Loading...
HomeMy WebLinkAbout20230630_ESC_Calcs_80-32 SEDCAD 4 for Windows rn,—inF.loon_Onln Pain I o,h—h 1 Keller Mining-Sand Mine & Recycle Kannapolis, NC MGE Proj , 220703.440 10 YR124 HR STORM RECEIVED ?�(goEEs /0 JUN 3 9 20D LAND QUALITY 139 3 MINING PROGRAM • �HGIN�c��' . Jerry L. Meade MEADE GUNNELL engineering, PC P.O. Box 790 Cornelius, NC 28031 Phone: 704-655-7290 Email: jmeade@meadegunnell.com Filename: KellerSanditeRl.sc4 Printed 05-29-2023 SEDCAD 4 for Windows f:nnvrinhf 1QQA�7M11 Pomolo { Ghuiah 2 General Information Storm Information: Storm Type: MRCS Type II Design Storm: 10 yr-24 hr Rainfall Depth: 5.070 inches Particle Size Distribution: Size(mm) S-2 9.5000 100.000% 4.7500 97.000% 2.0000 64.700% 0.4250 54.000% 0.1500 36.700% 0.0750 29.000% 0.0184 20.700% 0.0056 15.600% 0.0012 14,400% Filename:KellerSandMineRl.sc4 Printed 05-29-2023 Particle Size Analysis CD c c c c = _ 0 00 0 0 fo�pp a v 0 fD P7 N r r � � 1 3t # ,�C 100 I I I I I 11 I I I I I so I I I I I I I I I I I I I 80 I I I I I I I I I I I I I I 70 I I I I I l i I I f l l l l W I I I I I I I I I I Z so I I I I I I I I I I I I u- Z 50 w I I I I I I I I I I1 I I w 40 I I I I I I I I I I N I I I CL I I 1 1 1 I ! I I 30 I I I I I l i ( I I I I I l I I I I I I 20 10 I I I I I 1 1 f I I I I I I I I I I I f I a 100 10 1 0.1 0.01 0.001 GRAIN SIZE-mm. *3„ %Gravel %Sand %Fines Coarse Fine Coarse Medium Fine Silt Clay 0.0 0.0 3.0 32.1 10.9 25.0 13.6 15.4 SIEVE PERCENT SPEC. PASS? Material Description SIZE FINER PERCENT (X=NO) Yellowish red,silty clayey SAND 3/8" 100.0 #4 97.0 #10 64.9 #40 4. Atterberg Limits #100 36.7 PL= LL= P1= #200 29.0 Coefficients .0386 mm. 25.2 D90= 3.7810 D85= 3.3288 D60= 0.7451 .0281 mm. 23.2 D50= 0.3094 D30= 0.0854 D15= 0.0023 .0184 mm. 20.7 D10= Cu= Cc= .0109 mm. 18.8 Classification .0079 mm. 16.9 USCS= SC-SM AASHTO= .0056 mm. 15.6 .0028 mm. 15.1 Remarks .0012 mm. 14.4 Sample delivered to KEG by Mr.Jerry Meade,P.E.with Meade Gunnell Engineering. (no specification provided) Source of Sample:Keller Mining Sample Number:S-2 Date: 11/18/2022 Kessel Engineering Group Client: Meade Gunnell Engineering Project: Meade Pit Study Project No: JM22-4547-01 Figure SEDCAD 4 for Windows r..nnvrinht 1 aas%_7n1 n Domoln 1 Crhueah 3 Structure Networking: Type Stru (flows Stru Musk.K Musk.X Description # into) # (hrs) Pond #1 #2 0.000 0.000 P-1 Pond #2 =_> #3 0.000 0.000 P-2 Pond #3 =_> End 0.000 0.000 P-3 #1 Pond 4 #2 Pond #3 Pond Filename:KellerSandMineR1.sc4 Printed 05-29-2023 SEDCAD 4 for Windows f`nnvrinfif iQOR_7M�1 Pamnh 1 Crh+mh 4 Structure Summary: Immediate Total Peak Total I Peak Peak Contributing Contributing Runoff Sediment Sediment Settleable 24VW Area Area Discharge Volume (tons) Conc. Conc. (ac) (ac) ( S) (ac-ft) (mg/1) (ml/1) #1 In I1.700 11.700 38.23 3.46 80.8 33,768 21.92 11.05 Out 14.44 3.62 13.3 4,062 0.06 0.04 In 17.05 3.85 13.3 3,916 0.05 0.04 #2 0.800 12.500 Out 9.52 3.55 11.9 3,113 0.00 0.00 #3 In 24.900 37.400 75.59 10.68 61.3 9,758 5.09 2.39 Out 6.62 5.08 10.4 1,853 0.00 0.00 Filename:KellerSandMineR1.sc4 Printed 05-29-2023 SEDCAD 4 for Windows rmwrinh4 100fi_7nin Pommo 1 Crhuiah 5 Particle Size Distribution(s) at Each Structure Structure #1 (P-1). Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 97.021% 100.000% 2.0000 64.714% 100.000% 0.4250 54.012% 100.000% 0.1500 36.708% 100.000% 0.0750 29.006% 100.000% 0.0184 20.705% 100.000% 0.0056 15.603% 95.174% 0.0012 14.403% 87.853% Structure #2 (P-2): Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 100.000% 100.000% 2.0000 100.000% 100.000% 0.4250 100.000% 100.000% 0.1500 100.000% 100.000% 0.0750 100.000% 100.000% 0.0184 100.000% 100.000% 0.0056 95.182% 100.000% 0.0012 87.873% 97.905% Structure #3: Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 98.058% 100.000% 2.0000 72.023% 100.000% 0.4250 63.327% 100.000% 0.1500 49.266% 100.000% 0.0750 43.008% 100.000% Filename:KellerSandMineR1.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r.nnurinhl 1QQfi-,7n4n Comela 1 Qr-hurmh 6 Size(mm) In Out 0.0184 36.262% 100.000% 0.0056 32.117% 100.000% 0.0012 30.735% 100.000% Filename:KelierS and Mine Rl.sc4 Printed 05-29-2023 SEDCAD 4 for Windows rn ,,anht loOR-OMn P-1. I Q1h—h Structure Detail; Structure #1 (Pondl P-1 Pond Inputs: Initial Pool Elev: 769.00 ft Initial Pool: 0.09 ac-ft *Sediment Storage: 0.33 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser - Barrel Number of Diameter Riser Height Diameter Barrel *I Slope Mann ing's n Spillway Elev Hales per (in) (ft) (In) Length(ft) (/o) (ft) Elev 24.00 3.001 18.00 128.00 0.751 0.0150 770.00 4 Floating Siphon Crest Elev Inlet Elev Outlet Elev DI(Ime)ter Length(ft) Manning's n 772.00 769.00 767.50 2.00 100.00 0.0140 Pond Results: Peak Elevation: 771.77 ft H'graph Detention Time: 3.30 hrs Pond Model: CSTRS Dewater Time: 1.07 days Trap Efficiency: 83.61% Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (ds) (hrs) 768.74 0.339 0.000 0.000 Top of Sed.Storage 769.00 0.360 0.090 0.000 Low hole SPW#1 769.50 0.404 0.281 0.363 6.36* 770.00 0.450 0.495 0.495 7.25 Spillway#1 770.50 0.501 0.732 6.970 10.90 Filename:KellerSandMineR1.so4 Printed 05-29-2023 SEDCAD 4 for Windows r. .h,+uon-oMn Pamela 1 46umh 8 Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (ds) (hrs) 771.00 0.555 0.996 13.430 0.45 771.50 0.611 1.287 14.093 0.40 771.77 0.644 1.463 14.441 0.40 Peak Stage 772.00 0.670 1.607 14.726 Spillway#2 772.50 0.685 1.946 15.334 773.00 0.700 2.292 15.918 Detailed Discharge Table Combined Elevation Perf. Riser(ds) Floating Siphon Total (ft) (cfs) Discharge (cfs) 768.74 0.000 0.000 0.000 769.00 2.00>0.000 0.000 0.000 769.50 0.297 0.066* 0.363 770.00 0.420 0.075* 0.495 770.50 6.886 0.083* 6.970 771.00 13.339 0.091* 13.430 771.50 13.995 0.098* 14.093 772.00 14.622 0.105 14.726 772.50 15.223 0.111 15.334 773.00 15.801 0.117 15.918 Structure #2 Pond) P-2 Pond Inputs: Initial Pool Elev: 766.50 ft Initial Pool: 0.15 ac-ft *Sediment Storage: 0.00 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser Riser Height Barrel Barrel Barrel Slope Spillway Elev Number of Diameter (ft) Diameter Length(ft) (0/0) Manning's n (ft) Holes per (In) (In) Elev 24.00 5.001 18.00 220.00 0.50 0.0150 770.00 2 Filename:KellerSandMineR1.sc4 Printed 05-29-2023 ♦ y SEDCAD 4 for Windows rnn%t inht 1oaR_,)nin Pamni:% I Crhurah 9 Riser Riser Height Barrel Barrel Slope Spillway Barrel S illwa Elev Humber of Diameter (ft) Diameter Length(ft) (%) Manning s n (ft) Holes per (in) (in) Elev 24.00 5.00 18.00 220.00 0.501 0.0150 770.00 2 Pond Results: Peak Elevation: 770.70 ft H'graph Detention Time: 6.35 hrs Pond Model: CSTRS Dewater Time: 2.25 days Trap Efficiency: 10.25% Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 765.00 0.000 0.000 0.000 Top of Sed.Storage 765.50 0.043 0.007 0.000 766.00 0.170 0.057 0.000 766.50 0.209 0.151 0.000 Low hole SPW#1 767.00 0.252 0.266 0.149 9.37* 767.50 0.299 0.404 0.210 7.92* 768.00 0.350 0.566 0.406 4.83* 768.50 0.369 0.746 0.507 6.05 769.00 0.389 0.935 0.738 5.50 769.50 0.409 1.135 0.871 5.45 770.00 0.430 1.345 0.983 8.40 Spillway#1 770.50 0.449 1.564 6.886 5.95 770.70 0.457 1.656 9.516 0.60 Peak Stage 771.00 0.469 1.794 13.496 771.50 0.489 2.034 13.963 772.00 0.510 2.283 14.415 772.50 0.554 2.549 14.854 773.00 0.600 2.838 15.279 *Designates times)to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Filename:KellerSandMineR1.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r._Mri h1100A-OMn Pamda I R -h 10 Combined Elevation Total Pert. Riser(cfs) (ft) Discharge (cfs) 765.00 0.000 0.000 765.50 0.000 0.000 766.00 0.000 0.000 766.50 2.00>0.000 0.000 767.00 0.149 0.149 767.50 2.00>0.210 0.210 768.00 0.406 0.406 768.50 2.00>0.507 0.507 769.00 0.738 0.738 769.50 0.871 0.871 770.00 0.983 0.983 770.50 6.BB6 6.886 771.00 13.496 13.496 771.50 13.963 13.963 772.00 14.415 14.415 772.50 14.854 14.854 773.00 15.279 15.279 Structure #3(Pond1 P-3 Pond Inputs: Initial Pool Elev: 766.00 ft Initial Pool: 0.51 ac-ft *Sediment Storage: 0.63 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser Barrel Number of Diameter Riser Height Diameter Barrel Barren Slope Manning's n Spillway Elev Holes per (in) (ft) (in) Length(ft) (/o) (ft) Elev 36.00 7.001 18.00 100.00 1.00 0.0150 771.50 2 Floating Siphon Crest Elev Inlet Elev Outlet Elev Diameter Length(ft) Manning's n (In) 772.00 766.00 763.00 2.00 100.00 0.0140 Filename:KellerSandMineRl.sc4 Printed 05-29-2023 SEDCAD 4 for Windows !`nnrrinhllQQq_9M11 P�mola I Crhurah 11 Pond Results: Peak Elevation: 771.81 ft H'graph Detention Time: 7.19 hrs Pond Model: , CSTRS Dewater Time: 20.50 days Trap Efficiency: 83.08% Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacitor-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 765.32 0.630 0.000 0.000 Top of Sed.Storage 765.50 0.688 0.119 0.000 766.00 0.870 0.508 0.000 766.50 0.909 0.952 0.091 59.21* 767.00 0.948 1.417 0.098 57.31* 767.50 0.989 1.901 0.105 55.92* 768.00 1.030 2.405 0.111 54.90* Low hole SPW#1 768.50 1.071 2.931 0.154 41.16* 769.00 1.113 3.477 0.176 37.63* 769.50 1.156 4.044 0.193 35.57* 770.00 1.200 4.633 0.208 34.20* 770.50 1.241 5.244 0.260 28.45* 771.00 1.284 5.875 0.288 26.52* 771.50 1.326 6.527 0.312 25.30* Spillway#1 771.81 1.354 6.945 6.615 35.05 Peak Stage 772.00 1.370 7.201 10.484 Spillway#2 772.50 1.459 7.908 19.326 773.00 1.550 8.660 19.856 *Designates time(s)to dewater have been extrapolated beyond the 50 hour hydrograph limit. Detailed Discharge Table