HomeMy WebLinkAbout20230927_Application_92-01 Martin Phillip N.Pressley,PE
Marietta Sr.Environmental Engineer
September 27,2023
Mr.Adam Parr,Acting State Mining Engineer
Land Quality Section
NC DEQ Division of Energy, Mineral,and Land Resources
1612 Mail Service Center
Raleigh, NC 27699
SUBJECT: Martin Marietta Materials, Inc.—Garner Quarry
Mining Permit No.92-01
Request for Mining Permit Modification
Dear Mr. Parr:
Enclosed please find Martin Marietta's application to modify Mining Permit Number 95-01 for Garner
Quarry located in Wake County, North Carolina. The application will convert 15 acres of undisturbed
buffer to pit and remove the stormwater control measures the protected the buffer.
The buffered area was removed from the Future Pit area to resolve comment number five on the April
18,2018 request for additional information. Due to timing, Martin Marietta chose to voluntarily buffer
the area, instead of waiting on a stream call. We received the attached Neuse Buffer Determination,
dated August 29,2023 that indicates none of the streams in question are subject to the buffer rules. All
other changes are the result of updated mapping.
Enclosed for your review are:
• One(1) complete original mine permit application package with maps
• Five(5)copies of the application package
• A check for the$750 permit modification fee
If you have any questions please contact me at(919)783-4505 or via email at
phillip.pressley@martinmarietta.com.
Sincerely,
� 1 � RECEIVED
�J SEP 2 7 M
Phillip N. Pressley, PE L, i ,
Sr. Environmental Engineer MINING PR06tiNvi
Enclosures
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
NOTE: It is recommended that you contact the appropriate Regional Office or the Raleigh Central Office for a PRE-
APPLICATION MEETING to discuss your intentions and address any questions.
1. Name of Mine Garner Quarry
County Wake River Basin Neuse
Latitude(decimal degrees to four
places) 35.7056 N
Longitude(decimal degrees to four
places) 78.5753 W
2. Name of Applicant Martin Marietta Materials, Inc.
Applicant Contact Phillip Pressley Consultant Contact
Applicant Email phillip.pmssley®maMinmanetta.wm Consultant Email
Telephone (919) 783-4505 Telephone
Cell Phone Cell Phone
3 Permanent Address for Receipt of
Official Mail" P.O. Box 30013
Raleigh, NC 27622
4. Mine Office Address 1111 East Garner Road, Garner, NC 27529
5. Mine Manager Jason Gilmore
Mine Manager Email jason.gilmore@martinmarietta.com
Telephone (919) 714-8685 Cell Phone
I certify that all details contained in this permit application are true and correct to the best of our knovvledge.We
fully understand that any willfulmisrepresentation of facts will be cause for permit revocation.
Signature'" l—&,t,AXCrIan �/�{, �/ Date
Print Name Ronald M.Kopplin
Title President,East Division
'This will be the name that the mining permit will be issued to and the name that must be indicated on the reclamation bond tsecudtvl that
corresponds to this site.
"The Division of Energy,Mineral,and Land Resources must be noted of any changes in the permanent address or telephone number.
"'Signature of company officer required.
G.S.74-51 provides that the Department shall grant or deny an application for a permit within 60 days of receipt of a complete
application or,if a public hearing is held,within 30 days following the hearing and the filing of any supplemental information
required by the Department.All questions must be addressed,and all required maps provided before this application can
be considered complete.Attach additional sheets as needed.
Revised September 21, 2021 P a g e l
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
NOTE:All the following questions must be thoroughly answered regarding your mining operation for the intended
life of the mine.All responses must be clearly conveyed on a corresponding,detailed mine map.
A.GENERAL CHARACTERISTICS OF THE MINE
1. Answer all the following that apply:
F-1 This is an application for a NEW permit.
Indicate the total acreage at the site to be covered by the permit
(This is the acreage the new permit fee will be based upon.)
Of this acreage,how much is owned and how much is leased?
Acres owned: Acres leased:
Property owner if leased:
This is an application for a MODIFICATION to a mining permit.
Mining Permit Number: 92-01 Total permitted acreage: 407
Does the modification involve acreage within the previously approved permitted boundary?
RX YES F ]NO
If yes,indicate the acreage to be covered by this modification 17
Does the modification involve acreage outside the previously approved permitted boundary?
1-1 YES FX]NO
If yes,indicate the additional acreage to be covered by this modification
NOTE:You must complete all of Section F of this application form entitled Notification of Adjoining
Landowners
Of the acreage to be added to the permit,will any portion be affected(i.e.:disturbed,ground cover
removed by the mining operation?
YES 1-1 NO
If yes,indicate the acreage to be affected within the acreage to be added to the permit NIA
The modification fee is based upon the proposed new affected acreage within the previously
approved permitted boundary plus the proposed total acreage to be added outside the previously
approved permitted boundary.
F-1 This is an application for TRANSFER of a mining permit.
Mining Permit Number: Total permitted acreage:
Revised September 21,2021 Page 12
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
MINING FEE SCHEDULE
A nonrefundable permit application processing fee when filing for a new mining permit,permit modification,or transferred permit is
required as follows:
APPLICATION TYPE 0—25 ACRES 26+ACRES
New Permit Applications $3,750.00 $5,000.00
Permit Modifications $750.00 $1,000.00
Permit Transfers $100.00 $100.00
Annual Operating Fee $400.00 $400.00
Acres for new permits means the total acreage at the site to be covered by the permit Acres for modification of permits means the
new affected acres within the previously approved permitted boundary plus the proposed total acreage to be added outside the
previously approved permitted boundary.
