Subject: FW: [External] FW: SUP Application Sand Mine
Date: Wednesday, September 6, 2023 at 4:40:19 PM Eastern Daylight
Time
From: Bridgette Spann
To: Jody Bland
CC: Gary Lanier
Attachments: image001.png, image002.jpg
Jody,
Please see below. This information will complete your file and we will have everything we
need. Thank you
From: Wen, Jintao (NCEM) [maiito:jintao.wen@ncdps.gov
Sent: Wednesday, September 6, 2023 4:14 PM
To: Bridgette Spann<brid eq, tte.s ann@columbusco.org>
Cc: Gary Lanier<glanier@columbusco.org>; Futral, Eryn (NCEM)<eryn.futraI@ncdps.g 1>;
Garrett, Steve (NCEM)<Steve.Garrett 9ncdps.ggvv>
Subject: RE: [External] FW: SUP Application Sand Mine
Good afternoon Bridgette,
Thanks for reaching out to us. Sorry for my late response.
9
As Eryn mentioned, if the four different sand mines are located on different parcels;then you'll
need to issue a separate floodplain development applications/permit for each of parcels.
If any of the sand mines encroaches into floodway or non-encroachment area, then a PE signed
& sealed No-rise certification will be required as part of the permit application.
Typically those No-rise certifications need to be supported by a hydraulics analysis/report.
However, for your case, if there is no proposed structures; fills, material storage/stockpiles, or
any,:other permanent obstructions within the floodway; the no-rise certification can be supported
by.a an_enginper's,lefter-expiainingTustifying why the project won't impact the BFE (No structures,
fills,:material-storagelstockpile, or any other permanent obstructions within the floodway; only
excavations below existing grade, t _ _ impact wori
flew alla mewibemra andcan amoove _o -o o ma o r lood
a a.''even Thanks, please let us know if you have any other questions.
Jintao Wen, Ph.D., PE
NFIP Engineer
NC Department of Public Safety
Division of Emergency Management
(0):919-825-2317
jintao.wen @ ncdps.gov
1 of 4
From: Bridgette Spann<bridgette.spann@columbusco.org>
Sent: Wednesday, September fi, 2023 2:24 PM
To: Wen, Jintao (NCEM)<jintao.wen@ncdps.gov>
Cc: Gary Lanier<glanier@columbusco.org>
Subject: RE: [External] FW: SUP Application Sand Mine
CAUTO®N: External email. Do not dick links.or open attachments unless verified. Report suspicious
emalls with the Report Message button located on your Outlook menu bar on the Home tab.
Good Afternoon Jintao,
I just wanted to touch basis with you concerning the no-rise that Eryn mentioned for these
parcels. I look forward to hearing from you. Thank you.
From: Bridgette Spann mailto:bridgette.spann@c ol_umbusco.org]
Sent: Friday, August 18, 2023 8:45 AM
To: 'Wen, Jintao (NCEM)'<jintao.wen@ncdps.gov>
Cc: Gary Lanier<glanier@columbusco.org>
Subject: FW: [External] FW: SUP Application Sand Mine
I really need guidance on this one. Please see Eryn's response when I reached out to her and I
have included the response from the applicant which is beneath in red. I have made the
applicant aware that this SUP will not go before the Planning Board on 08/22/2023. Thank you
for your help in this matter. I look forward to talking with you.
From: Futral, Eryn (NCEM) m ilto:eryn.futral@ncdps.gov
Sent: Monday, July 17, 2023 2:44 PM
To: Bridgette Spann<bridgette.spann@columbusco.org>
Subject: RE: [External] FW:SUP Application Sand Mine
Good afternoon,
The proposed development is for 4 different sand mines and appear to be located on 4 different
parcels;this will separate floodplain development applications/permits for those that are located
on different parcels.
Each of the mines is located in the AE Floodway-flood zone and is subject to the development
standards in Article 5, Section A.General Standards,Section B.Specific Standards,and Section
F.Floodways and Non-Encroachment Areas.
I don't see on the plans the location for equipment staging,mined material storage,or structures
;(including manufactured buildings/temp structures).All development and staging/storage areas
will need to be identified on the plans and permitted accordingly.All of which will need to be
included in a no-rise analysis.If a rise is identified,then a CLOMR pre-development and LOMR
post-development will be required.