Combined Elevation Floating Siphon Total Perf.Riser(cfs) (ft) (cfs) Discharge (cfs) 765.32 0.000 0.000 0.000 765.50 0.000 0.000 0.000 I 766.00 0.000 0.000 0.000 766.50 0.000 0.000 0.091 f Printed 05-29-2023 Filename:KellerSandMineR1.sc4 i s` E SEDCAD 4 for Windows rnnurinhf ioaA_,)ni 1 Pamoio 1 CI-h%AJMh 12 Combined Elevation Perf.Riser(cfis) Floating Siphon Total Ut) (cfs) Discharge (cfs) 767.00 0.000 0.000 0.098 767.50 0.000 0.000 0.105 768.00 1.00>0.000 0.000 0.111 768.50 0.037 0.000 0.154 769.00 0.053 0.000 0.176 769.50 0.064 0.000 0.193 770.00 1.00>0.074 0.000 0.208 770.50 0.120 0.000 0.260 771.00 0.143 0.000 0.288 771.50 0.163 0.000 0.312 772.00 10.330 0.000 10.484 772.50 19.167 0.000 19.326 773.00 19.692 0.000 19.856 i i Printed 05-29-2023 Filename:KellerSandMineR1.sc4 SEDCAD 4 for Windows 13 Subwatershed Hydrology Detail; SWS Area Time of Musk K Curve Peak Runoff Stru SWS Conc Musk UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 0.600 0.001 0.096 0.242 91.000 TR55 2.19 0.202 2 7.500 0.115 0.000 0.000 91.000 TR55 27.39 2.529 3 3.600 0.093 0.092 0.267 74.000 TR55 9.30 0.725 71 11.700 38.23 3.456 #2 1 0.800 0.001 0.123 0.231 86.000 TR55 2.71 0.235 E 12.500 17.05 3.853 #3 1 2.100 0.092 0.060 0.307 91.000 TR55 7.67 0.708 2 13.200 0.118 0.000 0.000 91.000 TR55 48.21 4.452 3 9.600 0.163 0.091 0.267 74.000 TR55 22.95 1.966 37,400 75.59 10.679 Subwatershed SedimentologyDetail: Peak Peak Sediment Sediment Settleable 24VW S#u S#S Soil K L(ft) S(%) C P PS# Conc. Conc (tons) (ml/I) (mg/1) (ml/I) #1 1 0.170 50.00 33.00 0.4500 1.0000 1 17.8 115,013 74.65 40.70 2 0.170 100.00 5.00 0.4500 1.0000 1 48.2 25,050 16.26 9.02 3 0.240 100.00 5.00 0.3600 1.0000 1 14.8 28,583 18.55 9.64 E 80.8 33,768 21.92 11.05 #2 1 0.170 50.00 33.00 0.4500 1.0000 1 21.9 120,331 78.10 42.83 E 13.3 3,916 0.05 0.04 #3 1 0.240 100.00 5.00 0.0820 1.0000 1 3.0 5,658 3.67 2.01 2 0.170 100.00 2.00 0.4500 1.0000 1 36.7 10,904 7.08 3.92 3 0.240 100.00 5.00 0.0820 1.0000 1 9.7 6,816 4.38 2.32 1 61.3 9,758 5.09 2.39 Subwatershed Time of Concentration Details; Stru SWS Land Flow Condition Slope(%) Vert. Dist. Horiz. Dist. Velocity Time(hrs) # # (ft) (ft) (fps) #1 1 5.Nearly bare and untilled,and 50.00 24.00 48.00 7.070 0.001 alluvial valley fans #1 1 Time of Concentration: 0.001 Filename:KellerSandMineRt.sc4 Printed 05-29-2023 SEDCAD 4 for Windows (.nnurinhf 1 aaA-,)nl n Domain I -Q h%Aiah 14 Stru SWS Land Flow Condition Slope(%) Vert.Dist. Horiz.Dist. Velocity Time(hrs) # # (ft) (ft) (fps) #1 2 5.Nearly bare and untilled,and 2.46 16.00 650.00 1.560 0.115 alluvial valley fans #1 2 Time of Concentration: 0.115 #1 3 3.Short grass pasture 5.32 33.00 620.00 1.840 0.093 #1 3 Time of Concentration: 0.093 #2 1 5.Nearly bare and untitled,and 5.33 32.00 600.00 2.300 0.072 alluvial valley fans #2 1 Time of Concentration: 0.001 #3 1 3.Short grass pasture 5.67 36.00 635.00 1.900 0.092 #3 1 Time of Concentration: 0.092 #3 2 S.Nearly bare and untilled,and 2.00 12.00 600.00 1.410 0.118 alluvial valley fans #3 2 Time of Concentration: 0.118 #3 3 2.Minimum tillage cultivation 4.72 30.00 635.00 1.080 0.163 #3 3 Time of Concentration: 0.163 subwatershed Muskingum Routing Details: Stru SWS Land Flow Condition Slope(%) Vert.Dist. Horiz.Dist. Velocity Time(hrs) # # (ft) (ft) (fps) #1 1 5.Nearly bare and untilled,and 2.55 14.00 550.00 1.590 0.096 alluvial valley fans #1 1 Muskingum K: 0.096 #1 3 5.Nearly bare and untitled,and 32.73 18.00 55.00 5.720 0.002 alluvial valley fans 5.Nearly bare and untilled,and 2.40 12.00 500.00 1.540 0.090 alluvial valley fans #1 3 Muskingum K: 0.092 #2 1 S.Nearly bare and untilled,and 2.33 14.00 600.00 1.520 0.109 alluvial valley fans #2 1 Muskingum K: 0.123 #3 1 S.Nearly bare and untilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans 5.Nearly bare and untilled,and 5.86 30.00 510.00 2.420 0.058 alluvial valley fans #3 1 Muskingum K: 0.060 #3 3 5.Nearly bare and untilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans S.Nearly bare and untilled,and 2.55 13.00 510.00 1.590 0.089 alluvial valley fans #3 3 Muskingum K: 0.091 f i i Filename:KellerSandMineR1.sc4 Printed 05-29-2023 P-1 773 772 : . . . : . . . : . . . : . . . : . . . . . . . : . . . . . . : . . . . : . . � 771 . . . . . . . . . . 770 T rL� i .769 C D:. . . . . . . .768 . .:. . . .:. . . . . . . . . .767 0.0 0.2 0.4 0.6 0.8 1 .0 1 .2 1 .4 1 .6 1 .8 2.0 2.2 2.4 2.6 2.8 Capacity (ac-ft) i P-21 773 772 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 771 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 770 of �isf2 0 = 769 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . -2 768 .. . . . . . . . . . . . . . . . . . . . . . . * . . . . . . . . . . . . . ui . