Loading...
HomeMy WebLinkAbout20230927_Application_92-01 Martin Phillip N.Pressley,PE Marietta Sr.Environmental Engineer September 27,2023 Mr.Adam Parr,Acting State Mining Engineer Land Quality Section NC DEQ Division of Energy, Mineral,and Land Resources 1612 Mail Service Center Raleigh, NC 27699 SUBJECT: Martin Marietta Materials, Inc.—Garner Quarry Mining Permit No.92-01 Request for Mining Permit Modification Dear Mr. Parr: Enclosed please find Martin Marietta's application to modify Mining Permit Number 95-01 for Garner Quarry located in Wake County, North Carolina. The application will convert 15 acres of undisturbed buffer to pit and remove the stormwater control measures the protected the buffer. The buffered area was removed from the Future Pit area to resolve comment number five on the April 18,2018 request for additional information. Due to timing, Martin Marietta chose to voluntarily buffer the area, instead of waiting on a stream call. We received the attached Neuse Buffer Determination, dated August 29,2023 that indicates none of the streams in question are subject to the buffer rules. All other changes are the result of updated mapping. Enclosed for your review are: • One(1) complete original mine permit application package with maps • Five(5)copies of the application package • A check for the$750 permit modification fee If you have any questions please contact me at(919)783-4505 or via email at phillip.pressley@martinmarietta.com. Sincerely, � 1 � RECEIVED �J SEP 2 7 M Phillip N. Pressley, PE L, i , Sr. Environmental Engineer MINING PR06tiNvi Enclosures NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE: It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE- APPLICATION MEETING to discuss your intentions and address any questions. 1. Name of Mine Garner Quarry County Wake River Basin Neuse Latitude(decimal degrees to four places) 35.7056 N Longitude(decimal degrees to four places) 78.5753 W 2. Name of Applicant Martin Marietta Materials, Inc. Applicant Contact Phillip Pressley Consultant Contact Applicant Email phillip.pmssley®maMinmanetta.wm Consultant Email Telephone (919) 783-4505 Telephone Cell Phone Cell Phone 3 Permanent Address for Receipt of Official Mail" P.O. Box 30013 Raleigh, NC 27622 4. Mine Office Address 1111 East Garner Road, Garner, NC 27529 5. Mine Manager Jason Gilmore Mine Manager Email jason.gilmore@martinmarietta.com Telephone (919) 714-8685 Cell Phone I certify that all details contained in this permit application are true and correct to the best of our knovvledge.We fully understand that any willfulmisrepresentation of facts will be cause for permit revocation. Signature'" l—&,t,AXCrIan �/�{, �/ Date Print Name Ronald M.Kopplin Title President,East Division 'This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond tsecudtvl that corresponds to this site. "The Division of Energy,Mineral,and Land Resources must be noted of any changes in the permanent address or telephone number. "'Signature of company officer required. G.S.74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete application or,if a public hearing is held,within 30 days following the hearing and the filing of any supplemental information required by the Department.All questions must be addressed,and all required maps provided before this application can be considered complete.Attach additional sheets as needed. Revised September 21, 2021 P a g e l NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 NOTE:All the following questions must be thoroughly answered regarding your mining operation for the intended life of the mine.All responses must be clearly conveyed on a corresponding,detailed mine map. A.GENERAL CHARACTERISTICS OF THE MINE 1. Answer all the following that apply: F-1 This is an application for a NEW permit. Indicate the total acreage at the site to be covered by the permit (This is the acreage the new permit fee will be based upon.) Of this acreage,how much is owned and how much is leased? Acres owned: Acres leased: Property owner if leased: This is an application for a MODIFICATION to a mining permit. Mining Permit Number: 92-01 Total permitted acreage: 407 Does the modification involve acreage within the previously approved permitted boundary? RX YES F ]NO If yes,indicate the acreage to be covered by this modification 17 Does the modification involve acreage outside the previously approved permitted boundary? 1-1 YES FX]NO If yes,indicate the additional acreage to be covered by this modification NOTE:You must complete all of Section F of this application form entitled Notification of Adjoining Landowners Of the acreage to be added to the permit,will any portion be affected(i.e.:disturbed,ground cover removed by the mining operation? YES 1-1 NO If yes,indicate the acreage to be affected within the acreage to be added to the permit NIA The modification fee is based upon the proposed new affected acreage within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. F-1 This is an application for TRANSFER of a mining permit. Mining Permit Number: Total permitted acreage: Revised September 21,2021 Page 12 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 MINING FEE SCHEDULE A nonrefundable permit application processing fee when filing for a new mining permit,permit modification,or transferred permit is required as follows: APPLICATION TYPE 0—25 ACRES 26+ACRES New Permit Applications $3,750.00 $5,000.00 Permit Modifications $750.00 $1,000.00 Permit Transfers $100.00 $100.00 Annual Operating Fee $400.00 $400.00 Acres for new permits means the total acreage at the site to be covered by the permit Acres for modification of permits means the new affected acres within the previously approved permitted boundary plus the proposed total acreage to be added outside the previously approved permitted boundary. 