2. Name of all materials mined: Granite
3. Mining Method:
Hydraulic Dredge 0 Front-end Loader&Truck QShovel&Truck
Dragline&Truck Self-loading Scraper Excavator&Truck
Other(please explain):
4. Expected maximum depth of mine(feet)500
Depth is relative to what benchmark?(e.g.,natural ground level,mean seal level,road elevation,etc.):
natural ground level
Expected average depth of mine(feet) 350
6. Has an area at this site been mined in the past?
YES X NO 1-1
If yes,when and by whom was this activity conducted? Martin Marietta Materials, Inc., Presently
6. Estimated life of the operation(years):50
NOTE:The Department may request clarification on how life of mine was calculated.
Revised September 21,2021 Page 3
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
B.MAPS
1. Clearly mark and label the location of your mining operation on six(6)copies of a 7.5-minute quadrangle and a county
highway map.These maps,in addition to six(6)copies of all mine maps and reclamation maps,must be submitted
with each permit application.
7.5-minute quadrangles may be obtained from the N.C.Geological Survey,
Mailing Address Physical Address
1612 Mail Service Center 512 N.Salisbury St.,5t'Floor
Raleigh,NC 27699-1612 Raleigh,NC 27604
Hffp:llportal.ncdenr.org/webArtgeological home (919)733-2423
County highway maps may be obtained from the N.C.Department of Transportation:
Mailing Address Physical Address
NCDOT GIS Unit NCDOT GIS Unit
1587 Mail Service Center 3401 Carl Sandburg Court
Raleigh,NC 27699-1587 Raleigh,NC 27610
http://www.ncdot.rgfit/gis (919)212-6000
2. A table/chart must be provided on the mine map that clearly lists the approximate acreage of tailings/sediment ponds,
stockpiles,waste piles,processing areas/haul roads,mine excavations and any other major aspect of the mining
operation that is proposed to be affected/disturbed during the life of the mining permit.A tablekhart similar to the
following will be acceptable:
AFFECTED ACREAGE TABLE:
For new permits,complete only the total affected acreage column.
For modifications,complete all columns.
CATEGORY CURRENT AFFECTED PROPOSED CHANGE TO TOTAL AFFECTED
ACREAGE AFFECTED ACREAGE ACREAGE
Tailings/Sediment Ponds 4.3 0 4
Stockpiles 14.0 0 14
Waste piles 81.1 2 83
Processing Areas/Haul Roads 63.9 0 64
Mine Excavations 184.2 15 199
Other(Please explain) 0 0 0
Total Affected Acreage 347.5 17 364
Total Permitted Acreage 407 0 407
Revised September 21,2021 P a g e 14
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
3. Mine maps must be accurate and appropriately scaled drawings,aerial photographs,or enlarged topographic maps of
the entire mine site.All aspects of the mine site must be clearly labeled on the maps along with their
corresponding(approximate)acreage.Thus,all mine and reclamation maps must denote those act!vMes that
are intended to be conducted during the life of the mining permit.All maps must be of a scale sufficient to clearly
illustrate the following,at a minimum:
a) Property lines of the tract or tracts of land on which the proposed mining activity is to be located including
easements and rights-of-way.
b) Existing or proposed permit boundaries with geographic controls(e.g.metes and bounds,coordinates)labeled
c) Initial and ultimate limits of clearing and grading
d) Outline and width of all buffer zones(both undisturbed and unexcavated)
e) Outline and acreage of all pits/excavations
f) Outline and acreage of all stockpile areas
g) Outline and acreage of all temporary and/or permanent overburden disposal areas
h) Location and acreage of all processing plants(may be described as to location and distance from mine if
sufficiently far removed)
i) Locations and names of all streams,rivers,and lakes
j) Outline and acreage of all settling and/or processing wastewater ponds
k) Outline and acreage of all planned and existing access roads and on-site haul roads
1) Location of planned and existing on-site buildings
m) Location and dimensions of all proposed sediment and erosion control measures
n) Location of 100-year floodplain limits and wetland boundaries
o) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit
boundary;if an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,
names of owners of record of tracts adjoining these tracts that are within 1,000 feet of the mining permit boundary
must be provided on the mine map.
p) Names of owners of record,both public and private,of all tracts of land that are adjoining the mining permit
boundary which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse,
railroad track,or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is
owned by the lessor of the mine tract,names of owners of record of tracts adjoining these tracts,that are within
1,000 feet of the mining permit boundary,must be provided on the mine map(s).NOTE:"Highway"means a road
that has four lanes of travel or less and is not designated as an Interstate Highway.
q) Map legend
1) Applicant name 5) Scale
2) Mine name 6) Symbols used and corresponding names
3) North arrow 7) Date prepared and revised
4) County 8) Name and title of person preparing map
Map scales should meet the following guidelines:
PERMITTED ACREAGE MAP SCALE
0—49 acres 1"=50'
50—199 acres 1"=100'
200+acres 1"=200'
NOTE:Smaller scaled maps may be acceptable if they clearly illustrate the above items.
NOTE:In addition to the above,the maps must also include any site-specific information that is provided in
the answers to the following questions(italicized questions/statements)in this application form.This
application will not be considered complete without all relevant items being adequately addressed on the mine
maps.
Revised September 21,2021 Page 5
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
C.PROTECTION OF NATURAL RESOURCES
1. Describe in detail the sequence of events for the development and operation of the mine and reference the sequence
to the mine map(s).Attach additional sheets as needed.
Pit development is typical for a mature granite quarry. Rock adjacent to the pit is
exposed via stripping of soil. The disturbed area is graded to drain to the pit or
other approved erosion control measures. The sequence of the existing pit,
stripped areas, and future pit is included on the enclosed mine map.
