Loading...
HomeMy WebLinkAbout20230614_ADI_67-84 �diHESTAT-Q, ROY COOPER Governor ? i' - r ELIZABETH S.BISER Secretary Q AM VIOL DOUGLAS R.ANSEL NORTH CAROLINA Interim Director Environmental Quality June 14, 2023 Certified Mail Return Receipt Requested 7022 0410 0003 1130 6819 Rick Williford Sunland Sand and Gravel, Inc. PO Box 1505 Swansboro,NC 28584 RE: Firetower Road Sand Mine Onslow County White Oak River Basin Dear Mr. Williford: We have reviewed the application your company submitted for the referenced mine site. In order for this office to complete its review of the referenced project in accordance with N.C.G.S. §74-50 and§74-51 of the Mining Act of 1971,please provide the additional or revised information in accordance with the following comments: 1. Please provide proof, such as copy of the signed return receipts from certified mail, that all adjoining landowners and chief administrative officer of each county and municipality have been properly notified. Please provide proof of notice for Julie Willaford and Donald Gene Riggs. 2. Please clearly indicate and label on the mine map the names of owners of record, both public and private,of all tracts of land that are adjoining the mining permit boundary which lie directly across and are contiguous to any highway, creek, stream, river, or other watercourse, railroad track, or utility or other public right-of-way. If an adjoining tract is owned or leased by the applicant or is owned by the lessor of the mine tract,names of owners of record of tracts adjoining these tracts,that are within 1,000 feet of the mining permit boundary, must be provided on the mine map(s).NOTE: "Highway"means a road that has four lanes of travel or less and is not designated as an Interstate Highway. Please label the properties for Julie Willaford and Donald Gene Riggs. 3. The existing wetlands crossing that has been used for timber and agriculture use will need to be improved for mining or haul truck access. Please provide additional details including construction and maintenance details for the wetlands crossing. 4. The response in the last letter stated that the USACE has not yet reviewed the delineation. Once the delineation has been reviewed and please provide correspondence or a Jurisdictional Determination (JD) from the USACE. 5. Please provide the pump size for pumping water to the basin. 6. You stated in your last response that the 30x60 basin is not an Erosion Control Structure,but rather a dewatering structure to control the flow at the discharge point. Please clarify if there will be another pond onsite to collect stormwater and groundwater to allow sediment to settle before pumping to the settling basin. Please clarify if there will be pit to pit pumping utilized as part of the dewatering method. D E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh,North Carolina 27699-1612 NORTH CAROLINA - oaae�.mai Environmental Quality /`� 919.707.9200 Certified Mail 7022 0410 0003 1130 6819 Mr. Williford Page 2 In order to complete the processing of your application,please forward two(2)copies of the requested information to my attention at the following address: Division of Energy,Mineral and Land Resources Department of Environmental Quality 1612 Mail Service Center Raleigh,NC 27699-1612 If hand delivering or delivering by shipping company(e.g.,FedEx,UPS),please deliver to our physical address: Division of Energy,Mineral,and Land Resources Department of Environmental Quality 512 N. Salisbury Street, 5th Floor Raleigh,NC 27604 As required by 15A NCAC 5B.0113,you are hereby advised that you have 180 days from the date of your receipt of this letter to submit all of the requested information. If you are unable to meet this deadline and wish to request additional time,you must submit information,in writing,to the Director clearly indicating why the deadline cannot be met and request that an extension of time be granted. If an extension of time is not granted, a decision will be made to grant or deny the mining permit based upon the information currently in the Department's files at the end of the 180-day period. Though the preceding statement cites the maximum time limit for your response,we encourage you to provide the additional information requested by this letter as soon as possible. Your prompt response will help us to complete the processing of your application sooner. Please contact me at(919) 707-9220 if you have any questions. Sincerely, Adam Parr, PE Assistant State Mining Engineer cc: Mr. Dan Sams,PE