2. Name of all materials mined: Granite 3. Mining Method: Hydraulic Dredge 0 Front-end Loader&Truck QShovel&Truck Dragline&Truck Self-loading Scraper Excavator&Truck Other(please explain): 4. Expected maximum depth of mine(feet)500 Depth is relative to what benchmark?(e.g.,natural ground level,mean seal level,road elevation,etc.): natural ground level Expected average depth of mine(feet) 350 6. Has an area at this site been mined in the past? YES X NO 1-1 If yes,when and by whom was this activity conducted? Martin Marietta Materials, Inc., Presently 6. Estimated life of the operation(years):50 NOTE:The Department may request clarification on how life of mine was calculated. Revised September 21,2021 Page 3 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 B.MAPS 1. Clearly mark and label the location of your mining operation on six(6)copies of a 7.5-minute quadrangle and a county highway map.These maps,in addition to six(6)copies of all mine maps and reclamation maps,must be submitted with each permit application. 7.5-minute quadrangles may be obtained from the N.C.Geological Survey, Mailing Address Physical Address 1612 Mail Service Center 512 N.Salisbury St.,5t'Floor Raleigh,NC 27699-1612 Raleigh,NC 27604 Hffp:llportal.ncdenr.org/webArtgeological home (919)733-2423 County highway maps may be obtained from the N.C.Department of Transportation: Mailing Address Physical Address NCDOT GIS Unit NCDOT GIS Unit 1587 Mail Service Center 3401 Carl Sandburg Court Raleigh,NC 27699-1587 Raleigh,NC 27610 http://www.ncdot.rgfit/gis (919)212-6000 2. A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds, stockpiles,waste piles,processing areas/haul roads,mine excavations and any other major aspect of the mining operation that is proposed to be affected/disturbed during the life of the mining permit.A tablekhart similar to the following will be acceptable: AFFECTED ACREAGE TABLE: For new permits,complete only the total affected acreage column. For modifications,complete all columns. CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED ACREAGE AFFECTED ACREAGE ACREAGE Tailings/Sediment Ponds 4.3 0 4 Stockpiles 14.0 0 14 Waste piles 81.1 2 83 Processing Areas/Haul Roads 63.9 0 64 Mine Excavations 184.2 15 199 Other(Please explain) 0 0 0 Total Affected Acreage 347.5 17 364 Total Permitted Acreage 407 0 407 Revised September 21,2021 P a g e 14 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 3. Mine maps must be accurate and appropriately scaled drawings,aerial photographs,or enlarged topographic maps of the entire mine site.All aspects of the mine site must be clearly labeled on the maps along with their corresponding(approximate)acreage.Thus,all mine and reclamation maps must denote those act!vMes that are intended to be conducted during the life of the mining permit.All maps must be of a scale sufficient to clearly illustrate the following,at a minimum: a) Property lines of the tract or tracts of land on which the proposed mining activity is to be located including easements and rights-of-way. b) Existing or proposed permit boundaries with geographic controls(e.g.metes and bounds,coordinates)labeled c) Initial and ultimate limits of clearing and grading d) Outline and width of all buffer zones(both undisturbed and unexcavated) e) Outline and acreage of all pits/excavations f) Outline and acreage of all stockpile areas g) Outline and acreage of all temporary and/or permanent overburden disposal areas h) Location and acreage of all processing plants(may be described as to location and distance from mine if sufficiently far removed) i) Locations and names of all streams,rivers,and lakes j) Outline and acreage of all settling and/or processing wastewater ponds k) Outline and acreage of all planned and existing access roads and on-site haul roads 1) Location of planned and existing on-site buildings m) Location and dimensions of all proposed sediment and erosion control measures n) Location of 100-year floodplain limits and wetland boundaries o) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract, names of owners of record of tracts adjoining these tracts that are within 1,000 feet of the mining permit boundary must be provided on the mine map. p) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse, railroad track,or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,names of owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary,must be provided on the mine map(s).NOTE:"Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. q) Map legend 1) Applicant name 5) Scale 2) Mine name 6) Symbols used and corresponding names 3) North arrow 7) Date prepared and revised 4) County 8) Name and title of person preparing map Map scales should meet the following guidelines: PERMITTED ACREAGE MAP SCALE 0—49 acres 1"=50' 50—199 acres 1"=100' 200+acres 1"=200' NOTE:Smaller scaled maps may be acceptable if they clearly illustrate the above items. NOTE:In addition to the above,the maps must also include any site-specific information that is provided in the answers to the following questions(italicized questions/statements)in this application form.This application will not be considered complete without all relevant items being adequately addressed on the mine maps. Revised September 21,2021 Page 5 