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 767 . . . . . . . . 766 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . 765 0.0 1 .0 2.0 3.0 Capacity (ac-ft) P-3 774 772 . . . . . . . . . . . .o . -lsEQ . . . . . . . . . . . . . . . . . . . . . :. . . . . . : . . . . . . . 770 . . . . . . . . . . . ... . . . . . . . . . . . .. . . . . . . .. o 768 . . . . . ... . . . . .:. . . . . . . . . . . . . . . . . . . . . . . .:. . . . . . :. . . . . . . . . . . . W 766 ;G1 . : . . . . . . . . . . . . . . . ; . . . . . ... . . . . . . . . . . . ; . . . . . . p 764 . . . . . . . . . ... . . . . . . . . . . . .. . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . 0 1 2 3 4 5 6 7 8 9 10 Capacity (ac-ft) SEDCAD 4 for Windows !`nnwalnht loan_OM n Pamnla I Crhwah Keller MiningmSand Mine & Recvcle Kannapolis, Nc MGE Pro '. 220703.440 25 YR124 HR STORM Jerry L. Meade MEADE GUNNELL engineering, PC P.O. Box 790 Cornelius, NC 28031 Phone: 704-655-7290 Email: jmeade@meadegunnell.com Filename:KellerSandMine25yr=4 Printed 05-29-2023 SEDCAD 4 for Windows f:nn%trinhf 10QA_,>mn Pamola l Cnh%AlMh 2 General Information Storm Information: Storm Type: MRCS Type II Design Storm: 25 yr-24 hr Rainfall Depth: 6.010 inches Particle Size Distribution: Size(mm) S-2 9.5000 100.000% 4.7500 97.000% 2.0000 64.700% 0.4250 54.000% 0.1500 36.700% 0.0750 29.000% 0.0184 20.700% 0.0056 15.600% 0.0012 14.400% Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r:nrnirinh4 1OOR-,;nin Pamoln I CrhlAlQh 3 Structure Networking; Type Stru (flows Stru Musk.K Musk.X Description # Into) # (hrs) Pond #1 =_> #2 0.000 0.000 P-1 Pond #2 =_> #3 0.000 0.000 P-2 Pond #3 =_> End 0.000 0.000 P-3 1�f #x Pond #2 Pond #3 Pond Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r.nrwrinht i aan-7ni n Pamela I Crh%Amh A Structure Summary: Immediate Total Peak Total Peak Peak Contributing Contributing Discharge Runoff Sediment Sediment Settleable 24VW Area Area Volume (tons) Conc. Conc. (mijl) (ac) (ac) (cfs) (ac-ft) (mg/1) (ml/l) In 46.89 4.31 102.0 33,942 22.03 11.19 #1 11.700 11.700 Out 16.47 4.26 16.8 4,193 0.06 0.05 In 19.64 4.55 16.8 4,023 0.06 0.04 #2 Out 0.800 12.500 13.02 4.26 15.3 3,309 0.00 0.00 In 93.82 13.19 77.8 10,006 5.21 2.45 #3 Out 24.900 37.400 15.74 7.17 15.9 1,938 0.00 0.00 Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 • T SEDCAD 4 for Windows r:nmosinhi 9QQR_9M/1 Parnmin I Cf-himah 5 Particle Size Distribution(s) at Each Structure Structure #Y (P-1): Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 97.022% 100.000% 2.0000 64.715% 100.000% 0.4250 54.012% 100.000% 0.1500 36.708% 100.000% 0.0750 29.007% 100.000% 0.0184 20.705% 100.000% 0.0056 15.604% 94.932% 0.0012 14.403% 87.630% Structure #2 (P-2): Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 100.000% 100.000% 2.0000 100.000% 100.000% 0.4250 100.000% 100.000% 0.1500 100.000% 100.000% 0.0750 100.000% 100.000% 0.0184 100.000% 100.000% 0.0056 94.941% 100.000% 0.0012 87.650% 96.248% Structure #3: Size(mm) In Out 9.5000 100.000% 100.000% I 4.7500 98.098% 100.000% i 2.0000 72.030% 100.000% 0.4250 63.369% 100.000% I 0.1500 49.366% 100.000% E 0.0750 43.133% 100.000% i Printed 05-29-2023 Filename:KellerSandMine25yr.sc4 r i t r i £ZOZ-6Z-90 POP d ��s a�(gZauiWpueglaf�a�{:aweua(!� %000"OOT %8LS'0£ ZTOO'0 %000100T %L8Z'Z£ 9500'0 %000'OOT %sTV9£ t8T0'0 Tnp uX (ww)azig 9 4cm4.r+tS ] clowod U PUG-U006 i4uF'%uv:) SAAOPUIM 101 t atlOMIS SEDCAD 4 for Windows P—Mm F11UO1_9nln P-1. I RrMueF 7 Structure Detail; Structure #1 (Pond) P-1 Pond Inputs: Initial Pool Elev: 769.00 ft Initial Pool: 0.09 ac-ft *Sediment Storage: 0.33 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser Barrel Number of Diameter Riser Height Diameter Barrel Barrel Slope Manning's n Spillway Elev Holes per (in) (ft) (in) Length(ft) (%) (ft) Elev 24.00 3.00 18.00 128.00 0.75 0.0150 770.00 2 Floating Siphon Crest Elev Inlet Elev Outlet Elev Di(me)ter Length(ft) Manning's n 772.00 769.00 767.50 2.00 100.00 0.0140 Emergency Soillwav Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 772.00 10.00 3.00:1 3.00:1 10.00 Pond Results: Peak Elevation: 772.32 ft H'graph Detention Time: 2.67 hrs Pond Model: CSTRS Dewater Time: 1.39 days Trap Efficiency: 83.56% Dewatenng time is calculated from peak stage to lowest spillway Elevation-Capad!)LDischarge Table Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows en,w.u,n�+oan_omnoomd� i s�M.on 8 Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 768.74 0.339 0.000 0.000 Top of Sed.Storage 769.00 0.360 0.090 0.000 Law hole SPW#1 769.50 0.404 0.281 0.215 10.75* 770.00 0.450 0.495 0.285 10.35 Spillway#1 770.50 0.501 0.732 6.970 10.70 771.00 0.555 0.996 13.430 0.45 771.50 0.611 1.287 14.093 0.35 772.00 0.670 1.607 14.726 