Loading...
HomeMy WebLinkAbout20230804_ESC_Calculations Appendix IX - Calculations Culvert Design Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I Mitchell County, North Carolina S&ME Project No. 213314 COMPUTATIONS BY: Signature Date 07/07/2023 Name C.Ty Brooks, E.I. Title Staff Professional II ASSUMPTIONS Signature l-Jd �- ' -� A Date 07/07/2023 AND PROCEDURES Name Cedric H. Ruhl, P.E. CHECKED BY: Title Senior Engineer- Project Manager COMPUTATIONS Signature Date 07/07/2023 CHECKED BY: Name Andrew E.Wilmer, E.I. Title Associate Project Manager Al a� REVIEWED BY: Signature Date 07/07/2023 Name Christopher J.L. Stahl, P.E. Title Principal Engineer, V.P. REVIEW NOTES/COMMENTS: June 9, 2023 1 Culvert Design Calculation s Mining Modification Permit No. 61-16 The Quartz Corp. USA I I Mitchell County, North Carolina S&ME Project No. 213314 OBJECTIVE: The objective of this calculation report is to design a culvert and energy dissipation system at the new entrance road for the proposed modification to the Quartz Corp. USA Mining Permit No. 61-16 for the facility in Mitchell County, North Carolina. SUMMARY: The proposed culvert and dissipator design are in accordance with the design criteria presented in the North Carolina Department of Environmental Quality (NCDEQ) Erosion and Sediment Control Planning and Design Manual [Ref. 1]. REFERENCES North Carolina Erosion and Sediment Control Planning and Design Manual; NCDEQ; May 2013. 2 NOAA Atlas 74, Volume 2, Version 3, Bonnin, G.M., Martin, D., Lin, B., Parzybok, T., Yekta, M., & Riley, D., April 21, 2017. 3 NRCS Soil Figures, S&ME Inc., June 2023. 4 Compiled HydroCAD Report, Culvert Design, S&ME Inc., June 2023. Culvert Delineation Figure, S&ME Inc.,July 2023. DEFINITION OF VARIABLES A = drainage area (acres) CN = runoff curve number (dimensionless) Q = flow rate (cfs) P = rainfall depth (in) S = potential maximum retention after runoff(in) Tc = time of concentration (min) n = Manning's roughness coefficient (dimensionless) KNOWN AND ASSUMED VARIABLES: P2 = 3.93 in, Pao = 5.89 in, P25 = 7.14 in, Pioo= 9.27 in. [Ref. 2] June 9, 2023 2 Culvert Design Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I I Mitchell County, North Carolina S&ME Project No. 213314 CALCULATIONS S&ME applied the methodologies and approaches described within Section one (1.0) to calculate the peak run-off flow capacity for the unnamed tributary to Grassy Creek at the proposed culvert location in accordance with the proposed entrance road. The culvert design was evaluated to determine culvert dimensions necessary to pass the calculated peak run-off flow capacity for the design storm event. In parallel with the culvert design, a riprap energy dissipater was designed to handle the peak outflows from the culvert. The riprap energy dissipator design included the determination of the dissipater footprint and necessary riprap size/class. 1.0 Culvert Design The proposed culvert has a maximum drainage area of 59.8 acres.The proposed culvert will be constructed in an unnamed tributary to Grassy Creek. The approximate location of where the culvert is to be constructed is approximately 550 linear feet upstream of the confluence with Grassy Creek. 1.1 Culvert Hydrology The HydroCADS stormwater modeling software was utilized to calculate the runoff volume for the design storm in the unnamed tributary at the location of the proposed culvert. S&ME utilized HydroCAD® to apply the SCS Curve Number Method, specifically the SCS TR-20 event simulation model for the representative drainage area. The curve number(CN) is an empirical parameter developed by the Natural Resources Conservation Service (NRCS) from hydrology evaluations, soil type, and surface conditions to predict direct runoff volume from a rainfall event. NRCS Technical Release 55 (TR-55) Table 2-2 [Ref. 3] was used to select the CN value for each cover type, or surface condition, for the representative drainage area. Due to the variable Hydrologic Soil Groups (HSG) referenced in the NRCS Web Soil Survey [Ref. 3], S&ME applied HSG "B" as a constant on-site soil type for the representative drainage