Loading...
HomeMy WebLinkAbout20231127_ADI_Received 3M Industrial Minerals Product Division 4191 Hwy 87 South Moncure, NC 27559 11/20/2023 Mr.Adam Parr, PE NC Department of Environmental Quality RECEIVED Division of Energy, Minerals,and Land Resources 512 North Salisbury Street, 51b Floor NOV 2 7 2923 Raleigh, NC 27604 LAND QUALITY Re: 3M Pittsboro Mine, Mining Permit No. 19-16 MINING PROGRAM Dear Mr. Parr: 3M Company(3M)is pleased to submit this response to nine comments in the letter sent to Andrew Miller on September 20',2023; regarding 3M's mine permit modification/application. Please see the individual responses to the comments below, along with the included drawings. Comment#1: Please verify that the overburden waste pile has been engineered to avoid slope stability issues. 3M Response:The overburden waste pile has been engineered with 2:1 maximum slope and terraced with 30'wide benches every 50'vertically.The current plan has been stamped by a professional engineer,submitted, and approved by NC DEQ in 2017. No changes to that plan have been made since the last approval. Comment#2: It is difficult to see affected area boundaries and boundaries of excavations,plant area, overburden area etc. Please submit a map with increased line weight or hatching to clearly identify these areas. Please consider also submitting a version without the imagery base layer. 3M Response:See attached drawing PBOR-888-C-716A Comment#3: Details on the proposed changes to Outfall3 and 4 and the symbology/hatching for their features are difficult to discern. 3M Response: See attached enlarged plan showing these changes for Outfall 3 and 4. 3M is not including any other enlarged details for BMPs since there is nothing else that has changed at the site.These details were provided to the agency in past submittals. Please let us know if you have any questions on specific locations and we are pleased discuss further. Comment#4: The plan submitted shows outdated references including "Ponds to be built in 2019". Please provide updated erosion and sediment control plan sheets that reflect the current site conditions including any updated plan details, sediment basins, haul roads, diversion ditches, outfalls, as well as other erosion and sediment control features. The existing E&SC plan last revised 2017 and updated 2021 should be updated to include the proposed stormwater changes. 3M Response:See updated drawing PBOR-888-C-716, revision 9. Comment#5: Please clearly identify and label on the mine map the latitude and longitude of permit boundary corners so field verification of permit boundaries can be conducted during future inspections. 3M Response:See updated drawing PBOR-888-C-716, revision 9. Comment#6: Please provide clarification regarding the "Forestry Activities"and limits thereof that are to continue in unmined areas. Please clearly identify and label the Forestry Activity boundaries. Be advised that removal of significant numbers of the existing trees may necessitate additional screening measures in some locations. 3M Response: "Forestry activities"generally relate to parts of the 3M site within the permit boundary which are not planned to be used for relative near-term mining operations.3M contracts with a 3 d party forester and these areas of the site on an annual basis for forestry services.Over the last several years this forestry contractor has been Gelbert, Fullbright, & Randolph Forestry Consultants(GHR).The forestry services that are conducted may be (but not limited to)tree surveys, managing timber sales,tree clearing,tree planting and weed abatement.Any permit requirement for any of these activities is managed by GHR. locations for any tree removal are away from the active mine areas and will not interfere with any previously established visual screening elements,or any other elements of the mine permit. Comment V. Sheet C717 referenced in the application was not included as a map submission. 3M Response:This drawing was not included in the latest modification submittal since this drawing did not change since last time it was submitted and approved by DEQ in 2017 as revision 4 dated 1/10/17. Revision 4 is included in this response for reference only. Comment#8: The affected area table does not match the affected area table included in the application. 3M Response:See updated drawing PBOR-888-C-716,revision 9.Also,it was found that an error was made in the application table.See revised version of page 4 of the application attached. Comment#9: Their previous 4011404, Buffer Authorization, and Buffer Determination have all expired. Please verify that you will contact the USACE and DWR prior to impacting surface waters. 3M Response:3M will contact USACE and DWR prior to impacting surface waters.3M currently has active 404 permit SAW-2013-02028,which expires December 31, 2027.3M has plans to impact the streams identified in that permit. Please do not hesitate to contact me should you have any questions or comments. I can be reached at(651) 785-5904 or via email at tccrawford6Dmmm.com.3M greatly appreciates the opportunity to continue working with the DEMLR. Sincerely, �� Trevor Crawford, PE 3M IMPD, Civil Engineer Cc: Blake Arnett Andrew Miller Attachments: • Drawing—PBOR-888-C-716, revision 9 • Drawing—PBOR-888-C-716A, revision 1 • Drawing—PBOR-888-C-717, revision 4 • Outfall 003-004 changes.pdf • Page 4—NC Mine Application NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 B.MAPS 1. Clearly mark and label the location of your mining operation on six(6)copies of a 7.5-minute quadrangle and a county highway map.These maps,in addition to six(6)copies of all mine maps and reclamation maps,must be submitted With each permit application. 7.5-minute quadrangles may be obtained from the N.C.Geological Survey: Mailing Address Physical Address 1612 Mail Service Center 512 N.Salisbury St.,5N Floor Raleigh,NC 27699-1612 Raleigh,NC 27604 Http://Portal.ncdenr.org/web/Ir/geological home (919)733-2423 County highway maps may be obtained from the N.C.Department of Transportation: Mailing Address Physical Address NCDOT GIS Unit NCDOT GIS Unit 1587 Mail Service Center 3401 Cad Sandburg Court Raleigh,NC 27699-1587 Raleigh,NC 27610 httD://www.ncdot.rafiUgis (919)212-6000 2. A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds, stockpiles,waste piles,processing areasthaul roads,mine excavations and any other major aspect of the mining operation that is proposed to be affected/disturbed during the life of the mining permit.A tablelchart similar to the following will be acceptable: AFFECTED ACREAGE TABLE: For new permits,complete only the total affected acreage column. For modifications,complete all columns. CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTEDACREAGE ACREAGE Tailings/SedimentPonds 50.40 0.00 50.40 Stockpiles 11.30 0.00 11.30 Waste piles 371.40 0.00 371.40 Processing Areas/Haul Roads 147.80 0.00 147.80 Mine Excavations 276.10 0.00 276.10 Other(Please explain) 38.40 0.00 38.40 Total Affected Acreage 895.40 0.00 895.40 Total Permitted acreage 2,184.40 0.00 2,184.40 Revised September 21, 2021 P a r; e 4 x'• 1 t °"fi r _ r • �� ,." PROCESS WATER - POND 3 .; r� Former Outfall 003 ' EXISTING 15-INCH CMP t ROPOSED JUNCTION BOX � r i•V.;, a` ' tit>. ` INCH HDPE St LOTH PIPE +! EXISTING 24-INCH RCP Ito tMr w „� t ,�} / .<- ✓. . ,ate s POND 4 r .A, '1 ROPOSED PROCESS h -- -WATER DISCHARGE PO 1 . ^, Note: Outfall 003 would -Discharge to existing rip rap -.. - ischarge and then flow outlet protection apron. --- into pond 4,and then out Existing OutFall 00g'� into pond 004 } Y Relocated Outfaii 003 gyp; ti WCKUSTONE. +' PITTSBORO QUARRY Process Water Outfoll Culvert Relocation y �r-rar 'ew