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C.PROTECTION OF NATURAL RESOURCES 1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence to the mine map(s).Attach additional sheets as needed. Pit development is typical for a mature granite quarry. Rock adjacent to the pit is exposed via stripping of soil. The disturbed area is graded to drain to the pit or other approved erosion control measures. The sequence of the existing pit, stripped areas, and future pit is included on the enclosed mine map. 2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to prevent offsite sedimentation(include speck plans for sediment and erosion control for mine excavation(s),waste piles,access/mine roads,and process areas),and give a detailed sequence of installation and schedule for maintenance of the measures.Locate and label all sediment and erosion control measures on the mine maps)and provide typical cross-sectionskonstruction details of each measure.Engineering designs and calculations are required to justify the adequacy of any proposed measures. Erosion control measures are shown on the attached mine map. Each of these measures is designed to meet the criteria in the Division's Erosion and Sediment Control Planning and Design Manual. Details for existing structures have been previously submitted and approved. New erosion control measures included as part of this modification are described and detailed in the supporting documentation. 3. A)Will the operation involve wash in the material mined,recycling process water,or other wastewater handling? ZYES NO If yes,briefly describe all such processes including any chemicals to be used. The mine discharges comingled stormwater and groundwater from the pit. The stormwater includes precipitation that fell directly into the pit as well as runoff that drained into the pit. Both the stormwater and groundwater accumulate in a sump in the bottom of the pit,which is pumped out as needed. The pump discharges into a clarification pond prior to leaving the site. NC NPDES General Permit No.NCG020000 allows the use of chemical flocculants from a list of polymers approved by the Division of Water Resources. One of these flocculants may be used periodically to maintain water quality. All process water from washing of material is handled through a closed-loop recycle system of settling ponds. B)Will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters of the State? EYES FNO If yes,briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of stabilization)on the mine map(s). The site is permitted to discharge pit water, process water, and stormwater by NC NPDES General Permit No. NCG020000 Certificate of Coverage No. NCG020086. Mine dewatering wastewater is discharged to unnamed tributary of Big Branch. Stormwater may be discharged from sediment basins shown on the mine map. Revised September 21,2021 Page 16 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C)Will any part of the proposed mine excavation(s)extend below the water table? FX-1YES ] NO If yes,do you intend to dewater the excavation(s)? FX-]YES F] NO Estimated withdrawal rate in gallons per day: 1.75 MGD(2022 Annual Water Use Report) If yes,what impact,if any,will mine dewatering have on neighboring wells?Locate all existing wells on the mine map(s)that lie within 500 feet of the proposed excavation area.Provide data to support any conclusions or statement made,including any monitoring well data,well construction data,and current water withdrawal rates.Indicate whether the proposed mine locale is served by a public water system or private wells. This site has not historically adversely affected offsite wells.All known well locations within 500 feet of the proposed excavation are depicted on the site plan. The site is served by several wells,while the locale is served by a combination of the Town of Gamer's public water system and private wells. The pit sump accumulates stormwater runoff,precipitation,and groundwater seepage. The amount of groundwater in the pit discharge is unknown. Most of the discharge is comprised of stormwater. No water is withdrawn from a stream,lake,or river.The pit discharge is covered by NC NPDES General Permit No.NCG020000 Certificate of Coverage No.NCG020086. The estimated withdrawal rate is the rate calculated as part of the annual withdrawal rate submitted to the Division of Water Resources. D)If you answered yes to any of the above questions,provide evidence that you have applied for or obtained the appropriate water quality permit(s)(i.e.,non-discharge,NPDES,Stormwater,etc.)from the Stormwater Program.In addition,the applicant is required to register water use with the Division of Water Resources,Ground Water Management Branch,if the operation withdraws more than 10,000 gallons per day and needs a capacity use permit from the Division of Water Resources,Ground Water Management Branch,if the operation lies in a capacity use area and withdraws more than 100,000 gallons per day. The site is permitted to discharge stormwater, process water, and pit water by NC NPDES General Permit No. NCG020000 Certificate of Coverage No. NCG020086 and and registered with the Division of Water Resource's Water Withdrawal Registration Program. 