Loading...
HomeMy WebLinkAboutRANDO-027 Final ReportDAM HYDRAULIC CAPACITY ASSESSMENT REPORT (DRAFT) LUCAS LAKE DAM RANDO-027 RANDOLPH COUNTY, NC PREPARED BY: HDR Engineering Inc. of the Carolinas under contract with WOOD E&I Solutions 2020 EXECUTIVE SUMMARY A hydraulic capacity analysis was completed for the Lucas Lake Dam in Randolph County, North Carolina. The purpose of the study was to analyze the existing potential of the dam for overtopping during predetermined specified rainfall events using the North Carolina Dam Safety defined process and templates. The analyses were completed using the United States Army Corps of Engineers developed software Hydrologic Engineering Center – Hydrologic Modeling System (HEC-HMS) in combination with Arc-GIS to develop required input parameters. The rainfall events included in the analyses consist of 24-hour durations with return periods of 25 years, 50 years, 100 years, 200 years, 500 years and 1000 years. Results of the analyses indicate that this structure is hydraulically adequate for 25 years, 50 years, 100 years, 200 years, 500 years, and 1000 years rainfall events. Data, input parameters, and final results can be found on the attached summary sheets and in the appendices of this report as well as in the associated electronic file in which all program files are stored. Drainage Area (Sq. Mi.)= Curve Number = Lag Time (min.)= Rainfall Distribution Methods = Primary Auxiliary 10700.1 8967.0 9247.4 9531.3 9818.5 10109.0 10402.8 544.0 544.5 545.0 545.5 546.0 ELEVATION 541.5 542.0 542.5 543.0 543.5 1322.5 STORAGE (ACRE-FT) 0.0 134.0 272.3 413.6 557.8 704.7 854.5 525.5 522.5 523.0 523.5 524.0 524.5 525.0 521.0 NA ELEVATION 521.0 521.5 522.0 STORAGE (ACRE-FT) 8147.3 8417.0 8690.2 1007.1 1163.0 SPILLWAY TYPE Concrete Ogee NA ELEVATION SUMMARY OF INPUT PARAMETERS 15.56 24 HOUR - 200 YEAR EVENT, 8.15 INCHES, ELEVATION 526.8 (1.7 FT FREE-BOARD) 24 HOUR - 100 YEAR EVENT, 7.4 INCHES, ELEVATION 526.2 (2.3 FT FREE-BOARD) 24 HOUR - 50 YEAR EVENT, 6.66 INCHES, ELEVATION 525.6 (2.9 FT FREE-BOARD) 24 HOUR - 25 YEAR EVENT, 5.94 INCHES, ELEVATION 525 (3.5 FT FREE-BOARD) SUMMARY SHEET OF HYDRAULIC CAPACITY RESULTS LUCAS LAKE DAM, RANDO-027 ANALYSIS PERFORMED BY: S. MURPHY, HDR 74.38 147 SCS Type 2 TOP OF DAM ELEVATION = 528.5 24 HOUR - 1000 YEAR EVENT, 9.99 INCHES, ELEVATION 528.3 (0.2 FT FREE-BOARD) 24 HOUR - 500 YEAR EVENT, 9.18 INCHES, ELEVATION 527.7 (0.8 FT FREE-BOARD) RANDO-027LUCAS LAKE DAM OCTOBER 5, 2020 21671.3 NOT TO SCALE 19153.6 19561.9 19974.7 20392.0 20813.8 21240.3 16798.0 17179.6 17565.4 17955.7 18350.3 18749.8 14602.3 14957.0 15316.3 15680.0 16048.3 16420.9 12570.4 12897.7 13229.5 13565.9 13906.8 14252.2 11001.0 11306.0 11615.2 11929.0 12247.5 561.0 556.0 556.5 557.0 557.5 558.0 558.5 559.0 559.5 560.0 553.0 553.5 554.0 554.5 555.0 555.5 550.0 549.0 549.5 546.5 560.5 550.5 551.0 551.5 552.0 552.5 547.0 547.5 548.0 7361.5 7619.6 7881.3 5648.4 5883.3 6121.6 6363.1 6607.8 6855.6 4310.9 4525.7 4743.9 4965.1 5189.6 5417.3 3093.2 3287.6 548.5 3891.4 4099.5 1994.6 2170.2 2348.8 2530.3 2714.6 2902.2 7106.8 1485.6 1652.2 1821.9 540.5 541.0 537.5 538.0 538.5 539.0 539.5 540.0 534.5 535.0 3485.4 3686.7 535.5 536.0 536.5 537.0 531.5 532.0 532.5 533.0 533.5 534.0 528.5 529.0 529.5 530.0 530.5 531.0 526.0 