0.45 Spillway#2 Spillway#3 772.32 0.672 1.825 16.470 0.40 Peak Stage 772.50 0.685 1.946 17.440 773.00 0.700 2.292 46.011 Detailed Discharge Table Combined Elevation Perf. Riser(cfs) Floating Siphon Emergency Total (ft) (cfs) Spillway(cfs) Discharge (cfs) 768.74 0.000 0.000 0.000 0.000 769.00 2.00>0.000 0.000 0.000 0.000 769.50 0.149 0.066* 0.000 0.215 770.00 0.210 0.075* 0.000 0.285 770.50 6.886 0.083* 0.000 6.970 771.00 13.339 0.091* 0.000 13.430 771.50 13.995 0.098* 0.000 14.093 772.00 14.622 0.105 0.000 14.726 772.50 15.223 0.111 2.106 17.440 773.00 15.801 0.117 30.093 46.011 Structure #2(Ponds P-2 Pond Inputs: Initial Pool Elev: 766.50 ft Initial Pool: 0.15 ac-ft *Sediment Storage: 0.00 ac-ft Dead Space: 20.00% *5ed1ment capacity was entered by user Perforated Riser Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows f`nnurinht 1 QGR-9nI n Pomo17 I CrhMroh 9 Riser g Barrel Number of Riser Height Barrel Barrel Slope Ss n (p }Spillway Elev Diameter (ft) Diameter Length(ft) (7o Mannin ft Holes per (in) (in) o ) Elev 24.00 5.00 18.00 220.00 0.50 0.0150 770.00 2 Emergency Spillway Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 771.00 10.00 3.00:1 3.00:1 10.00 Pond Results: Peak Elevation: 770.96 ft Kgraph Detention Time: 5.23 hrs Pond Model: CSTRS Dewater Time: 2.20 days Trap Efficiency: 8.93% Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (dfs) (hrs) 765.00 0.000 0.000 0.000 Top of Sed.Storage 765.50 0.043 0.007 0.000 766.00 0.170 0.057 0.000 766.50 0.209 0.151 0.000 Low hole SPW#1 767.00 0.252 0.266 0.149 9.37* 767.50 0.299 0.404 0.210 7.92* 768.00 0.350 0.566 0.406 4.83* 768.50 0.369 0.746 0.507 6.60 769.00 0.389 0.935 0.738 5.60 769.50 0.409 1.135 0.871 4.35 770.00 0.430 1.345 0.983 7.00 Spillway#1 770.50 0.449 1.564 6.886 6.20 770.96 0.468 1.778 13.024 0.90 Peak Stage 771.00 0.469 1.794 13.496 Spillway#2 771.50 0.489 2.034 16.069 772.00 0.510 2.283 44.508 772.50 0.554 2.549 80.830 773.00 0.600 2.838 128.194 *Designates time(s)to dewater have been extrapolated beyond the 50 hour hydrograph limit. Filename:KellerS and Mine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows rn-Hnh,toes_onln P-tu 1 R,6umh 10 Detailed Discharge Table Combined Elevation Emergency Total (ft) Perf.Riser(cfs) Spillway(cis) Discharge (cis) 765.00 0.000 0.000 0.000 765.50 0.000 0.000 0.000 766.00 0.000 0.000 0.000 766.50 2.00>0.000 0.000 0.000 767.00 0.149 0.000 0.149 767.50 2.00>0.210 0.000 0.210 768.00 0.406 0.000 0.406 768.50 2.00>0.507 0.000 0.507 769.00 0.738 0.000 0.738 769.50 0.871 0.000 0.871 770.00 0.983 0.000 0.983 770.50 6.886 0.000 6.886 771.00 13.496 0.000 13.496 771.50 13.963 2.106 16.069 772.00 14.415 30.093 44.508 772.50 14.854 65.976 80.830 773.00 15.279 112.915 128.194 Structure #3(Pond) P-3 Pond Inputs: Initial Pool Elev: 766.00 ft Initial Pool: 0.51 ac-ft *Sediment Storage: 0.63 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser Barrel Number of Diameter Riser(ft) Diameter Baelft Barre�l*Slope Manning's n Spillway Elev Holes per (In) ( ) (In) Length( ) ( ) ( ) Elev 36.00 7.001 18.00 100.00 1.00 0.0150 771.50 2 Floating Siphon Crest Elev Inlet Elev Outlet Elev Diameter Length(ft) Manning's n (in) 772.00 766.00 763.00 2.00 100.00 0.0140 Filename:KelierSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows (tnnutinhl 1 QOR_OfN n Pomcin i QPhuroh 11 Emergency Spillway Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 772.00 10.00 3.00:1 3.00:1 20.00 Pond Results: Peak Elevation: 772.20 ft H'graph Detention Time: 4.21 hrs Pond Model: CSTRS Dewater Time: 20.44 days Trap Efficiency: 79.58% Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) ffs) (hrs) 765.32 0.630 0.000 0.000 Top of Sed.Storage 765.50 0.688 0.119 0.000 766.00 0.870 0.508 0.000 766.50 0.909 0.952 0.091 59.21* 767.00 0.948 1.417 0.098 57.31* 767.50 0.989 1.901 0.105 55.92* 768.00 1.030 2.405 0.111 54.90* Low hole SPW#1 768.S0 1.071 2.931 0.154 41.16* 769.00 1.113 3.477 0.176 37.63* 769.50 1.156 4.044 0.193 35.57* 770.00 1.200 4.633 0.208 34.20* 770.50 1.241 5.244 0.260 28.45* 771.00 1.284 5.875 0.288 26.52* 771.50 1.326 6.527 0.312 25.30* Spillway#1 772.00 1.370 7.201 10.484 33.05 Spillway#2 Spillway#3 772.20 1.419 7.487 15.735 1.30 Peak Stage 772.50 1.459 7.908 23.471 773.00 1.550 8.660 75.399 *Designates time(s)to dewater have been extrapolated beyond the 50 hour hydrograph limit: Detailed Discharge Table Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r:nroninht 1 PQR_*mi n Pomola I Crrh%At*h 12 Combined Elevation Floating Siphon Emergency Total ft Perf.Riser(cfs) Spillway( ) (cfs) (cfs) Discharge (cfs) 765.32 0.000 0.000 0.000 0.000 765.50 0.000 0.000 0.000 0.000 766.00 0.000 0.000 0.000 0.000 766.50 0.000 0.091* 0.000 0.091 767.00 