4. A)Will the operation involve crushing or any other air contaminant emissions? AF YES NO If yes,indicate evidence that you have applied for or obtained an air quality permit issued by the Division of Air Quality or local governing body. The site is permitted to operate by Air Permit No. 04252R23 issued by the NC Division of Air Quality. B)How will dust from stockpiles,haul roads,etc.,be controlled? Wet suppression is used to control plant emissions. Haul roads and stockpiles are controlled by the use of a water truck equipped with powered rear spray and front mounted water cannon. Revised September 21,2021 Page 17 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 5. A)A buffer will be required between any mining activity and any mining permit boundary or right-of-way.It may be an unexcavated buffer(no excavation,but roadways,berms,and erosion&sedimentation control measures may be installed within it),an undisturbed buffer(no disturbance within the buffer whatsoever),or a combination of the two, depending upon the site conditions.Note that all buffers must be located within the mining permit boundaries. How wide a buffer will be maintained between any mining activity and any mining permit boundary or right-of-way at this site?A minimum buffer of 25 feet is recommended,although a wider buffer may be needed depending on site conditions.Show all buffer locations and widths on the mine map(s). Buffer locations and widths are shown on the included mine map. A buffer of at least 25 feet extends around the perimeter of the permitted area. Buffer widths greater than 25 feet are shown on the enclosed mine map. B)A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands unless smaller undisturbed buffers can be justified. Depending on site conditions,a buffer wider than 50 feet may be needed. How wide an undisturbed buffer will be maintained between any land disturbing activities within the mining permit boundaries and any natural watercourses and wetlands at this site?Show all buffer locations and widths on the mine map(s). A buffer of 50 feet width will be maintained between all natural watercourses and wetlands and any land disturbing activities, as shown on the mine map. 6. A)Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries during mining. Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and minimum 3 horizontal to 1 vertical slopes or flatter for sandy material are generally required unless technical justification can be provided to allow steeper slopes. As shown on the mine map, the mine excavation will not extend close enough to the property boundaries to create a landslide boundary. B)Provide a cross-section on the mine map(s)for all fill slopes(berms,waste piles,overburden disposal areas,etc.), clearly indicating the intended side slope gradient,installation of any benches and/or slope drains(with supporting design information)if needed,and the method of final stabilization. Revised September 21,2021 Page 19 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 C)In excavation(s)of unconsolidated(non-rock)materials,specify the angle of all cut slopes including specifications for benching and sloping.Cross sections for all cut slopes must be provided on the mine map(s). Final excavation slopes of unconsolidated materials will be 2:1. Where the height of a cut face warrants, a bench will be cut to slope toward the face of cut and drain to the pit excavation. Cross-sections are shown on the detail sheet. D)In hardrock excavations,specify proposed bench widths and heights in feet Provide crass-sections of the mine excavation clearly noting the angles of the cut slopes,widths of all safety benches and mine benches,and the expected maximum depth of the excavation. Final excavation slopes of unconsolidated materials will be 2:1. Where the height of a cut face warrants, a bench will be cut to slope toward the face of cut and drain to the pit excavation. Cross-sections are shown on the detail sheet. 7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling,house, public road,or public,commercial or industrial building from any mine excavation.Locate all such structures on the mine map if they are within 300 feet of any proposed excavation. The mine excavation will not extend close enough to the property boundaries to cause any physical damage to offsite buildings or roads. Quarry blasting is designed to prevent excessive vibrations. Seismograph readings are recorded during each blasting shot. The shots are typically scheduled,near mid-and will appear similar to distant thunder lasting under a second from adjacent properties. Blasting typically occurs between one and three times a week. Structures within 300 feet are shown on the mine map. 8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area and when it will be implemented.Vegetated earthen berms,appropriate fencing and adequate boulder barriers may be acceptable high wall barricades.A construction detaiUcross-section and location of each type of barricade to be used must be indicated on the mine map(s). A boulder barrier or earthen berm will be used around the perimeter of high wall areas. Barriers will be installed upon the completion of stripping activities. 9. Are acid roducing minerals or soils present? YES a NO If yes,how will acid water pollution from the excavation,stockpiles,and waste areas be controlled? Revised September 21,2021 Page 19 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 10. A)Describe specific plans(including a schedule of implementation)for screening the operation from public view such as maintaining or planting trees,bushes or other vegetation,building berms or other measures.Show the location of all visual screening on the mine map(s)and provide cross-sections through all proposed berms or proposed spacing, sizes and species for tree plantings. Existing trees, terrain and berms effectively screen the mining operation from nearby roads and homes. B)Could the operation have a significantly adverse effect on the purposes of a publicly owned park,forest,or recreation area?If so,how will such effects(i.e.,noise,visibility,etc.)be mitigated? There are no publicly owned parks, forest or recreation areas adjacent to the quarry. 