Loading...
HomeMy WebLinkAboutYADKI-044 Final Report DAM HYDRAULIC CAPACITY ASSESSMENT REPORT (DRAFT) DAVIS DAM YADKI-044 YADKIN COUNTY, NC PREPARED BY: HDR Engineering Inc. of the Carolinas 2020 EXECUTIVE SUMMARY A hydraulic capacity analysis was completed for the Davis Dam in Yadkin County, North Carolina. The purpose of the study was to analyze the existing potential of the dam for overtopping during predetermined specified rainfall events using the North Carolina Dam Safety defined process and templates. The analyses were completed using the United States Army Corps of Engineers developed software Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) in combination with Arc-GIS to develop required input parameters. The rainfall events included in the analyses consist of 24-hour durations with return periods of 25 years, 50 years, 100 years, 200 years, 500 years and 1000 years. Results of the analyses indicate that this structure is not hydraulically adequate for 25 years, 50 years, 100 years, 200 years, 500 years, and 1000 years rainfall events. Data, input parameters, and final results can be found on the attached summary sheets and in the appendices of this report as well as in the associated electronic file in which all program files are stored. Drainage Area (Sq. Mi.)= Curve Number = Lag Time (min.)= Rainfall Distribution Methods = 518.6 418.5 434.3 450.4 466.9 483.8 501.0 795.9 796.4 796.9 797.4 797.9 ELEVATION 793.4 793.9 794.4 794.9 795.4 36.7 42.8 49.0 STORAGE (ACRE-FT) 0.0 4.8 9.6 14.5 19.6 25.1 30.8 777.4 774.4 774.9 775.4 775.9 776.4 776.9 772.9 NA ELEVATION 772.9 773.4 773.9 STORAGE (ACRE-FT) 373.2 387.9 403.0 72.91 29 SCS Type 2 SPILLWAY Primary Auxiliary TYPE Riser / Barrel NA ELEVATION 24 HOUR - 100 YEAR EVENT, 7.61 INCHES, ELEVATION 777.6 (1 FT OVER-TOPPED) 24 HOUR - 50 YEAR EVENT, 6.79 INCHES, ELEVATION 777.3 (0.7 FT OVER-TOPPED) 24 HOUR - 25 YEAR EVENT, 5.99 INCHES, ELEVATION 776.8 (0.2 FT OVER-TOPPED) TOP OF DAM ELEVATION = 776.6 SUMMARY OF INPUT PARAMETERS 0.41 SUMMARY SHEET OF HYDRAULIC CAPACITY RESULTS DAVIS DAM, YADKI-044 ANALYSIS PERFORMED BY: S. MURPHY, HDR 24 HOUR - 1000 YEAR EVENT, 10.6 INCHES, ELEVATION 778.5 (1.9 FT OVER-TOPPED) 24 HOUR - 500 YEAR EVENT, 9.65 INCHES, ELEVATION 778.3 (1.7 FT OVER-TOPPED) 24 HOUR - 200 YEAR EVENT, 8.46 INCHES, ELEVATION 777.9 (1.3 FT OVER-TOPPED) YADKI-044DAVIS DAM DECEMBER 3, 2020 1232.9 NOT TO SCALE 1059.2 1087.0 1115.2 1143.9 1173.1 1202.8 901.8 926.9 952.5 978.5 1004.9 1031.8 759.8 782.4 805.5 828.9 852.8 877.1 632.3 652.6 673.2 694.3 715.7 737.5 536.6 554.9 573.6 592.8 612.3 810.9 811.4 811.9 812.4 812.9 807.9 808.4 808.9 809.4 809.9 810.4 804.9 805.4 805.9 806.4 806.9 807.4 801.9 802.4 802.9 803.4 803.9 804.4 798.9 799.4 799.9 800.4 800.9 801.4 798.4 317.3 330.8 344.6 358.7 242.9 254.5 266.4 278.6 291.2 304.1 178.8 188.9 199.2 209.7 220.5 231.5 123.5 