Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SURRY-066 Final Report
DAM HYDRAULIC CAPACITY ASSESSMENT REPORT (DRAFT) HUGH CHATHAM HOSPITAL DAM SURRY-066 SURRY COUNTY, NC PREPARED BY: HDR Engineering Inc. of the Carolinas under contract with WOOD E&I Solutions 2020 EXECUTIVE SUMMARY A hydraulic capacity analysis was completed for the Hugh Chatham Hospital Dam in Surry County, North Carolina. The purpose of the study was to analyze the existing potential of the dam for overtopping during predetermined specified rainfall events using the North Carolina Dam Safety defined process and templates. The analyses were completed using the United States Army Corps of Engineers developed software Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) in combination with Arc-GIS to develop required input parameters. The rainfall events included in the analyses consist of 24-hour durations with return periods of 25 years, 50 years, 100 years, 200 years, 500 years and 1000 years. Results of the analyses indicate that this structure is hydraulically adequate for 25 years, 50 years, 100 years, 200 years, 500 years, and 1000 years rainfall events. Data, input parameters, and final results can be found on the attached summary sheets and in the appendices of this report as well as in the associated electronic file in which all program files are stored. Drainage Area (Sq. Mi.)= Curve Number = Lag Time (min.)= Rainfall Distribution Methods = 176.8 144.0 149.2 154.5 159.9 165.4 171.0 1020.1 1020.6 1021.1 1021.6 1022.1 ELEVATION 1017.6 1018.1 1018.6 1019.1 1019.6 13.9 16.1 18.4 STORAGE (ACRE-FT) 0.0 1.8 3.7 5.6 7.6 9.6 11.7 1001.6 998.6 999.1 999.6 1000.1 1000.6 1001.1 997.1 NA ELEVATION 997.1 997.6 998.1 STORAGE (ACRE-FT) 129.1 134.0 138.9 73.53 16 SCS Type 2 SPILLWAY Primary Auxiliary TYPE Riser / Barrel NA ELEVATION 24 HOUR - 200 YEAR EVENT, 8.93 INCHES, ELEVATION 1000.5 (20.1 FT FREE-BOARD) 24 HOUR - 100 YEAR EVENT, 8.01 INCHES, ELEVATION 999.9 (20.7 FT FREE-BOARD) 24 HOUR - 50 YEAR EVENT, 7.13 INCHES, ELEVATION 999.4 (21.2 FT FREE-BOARD) 24 HOUR - 25 YEAR EVENT, 6.28 INCHES, ELEVATION 998.9 (21.7 FT FREE-BOARD) SUMMARY OF INPUT PARAMETERS 0.1 SUMMARY SHEET OF HYDRAULIC CAPACITY RESULTS HUGH CHATHAM HOSPITAL DAM, SURRY-066 ANALYSIS PERFORMED BY: S. MURPHY, HDR TOP OF DAM ELEVATION = 1020.6 24 HOUR - 1000 YEAR EVENT, 11.2 INCHES, ELEVATION 1001.9 (18.7 FT FREE-BOARD) 24 HOUR - 500 YEAR EVENT, 10.2 INCHES, ELEVATION 1001.3 (19.3 FT FREE-BOARD) SURRY-066HUGH CHATHAM HOSPITAL DAM NOVEMBER 23, 2020 402.9 NOT TO SCALE 349.3 357.9 366.6 375.5 384.5 393.6 300.3 308.2 316.2 324.3 332.5 340.9 255.2 262.4 269.8 277.2 284.8 292.5 214.0 220.6 227.3 234.1 241.0 248.0 182.7 188.8 194.9 201.1 207.5 1035.1 1035.6 1036.1 1036.6 1037.1 1032.1 1032.6 1033.1 1033.6 1034.1 1034.6 1029.1 1029.6 1030.1 1030.6 1031.1 1031.6 1026.1 1026.6 1027.1 1027.6 1028.1 1028.6 1023.1 1023.6 1024.1 1024.6 1025.1 1025.6 1022.6 110.5 115.0 119.6 124.3 85.7 89.6 93.6 97.7 101.9 106.2 63.9 67.4 70.9 74.4 78.1 81.9 44.8 47.8 50.9 54.1 57.3 60.6 28.2 30.8 33.4 36.2 39.0 41.9 20.7 23.1 25.6 1016.6 1017.1 1013.6 1014.1 1014.6 1015.1 1015.6 1016.1 1010.6 