Loading...
HomeMy WebLinkAbout20231031_Cover_letter RECF-IVF'r) _ r:T I- 11g23 0EMLR•StomHfi Wprugram October 30, 2023 NCDEQ Division of Energy, Mineral and Land Resources 1612 Mail Service Center Raleigh, NC 27699-1612 Attention: Mr.Adam Parr, PE Reference: Ameri-Con Materials Proposed Lake Adger Sand Mine Application 480 Palmer Road, Mill Spring, NC 28756 S&ME Project No.422620041 Dear Mr. Parr: On behalf of Jason Deck, please see the below responses to your October 201h letter related to the Adger Mine Mining Application. Our embedded responses are in Red below: 1.The Mine Permit boundary needs to be shown to include the area that you are proposing to operate in the river. Please clearly identify and label on the Mine Map the mine permit boundary that encompasses the entire operation. The mine map has been revised to show additional labeling for the on-shore mining boundaries and the in-stream mining boundaries. Revised map is attached. Blue shading depicts the in- stream mining boundary and the orange shading depicts the on-shore mine boundary. This revised map is attached. 2. Please clarify how you propose to mitigate potential erosion from the outlet pipe from the settling pond. The outlet pipe from the settling pond will discharge directly into the river with riprap placed below the pipe to minimize any potential erosion. It is not clear from the application details where the discharge point of the pipe is located. Map has been revised to clarify pipe location. 3. Please provide proof you have submitted your application for the NPDES NCG052. Proof of this submittal from the NCDEQ Permit tracking website and NCDEQ issuance of a permit number while the application is being reviewed is attached. 4. Please provide proof you have submitted your application to the USACE. The USACE Applications have already been approved and our approvals are attached. 5. Please clearly identify and label on the mine map the location of the fuel storage tanks. The diesel fuel storage tank will be located adjacent to the plant and is now shown on the revised figure. 6. Please provide proof, such as copy of the signed return receipts from certified mail, that all adjoining landowners and chief administrative officer of each county and municipality have been properly notified. Proof of receipt in the form of certified mail receipts and or tracking information is attached. 7. Please clarify if you intend to use treatment additives (flocculant) in the settling pond. No flocculants are currently planned for the pond. S&ME, Inc.1 301 Zima Park Dr I Spartanburg,SC 293011 p 864.574.2360 1 www.smeinc.com 1 ' Ameri-Con Materials Proposed Lake Adger Sand Mine Application October 30, 2023 Mill Spring, NC Page 2 If you have questions regarding this application please do not hesitate to contact me at 864-208-9378 or ilindsey@smeinc.com or you can reach out to the applicant Jason Deck directly at 828-817-0544 or daddyied37@yahoo.com. Sincerely, 5&ME, Inc. J&indsey P.E. Project Engineer Attachments T:\GSP-1260\Projects\2020\4226-20-041 Ameri-CON Materials- Blacksburg Mine\Working Documents\Adger Mine Permitting\Mine Permitting\Mining Application Response Cover Letter.docx S&ME, Inc.