132.1 141.0 150.1 159.4 169.0 76.1 83.4 91.0 98.8 106.8 115.0 55.5 62.1 69.0 792.4 792.9 789.4 789.9 790.4 790.9 791.4 791.9 786.4 786.9 787.4 787.9 788.4 788.9 783.4 783.9 784.4 784.9 785.4 785.9 780.4 780.9 781.4 781.9 782.4 782.9 777.9 778.4 778.9 779.4 779.9 YADKI-044DAVIS DAM DECEMBER 3, 2020 APPENDIX A Watershed Boundary Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P,NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea,Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and theGIS User Community Davis Dam - YADKI-044 - Watershed Boundary Legend Longest FlowPath Watershed Bound ary 0 0.25 0.50.125 Miles Date: 10 /5/2020 /Drainage Area: 0.41 Square MilesFlowpath Length: 1.1 miles APPENDIX B Lag Time Calculation Dam No:YADKI-044 Date:10/26/2020 Dam Name:Davis Dam Engineer:K. Trefzger Maximum Potential Retention (inches):S =(1000/cn')-10 Time of Concentration (hours):Tc =l0.8*(S+1)0.7 1140*Y0.5 Basin Data:Input Values in yellow Curve Number CN =72.9067 from NRCS CN Calculation S =3.71616 in. Mean Basin Slope Y =10.6581 %from Watershed Mean slope Longest Flowpath:1.08 mi.from Watershed Longest flowpath Flow Length l =5702.4 ft. Time of Concentration Tc =0.80 Hours Tc =48 mins Lag Time TL =0.48 Hours TL =29 mins APPENDIX C NRCS Curve Number Summary Sheet Change CN according to TR-55 (see tables below) NLCD (2016) Landuse TR-55 Landuse HSG A (sq. ft.)CN HSG B (sq. ft.)CN HSG C (sq. ft.)CN HSG D (sq. ft.)CN Open Water Not Available 0 100 0 67764 100 6776419 5140 100 514043 227401 100 22740066 Developed, Open Space Open space - Fair condition (grass cover 50% to 75%)0 49 0 372077 69 25673289 333242 79 26326120 138306 84 11617682 Developed, Low Intensity Residential districts by average lot size: 1/3 acre 0 57 0 23462 72 1689230 53429 81 4327747 15288 86 1314731 Developed, Medium Intensity Residential districts by average lot size: 1/8 acre 0 77 0 0 85 0 0 90 0 0 92 0 Developed, High Intensity Urban districts - Commercial and business 0 89 0 0 92 0 0 94 0 0 95 0 Barren Land Newly graded areas 0 77 0 0 86 0 0 91 0 0 94 0 Deciduous Forest Woods - Fair 0 36 0 1961836 60 117710158 432248 73 31554081 2168142 79 171283204 Evergreen Forest Woods - Fair 0 36 0 467675 60 28060496 378302 73 27616058 500436 79 39534432 Mixed Forest Woods - Fair 0 36 0 682849 60 40970927 208550 73 15224120 672997 79 53166772 Shrub/Scrub Brush - Fair 0 35 0 0 56 0 2268 70 158727 0 77 0 Herbaceuous Herbaceuous - Fair 0 60 0 104148 71 7394526 1156 81 93636 19375 89 1724332 Hay/Pasture Pasture - Fair 0 49 0 923349 69 63711107 1083298 79 85580528 517942 84 43507146 Cultivated Crops Row crops (SR + CR) - Poor 0 71 0 0 80 0 0 87 0 0 90 0 Woody Wetlands Not Available 0 80 0 0 85 0 0 90 0 0 95 0 Emergent Herbaceuous Wetlands Not Available 0 80 0 0 85 0 0 90 0 0 95 0 Weighted CN=72.91 NOTE: Curve Numbers are from SCS TR-55 with the exception of assumed