0.000 0.098* 0.000 0.098 767.50 0.000 0.105* 0.000 0.105 768.00 1.00>0.000 0.111* 0.000 0.111 768.50 0.037 0.117* 0.000 0.154 769.00 0.053 0.123* 0.000 0.176 769.50 0.064 0.129* 0.000 0.193 770.00 1.00>0.074 0.134* 0.000 0.208 770.50 0.120 0.139* 0.000 0.260 771.00 0.143 0.144* 0.000 0.288 771.50 0.163 0.149* 0.000 0.312 772.00 10.330 0.154 0.000 10.484 772.50 19.167 0.159 4.145 23.471 773.00 19.692 0.164 55.544 75.399 Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows 13 Subwatershed Hydrology Detail; SWS Area Time of Musk K Curve Peak Runoff #S SWS Conc Musk X UHS Discharge Volume # # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 0.600 0.001 0.096 0.242 91.000 TR55 2.64 0.248 2 7.500 0.115 0.000 0.000 91.000 TP55 32.97 3.102 3 3.600 0.093 0.092 0.267 74.000 TR55 11.99 0.957 E 11.700 46.89 4.307 #2 1 0.800 0.001 0.123 0.231 86.000 TR55 3.32 0.294 E 12.500 19.64 4.554 #3 1 2.100 0.092 0.060 0.307 91.000 TR55 9.23 0.868 2 13.200 0.118 0.000 0.000 91.000 TR55 58.03 5.460 3 9.600 0.163 0.091 0.267 74.000 TR55 30.06 2.594 37.400 93.82 13.186 Subwatershed Sedimentology Detail.- Peak Peak Stru SWS Soil K L(ft) S(%) C P PS# Sediment Sediment Settleable 24VW # # (tons) Conc. Conc (ml/I) (mg/1) (ml/l) #1 1 0.170 50.00 33.00 0.4500 1.0000 1 22.2 116,831 75.83 41.22 2 0.170 100.00 5.00 0.4500 1.0000 1 60.0 25,422 16.50 9.15 3 0.240 100.00 5.00 0.3600 1.0000 1 19.9 28,780 18.68 9.84 102.0 33,942 22.03 11.19 #2 1 0.170 50.00 33.00 0.4500 1.0000 1 27.8 122,038 79.21 43.37 1 16.8 4,023 0.06 0.04 #3 1 0.240 100.00 5.00 0.0820 1.0000 1 3.7 5,748 3.73 2.03 2 0.170 100.00 2.00 0.4500 1.0000 1 45.7 11,067 7.18 3.98 3 0.240 100.00 5.00 0.0820 1.0000 1 13.1 6,965 4.48 2.39 77.8 10,006 5.21 2.45 Subwatershed Time of Concentration Details: Stru SWS Vert.Dist. Horiz.Dist. Velocity Time(hrs) # # Land Flaw Condition Slope(Mo) (ft) (ft) (fps) #1 1 5.Nearly bare and untilled,and 50.00 24.00 48.00 7.070 0.001 alluvial valley fans #1 1 Time of Concentration: 0.001 Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for Windows r`nrrnirinhl loon_inin oamnla I Crhumh 14 Stru SWS Land Flow Condition Slope(%) Vert.Dist. Horiz.Dist. Velocity Time(hrs) # # (ft) (ft) (fps) #1 2 5.Nearly bare and untilled,and 2.46 16.00 650.00 1.560 0.115 alluvial valley fans #1 2 Time of Concentration: 0.115 #1 3 3.Short grass pasture 5.32 33.00 620.00 1.840 0.093 #1 3 Time of Concentration: 0.093 #2 1 S.Nearly bare and untilled,and 5.33 32.00 600.00 2.300 0.072 alluvial valley fans #2 1 Time of Concentration: 0.001 #3 1 3.Short grass pasture 5.67 36.00 635.00 1.900 0.092 #3 1 Time of Concentration: 0.092 #3 2 S.Nearly bare and untilled,and 2.00 12.00 600.00 1.410 0.118 alluvial valley fans #3 2 Time of Concentration: 0.118 #3 3 2.Minimum tillage cultivation 4.72 30.00 635.00 1.080 0.163 #3 3 Time of Concentration: 0.163 Subwatershed Muskingum Routing Details. Stru SWS Vert.Dist. Horiz.Dist. Velocity # # Land Flow Condition Slope{%) (ft) (ft) (fps) Time(hrs) #1 1 5.Nearly bare and untilled,and 2.55 14.00 550.00 1.590 0.096 alluvial valley fans #1 1 Muskingum K: 0.096 #1 3 S.Nearly bare and untilled,and 32.73 18.00 55.00 5.720 0.002 alluvial valley fans 5.Nearly bare and untilled,and 2.40 12.00 500.00 1.540 0.090 alluvial valley fans #1 3 Muskingum K: 0.092 #2 1 5.Nearly bare and untilled,and 2.33 14.00 600.00 1.520 0.109 alluvial valley fans #2 1 Muskingum K: 0.123 #3 1 5.Nearly bare and untilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans S.Nearly bare and untilled,and 5.88 30.00 510.00 2.420 0.058 alluvial valley fans #3 1 Muskingum K: 0.060 #3 3 5. Nearly bare and untilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans 5.Nearly bare and untilled,and 2.55 13.00 510.00 1.590' 0.089 alluvial valley fans #3 3 Muskingum K: 0.091 Filename:KellerSandMine25yr.sc4 Printed 05-29-2023 SEDCAD 4 for windows f:ntt«rinhf 404A_7f11A P�mcl� 1 Crhuofi Keller MininqmSand Mine & Recvcle Kannapolis, Nc MGE Pro '. 220703.440 50 YR124 HR STORM Jerry L. Meade MEADE GUNNELL engineering, PC P.O. Box 790 Cornelius, NC 28031 Phone: 704-655-7290 Email: jmeade@meadegunnell.com Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows f nrnsrinh4 1 QQR-,)nl n Pamnfa 1 2 General.Information Storm .Information: Storm Type: NRCS Type II Design Storm: 50 yr-24 hr Rainfall Depth: 6.770 inches Particle Size Distribution: Size(mm) S-2 9.5000 100.000% 4.7500 97.000% 2.0000 64.700% 0.4250 54.000% 0.1500 36.700% 0.0750 29.000% 0.0184 20.700% 0.0056 15.600% 0.0012 14.400% Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows remwinfi4-taaR-,)nin Pamela I CrhiArah 3 Structure Networking: Type Stru (flows Stru Musk.K Musk.X Description # into) # (hrs) Pond #1 =_> #2 0.000 0.000 P-1 Pond #2 =_> #3 