2. Describe specific erosion control measures to be installed prior to land disturbing activities and during mining to
prevent offsite sedimentation(include speck plans for sediment and erosion control for mine excavation(s),waste
piles,access/mine roads,and process areas),and give a detailed sequence of installation and schedule for
maintenance of the measures.Locate and label all sediment and erosion control measures on the mine maps)and
provide typical cross-sectionskonstruction details of each measure.Engineering designs and calculations are required
to justify the adequacy of any proposed measures.
Erosion control measures are shown on the attached mine map. Each of these
measures is designed to meet the criteria in the Division's Erosion and Sediment
Control Planning and Design Manual. Details for existing structures have been
previously submitted and approved. New erosion control measures included as
part of this modification are described and detailed in the supporting
documentation.
3. A)Will the operation involve wash in the material mined,recycling process water,or other wastewater handling?
ZYES NO
If yes,briefly describe all such processes including any chemicals to be used.
The mine discharges comingled stormwater and groundwater from the pit. The stormwater includes precipitation that fell
directly into the pit as well as runoff that drained into the pit. Both the stormwater and groundwater accumulate in a sump in
the bottom of the pit,which is pumped out as needed. The pump discharges into a clarification pond prior to leaving the site.
NC NPDES General Permit No.NCG020000 allows the use of chemical flocculants from a list of polymers approved by the
Division of Water Resources. One of these flocculants may be used periodically to maintain water quality.
All process water from washing of material is handled through a closed-loop recycle system of settling ponds.
B)Will the operation involve discharging fresh or wastewater from the mine or plant as a point discharge to the waters
of the State?
EYES FNO
If yes,briefly describe the nature of the discharge and locate all proposed discharge points(along with their method of
stabilization)on the mine map(s).
The site is permitted to discharge pit water, process water, and stormwater by
NC NPDES General Permit No. NCG020000 Certificate of Coverage No.
NCG020086. Mine dewatering wastewater is discharged to unnamed tributary
of Big Branch. Stormwater may be discharged from sediment basins shown on
the mine map.
Revised September 21,2021 Page 16
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
C)Will any part of the proposed mine excavation(s)extend below the water table?
FX-1YES ] NO
If yes,do you intend to dewater the excavation(s)?
FX-]YES F] NO
Estimated withdrawal rate in gallons per day: 1.75 MGD(2022 Annual Water Use Report)
If yes,what impact,if any,will mine dewatering have on neighboring wells?Locate all existing wells on the mine
map(s)that lie within 500 feet of the proposed excavation area.Provide data to support any conclusions or statement
made,including any monitoring well data,well construction data,and current water withdrawal rates.Indicate whether
the proposed mine locale is served by a public water system or private wells.
This site has not historically adversely affected offsite wells.All known well locations within 500 feet of the proposed excavation are
depicted on the site plan. The site is served by several wells,while the locale is served by a combination of the Town of Gamer's
public water system and private wells.
The pit sump accumulates stormwater runoff,precipitation,and groundwater seepage. The amount of groundwater in the pit
discharge is unknown. Most of the discharge is comprised of stormwater. No water is withdrawn from a stream,lake,or river.The pit
discharge is covered by NC NPDES General Permit No.NCG020000 Certificate of Coverage No.NCG020086. The estimated
withdrawal rate is the rate calculated as part of the annual withdrawal rate submitted to the Division of Water Resources.
D)If you answered yes to any of the above questions,provide evidence that you have applied for or obtained the
appropriate water quality permit(s)(i.e.,non-discharge,NPDES,Stormwater,etc.)from the Stormwater Program.In
addition,the applicant is required to register water use with the Division of Water Resources,Ground Water
Management Branch,if the operation withdraws more than 10,000 gallons per day and needs a capacity use permit
from the Division of Water Resources,Ground Water Management Branch,if the operation lies in a capacity use area
and withdraws more than 100,000 gallons per day.
The site is permitted to discharge stormwater, process water, and pit water by
NC NPDES General Permit No. NCG020000 Certificate of Coverage No.
NCG020086 and and registered with the Division of Water Resource's Water
Withdrawal Registration Program.
4. A)Will the operation involve crushing or any other air contaminant emissions?
AF
YES NO
If yes,indicate evidence that you have applied for or obtained an air quality permit issued by the Division of Air Quality
or local governing body.
The site is permitted to operate by Air Permit No. 04252R23 issued by the NC
Division of Air Quality.
B)How will dust from stockpiles,haul roads,etc.,be controlled?
Wet suppression is used to control plant emissions. Haul roads and stockpiles
are controlled by the use of a water truck equipped with powered rear spray and
front mounted water cannon.
Revised September 21,2021 Page 17
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
5. A)A buffer will be required between any mining activity and any mining permit boundary or right-of-way.It may be an
unexcavated buffer(no excavation,but roadways,berms,and erosion&sedimentation control measures may be
installed within it),an undisturbed buffer(no disturbance within the buffer whatsoever),or a combination of the two,
depending upon the site conditions.Note that all buffers must be located within the mining permit boundaries.
How wide a buffer will be maintained between any mining activity and any mining permit boundary or right-of-way at
this site?A minimum buffer of 25 feet is recommended,although a wider buffer may be needed depending on site
conditions.Show all buffer locations and widths on the mine map(s).
Buffer locations and widths are shown on the included mine map. A buffer of at
least 25 feet extends around the perimeter of the permitted area. Buffer widths
greater than 25 feet are shown on the enclosed mine map.
