Loading...
HomeMy WebLinkAbout20230623_ADI_Received From: Cole Atkins To: Parr,Adam Cc: Summers,Kimberly M; Hunter Bratton Subject: [External] RE: Knightdale teams call Date: Thursday,June 22,2023 3:55:24 PM Attachments: imaae001.Dna Plan Set Page 1 Revised 6-22-23.Ddf Western Ditch Culverts.Ddf CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Adam and Kimberly, Thank you both for your time today on Teams. I've attached a revised page 1 of the Knightdale Quarry permit mod plans with lat/long points around the mining permit boundary. I have also added to the map the existing 3 x 30" pipes at the end of the western stormwater ditch, and attached calculations for the proposed 30" CMP pipes that will provide additional access across that same ditch. Each proposed culvert pipe will pass 40.2 cfs (total of 120.6 cfs for 3 pipes) before overtopping the ditch. I am confident that these three pipes will easily pass any storm event without overtopping the ditch and going offsite. Also, our plotter is being serviced today, so I am hopeful that I can deliver 2 printed copies tomorrow. We will have them to you early next week at the latest. Please let me know if you have any questions or need any additional information. Sincerely, Cole L. Cole Atkins Environmental Supervisor/Chief Geologist Wake Stone Corporation (919) 266-1100 } WAKE STONE (:OR PO RATION From: Parr, Adam <adam.parr@deq.nc.gov> Sent:Thursday,June 22, 2023 10:34 AM To: Cole Atkins<coleatkins@wakestonecorp.com> Subject: Knightdale teams call https://teams.microsoft.com/1/meeiup- a oin/19:meeting ND15MzRhMTMtYmRmYSOOYzA3LWJkNmMtZDZkNeg5YzNIYTNipthread.v2/0? context=%7B%22Tid%22:%227a7681dc-b9d0-449a-85c3- ecc26cd7ed19%22.%220id%22:%22c676126d-d2e5-405f-a55f-48db50a85d95%22%7D Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. Culvert Analysis Spreadsheet Ver 5/2012 Client: Knightdale Quarry County: Wake Date: 22-Jun-23 Design By: LCA Checked By: LCA Date: Comments: 3 x 30" CMP will pass 120.6 cfs without overtopping ditch Inputs: Headwater(Upstream Water Surface) Elevation: 267.00 Feet Culvert Inlet Invert Elevation: 262.00 Feet Culvert Diameter: 30.00 Inches Select Culvert Material: JCMP Length of Culvert: 65.00 Feet Select Culvert Inlet Type: I Projecting-Thin Edge Culvert Outlet Invert Elevation: 259.00 Feet Tailwater(Downstream) Elevation: 259.00 Feet Outputs: CAPACITY = 40.2 cfs INLET CONTROLS (Submerged Equation) Manning's n value: 0.024 CMP Entrance Coefficient, Ke: 0.9 Projecting-Thin Edge