area. HSG "B"was the most prevalent Hydrologic Soil Group for the site. The time of concentration is the time for flow from the most hydrologically remote point in the contributing drainage area to leave the watershed. The minimum allowable time of concentration for use in TR-55 is 0.1 hours, or 6 minutes.A time of concentration was manually computed for the representative watershed. Since the project site is located in Mitchell County, a non-coastal county, a SCS Type-II rainfall distribution will be utilized.The duration of these storms will be 24-hours. Rainfall data was obtained from NOAA Precipitation Frequency Estimates [Ref. 2]. Woods/grass was selected as the land use for the representative area. Table 1, shown below, highlights the CN for the selected land use [Ref. 1] considering the soil conditions [Ref. 3]. The 100-yr. storm event was utilized to evaluate site conditions. June 9, 2023 3 Culvert Design Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I I Mitchell County, North Carolina S&ME Project No. 213314 Table 1: Hydrologic Conditions-Culvert 24-Hour Rainfall Curve Drainage Time of Peak Flow Storm Depth Tributary Area Land Use Description Recurrence {P} Number Area Concentration {Q} Interval (inches) {CN} {A} {T�} (cfs) [Ref.1] (ac) (min) [Ref.1] (years) I [Ref.2] Woods/Grass I 100-Year 1 9.27 71 59.8 36.9 257.29 The culvert will be designed to pass the peak flow of a 100-yr. storm event (257.29 cfs). 1.2 Culvert Capacity The culvert design was evaluated, in the sections below, to determine culvert dimensions, the dimensions are presented in Table 2. The culvert capacity was evaluated using HydroCAD [Ref. 4].The dimensions of the culvert design were determined based on the culvert capacity to pass the 100-yr. design storm. The culverts failure mode of concern is road overtopping.The culvert design was evaluated with a minimum cover depth of 2-ft., as listed in Table 2.Any culvert with a cover depth less than 2-ft. has an increased risk of failure due to overtopping. The Manning's roughness, "n" for the culvert design is shown in Table 2. Table 2: Culvert Characteristics Quantity Diameter Length Manning's n Upstream Downstream Flow Area Longitudinal Culvert Type {Q} {D} {L} Pipe {n} Invert Invert {A} Slope [Ref.4] (in) (ft) Material [Ref. {IU} {ID} (ft2) {S} [Ref.4] [Ref.4] (ft) (ft) (ft/ft) Circular 2.0 48.0 170.0 RCP 0.012 2610 2598 25.13 0.071 The dimensions of the culvert design (Table 2) indicate that the proposed culvert size has sufficient capacity to handle the peak flow (Table 3) for the hydraulic conditions found on site. Table 3: Culvert Design Results Culvert Road Water Upstream Elevation Surface Freeboard Outflow Invert {RE} Elevation {F} {Q} {IU} (ft) {WSE} (ft) (cfs) (ft) (ft) 2610.0 2636.0 2616.2 19.8 248.23 2.0 Riprap Energy Dissipater Design In parallel with the culvert design a riprap energy dissipater was designed to prevent the outflow from the culvert from scouring the existing stream channel bed. The NCDEQ Riprap Energy Dissipater Nomograph Figure 8.06a June 9, 2023 4 Culvert Design Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I I Mitchell County, North Carolina S&ME Project No. 213314 [Ref 1.] was utilized to determine the d50 Riprap size and the apron footprint. The figure is for the "Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter)." Utilizing the culvert discharge for the design storm event the parameters for the riprap energy dissipater were determined and are shown in Table 4. Table 4: Riprap Energy Dissipater Design Parameters Culvert Culvert Minimum Minimum Diameter Capacity Riprap d50 Apron Apron {DI M (D) Length Width (in) (cfs) (in) {LaI {LaI [Ref.5] [Ref.5] [Ref.6] (ft) (ft) [Ref.6] [Ref.6] 48 124.12 10.0 28.0 32.0 CONCLUSIONS A culvert design over the unnamed tributary to Grassy Creek was evaluated to be used within the design for the proposed modification to the Quartz Corp. USA Mining Permit No. 61-16. The proposed culvert and dissipator design are in accordance with the design criteria presented in the North Carolina Department of Environmental Quality (NCDEQ) Erosion and Sediment Control Planning and Design Manual [Ref. 1]. June 9, 2023 5 References Reference 1 North Carolina Erosion and Sediment Control Planning and Design Manual;NCDEQ;May2073. Appendices Table 8.03e Runoff curve numbers of urban areas' Curve number for ---------------------------------------Cover Description------------------------- ---------hydrologic soil group-------- Covertype and hydrologic condition Average percent A B C D impervious area Fully developed urban areas (vegetation established) Open space (lawns, parks, golf courses, cemeteries, etc.)3: Poor condition (grass cover< 50%) ............................. 