Take care!
Respectfully,
2 of 4
Eryn K. Futral,AICP,CFM,CZO
NFIP Planner,Eastern Branch
NC Department of Public Safety
Emergency Management/Hazard Mitigation Section
0
Mobile: (919) 819-1734
Eryn.futral @ncdps.gov
www.ncdp&gov
in n C
Plan. Prepare. Stay informed.
Download the ReadyNC app—it's free!
vwvwreadync.org
Hi Mrs. Spann/Mr. Futrai,
Where are no proposed structures or material storage proposed with this project. The
only equipment that would be only on any type of semi-permanent basis would be the
needed excavation equipment (track hoe). All material is proposed to be excavated on an
as needed basis.
Thanks,
Joseplx Bllzimd, PE
NOWS TTNSTALL
C0Nstn�G ENGM s PC
1429 Ash-Little River Road
Ash, NC 28420
910-287-5900 (phone)
910-512-8148 (mobile)
910-287-5902 (fax)
jbland@oteuginee-rs.com
From: Bridgette Spann*;b dgette.spann@columbusco.org>
Sent: Friday, July 14, 2023 2:12 PM
To: Futral, Eryn (NCEM) <eryn.futral@ ncd ss..g2 >
Subject: [External] FW: SUP Application Sand Mine
CAUTOON: External email. Do not click links or open attachments unless verified. Report suspicious
emails with the Report Message button located on your Outlook menu bar on the Home tab.
Here you go
3 of 4
From: Bridgette Spann fmailto:bridgette.spann@columbusco.org]
Sent: Friday, July 14, 2023 1:55 PM
To: Barbara Featherson<bobfeatherson@vahoo.com>; Brent Watts
<bwatts@columbusco.org>; Buddy Byrd<buddyby c�i@_gmail.com>; Chris Smith
<csmith@columbusco.org>; Laverne Coleman <Icoleman@columbusco.org>; 'Ricky Bullard'
<jrbullard0812@ icloud.com>; Scott Floyd <s fs ncshp@gmail.com>
Cc: 'Jana Nealey' <jana.nealey@columbusco.org>
Subject: SUP Application Sand Mlne
Good Afternoon,
Please see the attached SUP Application as an FYI. The above information has been sent to
the TRC today in preparation for the Columbus County Planning Board Meeting that will be held
on 08/22/2023 at 6:30 pm. Please contact Gary Lanier with any questions. Thank you
Bridgette Spann
Sr. Administrative Support Specialist
Economic Development Commission, Columbus County Planning Department
127 W. Webster Street
Whitevilla, NC 28472
Work 910 640-6606
brsd .a�pann@c®I�re�rbus�o.org
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties by an authorized state official.
4of4
a
NO IS &TUNSTALL
--�CONSULTING ENGINEERS P.C.�--�
2602 Iron Gate Dr.Suite 102 1429 Ash-Little River Road
Wilmington,NC 28412 Ash,NC 28420
(910)343-9653 (910)287-5900
(910)343-9604 Fax (910)287-5902 Fax
John S.Tunstall,P.E. J.Phillip Norris,P.E.
T.Jason Clark,P.E. Joseph K.Bland,P.E.
Robbie P.Hennelly,E.I.
September 14, 2023
Gary Lanier, Interim Planning Director
127 W. Webster Street
Whiteville, NC 28472
Re: WBM 4,LLC
No-Rise Explanation
N&T Project No.: 22081
Dear Mr. Lanier,
The proposed sand mine(s) project will not affect the capacity of the existing floodplain. The
proposed project will not install any permanent impediments within the floodplain. This includes
but is not limited to structures, stockpiles, waste piles, fill or any other permanent obstructions.
All equipment can be removed from the project areas in anticipation of upcoming flooding.
This project will create additional capacity in the floodplain area since material will be
excavated and removed. Each pit area will be reclaimed as a lake with approximately 3' —4' of
freeboard. This total freeboard area represents approximately 12,398,115CF or 92,737,900
gallons of potential storage area.
Sincerely,
NO S &TUNSTALL
ONS ING EN EERS, P C.
seph . Bland,