HSG A (CN=60) for Herbaceous,Open Water, Woody Wetlands, and Emergent Herbaceous Wetlands. NOTE: double-check all the land types are being calculated and texts are accurate NOTE: double-check the exported attribute table has the same table format as the "Export_Output" table APPENDIX D Hyetograph Results Used for Analysis 0.0 2.0 4.0 6.0 8.0 10.0 12.0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Cumulative Depth (in)Time (hrs) Hyetographs for 24-Hour SCS Type II Rainfall Distributions 25YR 50YR 100YR 200YR 500YR 1000YR APPENDIX E NOAA Atlas 14 Rainfall Table Point precipitation frequency estimates (inches) NOAA Atlas 14 Volume 2 Version 3 Data type: Precipitation depth Time series type: Partial duration Project area: Ohio River Basin Location name (ESRI Maps): Yadkinville, North Carolina USA Station Name: - Latitude: 36.128933° Longitude: -80.562771° Elevation (USGS): 826.1 ft PRECIPITATION FREQUENCY ESTIMATES by duration for ARI (years):1 2 5 10 25 50 100 200 500 1000 5-min:0.359 0.425 0.502 0.556 0.62 0.665 0.705 0.743 0.786 0.816 10-min:0.574 0.68 0.804 0.89 0.989 1.06 1.12 1.18 1.24 1.29 15-min:0.717 0.855 1.02 1.13 1.25 1.34 1.42 1.49 1.56 1.61 30-min:0.983 1.18 1.45 1.63 1.86 2.02 2.17 2.31 2.49 2.61 60-min:1.23 1.48 1.85 2.12 2.47 2.74 2.99 3.24 3.57 3.81 2-hr:1.44 1.75 2.2 2.54 3 3.35 3.69 4.05 4.52 4.87 3-hr:1.55 1.88 2.37 2.75 3.26 3.66 4.06 4.48 5.04 5.48 6-hr:1.9 2.31 2.9 3.37 4 4.52 5.04 5.57 6.31 6.88 12-hr:2.3 2.79 3.52 4.09 4.89 5.53 6.19 6.89 7.85 8.61 24-hr:2.8 3.39 4.29 5.01 5.99 6.79 7.61 8.46 9.65 10.6 2-day:3.29 3.96 4.97 5.76 6.82 7.67 8.54 9.42 10.6 11.6 3-day:3.5 4.21 5.26 6.07 7.17 8.05 8.95 9.87 11.1 12.1 4-day:3.71 4.46 5.54 6.38 7.52 8.43 9.36 10.3 11.6 12.6 7-day:4.24 5.07 6.18 7.05 8.21 9.13 10.1 11 12.3 13.3 10-day:4.85 5.78 6.96 7.87 9.07 10 11 11.9 13.2 14.1 20-day:6.52 7.71 9.13 10.2 11.7 12.8 14 15.1 16.6 17.8 30-day:8.09 9.53 11 12.1 13.5 14.6 15.7 16.7 18 19 45-day:10.2 11.9 13.6 14.8 16.3 17.5 18.6 19.7 21 22 60-day:12.2 14.2 16 17.3 19 20.3 21.5 22.6 24.1 25.1 Date/time (GMT): Mon Oct 26 20:44:36 2020 pyRunTime: 0.0152099132538 APPENDIX F Outlet Works Rating Curves Total outlet discharge from the spillway system Client:NCEM Date:10/26/2020 Project:Overtopping Study Engineer:T.Carter Dam:Davis Dam Dam No.YADKI-044 Reservior Water Level (RWS) Elevation (ft) Total discharge from the spillway system (cfs) (from Hydrocad) 772.9 0.0 773.7 3.6 774.5 13.0 775.3 25.2 776.1 35.0 776.9 42.5 777.7 48.8 778.5 54.4 779.3 59.5 780.1 64.2 780.9 68.5 781.7 72.6 782.5 76.5 783.3 80.2 784.1 83.7 784.9 87.1 785.7 90.3 786.5 93.5 787.3 96.5 788.1 99.5 788.9 102.3 789.7 105.1 790.5 107.8 791.3 110.5 792.1 113.0 792.9 115.6 793.7 118.0 794.5 120.5 795.3 122.8 796.1 125.2 796.9 127.5 797.7 129.7 798.5 131.9 799.3 134.1 800.1 136.2 800.9 138.3 801.7 140.4 802.5 142.4 803.3 144.5 804.1 146.4 804.9 