68 79 86 89 Fair condition (grass cover 50% to 75%) ..................... 49 69 79 84 Good condition (grass cover> 75%) ............................ 39 61 74 80 Impervious areas: Paved parking lots, roofs, driveways, etc. (excludingright-of-way) 98 98 98 98 Streets and roads: Paved; curbs and storm sewers (excluding 98 98 98 98 right-of-way) .................................................................. Paved; open ditches (including right-of-way) ................ 83 89 92 93 Gravel (including right-of-way) ...................................... 76 85 89 91 Dirt(including right-of-way) ........................................... 72 82 87 89 Urban districts: Commercial and business ................................................. 85 89 92 94 95 Industrial ........................................................................... 72 81 88 91 93 Residential districts by average lot size: 1/8 acre or less (town houses) ......................................... 65 77 85 90 92 1/4 acre ............................................................................ 38 61 75 83 87 1/3 acre ............................................................................. 30 57 72 81 86 1/2 acre ............................................................................. 25 54 70 80 85 1 acre ............................................................................... 20 51 68 79 84 2 acres .............................................................................. 12 46 65 77 82 Developing urban areas Newly graded areas 77 86 91 94 (pervious areas only, no vegetation)a .............................. Idle lands (CN's are determined using cover types similar to those in table 2-2c). 1.Average runoff condition,and la=0.2S. 2.The average percent impervious area shown was used to develop the composite CN's.Other assumptions are as follows:impervious areas are directly connected to the drainage system,impervious areas have a CN of 98,and pervious areas are considered equivalent to open space in good hydrologic condition.CN's for other combinations of conditions may be computed using Figure 8.03c or 8.03d. 3.CN's shown are equivalent to those of pasture.Composite CN's may be computed for other combinations of open space cover type. 4.Composite CN's to use for the design of temporary measures during grading and construction should be computed using Figure 8.03c or 8.03d based on the degree of development(impervious area percentage)and the CN's for the newly graded pervious areas. Rev.6/06 8.03.17 Appendices 30 Outlet W Do + La +I. pipe diameter (Do) La — 80 I ). �,� T ilwater < 0.5Da o _ _ 1 � v `4 a 4 i - �,oA 3 } d� •► 20 , �5 3 2 I 10TH a - m ......... Ma IlTf�1�1111111i it Mi `j _N 2 U) r a a a °C 20 1 k v I, I v c 10 d ► I. Iv 6 j . . I j I fj I6 ;l� 3 5 10 20 50 100 2001 500 1000 Discharge(0/sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(TW<0.5 diameter). Rev.12/93 8.06.3 Reference 2 NOAA Atlas 74, Volume 2, Version 3, Bonnin, G.M., Martin, D., Lin, B., Parzybok, T., Yekta, M., & Riley, D., April 21, 2017. 