11. will ex I sives be used? X YES F]NO If yes,specify the types of explosive(s)and describe what precaution(s)wiil be used to prevent physical hazard to persons or neighboring property from flying rocks or excessive air blasts or ground vibrations.Depending on the mine's location to nearby structures,more detailed technical information may be required on the blasting program(such as a third-party blasting study).Locate the nearest offsite occupied structure(s)to the proposed excavation(s)on the mine map and indicate its approximate distance to the proposed excavation. Explosives will be utilized for rock extraction. The principal explosive material is ammonium nitrate,which is also commonly used as a fertilizer. Blasting is conducted by a contractor. No explosives are stored onsite. A shot pattern is used that minimizes air and ground vibrations and optimizes rock breakage. Energy released via an excess air blast or ground vibrations is wasted energy. The intent is to make each blast as efficient as possible by reducing wasted energy. Blasting is expected to occur between one and three times per week and will be appear similar to distant thunder lasting less than a second. Permanent records are maintained for each blasting event that include shot pattern,explosives loading,delays,time,and weather. 12, will fuel tanks,solvents,or other chemical reagents be stored on-site? AYES FINO If yes,describe these materials,how they will be stored and method of containment in case of spill.Indicate the location(s)of all storage facilities on the mine map(s). Diesel fuel, bulk oil, used oil, and gasoline are stored in containers typical of industrial operation that often include drums and steel tanks. Petroleum products are stored in accordance with spill prevention, control, and countermeasure (SPCC) regulations. An SPCC plan is maintained for the site. Solvents are handled by a third-party contractor (e.g., Noble Oil). Revised September 21,2021 Page 110 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 D.RECLAMATION PLAN 1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate the sequence and general methods to be used in reclaiming this land.This must include the method of reclamation of settling ponds and/or sediment control basins and the method of restoration or establishment of any permanent drainage channels to a condition minimizing erosion,siltation and other pollution. This information must be illustrated on a reclamation map and must correspond directly with the information provided on the mine map(s).In addition, design information,including typical cross-sections,of any permanent channels to be constructed as part of the reclamation plan and the location(s)of all permanent channels must be indicated on the reclamation map. Disturbed areas will be vegetated in accordance with the enclosed seeding schedule. The excavation itself will be allowed to fill with groundwater and may potentially be used for water storage, recreation, or a wildlife sanctuary. 2. Is an excavated or impounded body of water to be left as part of the reclamation? FX-1YES F ]NO If yes,illustrate the location of the body(s)of water on the reclamation map and provide a scaled cross-sections) through the proposed body(s)of water.The minimum water depth must be at least 4 feet,measured from the normal low water table elevation,unless information is provided to indicate that a shallower water body will be productive and beneficial at this site. Will the body(s)of water be stocked with fish? YES FXINO If yes,specify species. 3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock including what kind of permanent barricade will be left.Acceptable permanent barricades are appropriate fencing,large boulders placed end-to-end,etc.Construction details and locations of all permanent barricades must be shown on the reclamation map. A perimeter fence will be placed around all areas where slopes to the waters edge are unable to be safely traversed. Revised September 21,2021 Page 111 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 4. Indicate the method(s)of reclamation of overburden,refuse,spoil banks or other such on-site mine waste areas, including specifications for benching and sloping.Final cross sections and locations for such areas must be provided on the reclamation map. Overburden will be used to construct berms for visual screening. The berms will be vegetated and included within the final reclamation area. Overburden piles,refuse,spoil banks,and other mine waste areas existing at final reclamation will be graded and compacted to slopes no steeper than 2:1 and vegetated in accordance with the enclosed seeding schedule. The areas will be graded to prevent pooling,stagnation of water,and manage stormwater runoff. Existing overburden pile that are adequately stabilized and vegetated will remain without additional disturbance. 5. A)Describe reclamation of processing facilities,stockpile areas,and on-site roadways. The processing plant and stockpiles will be removed from the site. The plant and stockpile areas will be graded, scarified, and revegetated in accordance with the attached seeding schedule. Stabilized onsite roadways will be left to vegetate naturally. All other roadways will be graded, scarified, and vegetated. Erosion control measures necessary for final reclamation will be properly maintained. B)Will any on-site roadways be left as part of the reclamation? FX_�YES FINO If yes,identify such roadways on the reclamation map and provide details on permanent road and ditch line stabilization. 