑ Other Property, ❑ is ® Is not within SPRUCE PINE Zoning Area. _. At3RElE11�EN�', • I,the undersigned property owner,request access and permission to construct driveway(s)or street(s)on public right- of-way at the above location. • I agree to construct and maintain driveway(s)or street entrance(s)in absolute conformance with the current`Policy on Street and Driveway Access to North Carolina Highways"as adopted by the North Carolina Department of Transportation. • I agree that no signs or objects will be placed on or over the public right-of-way other than those approved by NCDOT. • I agree that the driveways)or street(s)will be constructed as shown on the attached plans. • I agree that that driveway(s)or street(s)as used In this agreement include any approach tapers,storage lanes or speed change lanes as deemed necessary. • I agree that if any future improvements to the roadway become necessary,the portion of driveway(s)or street(s) located on public right-of-way will be considered the property of the North Carolina Department of Transportation,and I will not be entitled to reimbursement or have any claim for present expenditures for driveway or street construction. �...� • I agree that this permit becomes void if construction of driveway(s)or street(s)is not completed within the time specified by the"Policy on Street and Driveway Access to North Carolina Highways • I agree to pay a$50 construction inspection fee. Make checks payable to NCDOT. This fee will be reimbursed If application is denied. • I agree to construct and maintain the driveway(s)or street(s)in a safe manner so as not to interfere with or endanger the public travel. • I agree to provide during and following construction proper signs,signal lights,flaggers and other warning devices for the protection of traffic in conformance with the current"Manual on Uniform Traffic Control Devices for Streets and Highways"and Amendments or Supplements thereto. Information as to the above rules and regulations may be obtained from the District Engineer. • I agree to Indemnify and save harmless the North Carolina Department of Transportation from all damages and claims for damage that may arise by reason of this construction. • I agree that the North Carolina Department of Transportation will assume no responsibility for any damages that may be caused to such facilities,within the highway right-of-way limits,in carrying out its construction. • I agree to provide a Performance and Indemnity Bond in the amount specified by the Division of Highways for any construction proposed on the State Highway system. • The granting of this permit is subject to the regulatory powers of the NC Department of Transportation as provided by law and as set forth in the N.C. Policy on Driveways and shall not be construed as a contract access point. • I agree that the entire cost of constructing and maintaining an approved private street or driveway access connection and conditions of this permit will be bome by the property owner,the applicant,and their grantees,successors,and assignees. • I AGREE TO NOTIFY THE DISTRICT ENGINEER WHEN THE PROPOSED WORK BEGINS AND WHEN IT IS COMPLETED. 2004.07 NOTE: Submit Four Copies of Application to Local District Engineer,N.C.Department of Transportation TEB 66-04rev. 614)M19 SIGNATURES OF APPLICANT PROPERTY OWNER(APPLICANT) WITLESS COMPANY j Q �au�r�G Curb USA• NAME S �c�e SIGNATURE SIGNATURE _ ADDRESS igj 4t s Lj r,.