2/2/23,3:44 PM Precipitation Frequency Data Server NOAA Atlas 14,Volume 2,Version 3 ' Location name: Spruce Pine,North Carolina,USA* � ,1" Latitude:35.902°,Longitude: -82.064° Elevation:2595.26 ft** source:ESRI Maps source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration� 2 � 1 1000 5-min 0.372 0.443 0.526 0.591 0.675 0.740 0.805 0.872 0.960 1.03 (0.339-0.410) (0.405-0.488) (0.478-0.579) (0.536-0.648) (0.608-0.743) (0.662-0.815) (0.716-0.889) (0.767-0.967) (0.833-1.07) (0.883-1.16) 10-min 0.595 0.709 0.843 0.944 1.08 1.18 1.28 1.38 1.52 1.62 (0.541-0.655) (0.648-0.780) (0.766-0.927) (0.856-1.04) (0.970-1.18) 1 (1.06-1.30) 1 (1.14-1.41) 11 (1.22-1.53) (1.32-1.69) (1.39-1.83) 15-min 0.744 0.891 1.07 1.20 1.36 1.49 1.62 1.75 1.91 2.04 (0.677-0.818) (0.814-0.981) (0.969-1.17) 1 (1.08-1.31) 1 (1.23-1.50) 11 (1.34-1.64) 11 (1.44-1.79) 1 (1.54-1.93) (1.66-2.13) (1.75-2.29) 30-min 1.02 1.23 1.52 1.73 2.62 2.25 2.48 2.72 3.04 3.30 (0.928-1.12) (1.13-1.36) (1.38-1.67) (1.57-1.90) (1.82-2.22) (2.01-2.48) (2.20-2.74) 11 (2.39-3.01) (2.64-3.39) (2.83-3.71) 60-min 1.27 1.55 1.94 2.25 2.69 3.05 3.41 3.81 4.36 4.82 (1.16-1.40) (1.41-1.70) (1.77-2.14) (2.04-2.48) (2.42-2.96) (2.73-3.35) (3.03-3.77) (3.35-4.22) (3.79-4.87) (4.13-5.41) 2-hr 1.46 1.79 2.28 2.67 3.25 3.73 4.24 4.80 5.62 6.31 (1.33-1.61) (1.63-1.97) (2.07-2.50) (2.42-2.94) (2.92-3.57) (3.32-4.10) (3.75-4.68) (4.21-5.32) (4.84-6.27) (5.37-7.09) E -hr 1.59 1.93 2.44 2.87 3.50 4.04 4.63 5.29 6.26 7.10 (1.44-1.75) (1.75-2.13) (2.22-2.69) (2.59-3.16) (3.14-3.86) (3.59-4.47) (4.07-5.13) 11 (4.60-5.88) (5.34-7.01) (5.98-8.01) :6.hr 2.03 2.45 3.04 3.55 4.31 4.96 5.69 6.49 7.71 ) 8.77 ) (1.86-2.22) (2.25-2.68) (2.78-3.33) (3.23-3.88) (3.89-4.72) (4.45-5.44) (5.04-6.26) (5.69-7.18) (6.62-8.60 (7.41-9.84 12-hr 2.61 3.15 3.90 4.51 5.37 6.09 6.85 7.68 8.88 9.90 (2.41-2.83) 1 (2.91-3.43) (3.59-4.24) (4.14-4.90) (4.91-5.86) (5.52-6.66) (6.17-7.52) (6.85-8.47) (7.82-9.87) (8.62-11.1) 24-hr 3.24 5.0 3.93 1 5.89 7.14 8.17 9.27 10.5 12.2 13.6 (2.93-3.66) 1 (3.55-4.45) 1 (4.52-5.68) (5.29-6.68) (6.37-8.12) (7.23-9.32) (8.13-10.6) (9.08-12.0) (10.4-14.1) (11.4-15.9) 2-day 3.90 4.71F 5.96 6.98 7 8.43 F 9.63 10.9 12.3 14.3 16.0 (3.54-4.32) 1 (5.41-6.63) (6.30-7.77) 1 (7.54-9.40) 1 (8.55-10.8) (9.60-12.3) (10.7-14.0) 1(12.2-16.4) (13.5-18.5) 3-day 4.17 5.03 F 6.31 F 7.35 F 8.82 F 10.0 F 11.3 F 12.7 i 14.7 iF 16.3 (3.79-4.62) 1 (4.58-5.58) 1 (5.73-7.02) 1 (6.65-8.18) (7.91-9.84) 1 (8.93-11.2) 1 (9.98-12.7) 1 (11.1(11.1-14.4) 1(12.6-16.7) 1(13.8-18.8) 4-day 4.44 5.34 F 6.67 F 7.73 9.22 10.4 11.7 13.1 15.0 16.6 (4.05-4.92) (4.87-5.93) (6.06-7.41) (7.00-8.59) (8.29-10.3) 1 (9.30-11.7) 1 (10.4-13.2) 1 (11.4-14.8) (12.9-17.1) (14.2-19.2) 7-day 4 5.16 6.19 7.59 8.70 10.2 11.5 12.8 14.1 16.0 17.6 ( .71-5.78) (5.64-6.94) (6.90-8.53) (7.89-9.80) (9.23-11.6) 1 (10.3-13.0) (11.3-14.6) 11 (12.4-16.2) (13.9-18.5) (15.0-20.5) 10-day 5.91 7.65 8.50 9.63 11.2 12.4 13.6 14.8 16.5 18.0 (5.42-6.57) (6.46-7.85) (7.77-9.48) (8.79-10.8) (10.1-12.5) (11.1-13.9) (12.1-15.3) (13.2-16.8) (14.5-18.9) (15.6-20.8) 20-day 7.90 9.35 11.1 12.5 14.3 15.8 17.3 18.8 20.9 22.6 (7.34-8.62) (8.67-10.2) (10.3-12.1) (11.5-13.7) (13.2-15.8) (14.4-17.4) (15.7-19.2) 1 (16.9-20.9) (18.6-23.4) (19.9-25.4) 30-day 9.76 11.5 13.4 14.9 16.8 18.3 19.8 21.3 23.3 -1 24.8 (9.08-10.5) 1 (10.7-12.4) 1 (12.5-14.5) 11 (13.8-16.2) 1 (15.5-18.3) 1 (16.8-20.0) 1 (18.1-21.7) 11 (19.3-23.4) (20.9-25.7) (22.1-27.5) 45-day 12.3 14.4 16.5 F 18.1 F 20.2 21.8 23.4 25.0 27.1 28.6 (11.5-13.1) 1 (13.5-15.4) 1 (15.5-17.6) 1 (16.9-19.3) 1 (18.9-21.6) 1 (20.3-23.4) 1 (21.7-25.2 1 (23.0-27.0) (24.7-29.4) (26.0-31.3) 60-day 14.6 17.1 19.4 F 21.2 23.5 25.2 26.9 28.5 30.6 32.1 (13.8-15.6) (16.1-18.2) (18.3-20.7) (19.9-22.6) (22.0-25.1) (23.6-27.0) (25.0-28.8) (26.4-30.7) (28.2-33.1) 1 (29.5-34.9) Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates (for a given duration and average recurrence interval)will be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PIMP values. Please refer to NOAAAtlas 14 document for more information. Back to Top PF graphical https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_Printpage.html?lat=35.9020&Ion=-82.0640&data=depth&units=english&series=pds 1/4 2/2/23,3:44 PM Precipitation Frequency Data Server PDS-based depth-duration-frequency (DDF) curves Latitude: 35.90201, Longitude: -82-1315401 35 Average recurrence 30 t ............ ----- ----t --- Ynlenral {yeara� 25 --- -- -- . --- — 1 C 2 20 --- -- -- - --- — 5 0 15 --- -- --- -- -- -- — 25 M — 60 100 — 200 500 5 -- -.:. .............. — 1000 0 - r- L L L L M o o o A A Lb A r-� a o o U�o ,I H m [aH ry rn v Ln Duration 35 30 -- - ------- ----- -------- ---- ----- ----- -------- 25 .