148.4 805.7 150.3 806.5 152.2 807.3 154.1 808.1 156.0 808.9 157.8 809.7 159.6 0.0 20.0 40.0 60.0 80.0 100.0 120.0 140.0 160.0 180.0 770.0 775.0 780.0 785.0 790.0 795.0 800.0 805.0 810.0 815.0Total discharge from the spillway system (cfs)Reservior Water Level (RWS) Elevation (ft) The whole spillway system rating curve (cfs) Yadki-044 Davis Dam Rainfall not specifiedYADKI-044 Printed 12/3/2020Prepared by HDR, Inc Page 1HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Summary for Pond 1P: YADKI-044 Davis Dam Volume Invert Avail.Storage Storage Description #1 772.90' 53,716,839 cf Custom Stage Data (Prismatic) Listed below (Recalc) Yadki-044 Davis Dam Rainfall not specifiedYADKI-044 Printed 12/3/2020Prepared by HDR, Inc Page 2HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 772.90 428,486 0 0 773.40 428,486 214,243 214,243 773.90 428,486 214,243 428,486 774.40 428,486 214,243 642,729 774.90 466,797 223,821 866,550 775.40 487,891 238,672 1,105,222 775.90 504,541 248,108 1,353,330 776.40 519,863 256,101 1,609,431 776.90 535,664 263,882 1,873,313 777.40 552,881 272,136 2,145,449 777.90 570,752 280,908 2,426,357 778.40 589,287 290,010 2,716,367 778.90 609,717 299,751 3,016,118 779.40 629,023 309,685 3,325,803 779.90 648,740 319,441 3,645,244 780.40 667,490 329,058 3,974,301 780.90 687,744 338,809 4,313,110 781.40 706,904 348,662 4,661,772 781.90 726,328 358,308 5,020,080 782.40 745,830 368,040 5,388,119 782.90 764,658 377,622 5,765,741 783.40 783,652 387,078 6,152,819 783.90 803,135 396,697 6,549,515 784.40 823,291 406,607 6,956,122 784.90 844,043 416,834 7,372,955 785.40 865,225 427,317 7,800,272 785.90 885,654 437,720 8,237,992 786.40 907,041 448,174 8,686,166 786.90 928,760 458,950 9,145,116 787.40 950,771 469,883 9,614,999 787.90 974,775 481,387 10,096,385 788.40 999,912 493,672 10,590,057 788.90 1,025,117 506,257 11,096,314 789.40 1,051,436 519,138 11,615,453 789.90 1,079,961 532,849 12,148,302 790.40 1,108,008 546,992 12,695,294 790.90 1,135,234 560,811 13,256,105 791.40 1,164,072 574,827 13,830,931 791.90 1,190,039 588,528 14,419,459 792.40 1,216,846 601,721 15,021,180 792.90 1,243,975 615,205 15,636,385 793.40 1,272,256 629,058 16,265,443 793.90 1,301,309 643,391 16,908,834 794.40 1,330,869 658,045 17,566,879 794.90 1,360,635 672,876 18,239,755 795.40 1,391,270 687,976 18,927,731 795.90 1,423,223 703,623 19,631,354 796.40 1,454,297 719,380 20,350,734 796.90 1,484,385 734,671 21,085,405 Yadki-044 Davis Dam Rainfall not specifiedYADKI-044 Printed 12/3/2020Prepared by HDR, Inc Page 3HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC 797.40 1,515,820 750,051 21,835,456 797.90 1,547,178 765,750 22,601,206 798.40 1,579,590 781,692 23,382,898 798.90 1,614,463 798,513 24,181,411 799.40 1,649,658 816,030 24,997,441 799.90 1,686,504 834,041 25,831,482 800.40 1,720,713 851,804 26,683,286 800.90 1,752,676 868,347 