6. Describe the method of control of contaminants and disposal of scrap metal,junk machinery,cables,or other such waste products of mining.(Note definition of refuse in The Mining Act of 1971.) No off-site generated waste shall be disposed of on the mine site without prior written approval from the NC Department of Environmental Quality,Division of Energy,Mineral,and Land Resources and either the Division of Waste Management(DWM)or local governing body.If a disposal permit has been issued by DWM for the site,a copy of said permit must be attached to this applicatlon.All temporary and permanent refuse disposal areas must be clearly delineated on the mine map(s)and reclamation map,along with a list of items to be disposed in said areas. Onsite equipment will be placed in a designated area for eventual disposal off-site by private disposal firms. Items such as drill steel, conveyor belting, screen cloth, and cable will be disposed of in accordance with local, state, and federal regulations. Revised September 21,2021 Page 112 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 7. Describe your plan for revegetation or other surface treatment of the affected areas.This plan must include recommendations for year-round seeding,including the time of seeding and the amount and type of seed,fertilizer, lime and mulch per acre.The recommendations must include general seeding instructions for both permanent and temporary revegetation.Revegetation utilizing only tree plantings is not acceptable.Recommendations can be sought from: a. Authorized representatives of the local Soil and Water Conservation District; b. Authorized representatives of the NC Forest Service,Department of Agriculture and Consumer Services; c. Authorized county representatives of the North Carolina Cooperative Extension Service,specialists and research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at North Carolina State University; d. North Carolina licensed landscape architects; e. Private consulting foresters referred by the NC Forest Service,Department of Agriculture and Consumer Services; f. N.C.Erosion and Sedimentation Control Planning and Design Manual; g. N.C.Surface Mining Manual:A Guide for Permitting,Operation and Reclamation; h. Others as may be approved by the Department. Lime Rate of Application(tons/acre): Please See Detail Sheet Fertilizer Analysis and Rate of Application(lbs/acre): Seed type(s)and rate(s)of application included year-round seeding schedule(lbs/acre): NOTE:Include legumes SEED TYPES SEEDING DATES SEEDING RATES Mulch Type,Rate of Application(lbs/acre),and Method of Anchoring: Other Vegetative Cover(s)Type(s)and Rate(s)of Application Including Seeding Schedule(lbstacre,trees/ acre,spacing of trees/shrubs,etc.): Revegetation and/or reforestation plan approved by: Signature Date Print Name Phillip N.Pressley,PE Title Senior Environmental Engineer Agency Martin Marietta Materials,Inc. Revised September 21,2021 Page 113 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 E.DETERMINATION OF AFFECTED ACREAGE AND BOND The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to$5,000 per affected acre)for each permitted mine site based upon the acreage approved by the Department to be affected during the life of the mining permit Please insert the approximate acreage for each aspect of the mining operation,that you intend to affect during the life of this mining permit(in addifion please insert the appropriate reclamation cosf/acre for each category from the Schedule of Reclamation Costs provided with this application form)OR you can defer to the Department to calculate your bond for you based upon your maps and standard reclamation costs: CATEGORY AFFECTED RECLAMATION RECLAMATION ACREAGE COST/ACRE COST Tailings/Sediment Ponds Ac. X $ /Ac. = $ 0.00 Stockpiles Ac. X $ /Ac. = $ 0.00 Waste Piles Ac. X $ /Ac. = $ 0.00 Processing Area/Haul Roads Ac. X $ /Ac. = $ 0.00 Mine Excavation Ac. X $ /Ac. = $ 0.00 Other Ac. X $ /Ac. = $ 0.00 TOTAL AFFECTED AC.: 0.00 Ac. TOTAL PERMITTED AC.: Ac. Temporary&Permanent Sedimentation&Erosion Control Measures: Divide the TOTAL AFFECTED AC.above into the following two categories:a)affected acres that drain into proposedlexisting excavation and/or b)affected acres that will be graded for positive drainage where measures will be needed to prevent offsite sedimentation and sedimentation to onsite watercourses and wetlands. a) Internal Drainage Ac. b) Positive Drainage Ac. X $1,500.00 = $ 0.00 SUBTOTAL COST:$ 0.00 Inflation Factor: SUBTOTAL COST LIFE OF MINING OPERATION OR LIFE INFLATION COST OF LEASE(YEARS) 0.02 X $ 0.00 X = $ 0.00 Total Reclamation Bond Cost: ETOTALCLAMATION BOND COST= Martin Marietta Materials, Inc. has posted a $1,000,000 blanket bond. NOTE:The reclamation bond cannot exceed$1 million per GS 74-54 Revised September 21,2021 Page 114 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 SCHEDULE OF RECLAMATION COSTS Based upon range of$500-$5,000 per affected acre COMMODITY CODES: SG Sand and/or Gravel DS Dimension Stone PF Pyrophyllite CL Clay/Shale GS Gemstone FS Feldspar OL Olivine PE Peat Borrow Borrow/fill dirt MI Mica KY Kyanite/Sillimanite/Andalusite AU Gold CS Crushed Stone LI Lithium PH Phosphate TI Titanium OT Other F PE T1S PONDS STOCKPILES WASTE PILES P.AREARR. MINE EXCAVATION ,Borrow $500/ac.