B)A minimum 50 foot wide undisturbed buffer will be required between any land disturbing activities within the mining
permit boundaries and any natural watercourses and wetlands unless smaller undisturbed buffers can be justified.
Depending on site conditions,a buffer wider than 50 feet may be needed.
How wide an undisturbed buffer will be maintained between any land disturbing activities within the mining permit
boundaries and any natural watercourses and wetlands at this site?Show all buffer locations and widths on the mine
map(s).
A buffer of 50 feet width will be maintained between all natural watercourses and
wetlands and any land disturbing activities, as shown on the mine map.
6. A)Describe methods to prevent landslide or slope instability adjacent to adjoining permit boundaries during mining.
Minimum 2 horizontal to 1 vertical slopes or flatter for clayey material and minimum 3 horizontal to 1 vertical slopes or
flatter for sandy material are generally required unless technical justification can be provided to allow steeper slopes.
As shown on the mine map, the mine excavation will not extend close enough to
the property boundaries to create a landslide boundary.
B)Provide a cross-section on the mine map(s)for all fill slopes(berms,waste piles,overburden disposal areas,etc.),
clearly indicating the intended side slope gradient,installation of any benches and/or slope drains(with supporting
design information)if needed,and the method of final stabilization.
Revised September 21,2021 Page 19
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
C)In excavation(s)of unconsolidated(non-rock)materials,specify the angle of all cut slopes including specifications
for benching and sloping.Cross sections for all cut slopes must be provided on the mine map(s).
Final excavation slopes of unconsolidated materials will be 2:1. Where the
height of a cut face warrants, a bench will be cut to slope toward the face of cut
and drain to the pit excavation. Cross-sections are shown on the detail sheet.
D)In hardrock excavations,specify proposed bench widths and heights in feet Provide crass-sections of the mine
excavation clearly noting the angles of the cut slopes,widths of all safety benches and mine benches,and the
expected maximum depth of the excavation.
Final excavation slopes of unconsolidated materials will be 2:1. Where the
height of a cut face warrants, a bench will be cut to slope toward the face of cut
and drain to the pit excavation. Cross-sections are shown on the detail sheet.
7. Describe other methods to be taken during mining to prevent physical hazard to any neighboring dwelling,house,
public road,or public,commercial or industrial building from any mine excavation.Locate all such structures on the
mine map if they are within 300 feet of any proposed excavation.
The mine excavation will not extend close enough to the property boundaries to cause any
physical damage to offsite buildings or roads. Quarry blasting is designed to prevent excessive
vibrations. Seismograph readings are recorded during each blasting shot. The shots are
typically scheduled,near mid-and will appear similar to distant thunder lasting under a second
from adjacent properties. Blasting typically occurs between one and three times a week.
Structures within 300 feet are shown on the mine map.
8. Describe what kind of barricade will be used to prevent inadvertent public access along any high wall area and when it
will be implemented.Vegetated earthen berms,appropriate fencing and adequate boulder barriers may be acceptable
high wall barricades.A construction detaiUcross-section and location of each type of barricade to be used must be
indicated on the mine map(s).
A boulder barrier or earthen berm will be used around the perimeter of high wall
areas. Barriers will be installed upon the completion of stripping activities.
9. Are acid roducing minerals or soils present?
YES a NO
If yes,how will acid water pollution from the excavation,stockpiles,and waste areas be controlled?
Revised September 21,2021 Page 19
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
10. A)Describe specific plans(including a schedule of implementation)for screening the operation from public view such
as maintaining or planting trees,bushes or other vegetation,building berms or other measures.Show the location of all
visual screening on the mine map(s)and provide cross-sections through all proposed berms or proposed spacing,
sizes and species for tree plantings.
Existing trees, terrain and berms effectively screen the mining operation from
nearby roads and homes.
B)Could the operation have a significantly adverse effect on the purposes of a publicly owned park,forest,or
recreation area?If so,how will such effects(i.e.,noise,visibility,etc.)be mitigated?
There are no publicly owned parks, forest or recreation areas adjacent to the
quarry.
11. will ex I sives be used?
X YES F]NO
If yes,specify the types of explosive(s)and describe what precaution(s)wiil be used to prevent physical hazard to
persons or neighboring property from flying rocks or excessive air blasts or ground vibrations.Depending on the mine's
location to nearby structures,more detailed technical information may be required on the blasting program(such as a
third-party blasting study).Locate the nearest offsite occupied structure(s)to the proposed excavation(s)on the mine
map and indicate its approximate distance to the proposed excavation.
Explosives will be utilized for rock extraction. The principal explosive material is ammonium nitrate,which is also commonly used
as a fertilizer. Blasting is conducted by a contractor. No explosives are stored onsite.
A shot pattern is used that minimizes air and ground vibrations and optimizes rock breakage. Energy released via an excess air
blast or ground vibrations is wasted energy. The intent is to make each blast as efficient as possible by reducing wasted energy.
Blasting is expected to occur between one and three times per week and will be appear similar to distant thunder lasting less than
a second.
Permanent records are maintained for each blasting event that include shot pattern,explosives loading,delays,time,and
weather.
12, will fuel tanks,solvents,or other chemical reagents be stored on-site?
AYES FINO
If yes,describe these materials,how they will be stored and method of containment in case of spill.Indicate the
location(s)of all storage facilities on the mine map(s).
Diesel fuel, bulk oil, used oil, and gasoline are stored in containers typical of
industrial operation that often include drums and steel tanks. Petroleum
products are stored in accordance with spill prevention, control, and
countermeasure (SPCC) regulations. An SPCC plan is maintained for the site.
Solvents are handled by a third-party contractor (e.g., Noble Oil).