-e A',A, ADDRESS A Y` ,��'7?7 Phone No. st AUTHORIZED AGENT WITNESS COMPANY NAME ►��CC�' SIGNATURE ��an _ SIGNATURE y f ADDRESS 130, �e�1.�d.+rLl cif_, urn P;.�� , ADDRESS a /� Ah77 Phona La. S�a9-UG7-3346 Spr.ct�C �16- C_ 2 �77 APPROVALS APPLICATION RECEIVED BY DISTRICT ENGINEER ❑ocusigned by: e� 10/18/2022 SIGNATURE CC81C75e1B2544E DATE APPLICATION APPROVED BY LOCAL GOVERNMENTAL AUTHORITY(when required) SIGNATURE TITLE DATE APPLICATION APPROVED BY NCDOT Doctiftned by: 11/11/2022 SIGNATURE CCMC7561B2544E TITLE DATE INSPECTION BY NCDOT SIGNATURE TITLE DATE COMMENTS: October 11, 2022 North Carolina Department of Transportation (NCDOT) Division 13, District 1 3931 NC-226 S Marion, NC 28752 Attention: Mr. Chris Guffey District Engineer Reference: NCDOT Street and Driveway Access Permit Application Freshwater Reservoir The Quartz Carp USA Spruce Pine, Mitchell County, North Carolina S&ME Project No. 213314 Dear Mr. Guffey: S&ME is pleased to submit this NCDOT Street and Driveway Access Permit Application for the Freshwater Reservoir and Emergency Basin on behalf of The Quartz Corp USA (Quartz Corp). Quartz Corp is proposing to install a new freshwater reservoir at their Spruce Pine Facility which will require driveway access along NC-226 (South 226 HWY). The proposed driveway access and area are depicted on the associated electronic file (NC DOTNUM B ER_Plan 1_213314_20220830). Project Description Construction will involve the installation of a proposed driveway along NC-226 (South 226 HWY). The proposed driveway access is located approximately 1,500 linear feet from the intersection of Carters Ridge Road (SR-1 117) and South 226 HWY (NC-226). There are no anticipated conflicts with other utilities at this time. S&ME, Inc.1 2016 Ayrsley Town Blvd.,Suite 2-A�Charlotte,NC 28273 1 p 704.523.4726 I www.smeinc.com NCDOT Street and Driveway Access Permit Application October 11, 2022 Freshwater Reservoir Page 2 Please contact S&M E, Inc. at your earliest convenience if you have any comments or require additional information regarding this submittal. Sincerely, S&ME, Inc. 4��.;1). A�L Ty D. Holderbaum, P.E. Project Engineer N.C. Registration No. 049834 tholderbaum@smeinc.com Senior Reviewed by Christopher J.E. Stahl, P.E. Associated Files: Forms Street and Driveway Access Permit Application (The Quartz Corp USA) Filename: D1310612200054 TEB6504 213314 20221011 Figures Quartz Corp USA Driveway Permit— Figure 1 (S&ME) Figures Filename: D1 31 061 2200054_Plan1_213314_20221011 `'"0+' S&ME, Inc. Ty D. Holderbaum From: Butler, Jason <jbutler5@ncdot.gov> Sent: Friday, September 9, 2022 9:13 AM To: Ty D. Holderbaum Cc: Cedric Ruhl;Julie Robertson; Guffey, Christopher A; Shelton, Tyler J Subject: RE: (External] FW: Mitchell County Driveway Permit Request This message originated outside of S&ME. Please report this as phishing if it implies it is from an S&ME employee. Good morning, We have checked the sight ditance in the field and have determined a driveway access can be permitted at the location noted on the map. Depending on what type of business will be on the property, NCDOT may require a require a trun lane to be provided for access. In addition, NC 226 is scheduled to be widened in this area with right of way acquisition beginning in 2029 under TIP R-5804. 7 �r `V 51ncerely, Ty Holderbaum Ty Holderbaum, PE ..