526.5 527.0 527.5 528.0 RANDO-027LUCAS LAKE DAM OCTOBER 5, 2020 APPENDIX A Watershed Boundary Sources: Esri, HERE, Garmin, USGS, Intermap, INCREMENT P,NRCan, Esri Japan, METI, Esri China (Hong Kong), Esri Korea,Esri (Thailand), NGCC, (c) OpenStreetMap contributors, and theGIS User Community Lucas Lake Dam - RANDO-027 - Watershed Boundary Legend Longest FlowPath Watershed Bound ary 0 1 20.5 Miles Date: 10 /2/2020 /Drainage Ar ea: 15.56 Square MilesFlowpath Length: 8.6 miles APPENDIX B Lag Time Calculation Dam No:RANDO-027 Date:10/8/2020 Dam Name:Lucas Lake Dam Engineer:K. Trefzger Maximum Potential Retention (inches):S =(1000/cn')-10 Time of Concentration (hours):Tc =l0.8*(S+1)0.7 1140*Y0.5 Basin Data:Input Values in yellow Curve Number CN =74.3793 from NRCS CN Calculation S =3.44461 in. Mean Basin Slope Y =10.5105 %from Watershed Mean slope Longest Flowpath:8.6 mi.from Watershed Longest flowpath Flow Length l =45408 ft. Time of Concentration Tc =4.09 Hours Tc =245 mins Lag Time TL =2.45 Hours TL =147 mins APPENDIX C NRCS Curve Number Summary Sheet Change CN according to TR-55 (see tables below) NLCD (2016) Landuse TR-55 Landuse HSG A (sq. ft.)CN HSG B (sq. ft.)CN HSG C (sq. ft.)CN HSG D (sq. ft.)CN Open Water Not Available 0 100 0 649080 100 64908002 1026627 100 102662748 11133464 100 ######### Developed, Open Space Open space - Fair condition (grass cover 50% to 75%)0 49 0 17428974 69 1202599224 6368636 79 503122269 11239118 84 944085899 Developed, Low Intensity Residential districts by average lot size: 1/3 acre 0 57 0 8305869 72 598022552 3380642 81 273832035 4967592 86 427212930 Developed, Medium Intensity Residential districts by average lot size: 1/8 acre 0 77 0 2808050 85 238684280 1116145 90 100453050 2052909 92 188867615 Developed, High Intensity Urban districts - Commercial and business 0 89 0 1150512 92 105847112 570265 94 53604903 1195086 95 113533154 Barren Land Newly graded areas 0 77 0 259401 86 22308446 761261 91 69274766 1818893 94 170975957 Deciduous Forest Woods - Fair 0 36 0 69230992 60 4153859543 58485791 73 4269462740 74744601 79 ######### Evergreen Forest Woods - Fair 0 36 0 4304990 60 258299385 3212220 73 234492059 3879521 79 306482131 Mixed Forest Woods - Fair 0 36 0 9105911 60 546354670 8790109 73 641677954 15390702 79 ######### Shrub/Scrub Brush - Fair 0 35 0 5742690 56 321590655 6958889 70 487122220 6163732 77 474607341 Herbaceuous Herbaceuous - Fair 0 60 0 2135378 71 151611855 1704940 81 138100137 2203638 89 196123796 Hay/Pasture Pasture - Fair 0 49 0 31204524 69 2153112177 12776749 79 1009363208 29609152 84 ######### Cultivated Crops Row crops (SR + CR) - Poor 0 71 0 5179267 80 414341341 257668 87 22417078 5957560 90 536180389 Woody Wetlands Not Available 0 80 0 141318 85 12011996 308944 90 27804923 159943 95 15194612 Emergent Herbaceuous Wetlands Not Available 0 80 0 0 85 0 0 90 0 19372 95 1840298 Weighted CN=74.38 NOTE: Curve Numbers are from SCS TR-55 with the exception of assumed HSG A (CN=60) for Herbaceous,Open Water, Woody Wetlands, and Emergent Herbaceous Wetlands. NOTE: double-check all the land types are being calculated and texts are accurate NOTE: double-check the exported attribute table has the same table format as the "Export_Output" table APPENDIX D Hyetograph Results Used for Analysis 