Revised September 21,2021 Page 110
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
D.RECLAMATION PLAN
1. Describe your intended plan for the final reclamation and subsequent use of all affected lands and indicate the
sequence and general methods to be used in reclaiming this land.This must include the method of reclamation of
settling ponds and/or sediment control basins and the method of restoration or establishment of any permanent
drainage channels to a condition minimizing erosion,siltation and other pollution. This information must be illustrated
on a reclamation map and must correspond directly with the information provided on the mine map(s).In addition,
design information,including typical cross-sections,of any permanent channels to be constructed as part of the
reclamation plan and the location(s)of all permanent channels must be indicated on the reclamation map.
Disturbed areas will be vegetated in accordance with the enclosed seeding
schedule. The excavation itself will be allowed to fill with groundwater and may
potentially be used for water storage, recreation, or a wildlife sanctuary.
2. Is an excavated or impounded body of water to be left as part of the reclamation?
FX-1YES F ]NO
If yes,illustrate the location of the body(s)of water on the reclamation map and provide a scaled cross-sections)
through the proposed body(s)of water.The minimum water depth must be at least 4 feet,measured from the normal
low water table elevation,unless information is provided to indicate that a shallower water body will be productive and
beneficial at this site.
Will the body(s)of water be stocked with fish?
YES FXINO
If yes,specify species.
3. Describe provisions for safety to persons and to adjoining property in all completed excavations in rock including what
kind of permanent barricade will be left.Acceptable permanent barricades are appropriate fencing,large boulders
placed end-to-end,etc.Construction details and locations of all permanent barricades must be shown on the
reclamation map.
A perimeter fence will be placed around all areas where slopes to the waters
edge are unable to be safely traversed.
Revised September 21,2021 Page 111
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
4. Indicate the method(s)of reclamation of overburden,refuse,spoil banks or other such on-site mine waste areas,
including specifications for benching and sloping.Final cross sections and locations for such areas must be provided
on the reclamation map.
Overburden will be used to construct berms for visual screening. The berms will be vegetated and included
within the final reclamation area.
Overburden piles,refuse,spoil banks,and other mine waste areas existing at final reclamation will be graded and
compacted to slopes no steeper than 2:1 and vegetated in accordance with the enclosed seeding schedule. The
areas will be graded to prevent pooling,stagnation of water,and manage stormwater runoff. Existing overburden
pile that are adequately stabilized and vegetated will remain without additional disturbance.
5. A)Describe reclamation of processing facilities,stockpile areas,and on-site roadways.
The processing plant and stockpiles will be removed from the site. The plant and stockpile
areas will be graded, scarified, and revegetated in accordance with the attached seeding
schedule. Stabilized onsite roadways will be left to vegetate naturally. All other roadways
will be graded, scarified, and vegetated.
Erosion control measures necessary for final reclamation will be properly maintained.
B)Will any on-site roadways be left as part of the reclamation?
FX_�YES FINO
If yes,identify such roadways on the reclamation map and provide details on permanent road and ditch line
stabilization.
6. Describe the method of control of contaminants and disposal of scrap metal,junk machinery,cables,or other such
waste products of mining.(Note definition of refuse in The Mining Act of 1971.)
No off-site generated waste shall be disposed of on the mine site without prior written approval from the NC
Department of Environmental Quality,Division of Energy,Mineral,and Land Resources and either the Division
of Waste Management(DWM)or local governing body.If a disposal permit has been issued by DWM for the
site,a copy of said permit must be attached to this applicatlon.All temporary and permanent refuse disposal
areas must be clearly delineated on the mine map(s)and reclamation map,along with a list of items to be disposed in
said areas.
Onsite equipment will be placed in a designated area for eventual disposal
off-site by private disposal firms. Items such as drill steel, conveyor belting,
screen cloth, and cable will be disposed of in accordance with local, state, and
federal regulations.
Revised September 21,2021 Page 112
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
7. Describe your plan for revegetation or other surface treatment of the affected areas.This plan must include
recommendations for year-round seeding,including the time of seeding and the amount and type of seed,fertilizer,
lime and mulch per acre.The recommendations must include general seeding instructions for both permanent and
temporary revegetation.Revegetation utilizing only tree plantings is not acceptable.Recommendations can be sought
from:
a. Authorized representatives of the local Soil and Water Conservation District;
b. Authorized representatives of the NC Forest Service,Department of Agriculture and Consumer Services;
c. Authorized county representatives of the North Carolina Cooperative Extension Service,specialists and
research faculty with the Colleges of Agriculture and Life Sciences and Forest Resources at North Carolina
State University;
d. North Carolina licensed landscape architects;
e. Private consulting foresters referred by the NC Forest Service,Department of Agriculture and Consumer
Services;
f. N.C.Erosion and Sedimentation Control Planning and Design Manual;
g. N.C.Surface Mining Manual:A Guide for Permitting,Operation and Reclamation;
h. Others as may be approved by the Department.
Lime Rate of Application(tons/acre): Please See Detail Sheet
Fertilizer Analysis and Rate of Application(lbs/acre):
Seed type(s)and rate(s)of application included year-round seeding schedule(lbs/acre):
NOTE:Include legumes
SEED TYPES SEEDING DATES SEEDING RATES
Mulch Type,Rate of Application(lbs/acre),and Method of Anchoring:
Other Vegetative Cover(s)Type(s)and Rate(s)of Application Including Seeding Schedule(lbstacre,trees/
acre,spacing of trees/shrubs,etc.):
Revegetation and/or reforestation plan approved by:
Signature Date
Print Name Phillip N.Pressley,PE
Title Senior Environmental Engineer
Agency Martin Marietta Materials,Inc.