- . ------- ----- --------- ........ - Duration t CL � 20 .- ----------=- ----=------ ---- - ............. — n — 2�ay 5�nY e — 76-mYn — 3-day " 15 - -------- --- - - ------ - . - — — 75�-mn 4-day 30-min 7-day --- — 60-mYn — 10-eay 10 ..... ........ ...... ...... — 2-nr — 20 rJay 3-hr — S�d2Yy 5 ----.. ........... — 6-hr — 45-tlay ------- — 12-hr — bo-eay 0 1 — 24-hr 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14,Volume 2,Version 3 Created(GMT):Thu Feb 2 20-43.37 2023 Back to Top Maps & aerials Small scale terrain https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9020&Ion=-82.0640&data=depth&units=english&series=pds 2/4 2/2/23,3:44 PM Precipitation Frequency Data Server 'Spruce Pine -F Grassy Creek 3 km 2mi La p scale terrain Blacksburg R Y %V I Kingsport' Bristol Johnson city" noxv'lle • I Greensl NORTH C Cha I OOkm --i` Greenville 60mi Large scale map rr BfA 01 Johnson I.qjtf inston-S lem Ash lie arl 100krn le --60rni Large scale aerial https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds—Printpage.html?lat=35.9020&lon=-82.0640&data=depth&units=english&series=pds 3/4 2/2/23,3:44 PM Precipitation Frequency Data Server Johnson Asheville Greensl GreenvilLe 100km 60mi Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring,MD 20910 Questions?: HDSC.Questionsflnoaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.9020&Ion=-82.0640&data=depth&units=english&series=pds 4/4 Reference 3 NRCS Soil Figures, S&ME, Inc., June 2023. 3 Hydrologic Soil Group—Mitchell County,North Carolina a (Bottomless Culvert DA) 402700 402BOO 402900 403000 403100 403200 403300 403400 403500 403600 Q 35o 54'13"N y� 35°54'13"N HffD— �. WgD o D o D r M41chone,Rd 44. �Y, t II I 35o 53 51"N - 35'53'51"N .1. 402800 412 W 403000 403100 403200 40. 403400 403500 403600 3 3 lV v Map Scale:1:4,930 if printed on A landscape(11"x 8.5")sheet. e Meters N 0 50 100 20D 300 Feet 0 200 400 8D0 1200 Map projection:Web Mer�tor Comer coordinates:WGS84 Edge tics:UTM Zone 17N WGS84 USDA Natural Resources Web Soil Survey 6/5/2023 Conservation Service National Cooperative Soil Survey Page 1 of 4 Hydrologic Soil Group—Mitchell County,North Carolina (Bottomless Culvert DA) MAP LEGEND MAP INFORMATION Area of Interest(AOI) p C The soil surveys that comprise your AOI were mapped at Area of Interest(A01) 0 C/D 1:12,000. Soils D Warning:Soil Map may not be valid at this scale. Soil Rating Polygons � A p Not rated or not available Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil 0 A/D Water Features line placement.The maps do not show the small areas of Streams and Canals contrasting soils that could have been shown at a more detailed 0 B scale. Transportation 0 B/D Rails Please rely on the bar scale on each map sheet for map 0 C measurements. Interstate Highways 0 C/D US Routes Source of Map: Natural Resources Conservation Service Web Soil Survey URL: 0 D Major Roads Coordinate System: Web Mercator(EPSG:3857) Not rated or not available Local Roads Maps from the Web Soil Survey are based on the Web Mercator Soil Rating Lines Background projection,which preserves direction and shape but distorts q distance and area.A projection that preserves area,such as the ® Aerial Photography Albers equal-area conic projection,should be used if more • A/D accurate calculations of distance or area are required. +'* B This product is generated from the USDA-NRCS certified data as B/D of the version date(s)listed below. x C Soil Survey Area: Mitchell County, North Carolina Survey Area Data: Version 17,Sep 12,2022 P1 0 C/D Soil map units are labeled(as space allows)for map scales * r D 1:50,000 or larger. r Not rated or not available Date(s)aerial images were photographed: Apr 1,2022—May 9, Soil Rating Points 2022 p A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background p A/D imagery displayed on these maps.As a result,some minor B shifting of map unit boundaries may be evident. B/D UU� Natural Resources Web Soil Survey 6/5/2023 � Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group—Mitchell County,North Carolina Bottomless Culvert DA Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CaE Cashiers sandy loam, A 2.2 3.6% 30 to 50 percent slopes,stony HnD Huntdale silty clay loam, B 0.2 0.3% 15 to 30 percent slopes,stony SdD Saunook-Thunder B 7.7 12.9% complex, 15 to 30 percent slopes,stony Ud Udorthents,loamy C 13.1 21.9% WgC Watauga sandy loam,8 B 20.2 33.7% to 15 percent slopes, stony WgD Watauga sandy loam, B 16.5 27.6% 15 to 30 percent slopes,stony Totals for Area of Interest 59.9 100.0% USDA Natural Resources Web Soil Survey 6/5/2023 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Mitchell County,North Carolina Bottomless Culvert DA Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Higher usDA Natural Resources Web Soil Survey 6/5/2023 Conservation Service National Cooperative Soil Survey Page 4 of 4 Reference 4 Compiled HydroCAD Report, Culvert Design, S&ME Inc., June 2023. 5S Conv . Culv . Entrance 1�7 Z4 Cult' Subcat Reach on Link Routing Diagram for 213314_Culvert HydroCAD Prepared by S&ME, Inc., Printed 6/29/2023 HydroCAD®10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC 213 314_C u I ve rt_H yd ro CAD Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Paces Project Notes Defined 10 rainfall events from 213314_Quartz Corp PF_Depth OF 213 314_C u I ve rt_H yd ro CAD Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Paces Area Listing (selected nodes) Area CN Description (acres) (subcatchment-numbers) 19.034 70 1/2 acre lots, 25% imp, HSG B (5S) 8.778 98 Paved parking, HSG B (5S) 32.031 65 Woods/grass comb., Fair, HSG B (5S) 59.843 71 TOTAL AREA 213 314_C u I ve rt_H yd ro CAD Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 4 Soil Listing (selected nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 59.843 HSG B 5S 0.000 HSG C 0.000 HSG D 0.000 Other 59.843 TOTAL AREA 213 314_C u I ve rt_HydroCAD Prepared by S&ME, Inc. Printed 6/29/2023 HydroCAD® 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 5 Ground Covers (selected nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 19.034 0.000 0.000 0.000 19.034 1/2 acre lots, 25% imp 5S 0.000 8.778 0.000 0.000 0.000 8.778 Paved parking 5S 0.000 32.031 0.000 0.000 0.000 32.031 Woods/grass comb., Fair 5S 0.000 59.843 0.000 0.000 0.000 59.843 TOTAL AREA 213 314_C u I ve rt_H yd ro CAD Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Paces Pipe Listing (selected nodes) Line# Node In-Invert Out-Invert Length Slope n Diam/Width Height Inside-Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 1 P 2,610.00 2,598.00 170.0 0.0706 0.011 48.0 0.0 0.0 213314_Culvert_HydroCAD Type 11 24-hr 100-yr Rainfall=9.27" Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 7 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 5S: Conv. Culy. Entrance Runoff Area=2,606,748 sf 22.62% Impervious Runoff Depth>5.24" Flow Length=3,140' Tc=36.9 min CN=71 Runoff=257.29 cfs 26.138 of Pond 1P: Culy Peak Elev=2,616.22' Storage=27,877 cf Inflow=257.29 cfs 26.138 of 48.0" Round Culvert x 2.00 n=0.011 L=170.0' S=0.0706 '/' Outflow=248.63 cfs 26.119 of Total Runoff Area = 59.843 ac Runoff Volume=26.138 of Average Runoff Depth = 5.24" 77.38% Pervious =46.306 ac 22.62% Impervious = 13.536 ac 213314_Culvert_HydroCAD Type 11 24-hr 100-yr Rainfall=9.27" Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 5S: Conv. Culy. Entrance Runoff = 257.29 cfs @ 12.33 hrs, Volume= 26.138 af, Depth> 5.24" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=9.27" Area (sf) CN Description 1,395,267 65 Woods/grass comb., Fair, HSG B 382,358 98 Paved parking, HSG B 829,123 70 1/2 acre lots, 25% imp, HSG B 2,606,748 71 Weighted Average 2,017,109 77.38% Pervious Area 589,639 22.62% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 13.1 100 0.2297 0.13 Sheet Flow, Woods: Dense underbrush n= 0.800 P2= 3.70" 14.0 1,001 0.2276 1.19 Shallow Concentrated Flow, Forest w/Heavy Litter Kv= 2.5 fps 8.8 1,077 0.0855 2.05 Shallow Concentrated Flow, Short Grass Pasture Kv= 7.0 fps 1.0 962 0.0891 16.10 563.63 Channel Flow, Area= 35.0 sf Perim= 20.0' r= 1.75' n= 0.040 Mountain streams 36.9 3,140 Total 213314_Culvert_HydroCAD Type 1124-hr 100-yr Rainfall=9.27" Prepared by S&ME, Inc. Printed 6/29/2023 HydroCAD® 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 9 Subcatchment 5S: Conv. Culv. Entrance Hydrograph 280 ❑Runoff ze .z9 ors 2so -1 - -1- - � Type ail-24+.hr- 240 1 11 220 - 1 - - - - - 1 - - - 1 1�Yr Oai 'nfaH'1=9.