(L) $1800/ac. $20001ac. $1800/ac. $500/ac.(L) 1500(FI) 2000(PD) MI,LI, 500(L) 500(L) 1800 2000 20002500(PD) L,KY 1500(FI) 1000(L) 2000(L) PH 2500 5000 5000 2500(FI) 5000(PD) 1000(L) 2500 5000 5000 2000(L) CL 2500(FI) 3700(PD) 1000(L) 2000(L} PE,AU,TI,OT 2500(FI) 2540 3000 3500 5000(PD) (L)=Reclamation to a lake and revegetating side slopes (FI)=Reclamation by filling in and revegetating (PD)=Reclamation by grading for positive drainage&revegetating AS PER NCAC 15A 5B.0003,IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE BOND CALCULATION WORKSHEET,YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS FROM A THIRD-PARTY CONTRACTOR. SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO THE FOLLOWING ADDRESS: Mining Program,1612 Mail Service Center,Raleigh,North Carolina 27699-1612 ALL ESTIMATES MUST INCLUDE THE FOLLOWING,AS A MINIMUM: •FINAL GRADING COSTS PER ACRE •LIME AND FERTILIZER COSTS PER ACRE •YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE(FROM APPROVED REVEGETATION PLAN IN APPLICATIONIPERMIT DOCUMENT) •MULCH AND ANCHORING COSTS PER ACRE •ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED RECLAMATION PLAN FOR THE SITE IN QUESTION YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION. Revised September 21,2021 Page 115 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 F.NOTIFICATION OF ADJOINING LANDOWNERS The"Notice"form,or a facsimile thereof,attached to this application must be sent certified or registered mail,return receipt requested,to; (1)the chief administrative officer of each county and municipality in which any part of the permitted area is located as indicated on the mine map(s); (2)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s);and (3)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse,railroad track, or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on the mine map(s)."Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. The only exception to the above method of giving notice is if another means of notice is approved in advance by the Director, Division of Energy,Mineral,and Land Resources. A copy of a tax map(or other alternative acceptable to the Department)must be mailed with the completed"Notice"form(the proposed overall permit boundaries and the names and locations of all owners of record of lands adjoining said boundaries must be clearly denoted on the tax map). The"Affidavit of Notification"attached to this application must be completed,notarized and submitted to the Department,with the remainder of the completed application form before the application will be considered complete. NOTES: THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS AND ALL MODIFICATIONS OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA,AS REQUIRED BY NCGS 74-50(b1). SEE THE NEXT TWO PAGES FOR THE"NOTICE"FORM AND THE"AFFIDAVIT OF NOTIFICATION" Revised September 21,2021 Page 116 NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612 Division of Energy,Mineral,and Land Resources (919)707-9220 G.LAND ENTRY AGREEMENT We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably required in the administration of the Mining Act of 1971 pursuant to G.S.74-56. We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be reasonably necessary and to take whatever actions as may be reasonably necessary in order to cant'out reclamation which the operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59. LANDOWNER: APPLICANT: Signature Signature* Print Name Print Name Title(if applicable) Title Company(if applicable) Company Address Mine Name Telephone Telephone Date Signed Date Signed *Signature must be the same as the individual who signed Page 1 of this application. One original and five(5)copies of the completed application,six(6)c0les of all location maps,mine maps and reclamation maps,and the appropriate processing fee in the form a check or money order payable to the North Carolina Department of Environmental Quality must be sent to the Raleigh Central Office at the address listed on the front cover of this application form. Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220. Revised September 21,2021 Page 129 REFERENCES _ - - �� TOPOGRAPHIC DATA FROM USGS GARNER,NC QUAD DATED 2016. cem i J U \ r Eiji l l eHORSR5Epg0�! ,o Po (I L'r f 1 I ((( _ 41 m a APPROXIMATE g' �'� ,,NA ' �� (�� 6 sT PROPERTY D/ `\ - TORWALLE ��—`-- BOUNDARY w ,° ? ` B Ro ° 1 � F"GARNER C6, , S 1 - - 150 ti ADO Nycto p ------- �\ � NENTUCKY DR `� � � ' J i ti Pine Hurst 1AV Park ° y Aub z OL Y \1 N e o a D so A _ /AmothA1,,�t,..,.���}y�} - 8AlNBRIDGE CIR�, ( �l ��� r-+- " 1`�NIICIIU T 1 o I MINE PERMIT APPLICATION Ro� I I' ��� tiMBEa:DR E - -�� �1`� SITE VICINITY MAP �' \✓` .. HILLANDAIE UN x—a. i m e / _ "` \\/ ` 50- c _ QUARRY: GARNER .gam.. % �_; '..300 mxOra BY MBRON MARIEnA TAM ERUEs oc AULRIU sRMAVED.UNAUTHORIZED DUPUrnnoN IS PROHIBITED. FILENAME: GARNER.SITE.LOCATION.MAPB PNP MARCN 30 $AD !References `NCDOT County Maintenance Map Sheet No. 8 It aut ( ~(�•x lJl " alm� -_-�� \� O F l :Mt V. ya \ �y e ' 4 I y� , uu _ MM litt r \ au ." '• ] ^ 71 ,ems e� o.t. mean � ��'Mu �•• uu �` ' _ ��//' mn "~w� � V I , � sass -"--_/" ��,,,;� MM Y ���. '' (�• -'��, \ �^� � •� tea• n/ � r Arffv%Marietta �� - NCDOT COUNTY MAINTENANCE MAP Garner Quarry ,.