Revised September 21,2021 Page 113
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
E.DETERMINATION OF AFFECTED ACREAGE AND BOND
The following bond calculation worksheet is to be used to establish an appropriate bond(based upon a range of$500 to$5,000
per affected acre)for each permitted mine site based upon the acreage approved by the Department to be affected during the
life of the mining permit Please insert the approximate acreage for each aspect of the mining operation,that you intend to affect
during the life of this mining permit(in addifion please insert the appropriate reclamation cosf/acre for each category from the
Schedule of Reclamation Costs provided with this application form)OR you can defer to the Department to calculate your bond
for you based upon your maps and standard reclamation costs:
CATEGORY AFFECTED RECLAMATION RECLAMATION
ACREAGE COST/ACRE COST
Tailings/Sediment Ponds Ac. X $ /Ac. = $ 0.00
Stockpiles Ac. X $ /Ac. = $ 0.00
Waste Piles Ac. X $ /Ac. = $ 0.00
Processing Area/Haul Roads Ac. X $ /Ac. = $ 0.00
Mine Excavation Ac. X $ /Ac. = $ 0.00
Other Ac. X $ /Ac. = $ 0.00
TOTAL AFFECTED AC.: 0.00 Ac.
TOTAL PERMITTED AC.: Ac.
Temporary&Permanent Sedimentation&Erosion Control Measures:
Divide the TOTAL AFFECTED AC.above into the following two categories:a)affected acres that drain into proposedlexisting
excavation and/or b)affected acres that will be graded for positive drainage where measures will be needed to prevent offsite
sedimentation and sedimentation to onsite watercourses and wetlands.
a) Internal Drainage Ac.
b) Positive Drainage Ac. X $1,500.00 = $ 0.00
SUBTOTAL COST:$ 0.00
Inflation Factor:
SUBTOTAL COST LIFE OF MINING OPERATION OR LIFE INFLATION COST
OF LEASE(YEARS)
0.02 X $ 0.00 X = $ 0.00
Total Reclamation Bond Cost:
ETOTALCLAMATION BOND COST= Martin Marietta Materials, Inc. has posted a
$1,000,000 blanket bond.
NOTE:The reclamation bond cannot exceed$1 million per GS 74-54
Revised September 21,2021 Page 114
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
SCHEDULE OF RECLAMATION COSTS
Based upon range of$500-$5,000 per affected acre
COMMODITY CODES:
SG Sand and/or Gravel DS Dimension Stone PF Pyrophyllite CL Clay/Shale
GS Gemstone FS Feldspar OL Olivine PE Peat
Borrow Borrow/fill dirt MI Mica KY Kyanite/Sillimanite/Andalusite AU Gold
CS Crushed Stone LI Lithium PH Phosphate TI Titanium
OT Other
F
PE T1S PONDS STOCKPILES WASTE PILES P.AREARR. MINE EXCAVATION
,Borrow $500/ac.(L) $1800/ac. $20001ac. $1800/ac. $500/ac.(L)
1500(FI) 2000(PD)
MI,LI, 500(L) 500(L)
1800 2000 20002500(PD)
L,KY 1500(FI)
1000(L) 2000(L)
PH 2500 5000 5000 2500(FI) 5000(PD)
1000(L) 2500 5000 5000 2000(L)
CL 2500(FI) 3700(PD)
1000(L) 2000(L}
PE,AU,TI,OT 2500(FI) 2540 3000 3500 5000(PD)
(L)=Reclamation to a lake and revegetating side slopes
(FI)=Reclamation by filling in and revegetating
(PD)=Reclamation by grading for positive drainage&revegetating
AS PER NCAC 15A 5B.0003,IF YOU DISAGREE WITH THE BOND AMOUNT DETERMINED BY THE BOND CALCULATION
WORKSHEET,YOU MAY SUBMIT AN ESTIMATE OF RECLAMATION COSTS FROM A THIRD-PARTY CONTRACTOR.
SAID ESTIMATE MUST BE PROVIDED WITHIN 30 DAYS TO THE FOLLOWING ADDRESS: Mining Program,1612 Mail
Service Center,Raleigh,North Carolina 27699-1612
ALL ESTIMATES MUST INCLUDE THE FOLLOWING,AS A MINIMUM:
•FINAL GRADING COSTS PER ACRE
•LIME AND FERTILIZER COSTS PER ACRE
•YEAR-ROUND SEEDING MIXTURE COSTS PER ACRE(FROM APPROVED REVEGETATION PLAN IN
APPLICATIONIPERMIT DOCUMENT)
•MULCH AND ANCHORING COSTS PER ACRE
•ANY OTHER RECLAMATION COSTS NECESSARY TO COMPLY WITH THE APPROVED RECLAMATION PLAN
FOR THE SITE IN QUESTION
YOU WILL BE NOTIFIED AS SOON AS POSSIBLE OF THE DIRECTOR'S FINAL BOND DETERMINATION.
Revised September 21,2021 Page 115
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
F.NOTIFICATION OF ADJOINING LANDOWNERS
The"Notice"form,or a facsimile thereof,attached to this application must be sent certified or registered mail,return receipt
requested,to;
(1)the chief administrative officer of each county and municipality in which any part of the permitted area is located as
indicated on the mine map(s);
(2)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary;if an
adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,all owners of record of
tracts adjoining these tracts must be notified(that are within 1,000 feet of the mining permit boundary)as indicated on
the mine map(s);and
(3)all owners of record,both public and private,of all tracts of land that are adjoining the mining permit boundary
which lie directly across and are contiguous to any highway,creek,stream,river,or other watercourse,railroad track,
or utility or other public right-of-way.If an adjoining tract is owned or leased by the applicant or is owned by the lessor
of the mine tract,all owners of record of tracts adjoining these tracts must be notified(that are within 1,000 feet of the
mining permit boundary)as indicated on the mine map(s)."Highway"means a road that has four lanes of travel or less
and is not designated as an Interstate Highway.