1011.1 1011.6 1012.1 1012.6 1013.1 1007.6 1008.1 1008.6 1009.1 1009.6 1010.1 1004.6 1005.1 1005.6 1006.1 1006.6 1007.1 1002.1 1002.6 1003.1 1003.6 1004.1 SURRY-066HUGH CHATHAM HOSPITAL DAM NOVEMBER 23, 2020 APPENDIX A Watershed Boundary Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P,NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea,Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and theGIS User Community Hugh Chatham Hospital Dam - SURRY-066 - Watershed Boundary Legend Longest FlowPath Watershed Bound ary 0 0.1 0.20.05 Miles Date: 11/19/2020 /Drainage Area: 0.10 Square MilesFlowpath Length: 2719.2 feet APPENDIX B Lag Time Calculation Dam No:SURRY-066 Date:11/19/2020 Dam Name:Hugh Chatham Hospital Dam Engineer:K. Trefzger Maximum Potential Retention (inches):S =(1000/cn')-10 Time of Concentration (hours):Tc =l0.8*(S+1)0.7 1140*Y0.5 Basin Data:Input Values in yellow Curve Number CN =73.5252 from NRCS CN Calculation S =3.60078 in. Mean Basin Slope Y =11.0973 %from Watershed Mean slope Longest Flowpath:0.52 mi.from Watershed Longest flowpath Flow Length l =2745.6 ft. Time of Concentration Tc =0.43 Hours Tc =26 mins Lag Time TL =0.26 Hours TL =16 mins APPENDIX C NRCS Curve Number Summary Sheet Change CN according to TR-55 (see tables below) NLCD (2016) Landuse TR-55 Landuse HSG A (sq. ft.)CN HSG B (sq. ft.)CN HSG C (sq. ft.)CN HSG D (sq. ft.)CN Open Water Not Available 0 100 0 0 100 0 36055 100 3605458 70514 100 7051368 Developed, Open Space Open space - Fair condition (grass cover 50% to 75%)0 49 0 307070 69 21187812 171063 79 13513939 11416 84 958966 Developed, Low Intensity Residential districts by average lot size: 1/3 acre 0 57 0 355543 72 25599101 23363 81 1892425 0 86 0 Developed, Medium Intensity Residential districts by average lot size: 1/8 acre 0 77 0 185662 85 15781304 9549 90 859393 0 92 0 Developed, High Intensity Urban districts - Commercial and business 0 89 0 43140 92 3968865 0 94 0 0 95 0 Barren Land Newly graded areas 0 77 0 9688 86 833172 0 91 0 0 94 0 Deciduous Forest Woods - Fair 0 36 0 279701 60 16782062 758722 73 55386672 55298 79 4368508 Evergreen Forest Woods - Fair 0 36 0 0 60 0 0 73 0 0 79 0 Mixed Forest Woods - Fair 0 36 0 88154 60 5289264 35724 73 2607836 3043 79 240378 Shrub/Scrub Brush - Fair 0 35 0 0 56 0 0 70 0 0 77 0 Herbaceuous Herbaceuous - Fair 0 60 0 34170 71 2426100 33646 81 2725310 0 89 0 Hay/Pasture Pasture - Fair 0 49 0 150511 69 10385264 48047 79 3795726 0 84 0 Cultivated Crops Row crops (SR + CR) - Poor 0 71 0 0 80 0 0 87 0 0 90 0 Woody Wetlands Not Available 0 80 0 0 85 0 0 90 0 0 95 0 Emergent Herbaceuous Wetlands Not Available 0 80 0 0 85 0 0 90 0 0 95 0 Weighted CN=73.53 NOTE: Curve Numbers are from SCS TR-55 with the exception of assumed HSG A (CN=60) for Herbaceous,Open Water, Woody Wetlands, and Emergent Herbaceous Wetlands. NOTE: double-check all the land types are being calculated and texts are accurate NOTE: double-check the exported attribute table has the same table format as the "Export_Output" table APPENDIX D Hyetograph Results Used for Analysis 0.0 2.0 4.0 6.0 8.0 10.0 12.0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Cumulative