� Please let me know if you have any questions, Jason Butler 1 Engineering Specialist 1 North Carolina Department of Transportation 828 803 6100 office ,.MOW, jbutler5@ncdot.gov 3931 NC 226 South Marion, NC 28752 r r t. From:Ty D. Holderbaum <tholderbaum@smeinc.com> Sent:Wednesday,August 24, 2022 9:32 AM To: Butler,Jason <jbutler5@ncdot.gov> Cc: Cedric Ruhl <cruhl@smeinc.com>;Julie Robertson <jrobertson@smeinc.com> Subject: [External] FW: Mitchell County Driveway Permit Request CAUTION:External email. Do not click links or open attachments unless you verify.Send all suspicious email as an attachment to Report Spam. Thanks for reaching out to me about the driveway entrance! Please see the screenshot below for parcel information. 2 .z =ilk: ti - ,� .;�} • .Y-�r,, R' fir_.. F ` Sincerely, Ty HOlderbaum Ty Holderbaum, PE Project Engineer II `IUMP" 3 S&ME �II■� 2016 Ayrsley Town Bivd.,Suite 2-A Charlotte,NC 28273 0:704.523.4726 EXT. 11735 M:724.972.S382 �a tholderbaum.@-smeinc.com www.srneinc.com Linkedln I Twitter I Facebook This electronic message is subject to the terms of use set forth at www.smeinc.com/email.If you received this message in error please advise the sender by reply and delete this electronic message and any attachments.Please consider the environment before printing this email, From:Ty D. Holderbaum Sent: Monday, August 22, 2022 2:56 PM To: caRuffey@ncdot.zov Cc: Cedric Ruhl <cruhl@smeinc.com> Subject: Mitchell County Driveway Permit Request Good Afternoon Chris, We are in the process of putting together plans for an upcoming project in Spruce Pine, Mitchell County, NC. One of the aspects of this project will be attaining a NCDOT Driveway Permit, and thus I wanted to write to you and ask whether a Temporary Driveway Access Permit was required before construction can begin? Thanks for whatever help you can provide! Please feel free to give me a call with any further questions. The project approximate proposed entrance is shown below. a l .+Vf1I jet... Y ram. G�,'�.1i • t _ } y �� y •t�4yr + tf � ' r ''hTi W4 1 .jfC,��zy..�1 --..�_ t ,�•, `e�.. � a� p -�� �,� � .° :� S F'� �-r' ''•� 4 � Sys �'t�Y�y�{� R � 4 IRK � t rl .S" ••', .,, �' T1. meµ' lir � ,�� � ,#� �,_ •�.;� `c 'r'y'• � ^gyp .1 I T� �t Tr �r ',$r.�.•.r rM Spruce Pine.NC 28777 � � • �1yIJ i} .,y� •� y }r,,. m ti © S&ME � r 2016 Ayrsley Town Blvd.,Suite 2-A Charlotte,NC 28273 I I s 0:704.523.4726 EXT.11735 M:724,972.5382 tholderbaum@smeinc.com r O R www.smeinc.com Linkedin I Twitter I Facebook This electronic message is subject to the terms of use set forth at www.smeinc.com/email.If you received this message in error please advise the sender by reply and delete this electronic message and any attachments.Please consider the environment before printing this email. Email correspondence to and from this sender is subject to the N.C.Public Records Law and may be disclosed to third parties. 6 INTERSECTION SIGHT DISTANCE Yy o o REQUIRED SIGHT m w INTERSECTION SIGHT INTERSECTION .� THfOUARTZ CORP US4 - � DIRECTION DISTANCE DISTANCE MET PARCEL JD:0799-09-76-2177 �O TURNING , PASSENGER CAR(PC) PASSENGER CAR(PC) LEFT TURN FROM-MINOR ,® =ry ENCROACHMENT ROAD 500 YFS LOCATION _ - 430 YES CROSSING MANEUVER FROM MINOR ROAD 9t16 AYRSLPY TOWN BLVD RIGHT TURN FROM MINOR SULTEaA ROAD YES 430 CHARLOTTE,NC 28273 24-FT. �.... (20A)szuT26 PROPOSED FRESHWATER DISTANCES OBTAINED FROM AASHTO GREENBOOK AS WELL AS OUR aNGINa9atNG PIRM RESERVOIR ACCESS �' ASSUMPTIONS FOR DRIVERS EYE(35-FT.)AND THE OBJECT TO BE SEEN 3.5-FT. ucaNsa NumaeR:am2s PROPOSED R7-1 STOP SIGN •', SPEED LIMIT OF THIS ROAD 45 M.P.N. i4AA2 (NCDOTSTANDARD) B B / 0+00 0 0+50 78-FT.TO NEAREST PROPERTY LINE ¢- REFERENCE:2022 MICROSOFT BING MAPS \S� � o � VICINITY MAP SCALE:1"=1000' \ r 3 N 0 1 u � o SOUTH226HWY__ Ni THE QUARTZ CORP USA 1 999 ALTAPASS ROAD SPFEO/ARIf$KPJL SPRUCE PiNC28- 1 8 - �O A o dx. ENTRANCE PLAN o zo eo SCALE:1"=20' GRAPHIC SCALE (IN FEET) xv o �x h N av, LiNaAM.LDNon FARCf7.100799-09-05-6s10 \\...xio - zao _ - --- _._ --- -- o+oo 411T)JFg0AR72 c0P,P LrSA \zuo- _. _ PARGEL ID:DTS- b2m._. \ .1+00 - 20-FT-'ram z -3100 b - 1+00 x _. z 30J11226 100 '�- `- 9UFWl,SEMAN a B�STg15-9931A '.