The only exception to the above method of giving notice is if another means of notice is approved in advance by the Director,
Division of Energy,Mineral,and Land Resources.
A copy of a tax map(or other alternative acceptable to the Department)must be mailed with the completed"Notice"form(the
proposed overall permit boundaries and the names and locations of all owners of record of lands adjoining said
boundaries must be clearly denoted on the tax map).
The"Affidavit of Notification"attached to this application must be completed,notarized and submitted to the Department,with the
remainder of the completed application form before the application will be considered complete.
NOTES:
THIS SECTION MUST BE COMPLETED FOR ALL APPLICATIONS FOR NEW MINING PERMITS AND ALL MODIFICATIONS
OF A MINING PERMIT TO ADD LAND TO THE PERMITTED AREA,AS REQUIRED BY NCGS 74-50(b1).
SEE THE NEXT TWO PAGES FOR THE"NOTICE"FORM AND THE"AFFIDAVIT OF NOTIFICATION"
Revised September 21,2021 Page 116
NORTH CAROLINA MINING State of North Carolina 1612 Mail Service Center
PERMIT APPLICATION Department of Environmental Quality Raleigh,NC 27699-1612
Division of Energy,Mineral,and Land Resources (919)707-9220
G.LAND ENTRY AGREEMENT
We hereby grant to the Department or its appointed representatives the right of entry and travel upon our lands or operation
during regular business hours for the purpose of making necessary field inspections or investigations as may be reasonably
required in the administration of the Mining Act of 1971 pursuant to G.S.74-56.
We further grant to the Department or its appointed representatives the right to make whatever entries on the land as may be
reasonably necessary and to take whatever actions as may be reasonably necessary in order to cant'out reclamation which the
operator has failed to complete in the event a bond forfeiture is ordered pursuant to G.S.74-59.
LANDOWNER: APPLICANT:
Signature Signature*
Print Name Print Name
Title(if applicable) Title
Company(if applicable) Company
Address Mine Name
Telephone
Telephone Date Signed
Date Signed
*Signature must be the same as the individual who signed Page 1 of this application.
One original and five(5)copies of the completed application,six(6)c0les of all location maps,mine maps and
reclamation maps,and the appropriate processing fee in the form a check or money order payable to the North Carolina
Department of Environmental Quality must be sent to the Raleigh Central Office at the address listed on the front cover
of this application form.
Inquiries regarding the status of the review of this application should be directed to the Mining Program staff at(919)707-9220.
Revised September 21,2021 Page 129
REFERENCES _ - -
�� TOPOGRAPHIC DATA FROM USGS GARNER,NC QUAD
DATED 2016.
cem
i J
U \ r
Eiji l l
eHORSR5Epg0�!
,o
Po (I L'r
f
1 I
((( _
41
m
a
APPROXIMATE
g' �'� ,,NA '
�� (�� 6 sT PROPERTY
D/
`\ - TORWALLE ��—`--
BOUNDARY w ,° ? ` B Ro °
1 �
F"GARNER C6, , S 1 -
- 150 ti
ADO
Nycto p -------
�\
� NENTUCKY DR `� � �
'
J i ti Pine Hurst
1AV Park ° y Aub z
OL Y \1 N
e o a
D
so A _ /AmothA1,,�t,..,.���}y�}
- 8AlNBRIDGE CIR�, ( �l ��� r-+- " 1`�NIICIIU
T
1
o
I
MINE PERMIT APPLICATION
Ro� I I' ��� tiMBEa:DR E - -�� �1`� SITE VICINITY MAP
�' \✓` .. HILLANDAIE UN x—a. i m e
/ _ "` \\/ ` 50- c _ QUARRY: GARNER
.gam.. % �_; '..300 mxOra BY MBRON MARIEnA TAM ERUEs oc AULRIU sRMAVED.UNAUTHORIZED DUPUrnnoN IS PROHIBITED. FILENAME: GARNER.SITE.LOCATION.MAPB PNP MARCN 30
$AD
!References
`NCDOT County Maintenance Map
Sheet No. 8
It
aut ( ~(�•x lJl " alm� -_-�� \� O F
l :Mt
V.
ya \
�y e ' 4
I y�
, uu _ MM litt r \ au ." '• ] ^ 71 ,ems
e� o.t.
mean � ��'Mu �•• uu �` ' _ ��//' mn "~w� � V I , � sass
-"--_/" ��,,,;� MM Y ���. '' (�• -'��, \ �^� � •� tea• n/
� r
Arffv%Marietta
�� -
NCDOT COUNTY MAINTENANCE MAP
Garner Quarry
,.•, �, Wake County, NC
I
s+>r+ suA•="•P e - - QUARRY: Garner
Mird aEPT. 202
-Ii=3 BY MWIN MAMMA MAMIAM INC. ALL RIWN RESEAMD. UNAUINONI4D FlLE NAME: Gamer.Mine.Ma
BMrucAnaN IS PRMIBIM. j°e2— 11 at 1
DocuSign Envelope ID:5E8ABC57-18F7-490B-960A-6476915E16BD
sTn7E.,
��ROY COOPER 1 D
Governor �'� O
ELIZABETH S.BISER
a't
o=
Secretary `z a:.n"`
RICHARD E.ROGERS,jR. NORTH CAROLINA
Director Environmental Quality
August 29`h, 2023
DWR Project 23-287
Wake County
Martin Marietta Materials Inc.