•, �, Wake County, NC I s+>r+ suA•="•P e - - QUARRY: Garner Mird aEPT. 202 -Ii=3 BY MWIN MAMMA MAMIAM INC. ALL RIWN RESEAMD. UNAUINONI4D FlLE NAME: Gamer.Mine.Ma BMrucAnaN IS PRMIBIM. j°e2— 11 at 1 DocuSign Envelope ID:5E8ABC57-18F7-490B-960A-6476915E16BD sTn7E., ��ROY COOPER 1 D Governor �'� O ELIZABETH S.BISER a't o= Secretary `z a:.n"` RICHARD E.ROGERS,jR. NORTH CAROLINA Director Environmental Quality August 29`h, 2023 DWR Project 23-287 Wake County Martin Marietta Materials Inc. Attn:Thomas Brown 2235 Gateway Access Point, Raleigh, NC 27607 ADDRESS Subject: On-Site Determination for Applicability to the Neuse Buffer Rules (15A NCAC 02B.0714) Project Name: Garner Quarry Site Address/Location: 1111 E. Garner Road,Garner, NC 27529 Dear Mr. Brown: On August 25th, Kevin Fowler conducted an on-site review of features located on the subject property at the request of Martin Marietta Materials Inc.to determine the applicability of the above-noted state regulations.Thomas Brown with Marietta Materials Inc.was also present during the site visit. The Division of Water Resources has determined that streams listed in the table below and identified on the attached maps are shown on either the most recently published NRCS Soil Survey of Wake County and/or the USGS National Map at a scale that incorporates the National Hydrography Dataset High Resolution data at 1:24,000 scale. Streams that are listed as"Subject"on the below table have been located on the ground at the site and possess characteristics that qualify them to be at least intermittent streams in accordance with the NC Stream Identification Manual v.4.11 and therefore subject to the Neuse River Buffer Rules. Please be aware that features identified as"not subject'may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. Please also be aware that features not identified during this visit are Presumed to be buffered unless a stream determination has been completed within the oast five years stating otherwise. Feature Subject Depicted Depicted on ID E/I/P/Other to Buffer Start@ Stop@ on USGSTopo Rules Soil Survey A E No South Project Boundary North Project Yes No Boundary ro"D_E Q North Carolina Department ofEnvitonmental Quality I Division of Water Resources 512 North Salisbury Street 1 1611 Mail Service Center I Raleigh.North Carolina 27699-1611 _ J0041 919.707.9000 a,AY�lYawtieY DocuSign Envelope ID:5E8ABC57-18F7490B-960A-6476915E16BD DWR 23-287 Garner Quarry Wake County Page 2 of 3 Feature Subject Depicted Depicted on ID E/I/P/Other to Buffer start @ stop @ on USGS Topo Rules Soil Survey No B E No South Project Boundary Feature C Yes C E No South Project Boundary Feature A Yes No D E No South Project Boundary East Project Boundary Yes No E NP I No I N/A N/A Yes No E=Ephemeral,I=Intermittent, P=Perennial,NP=Not Present,N/A=Not Applicable This on-site determination shall expire five(5)years from the date of this letter. The owner(or future owners)should notify the Division(and other relevant agencies)of this decision in any future correspondences concerning this property. Landowners or affected parties that dispute this determination made by the Division may request a determination by the Director of Water Resources. This determination is final and binding,unless an appeal request is made within sixty(60)calendar days of the date of this letter to the Director in writing. If sending via U.S. Postal Service: If sending via delivery service(UPS, FedEx, etc.) Stephanie Goss-DWR 401& Buffer Stephanie Goss-DWR 401& Buffer Permitting Branch Supervisor Permitting Branch Supervisor 1617 Mail Service Center 512 N Salisbury St. Raleigh, NC 27699-1617 Raleigh, NC 27604 This letter only addresses the applicability of the stated regulations on the features identified on the subject property and/or within the proposed project area. This letter does not approve any activity within buffers or within waters of the state. There may be other regulated waters,streams or other features located on the property that do not appear on the maps or table referenced above. Any waters,streams,or other features on the site,including the features identified in this letter, may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. If you have any additional questions or require additional information, please contact Kevin Fowler at(919)437-0047 or kevin.fowler@deq.nc.gov.This determination is subject to review as provided in Articles 3&4 of G.S. 150B. Sincerely, CDocualpned by: Untnt SSa -e. Ikoun ut l B281aE8AB32144F... Vanessa Manuel DWR Raleigh Regional Office D rl NonhCamlinaDcpunmentofEnvimnmcntalQualily I MvisionofWaterResourees 512 North Salisbury Street 1 I611 Mail Service Center I Raleigh.North Carolina 27699-1611 tx>anmux�ws �' 919.707.9000 DocuSign Envelope ID:5E8ABC57-18F7-490B-960A-6476915E16BD DWR 23-287 Garner Quarry Wake County Page 3 of 3 Enclosures: USGS Topographical Map published NRCS Soil Survey Electronic cc: Laserfische DE Q�� North Carolina Department orEnvimnmentalQuality I Division orWatcrResoumes _ 512 Noah Salisbury Street 1 1611 Mail Service Center I Raleigh.North Carolina 27699-1611 919.707.9000 owm DocuSign Envelope ID:5E8ABC57-18F7490B-960A-6476915E16BD 23-287 Garner Quarry Wake Apr- Feature J 1 E Feature A a it m ;'� -,,- I Villrt Feature B OC Feature C _t• d T AryryB II ApC2 i I Ap 8 , S { ; ,,.FAito Map provided by NCDEQ c ✓n Legend: Zq$y Division of Water Resources -Approximate Site Boundary: ::Locations are approximate 3 y and are provided for refer- ence only:: DocuSign Envelope ID:5E8ABC57-18F7-490B-96OA-6476915E16BD 23-287 Garner Quarry Wake I -- 1 1 } jr e"'RarFo Map provided by NCDEQ rA Legend: Division of Water Resources � • -Approximate Site Boundary: ::Locations are approximate Y and are provided for refer- ence only::