Loading...
HomeMy WebLinkAbout20231019_ADI_Received NORMS &TUNSTALL CONSULTING ENGINEERS P.C. 2602 Iron Gate Dr.Suite 102 1429 Ash-Little River Road Wilmington,NC 28412 Ash,NC 28420 (910)343-9653 (910)287-5900 (910)343-9604 Fax (910)287-5902 Fax John S.Tunstall,P.E. _ _ y ..yy ; J.Phillip Norris,P.E. T.Jason Clark,P.E. Y 1 M Joseph K Bland,P.E. Robbie P.Hennelly,E.I. � zirz� October 18, 2023 : Adam Parr, PE Assistant State Mining Engineer NCDEQ / Division of Land Resources Land Quality Section — 5th Floor 512 N. Salisbury Street Raleigh, NC 27604 Re: WBM 4 LLC Sand Mines 1-4 Review Comment Response Columbus County, NC NT Project No. 22081 Dear Mr. Parr, We are responding to your review letter dated September 6, 2023, as follows: 1. The mine permit boundary has been identified as requested. 2. Vegetated/undisturbed buffers have been noted on the plans. A hatch pattern has been added to these areas to mor clearly identify them. 3. The current applicant is in the process of updating NCSOS information that will change the named applicant to an LLC. The updated original signed application docs will be forwarded under separate cover. 4. NCG02 Notice of Intent Submittal cover letters and email correspondence with Brittney Cook, NPDES Stormwater General Permit Coordinator are enclosed. 5. NCDOT dewatering basins have been added to the plans. The outfall for both of these basins is labeled accordingly. 6. A NCDOT dewatering basin has been provided for each pit. It has been determined that the distance between pits is too far for pit to pit discharge. We have updated the application accordingly. 7. Copies of LISPS Receipts, Green Cards, Return Envelopes have been provided. 8. Details for the NCDOT dewatering basin are provided. NCBELS License C-3641 Mr. Adam Parr WBM 4 LLC Sand Mines 1-4 Review Comment Response NT Project No. 22081 October 18, 2023 Page 2 9. A pumping O&M plan has been provided as requested. 10.E & S measures have been provided as requested. 11.E & S measures are shown on the plans and details provided. 12. Temporary gravel construction entrance detail is provided on Sheet C5. See E & S notes on C5 for additional information. 13.A copy of ACOE concurrence has been provided for your use. 14.The connecting roads may require additional grading & compaction. Each section of haul road is allotted for according to which pit area it serves. 15.A copy of correspondence between Columbus County and the Flood Plain Administrator has been provided for your use. Sincerely, NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. 4ph oBla P.E. J KB/ttw 22081 10-18-23 s-mining-Itr resp. cc: Dave Tripp NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C.PROTECTION OF NATURAL RESOURCES 1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence to the mine map(s).Attach additional sheets as needed. Once all permits are granted the operator will begin clearing and excavating work. Any dewatering will discharge into the appropriate NCDOT watering basin. Sand will be mined on an as needed basis. 2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to prevent offsite sedimentation(include specific plans for sediment and erosion control for mine excavation(s),waste piles,access/mine roads,and process areas),and give a detailed sequence of installation and schedule for maintenance of the measures.Locate and label all sediment and erosion control measures on the mine map(s)and provide typical cross-sectionskonstruction details of each measure.Engineering designs and calculations are required to justify the adequacy of any proposed measures. The proposed excavation area will be surrounded by natural buffers. Areas surrounding excavation will drain internally to the site. No movement of silt is expected off site or into adjacent wetlands. 3. A)Will the operation involve washing the material mined,recycling process water,or other wastewater handling? FIYES FX NO If yes,briefly describe all such processes including any chemicals to be used. B)will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters of the State? FIYES 1NO If yes,briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of stabilization)on the mine map(s). Revised September 21,2021 Page 16