Attn:Thomas Brown
2235 Gateway Access Point, Raleigh, NC 27607
ADDRESS
Subject: On-Site Determination for Applicability to the Neuse Buffer Rules (15A NCAC 02B.0714)
Project Name: Garner Quarry
Site Address/Location: 1111 E. Garner Road,Garner, NC 27529
Dear Mr. Brown:
On August 25th, Kevin Fowler conducted an on-site review of features located on the subject property
at the request of Martin Marietta Materials Inc.to determine the applicability of the above-noted state
regulations.Thomas Brown with Marietta Materials Inc.was also present during the site visit.
The Division of Water Resources has determined that streams listed in the table below and identified on
the attached maps are shown on either the most recently published NRCS Soil Survey of Wake County
and/or the USGS National Map at a scale that incorporates the National Hydrography Dataset High
Resolution data at 1:24,000 scale. Streams that are listed as"Subject"on the below table have been
located on the ground at the site and possess characteristics that qualify them to be at least intermittent
streams in accordance with the NC Stream Identification Manual v.4.11 and therefore subject to the
Neuse River Buffer Rules. Please be aware that features identified as"not subject'may be considered
jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. Please
also be aware that features not identified during this visit are Presumed to be buffered unless a
stream determination has been completed within the oast five years stating otherwise.
Feature Subject Depicted Depicted on
ID E/I/P/Other to Buffer Start@ Stop@ on USGSTopo
Rules Soil Survey
A E No South Project Boundary North Project Yes No
Boundary
ro"D_E Q North Carolina Department ofEnvitonmental Quality I Division of Water Resources
512 North Salisbury Street 1 1611 Mail Service Center I Raleigh.North Carolina 27699-1611
_ J0041
919.707.9000
a,AY�lYawtieY
DocuSign Envelope ID:5E8ABC57-18F7490B-960A-6476915E16BD
DWR 23-287
Garner Quarry
Wake County
Page 2 of 3
Feature Subject Depicted Depicted on
ID E/I/P/Other to Buffer start @ stop @ on USGS Topo
Rules Soil Survey
No
B E No South Project Boundary Feature C Yes
C E No South Project Boundary Feature A Yes No
D E No South Project Boundary East Project Boundary Yes No
E NP I No I N/A N/A Yes No
E=Ephemeral,I=Intermittent, P=Perennial,NP=Not Present,N/A=Not Applicable
This on-site determination shall expire five(5)years from the date of this letter. The owner(or future
owners)should notify the Division(and other relevant agencies)of this decision in any future
correspondences concerning this property. Landowners or affected parties that dispute this
determination made by the Division may request a determination by the Director of Water Resources.
This determination is final and binding,unless an appeal request is made within sixty(60)calendar
days of the date of this letter to the Director in writing.
If sending via U.S. Postal Service: If sending via delivery service(UPS, FedEx, etc.)
Stephanie Goss-DWR 401& Buffer Stephanie Goss-DWR 401& Buffer
Permitting Branch Supervisor Permitting Branch Supervisor
1617 Mail Service Center 512 N Salisbury St.
Raleigh, NC 27699-1617 Raleigh, NC 27604
This letter only addresses the applicability of the stated regulations on the features identified on the
subject property and/or within the proposed project area. This letter does not approve any activity
within buffers or within waters of the state. There may be other regulated waters,streams or other
features located on the property that do not appear on the maps or table referenced above. Any
waters,streams,or other features on the site,including the features identified in this letter, may be
considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water
Act. If you have any additional questions or require additional information, please contact Kevin Fowler
at(919)437-0047 or kevin.fowler@deq.nc.gov.This determination is subject to review as provided in
Articles 3&4 of G.S. 150B.
Sincerely,
CDocualpned by:
Untnt SSa -e. Ikoun ut l
B281aE8AB32144F...
Vanessa Manuel
DWR Raleigh Regional Office
D rl NonhCamlinaDcpunmentofEnvimnmcntalQualily I MvisionofWaterResourees
512 North Salisbury Street 1 I611 Mail Service Center I Raleigh.North Carolina 27699-1611
tx>anmux�ws �'
919.707.9000
DocuSign Envelope ID:5E8ABC57-18F7-490B-960A-6476915E16BD
DWR 23-287
Garner Quarry
Wake County
Page 3 of 3
Enclosures: USGS Topographical Map
published NRCS Soil Survey
Electronic cc: Laserfische
DE Q�� North Carolina Department orEnvimnmentalQuality I Division orWatcrResoumes
_
512 Noah Salisbury Street 1 1611 Mail Service Center I Raleigh.North Carolina 27699-1611
919.707.9000
owm
DocuSign Envelope ID:5E8ABC57-18F7490B-960A-6476915E16BD
23-287
Garner Quarry
Wake
Apr-
Feature
J
1
E
Feature A
a
it
m ;'� -,,-
I
Villrt
Feature B OC
Feature C _t•
d T
AryryB II
ApC2 i
I Ap 8 ,
S { ;
,,.FAito Map provided by NCDEQ
c ✓n
Legend: Zq$y Division of Water Resources
-Approximate Site Boundary: ::Locations are approximate
3 y and are provided for refer-
ence only::
DocuSign Envelope ID:5E8ABC57-18F7-490B-96OA-6476915E16BD
23-287
Garner Quarry
Wake
I --
1
1
}
jr
e"'RarFo Map provided by NCDEQ
rA Legend: Division of Water Resources
� •
-Approximate Site Boundary: ::Locations are approximate
Y and are provided for refer-
ence only::