0.0 2.0 4.0 6.0 8.0 10.0 12.0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24Cumulative Depth (in)Time (hrs) Hyetographs for 24-Hour SCS Type II Rainfall Distributions 25YR 50YR 100YR 200YR 500YR 1000YR APPENDIX E NOAA Atlas 14 Rainfall Table Point precipitation frequency estimates (inches) NOAA Atlas 14 Volume 2 Version 3 Data type: Precipitation depth Time series type: Partial duration Project area: Ohio River Basin Location name (ESRI Maps): Randleman, North Carolina USA Station Name: - Latitude: 35.767464° Longitude: -79.847972° Elevation (USGS): 600.36 ft PRECIPITATION FREQUENCY ESTIMATES by duration for ARI (years):1 2 5 10 25 50 100 200 500 1000 5-min:0.398 0.472 0.549 0.6 0.657 0.693 0.724 0.749 0.774 0.789 10-min:0.636 0.755 0.879 0.96 1.05 1.1 1.15 1.19 1.22 1.24 15-min:0.794 0.949 1.11 1.21 1.33 1.4 1.45 1.5 1.54 1.56 30-min:1.09 1.31 1.58 1.76 1.97 2.1 2.23 2.33 2.45 2.53 60-min:1.36 1.65 2.03 2.29 2.62 2.85 3.07 3.27 3.52 3.69 2-hr:1.6 1.94 2.41 2.75 3.18 3.5 3.81 4.11 4.49 4.78 3-hr:1.71 2.08 2.59 2.96 3.44 3.81 4.17 4.53 4.99 5.34 6-hr:2.08 2.51 3.12 3.59 4.21 4.7 5.18 5.67 6.33 6.84 12-hr:2.47 2.99 3.73 4.32 5.12 5.76 6.42 7.1 8.05 8.81 24-hr:2.89 3.49 4.36 5.03 5.94 6.66 7.4 8.15 9.18 9.99 2-day:3.38 4.06 5.03 5.77 6.77 7.54 8.33 9.13 10.2 11.1 3-day:3.59 4.31 5.31 6.09 7.13 7.95 8.79 9.64 10.8 11.7 4-day:3.8 4.55 5.59 6.4 7.5 8.37 9.25 10.2 11.4 12.4 7-day:4.34 5.17 6.28 7.15 8.33 9.27 10.2 11.2 12.5 13.6 10-day:4.93 5.86 7.04 7.95 9.19 10.2 11.1 12.1 13.5 14.6 20-day:6.63 7.82 9.23 10.4 11.9 13.1 14.3 15.6 17.3 18.6 30-day:8.2 9.65 11.2 12.4 14 15.2 16.4 17.7 19.3 20.5 45-day:10.3 12.1 13.9 15.2 17 18.3 19.7 21 22.8 24.1 60-day:12.4 14.5 16.3 17.7 19.6 21 22.3 23.6 25.2 26.5 Date/time (GMT): Thu Oct 8 20:47:48 2020 pyRunTime: 0.0169880390167 APPENDIX F Outlet Works Rating Curves Total outlet discharge from the spillway system Client:NCEM Date:10/1/2020 Project:Overtopping Study Engineer:T.Carter Dam:Lucas Lake Dam Dam No.RANDO-027 Reservior Water Level (RWS) Elevation (ft) Primary spillway discharge (cfs) Total discharge from the spillway system (cfs) 521.0 0.0 0.0 521.5 124.9 124.9 522.0 353.4 353.4 522.5 649.2 649.2 523.0 999.6 999.6 523.5 1396.9 1396.9 524.0 1836.3 1836.3 524.5 2314.0 2314.0 525.0 2827.2 2827.2 525.5 3373.5 3373.5 526.0 3951.1 3951.1 526.5 4558.4 4558.4 527.0 5193.9 5193.9 527.5 5856.5 5856.5 528.0 6545.1 6545.1 528.5 7258.7 7258.7 529.0 7996.5 7996.5 529.5 8757.8 8757.8 530.0 9541.8 9541.8 530.5 10347.9 10347.9 531.0 11175.5 11175.5 531.5 12024.0 12024.0 532.0 12893.0 12893.0 532.5 13782.0 13782.0 533.0 14690.6 14690.6 533.5 15618.2 15618.2 534.0 16564.6 16564.6 534.5 17529.4 17529.4 535.0 18512.2 18512.2 535.5 19512.8 19512.8 536.0 20530.7 20530.7 536.5 21565.7 21565.7 537.0 22617.6 22617.6 537.5 23686.0 23686.0 538.0 24770.8 24770.8 538.5 25871.6 25871.6 539.0 26988.3 26988.3 539.5 28120.6 28120.6 540.0 29268.3 29268.3 540.5 30431.2 30431.2 541.0 31609.1 31609.1 541.5 32801.8 32801.8 542.0 34009.1 34009.1 542.5 35230.9 35230.9 543.0 36467.0 36467.0 0.0 5000.0 10000.0 15000.0 20000.0 25000.0 30000.0 35000.0 40000.0 515.0 520.0 525.0 530.0 535.0 540.0 545.0Total discharge from the spillway system (cfs)Reservior Water Level (RWS) Elevation (ft) The whole spillway system rating curve (cfs)