Loading...
HomeMy WebLinkAbout20230920_ADI_19-16 �diHESTAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality September 20, 2023 Certified Mail Return Receipt Requested 7022 0410 0003 1130 7182 Andrew Miller 3M Company 4191 Highway 87 South Moncure,NC 27312 RE: Pittsboro Mine Mining Permit No. 19-16 Chatham County Cape Fear River Basin Dear Mr. Miller: We have reviewed the modification request your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Please verify that the overburden waste pile has been engineered to avoid slope stability issues. 2. It is difficult to see affected area boundaries and boundaries of excavations,plant area,overburden area etc. Please submit a map with increased line weight or hatching to clearly identify these areas. Please consider also submitting a version without the imagery base layer. 3. Details on the proposed changes to Outfall 3 and 4 and the symbology/hatching for their features are difficult to discern. a. Please provide enlarged inset/detail for area of Outfall 3 and 4. b. Please provide a separate map for the entire site (same area and scale as Sheet C-716)without the imagery as background. Please show all mine features, buffers, and erosion control measures on this map. c. Please provide enlarged inserts for each of the stormwater outfall locations (existing and proposed). 4. The plan submitted shows outdated references including "Ponds to be built in 2019". Please provide updated erosion and sediment control plan sheets that reflect the current site conditions including any updated plan details, sediment basins, haul roads, diversion ditches, outfalls, as well as other erosion and sediment control features. The existing E&SC plan last revised 2017 and updated 2021 should be updated to include the proposed stormwater changes. 5. Please clearly identify and label on the mine map the latitude and longitude of permit boundary corners so field verification of permit boundaries can be conducted during future inspections. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORhI CAROLINA - oaaa�emaienmronmenmiuuality /`� 919.707.9200 Certified Mail 7022 0410 0003 1130 7182 Mr. Miller Page 2 6. Please provide clarification regarding the "Forestry Activities" and limits thereof that are to continue in unrnined areas. Please clearly identify and label the Forestry Activity boundaries. Be advised that removal of significant numbers of the existing trees may necessitate additional screening measures in some locations. 7. Sheet C717 referenced in the application was not included as a map submission. 8. The affected area table does not match the affected area table included in the application. 9. Their previous 401/404,Buffer Authorization,and Buffer Determination have all expired. Please verify that you will contact the USACE and DWR prior to impacting surface waters. Please note, this office may request additional information not included in this letter, as the mining application review progresses. Be advised that our review cannot be completed until all of the items listed above have been fully addressed. In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy,Mineral, and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 513.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete processing your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, Adam Parr,PE �- Acting State Mining Engineer cc: Mr. Bill Denton, PE