27,551,633 801.40 1,784,385 884,265 28,435,898 801.90 1,816,260 900,161 29,336,060 802.40 1,849,766 916,507 30,252,566 802.90 1,884,570 933,584 31,186,150 803.40 1,919,541 951,028 32,137,178 803.90 1,955,137 968,670 33,105,847 804.40 1,989,932 986,267 34,092,115 804.90 2,024,668 1,003,650 35,095,765 805.40 2,060,498 1,021,292 36,117,056 805.90 2,096,934 1,039,358 37,156,414 806.40 2,134,258 1,057,798 38,214,212 806.90 2,171,182 1,076,360 39,290,572 807.40 2,208,984 1,095,042 40,385,614 807.90 2,246,318 1,113,826 41,499,439 808.40 2,284,541 1,132,715 42,632,154 808.90 2,323,193 1,151,934 43,784,087 809.40 2,362,656 1,171,462 44,955,550 809.90 2,401,963 1,191,155 46,146,704 810.40 2,441,885 1,210,962 47,357,666 810.90 2,482,051 1,230,984 48,588,650 811.40 2,522,031 1,251,021 49,839,671 811.90 2,563,828 1,271,465 51,111,136 812.40 2,605,518 1,292,337 52,403,472 812.90 2,647,949 1,313,367 53,716,839 Device Routing Invert Outlet Devices #1 Primary 772.90'36.0" Round 36" HDPE L= 40.0' CPP, projecting, no headwall, Ke= 0.900 Inlet / Outlet Invert= 772.90' / 770.20' S= 0.0675 '/' Cc= 0.900 n= 0.020, Flow Area= 7.07 sf Primary OutFlow Max=0.00 cfs @ 5.00 hrs HW=0.00' (Free Discharge) 1=36" HDPE ( Controls 0.00 cfs) Yadki-044 Davis Dam Rainfall not specifiedYADKI-044 Printed 12/3/2020Prepared by HDR, Inc Page 4HydroCAD® 10.00-25 s/n 07102 © 2019 HydroCAD Software Solutions LLC Stage-Discharge for Pond 1P: YADKI-044 Davis Dam Elevation (feet) Primary (cfs) 772.90 0.00 773.30 0.95 773.70 3.64 774.10 7.77 774.50 13.04 774.90 19.03 775.30 25.24 775.70 30.88 776.10 35.03 776.50 38.94 776.90 42.48 777.30 45.76 777.70 48.81 778.10 51.69 778.50 54.41 778.90 57.00 779.30 59.48 779.70 61.86 780.10 64.15 780.50 66.36 780.90 68.50 781.30 70.58 781.70 72.60 782.10 74.56 782.50 76.47 782.90 78.34 783.30 80.16 783.70 81.94 784.10 83.69 784.50 85.39 784.90 87.07 785.30 88.71 785.70 90.32 786.10 91.91 786.50 93.47 786.90 95.00 787.30 96.51 787.70 97.99 788.10 99.45 788.50 100.90 788.90 102.32 789.30 103.72 789.70 105.10 790.10 106.47 790.50 107.81 790.90 109.15 791.30 110.46 791.70 111.76 792.10 113.04 792.50 114.32 792.90 115.57 Elevation (feet) Primary (cfs) 793.30 116.81 793.70 118.04 794.10 119.26 794.50 120.47 794.90 121.66 795.30 122.84 795.70 124.01 796.10 125.17 796.50 126.32 796.90 127.45 797.30 128.58 797.70 129.70 798.10 130.81 798.50 131.91 798.90 133.00 799.30 134.08 799.70 135.15 800.10 136.22 800.50 137.27 800.90 138.32 801.30 139.36 801.70 140.39 802.10 141.42 802.50 142.44 802.90 143.45 803.30 144.45 803.70 145.44 804.10 146.43 804.50 147.42 804.90 148.39 805.30 149.36 805.70 150.33 806.10 151.28 806.50 152.24 806.90 153.18 807.30 154.12 807.70 155.06 808.10 155.98 808.50 156.91 808.90 157.82 809.30 158.74 809.70 159.64 810.10 160.55 810.50 161.44 810.90 162.33 811.30 163.22 811.70 164.10 812.10 164.98 812.50 165.85 812.90 166.72