- °.. ENTRANCE PARCfLllk0799-09-7154R9 500 FT.MINIMUM REQUIRED SIGHT DISTANCE d j✓` I (CROSSING TRUCK-LOOKING RIGHT) UM1T.J$ ✓' m (MEETS MINIMUM SIGHT DISTANCE REQUIREMENTS) "-, --.t �..r_ i� 3,00 k / J` \ 4'00 / 5t EXISTING GRAVEL x 4. ACCESS ROAD \� o \ / _.✓�" �;. � _430-FT.MINIMUM REQUIRED SIGHT DISTANCE `, -1 g FIifENiiAYi7K N � y (ZROSSIN,G TRUIMMU4LSIGHTCK LOOKING LEFT) (MEETS M DISTANCE.REQUIREMENTS) - g 0794-09-06 3284 \ � PR7M4MUREDTRUSTEE \... sk m PARCEL fD:0799-09-05-8949 --- G VV41U,R1 HARDY STAGE "+..,..`..""•- _ i8 BETJYSTAFFORO - z� i SULdE DA1'TD.NN I WrWAM SECKEL Q'f."� \ - PN.-MID:0799-olaz WE LSA MGNi05N I PART Ia-0799-0945-ipRR \ s, _ -,- -.f PARCfl ID:0799-09-15-0NR FA tS ons-6945-2"f \ PARCFt 1R11fl9-0?-JS-t732 PUT, SITE DISTANCE PLAN o ao eo GRAPHIC SCALE (IN FEET) 2670— -- -----[1611 f 2670-7- 2 ._. ___--_—670 -230-F7 THR64TLENGM 0 __.. ! _._.. f , ww wLL 2660- aO i 266051 `2660 APPROXIMATE P�IOPOSED FINA(GRADEz wLL -} Z p c z S Z Z w 2650 265 _.._.. _. b40% - _--_ 2650 OZ APPROXIMATE - / F-+ w w 2640 --- PROP65ED 2640i-4 r...__.- -2640 FINAL GRADE C w I I — -_ -- APPROXIMTE EN A EEXISTINf C ROUNDSLRFACE G 3 � vzi OAPPIC IN R UND SUPFAC > C, Z c 2630 Z 2630-� 0 or 2G3, - 100 0t1_ _ 10 1+T �2630 0 040 0+50 0+ 0 _ 1 -+10 0+00 0+1 0+20 0+3060 O 1-0 0 0+20 0+30 0+ 0+I7 +BO 0+90 1+00 30 Q40 050 0+60 4z DRIVEWAY SECTION A-A' DRIVEWAY SECTION B-B' Q J = SCALE 1-=10' Qut r wa v EXISTING LEGEND: PROPOSED LEGEND: wNsraurnoN ENTRANCE MAINTENANCE a f -- MINOR CONTOUR(2-FT) —420—MAJOR CONTOUR 1 1. INSPECT TEMPORARY CONSTRUCTION ENTRANCES AT LEAST ONCE PER 7 CALENDAR DAYS AND WITHIN 24 HOURS OF A RAIN EVENT O MRJaR CONTOUR(I(€T:) MINOR CONTOUR({=FT:) GREATER THAN OR EQUAL TO 1.0-IN IN 24 HOURS.INSPECT MORE FREQUENTLY DURING PERIODS OF HEAVY USE PROFILENORIZ8NTdL PROPERTY BOUNDARY SIGHT DISTANCE TRIANGLES Z THE ENTRANCE WILL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO EXISTING r ROADWAYS.SEDIMENT TRACKED,SPILLED,DROPPED OR OTHERWISE DEPOSITED ONTO ROADWAYS WILL BE SWEPT UP AS SOON AS o 10 20 -GRAVEL DIRT ROAD PRACTICAL AND PLACED BACK WITHIN THE APPROVED DISTURBED AREA GRAVEL ACCESS ROAD 3. O EXCESS STONE HAS CLOGGED THE STONN THE ENTRANCEWILLBECOMES BE ENTIRELY SSED WITH NEW STONEAS NEEDED.REPLACEMENT GRAPHIC SCALE (IN FEET) -� SIGN OF THE STONE MAY BECOME NECESSARY WHEN THESTONE BECOME$ENTIRELY FILLED WITH SEDIMENT AND MUD. PROJECT NumseR Cy 4. THE CONSTRUCTION ENTRANCE AND CULVERT(IF PRESENT),WILL BE REMOVED WHEN CONSTRUCTION ACTIVITIES CEASE ON THE PROFILE VERTICAL 213314 PROJECT.THE REMOVED STONEAND SEDIMENT FROM THE ENTRANCEWILL BE HAULED OFF-SITE AND DISPOSED OF IN COPMLIANCE 0 10 20 WITH STATEAND LOCAL REGULATIONS. oRAvnwc NUMBER 5. UPON REMOVAL OF THE CONSTRUCTION ENTRANCE,THE CONTRACTOR SHALL BRING THE AREA TO ORIGINAL GRADE AND STABILIZE GRAPHIC SCALE (IN FEET) IT.IF TEMPORARY CULVERT WAS UTILIZED IN CONJUNCTION WITH THE CONSTRUCTION ENTRANCE,THE CONTRACTOR SHALL DP1 INSTALL TEMPORARY MATTING AND/OR WATTLES WITHIN ROADSIDE CHANNEL.