# 200 urho Area 606,7 1 s 180 1Rur, 1 olume�26,1381 of - - - - - - - - - - - - - - - - - - - - - - - - - 160 T _ _RO-o# Do{-thy5.24" 0140 — 4 - - - - - - - � _ Flow Lengthx3,140' LL 120 1 1 1 1 - - - - - - - - - - - -Te=3§.Jtyj-jn- 100 80 — 1 — —I — — I— — L — J — —I — I— I — —I— — L 1 1 — — — — 60 1 1 1 1 1 1 1 1 1 1 — — - — — — — — — - — — 1 1— — i 1 — ,— - 40 20 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 213314_Culvert_HydroCAD Type 11 24-hr 100-yr Rainfall=9.27" Prepared by S&ME, Inc. Printed 6/29/2023 HydroCADO 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Pond 1 P: Culy Inflow Area = 59.843 ac, 22.62% Impervious, Inflow Depth > 5.24" for 100-yr event Inflow = 257.29 cfs @ 12.33 hrs, Volume= 26.138 of Outflow = 248.63 cfs @ 12.39 hrs, Volume= 26.119 af, Atten= 3%, Lag= 4.0 min Primary = 248.63 cfs @ 12.39 hrs, Volume= 26.119 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 2,616.22' @ 12.39 hrs Surf.Area= 9,003 sf Storage= 27,877 cf Plug-Flow detention time= 1.4 min calculated for 26.119 of(100% of inflow) Center-of-Mass det. time= 1.1 min ( 800.2 - 799.1 ) Volume Invert Avail.Storage Storage Description #1 2,610.00' 110,509 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 2,610.00 998 0 0 2,612.00 2,711 3,709 3,709 2,614.00 5,446 8,157 11,866 2,616.00 8,616 14,062 25,928 2,618.00 12,113 20,729 46,657 2,620.00 15,889 28,002 74,659 2,622.00 19,961 35,850 110,509 Device Routing Invert Outlet Devices #1 Primary 2,610.00' 48.0" Round Culvert X 2.00 L= 170.0' RCP, square edge headwall, Ke= 0.500 Inlet/ Outlet Invert= 2,610.00' /2,598.00' S= 0.0706 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 12.57 sf Primary OutFlow Max=248.23 cfs @ 12.39 hrs HW=2,616.21' (Free Discharge) L1=Culvert (Inlet Controls 248.23 cfs @ 9.88 fps) 213314_Culvert_HydroCAD Type 1124-hr 100-yr Rainfall=9.27" Prepared by S&ME, Inc. Printed 6/29/2023 HydroCAD® 10.00-26 s/n 06707 ©2020 HydroCAD Software Solutions LLC Page 11 Pond 1 P: Culv Hydrograph i ■Inflow 280 — 25Z29 cfs —I `u Q h ■Primary 260 / — t — _ 248.63 cfs _ Infle YY Arap-1 59.84rpy_/� � I 240 lea ElIev:7�1;6-is2'- 220 200 -11 11-##race="�7,�77ICf — — — — — I— — - 4 — —I Q- 180 �v.o-il— � 160 -II -_R_o_u_nId _Culvert_x_2.0_0 140 + i I I I I I I ,I� LL 120 — + — � — — — — — - - — � n-10,QI11- 100 - L - � - -11- - i- - - - iL=�7070� 80 - - - - S--�0.07061 T 40 20 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Reference 5 Culvert Delineation Figure, S&ME Inc.,July 2023. m 2923 283\2828 2yy,�'L - 26 22s>2 26 61�7 mo .y2594 p2s u`2557 57 sNl p 12�a t � ' ._ �sps2 SS2g .�,\ j 27430 26� 716 ti 2569 s'17 25co 26 255 1 'zs Z560C 02 S 2g33 2 2:b 5672657 S60) 26 1\ , 263N 662 7 '83 26' 9`6 sgN �L bg1_268> 28 6� ro 22759 o 2596 I I I 10 107 22761 2 26822 261 / S 34 _�2>3p,763 2836 ti 2720 OS 94 2> 2650 2623 V�, rn 3b w ti N� '83Q 2758 2747 °� 2661 ti633 2i m N m 2980 0 2773 �S N N gB> o N 2774 ^ u' 2773 2722 167S ,L �,Sg 26 4 gq 2777 N 2835 2> 269S F 283y 2657 NS9p �w \s�v 28S, 2 2>19 N No�b 2667 N NCO 7 Z 'w ON 2783 2> N N 8A3 6oC o ay ?8,p 0 2 74 28 N� 2690 N Mo.^^3029 s� 28^^ cs�8 2 28g9 0o i 8 268376 2697 W 2> 6 2704 N N9$ m 9 2696 ^wrn ^ 283 2 2>6 12 2�03 N 2821 ti 2826 co 21g2 769 >� 2> 2�2117 b�O N 2 Z C'j 2 78 ti 2802 803 2g7> 2j85 2 � �271�33030 s_ 84 2 795 '776 2726272 2826 s__ ►_ �97 N 26p7 'L$' b� 1 Q ti M 026 0 ti� ry 34- r2j89 2777 277S 2189 2782 2 ti; 2727 2�3 z 3 0 �, o 0 Z (� oy �p m - --- 2908 a1 \ 1^y6 2>4S 21A2 L^o ~ z Q Q 0 ti v ^ 2925 N \ 2>q8 26 ? U 276� 2 666 W o 649-- Q 0 741 zd 263 O zZIV 54o ON 2592 2>33 H o° ��/9 —_zs77 Q Q Z 3�0 3p34 3033 3p19 v N9R7 Nw� "827 N>63 Sr ` - �2.