Loading...
HomeMy WebLinkAbout20231116_Engineering_Calculations Engineering Calculations • Culvert Calculations • Culvert Rip Rap Calculations • Erosion Control Basin Design Calculations A Ma--tin NCECSM#6.61-SKIMMER SEDIMENT BASIN CALCULATIONS Riser and Barrel DATE Onoher 26,2a23 rcv 3-2019 BASIN M Skimmer 1/2 TOTAL DRAINAGE AREA M BASIN 19.30 AC Over 10 AC TOTAL DISTURBED AREA TO BASIN t9,10 AC Te 12 Minutes INTFNSITY(Irs) S.6 C 1 03 Weighted INTENSITY(ly) G4S INTENSITY(It) 3.92 Q7r- CIA- 03 1. 16.45 11910 3696 1cfs QrU- CIA- D3 x 1560 1. 11910 3209. Ica Qt' C[ANNJ 03 Ix 1392 Ix 119to 1 12246 jar. MINIMUM VOLUME REQUIRED 19.10 z 1 80 I 343s0.CF SURFACE AREA REQUIRED Qts 32.09 1 x 1 "5 1 1 13,958'SF BASIN STORAGE DIMENSIONS L W at volume sce.volume BattomM591D 12,250 0 D o StaraLf 17,350 5 74,500 74,500 Spillway 18.7p6 6 18.128 92.628Tap2 21,11q 8 39,820 132,448 'Inside dopes Q 2:1 678 DEPTH OF STORAGE 5 a ROCK BAFFLE VOLUME REDUCTION ')'r Cu.Ft. Dimensions Tap Width 2',Bottom Width a' " Volume Cu.Ft. Height Y(I 1 side slopes) Length Basin Slarage Width STORAGE VOLUME PROVIDED 91 5 CF SPILLWAY HEIGHT 6 TOP OF DAM IIEIGHT- 8 SPILLWAY-L-(%Oa1(3xIN") 11 ft Use Minimum of2lr Spillway Flaw Depth(fl)- i Faireloth Skimmer Specifications Volume of Basin to Dewua(CF) 71 575 Drawdown(days) Volume(CF) Skimmer Pipe Diameter 5' 2 65,644 Slimmer Orifice Diameter 4. 3 98.4% Principle Spillway Calculations Principle Spillway Capacity 2-yr Peak Flow per State Standard 6 61 Principle Spillway Size(Riser) L W Wier Flaw Length Minimum Spillway Capacity(2-yr Peak Flow) 5 1 5 joax 16 5 Heighl of Box Height from Tap of Riser to Emergency Spillway 1 It Actual Riser Design Capacity(dz) 48 00 Qr 225 OK BA1'IYt Site Calculations Diameter IS"Minimum fl 641 efs Band Capacity 63.6 OK Approximate Barrel Len q0 Buoyancy Calculations Upward Fora Riser Area It Itiscr Height x Weight of Water per Cu.FL(62.4) $580 0 Downward Forte Weight of the concrete box less nude hole(00 Iblcl) 93153 Ballast Dimatsions Depth x Len x Width z Wdghl of Concrete per Cu.Ft.(150) 18750 Length Width Depth(R) Aren(eofl) (R) (fl) 5.0 5.0 1 OS 1 12.5 I Total Weight 10190.3 OK Martin 8701 Red Oak Blvd-Charlotte NC,28217 704-41W-147S Culvert A Sizing Calculations Date October 26,2023 Drainage Area Runoff 28 Year Proposed Required Provided Pipe Outlet Velocity structure (acres) Coeificlent Intensity on Pipe Slope Pipe Size size (fps) Culvert#2 95 0.3 0.45 183825 1000 13.98 f 8 8 Culvert A Rip Rap Apron Sizing Calculations NC Sediment and Erosion Control Manual NYDOT Method (Appendix 8.06.5) Outlet -1 p Rap Wnlmurn MYnTmum Structure Pipe Size in Velocity Zone Stone Size ft Width ft Culvert#2 18 8 1 1 T TT 6 45