Depth (in)Time (hrs) Hyetographs for 24-Hour SCS Type II Rainfall Distributions 25YR 50YR 100YR 200YR 500YR 1000YR APPENDIX E NOAA Atlas 14 Rainfall Table Point precipitation frequency estimates (inches) NOAA Atlas 14 Volume 2 Version 3 Data type: Precipitation depth Time series type: Partial duration Project area: Ohio River Basin Location name (ESRI Maps): Elkin, North Carolina USA Station Name: - Latitude: 36.264004° Longitude: -80.836198° Elevation (USGS): 1024.59 ft PRECIPITATION FREQUENCY ESTIMATES by duration for ARI (years):1 2 5 10 25 50 100 200 500 1000 5-min:0.35 0.416 0.493 0.551 0.623 0.675 0.727 0.777 0.84 0.89 10-min:0.56 0.666 0.79 0.881 0.992 1.08 1.16 1.23 1.33 1.4 15-min:0.7 0.837 0.999 1.11 1.26 1.36 1.46 1.55 1.67 1.76 30-min:0.959 1.16 1.42 1.61 1.86 2.05 2.24 2.42 2.66 2.85 60-min:1.2 1.45 1.82 2.1 2.48 2.78 3.08 3.39 3.82 4.16 2-hr:1.42 1.73 2.19 2.55 3.05 3.46 3.88 4.32 4.94 5.44 3-hr:1.54 1.88 2.38 2.77 3.32 3.78 4.24 4.74 5.44 6.02 6-hr:1.94 2.35 2.97 3.46 4.14 4.69 5.26 5.87 6.73 7.43 12-hr:2.42 2.94 3.68 4.27 5.09 5.74 6.41 7.12 8.12 8.92 24-hr:2.9 3.52 4.48 5.23 6.28 7.13 8.01 8.93 10.2 11.2 2-day:3.47 4.19 5.28 6.13 7.29 8.22 9.17 10.2 11.5 12.6 3-day:3.69 4.46 5.58 6.45 7.65 8.6 9.57 10.6 12 13.1 4-day:3.92 4.72 5.88 6.78 8 8.98 9.98 11 12.4 13.5 7-day:4.49 5.38 6.57 7.49 8.72 9.69 10.7 11.7 13 14.1 10-day:5.15 6.15 7.4 8.36 9.63 10.6 11.6 12.6 13.9 14.9 20-day:6.91 8.18 9.67 10.8 12.4 13.6 14.7 15.9 17.5 18.8 30-day:8.58 10.1 11.7 12.8 14.3 15.4 16.5 17.5 18.8 19.8 45-day:10.9 12.7 14.4 15.7 17.2 18.4 19.5 20.6 22 23 60-day:12.9 15.1 16.9 18.3 20.1 21.4 22.7 23.9 25.4 26.5 Date/time (GMT): Thu Nov 19 16:05:21 2020 pyRunTime: 0.0174450874329 APPENDIX F Outlet Works Rating Curves Total outlet discharge from the spillway system Client:NCEM Date:11/16/2020 Project:Overtopping Study Engineer:T.Carter Dam:Hugh Chatham Hospital Dam Dam No.SURRY-066 Reservior Water Level (RWS) Elevation (ft) Primary spillway discharge (cfs) Total discharge from the spillway system (cfs) 997.1 0.0 0.0 997.6 17.5 17.5 998.1 48.2 48.2 998.6 48.6 48.6 999.1 48.9 48.9 999.6 49.2 49.2 1000.1 49.5 49.5 1000.6 49.8 49.8 1001.1 50.1 50.1 1001.6 50.4 50.4 1002.1 50.7 50.7 1002.6 51.0 51.0 1003.1 51.3 51.3 1003.6 51.6 51.6 1004.1 51.8 51.8 1004.6 52.1 52.1 1005.1 52.4 52.4 1005.6 52.7 52.7 1006.1 53.0 53.0 1006.6 53.3 53.3 1007.1 53.6 53.6 1007.6 53.8 53.8 1008.1 54.1 54.1 1008.6 54.4 54.4 1009.1 54.7 54.7 1009.6 54.9 54.9 1010.1 55.2 55.2 1010.6 55.5 55.5 1011.1 55.8 55.8 1011.6 56.0 56.0 1012.1 56.3 56.3 1012.6 56.6 56.6 1013.1 56.8 56.8 1013.6 57.1 57.1 1014.1 57.4 57.4 1014.6 57.6 57.6 1015.1 57.9 57.9 1015.6 58.1 58.1 1016.1 58.4 58.4 1016.6 58.7 58.7 1017.1 58.9 58.9 1017.6 59.2 59.2 1018.1 59.4 59.4 1018.6 59.7 59.7 1019.1 59.9 59.9 1019.6 60.2 60.2 1020.1 60.4 60.4 1020.6 60.7 60.7 1021.1 60.9 60.9 1021.6 61.2 61.2 1022.1 61.4 61.4 1022.6 61.7 61.7 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 995.0 1000.0 1005.0 1010.0 1015.0 1020.0 1025.0Total discharge from the spillway system (cfs)Reservior Water Level (RWS) Elevation (ft) The whole spillway system rating curve (cfs)