` _ 277a tiO255A 2S62 C7 O m 3003 28� > rj 3�3306'' v�20\ ° 3 2S49 1 2 2 �5346jy D2P5 � by V OAS 299 269m roo ,0- ^ 3 ' zz ~ LLJ s 291 2563 io c2g 952 2g7g 25 'SSO 2938 N 6> y 2592 rs ^OS 2602930 Q .096 2921 co 260 29.1.1 6o N ', 26 N = C 76 1,680 N w h 0 ^ 2628 293ti 2896 2dj` N 2920 2906 n 2 26 266� N ^ 2637 .2 28B> 289 NJ �� 2> > 6° 26$ YJ NSOj. N 2648 LL291� 9 N N ti� 2181 86 abyy 2639 S 26S2 2648 �o c� c-'s, Nsi N bbo 8 2895 28g8 2852 286 2892 0, 2 628�_ 263 8 263 N yp N6, > 6 2886 10 N �6) 2625 2a 28g6 y^ ,y4,,L$p2 2�' 4 2> 9 2630 313 2� 2836 28>_ N ti8 2822 o NN 2 2 2622 m N50 2864 1 2819 w �r7 262> 0 26.1.1 w 2858 °'s 2607 2605 2827 's 2B2S 2845 5 2597 4 N Ns , sty N6`° �y 2875 28'8 c67° 2727 \ 25s6�^) LySU cs>y 60� °o 707 277,9 0 °'�2017 2823 2> c>6p' ,� m rn ( /6'j5 0 2191 2802 2� �qb �r 2>07 s, ra0 SCALE: z791 219s s zsy�s� LEGEND �> 2692 �6 1 " = 300 ' ss 2787 >> 1 1 CULVERT LOCATION 277a N �11p DATE: 2'j2 2153 °s 270 — SHEET FLOW 7/7/2023 ap 2752 6 Z o o SHALLOW CONCENTRATED FLOW PROJECT NUMBER 2743 1 �682 �°b E �,� CHANNELIZED FLOW 213314 CULVERT DRAINAGE AREA FIGURE NO. d REFERENCE: 6y° 3 GIS BASE LAYERS WERE OBTAINED FROM ESRI. THIS MAP IS FOR INFORMATIONAL 0 300 600 2663 �611 1 — MAJOR INTERVALS - (10') PURPOSES ONLY. ALL FEATURE LOCATIONS DISPLAYED ARE APPROXIMATED.THEY ARE N 6.,6 266 NOT BASED ON CIVIL SURVEY INFORMATION,UNLESS STATED OTHERWISE. (FEET) e 2666• 26So 2 MINOR INTERVALS - (2') IV 2ss6 asp c'6ys s53 2656 Temporary Holding Basin Volume Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I I Mitchell County, North Carolina S&ME Project No. 213314 COMPUTATIONS BY: Signature Date 07/07/2023 Name Cedric H. Ruhl, P.E. Title Senior Engineer— Project Manager ASSUMPTIONS Signature "d. Wt Date 07/07/2023 AND PROCEDURES Name Ty Holderbaum, P.E. CHECKED BY: Title Project Manager COMPUTATIONS Signature Date 07/07/2023 CHECKED BY: Name Andrew E.Wilmer, E.I. Title Associate Project Manager /* Al REVIEWED BY: 2023 Signature Date 07 07 a / / Name Christopher J.L. Stahl, P.E. Title Principal Engineer, V.P. REVIEW NOTES/COMMENTS: July 7, 2023 1 Temporary Holding Basin Volume Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I Mitchell County, North Carolina S&ME Project No. 213314 OBJECTIVE: The objective of this calculation report is to evaluate the proposed temporary holding basin volume, and flow rates into and out of the temporary holding basin. SUMMARY: The storage capacity of the proposed temporary holding basin was evaluated for a range of inflow and outflow pumping scenarios. CALCULATIONS The plant periodically needs to shut down the wastewater treatment system for maintenance. The temporary holding basin will be a double-lined facility that will temporarily store wastewater, allowing the plant to maintain operations during wastewater treatment system maintenance. The liquids in the temporary holding basin will be pumped to the existing wastewater treatment system when the system becomes operational after completion of maintenance activities. The temporary holding basin has an operating volume of 715,000 gallons not including freeboard. Several pumping scenarios were evaluated on a flow rate basis as summarized in the following table: Table 1: Temporary Holding Basin Pumping Analysis Temporary Holding Initial Condition Basin Operating Temporary Inflow Outflow Net Flow Filling Time Dewatering Description Holding Basin Time No. Volume (gpm) (gpm) (gpm) (hours) Storage Volume (hours) (gallons) (gallons) Inflow=100 gpm 1A Outflow=0gpm 715,000 0 100 0 100 119.2 N/A Basin is empty Inflow=1,000gpm 1B Outflow=0gpm 715,000 0 1,000 0 1,000 11.9 N/A Basin is empty Inflow=2,500 gpm 1C Outflow=0gpm 715,000 0 2,500 0 2,500 4.8 N/A Basin is empty Inflow=0 gpm 2A Outflow=50 gpm 715,000 715,000 0 50 -50 N/A 238 Basin is full Inflow=0 gpm 2B Outflow=100 gpm 715,000 715,000 0 100 -100 N/A 119 Basin is full Inflow=0 gpm 2C Outflow=1,000 gpm 715,000 715,000 0 1000 -1,000 N/A 12 Basin is full July 7, 2023 2 Temporary Holding Basin Volume Calculation Mining Modification Permit No. 61-16 The Quartz Corp. USA I I I Mitchell County, North Carolina S&ME Project No. 213314 CONCLUSIONS The storage capacity of the proposed temporary holding basin was evaluated for a range of inflow and outflow pumping scenarios. July 7, 2023 3