0.000 0.000 P-2 Pond #3 =_> End 0.000 0.000 P-3 #1 Pond #2 Pond #3 Pond Filename:KellerSandMine25yr.se4 Printed 05-30-2023 SEDCAD 4 for Windows r.nnvrinhf 1QQii_'7n1n Pamcla I Crhti►iah 4 Structure Summary: Immediate Total Peak Total Peak Peak Contributing Contributing Runoff Sediment Sediment Settleable 24VW Area Area Discharge Volume (tons) Conc. Conc. (MI/1) (ac) (ac) ( S) (ac-it) (mg/0 (ml/I) In 53.91 5.00 119.6 341104 22.13 11.30 #1 11.700 11.700 Out 26.61 4.96 19.8 4,392 0.07 0.05 In 30.30 5.30 19.9 4,182 0.07 0.05 #2 0.800 12.500 Out 13.90 5.00 18.3 3,441 0.00 0.00 In 108.69 15.40 90.8 10,039 5.18 2.42 #3 24.900 37.400 Out 21.49 9.38 21.4 21014 0.00 0.00 Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows r`.nn%mnht 1 QQA-7nl n Pamcla I C,-h%AlMh 5 Particle Size Distributions) at Each Structure Structure #1 (P-1): Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 97.022% 100.000% 2.0000 64.715% 100.000% 0.4250 54.012% 100.000% 0.1500 36.708% 100.000% 0.0750 29.007% 100.000% 0.0184 20.705% 100.000% 0.0056 15.604% 94.202% 0.0012 14.403% 86.956% Structure #2 (P-2): Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 100.000% 100.000% 2.0000 100.000% 100.000% 0.4250 100.000% 100.000% 0.1500 100.000% 100.000% 0.0750 100.000% 100.000% 0.0184 100.000% 100.000% 0.0056 94.212% 100.000% 0.0012 86.977% 94.592% Structure #3: Size(mm) In Out 9.5000 100.000% 100.000% 4.7500 98.247% 100.000% 2.0000 72.803% 100.000% 0.4250 64.088% 100.000% 0.1500 49.998% 100.000% 0.0750 43.727% 100.000% Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 I a SEDCAD 4 for Windows f.nnu inhf 4QOR_gnln Pammia 1 Crh%AmK 6 Size(mm) In Out 0.0184 36.967% 100.000% 0.0056 32.813% 100.000% 0.0012 30.749% 100.000% Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows n,.mm�e��oon_omn a�mei= i c�m.pe Structure Detail. Structure #1 (Pond) P-1 Pond Inputs: Initial Pool Elev: 769.00 ft Initial Pool: 0.09 ac-ft *Sediment Storage: 0.33 ac-ft Dead Space: 20.00% *Sediment opacity was entered by user Perforated Riser Riser Barrel Number of Diameter Riser Height Diameter Barrel Barrel Slope Manning's n Spillway Elev Holes per (in) (ft) (in) Length(ft) (%) (ft) Elev 24.00 3.00 18.00 128.00 0.75 0.0150 770.00 2 Floating Siphon Crest Elev Inlet Elev, Outlet Elev DI`mle)ter Length(ft) Manning's n 772.00 769.00 767.50 2.00 100.00 0.0140 Emergency Spillway Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 772.00 10.00 3.00:1 3.00:1 10.00 Pond Results: Peak Elevation: 772.66 ft H'graph Detention Time: 2.45 hrs Pond Model: CSTRS Dewater Time: 1.40 days Trap Efficiency: 83.44% Dewatering time is calculated from peak stage to lowest splllway Elevation-Capacity-Discharge Table Filename:KellerSandMine25yr.so4 Printed 05-30-2023 SEDCAD 4 for Windows r.-mhl iooa-omn c-1. I Q,h-h 8 Area Capacity Discharge D Timeer Elevation me (ac) (ac-ft) (ds) (hrs) 768.74 0.339 0.000 0.D00 Top of Sed.Storage 769.00 0.360 0.090 0.000 Low hole SPW#1 769.50 0.404 0.281 0.215 10.75* 770.00 0.450 0.495 0.285 10.40 Spillway#1 770.50 0.501 0.732 6.970 10.50 771.00 0.555 0.996 13.430 0.50 771.50 0.611 1.287 14.093 0.35 772.00 0.670 1.607 14.726 0.40 Spillway#2 Spillway#3 772.50 0.685 1.946 17.440 0.55 772.66 0.690 2.057 26.614 0.15 Peak Stage 773.00 0.700 2.292 46.011 Detailed Discharge Table Combined Elevation Perf. Riser(cfs) Floating Siphon Emergency Total Spillway O (cfs) (cfs) Discharge (cfs) 768.74 0.000 0.000 0.000 0.000 769.00 2.00>0.000 0.000 0.000 0.000 769.50 0.149 0.066* 0.000 0.215 770.00 0.210 0.075* 0.000 0.285 770.50 6.886 0.083* 0.000 6.970 771.00 13.339 0.091* 0.000 13.430 771.50 13.995 0.098* 0.000 14.093 772.00 14.622 0.105 0.000 14.726 772.50 15.223 0.111 2.106 17.440 773.00 15.801 0.117 30.093 46.011 Structure #2(Pond) P-2 Pond Inputs: Initial Pool Elev: 766.50 ft Initial Pool: 0.15 ac-ft *Sediment Storage: 0.00 ac-ft Dead Space: 20.00% *Sed%?lent capacty was entered by user Perforated Riser Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows rnmirinh}1QQfi_7nin Pamola I Crhumh 9 Riser Barrel Number of Riser Height Barrel Barrel Slope Spillway Elev Diameter (ft} Diameter Length(ft) (%} Manning s n (ft) Holes per (in) (in) Elev 24.00 5.001 18.00 220.00 0.501 0.0150 770.00 2 Emergency Spillway Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 771.00 10.00 3.00:1 3.00:1 10.00 Pond Results: Peak Elevation: 771.08 ft H'graph Detention Time: 4.61 hrs Pond Model: CSiRS Dewater Time: 2.21 days Trap Efficiency: 8.05 Dewatering time is calculated from peak stage to lowest spillway Elevation-Capacity-Discharge Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 765.00 0.000 0.000 0.000 Top of Sed.Storage 765.50 0.043 0.007 0.000 766.00 0.170 0.057 0.000 766.50 0.209 0.151 0.000 Low hole SPW#1 767.00 0.252 0.266 0.149 9.37* 767.50 0.299 0.404 0.210 7.92* 768.00 0.350 0.566 0.406 4.83* 768.50 0.369 0.746 0.507 6.50 769.00 0.389 0.935 0.738 5.55 769.50 0.409 1.135 0.871 4.35 770.00 0.430 1.345 0.983 6.20 Spillway#1 770.50 0.449 1.564 6.886 7.30 771.00 0.469 1.794 13.496 0.75 Spillway#2 771.08 0.472 1.832 13.900 0.30 Peak Stage 771.50 0.489 2.034 16.069 772.00 0.510 2.283 44.508 772.50 0.554 2.549 80.830 773.00 0.600 2.838 128.194 *Designates times)to dewater have been extrapolated beyond the 50 hour hydrograph limit. Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows r. m h,4Q.R-9OID P-1. I RQ,h-F 10 Detailed Discharge Table Combined Elevation Emergency Total (ft) Perf. Riser(ds) Spillway(cfs) Discharge (cfs) 765.00 0.000 0.000 0.000 765.50 0.000 0.000 0.000 766.00 0.000 0.000 0.000 766.50 2.00>0.000 0.000 0.000 767.00 0.149 0.000 0.149 767.50. 2.00>0.210 0.000 0.210 768.00 0.406 0.000 0.406 768.50 2.00>0.507 0.000 0.507 769.00 0.738 0.000 0.738 769.50 O.B71 0.000 0.871 770.00 0.983 0.000 0.983 770.50 6.886 0.000 6.886 771.00 13,496 0.000 13.496 771.50 13.963 2.106 16.069 772.00 14.415 30.093 44.508 772.50 14.854 65.976 80.830 773.00 15.279 112.915 128.194 Structure #3(Pondl P-3 Pond Inputs: Initial Pool Elev: 766.00 ft Initial Pool: 0.51 ac-ft *Sediment Storage: 0.63 ac-ft Dead Space: 20.00% *Sediment capacity was entered by user Perforated Riser Riser Barrel Number of Diameter RiserftHelc Diameter Length(ft) Barrel lope Manning's n Spillwafty Elev Holes per (in) ( ) (in) ( ) ( ) ( ) Elev 36.00 7.001 18.00 100.00 1.00 0.0150 771.50 2 Floating_Siphon Crest Elev Inlet Elev Outlet Elev Diameter Length(ft) Manning's n 772.00 766.00 763.00 2.00 100.00 0.0140 Filename:KellerSand1V1rne25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows r.nrnrrinh41aaA_9Mlt Domain I Qf-h%A#Oh 11 Emergency Spillway Spillway Elev Crest Length Left Right Bottom (ft) Sideslope Sideslope Width(ft) 772.00 10.00 3.00:1 3.00:1 20.00 Pond Results: Peak Elevation: 772.42 ft H'graph Detention Time: 3.31 hrs Pond Model: CSTRS Dewater Time: 20.47 days Trap Efficiency: 76.43% Dewatering time is calculated from peak stage to lowest spillway Elevation-Ca pacity-Dischar eq Table Area Capacity Discharge Dewater Elevation Time (ac) (ac-ft) (cfs) (hrs) 765.32 0.630 0.000 0.000 Top of Sed.Storage 765.50 0.688 0.119 0.000 766.00 0.870 0.508 0.000 766.50 0.909 0.952 0.091 59.21* 767.00 0.948 1.417 0.098 57.31* 767.50 0.989 1.901 0.105 55.92* 768.00 1.030 2.405 0.111 54.90* Low hole SPW#1 768.50 1.071 2.931 0.154 41.16* 769.00 1.113 3.477 0.176 37.63* 769.50 1.156 4.044 0.193 35.57* 770.00 1.200 4.633 0.208 34.20* 770.50 1.241 5.244 0.260 28.45* 771.00 1.284 5.875 0.288 26.52* 771.50 1.326 6.527 0.312 25.30* Spillway#1 Spillway#2 772.00 1.370 7.201 10.484 33.05 Spillway#3 772.42 1.449 7.800 21.487 2.00 Peak Stage 772.50 1.459 7.908 23.471 773.00 1.550 8.660 75.399 *Designates times)to dewater have been extrapolated beyond the 50 hour hydrograph limit Detailed Dischar a Table Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 J • SEDCAD 4 for Windows (:nnvrinht 1GCR_inin Damnia I Crhutah 12 Combined Elevation Perf.Riser(cfs) Floating Siphon Emergency Total (ft) (cfs) Spillway(cfs) Discharge (cfs) 765.32 0.000 0.000 0.000 0.000 765.50 0.000 0.000 0.000 0.000 766.00 0.000 0.000 0.000 0.000 766.50 0.000 0.091* 0.000 0.091 767.00 0.000 0.098* 0.000 0.098 767.50 0.000 0.105* 0.000 0.105 768.00 1.00>0.000 0.111* 0.000 0.111 768.50 0.037 0.117* 0.000 0.154 769.00 0.053 0.123* 0.000 0.176 769.50 0.064 0.129* 0.000 0.193 770.00 1.00>0.074 0.134* 0.000 0.208 770.50 0.120 0.139* 0.000 0.260 771.00 0.143 0.144* 0.000 0.288 771.50 0.163 0.149* 0.000 0.312 772.00 10.330 0.154 0.000 10.484 772.50 19.167 0.159 4.145 23.471 773.00 19.692 0.164 55.544 75.399 Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 SEDCAD 4 for Windows 13 Subwatershed Hydrology Detail, SWS Area Time of Musk K Curve Peak Runoff # # S SWS Conc Musk UHS Discharge Volume # (ac) (hrs) (hrs) Number (cfs) (ac-ft) #1 1 0.600 0.001 0.096 0.242 91.000 TR55 3.00 0.285 2 7.500 0.115 0.000 0.000 91.000 TR55 37.46 3.568 3 3.600 0.093 0.092 0.267 74.000 TR55 14.19 1.152 E 11.700 53.91 5.004 #2 1 0.800 0.001 0.123 0.231 86.000 TR55 3.81 0.342 E 12.500 30.30 5.300 #3 1 2-100 0.092 0.060 0.307 91.000 7R55 10.49 0.999 2 13.200 0.118 0.000 0.000 91.000 TRSS 65.93 6.279 3 9.600 0.163 0.091 0.267 74.000 TR55 35.93 3.122 1 37.400 108.69 15.403 Subwatershed Sedimentology Detail., Peak Peak Stru SWS Sediment Sediment Settleable 24VW # # Soil K L(ft) S(%) C P PS# Conc. Conc (tons) (ml/I) (mg/1) (ml/1) #1 1 0.170 50.00 33.00 0.4500 1.0000 1 25.8 118,172 76.70 41.58 2 0.170 100.00 5.00 0.4500 1.0000 1 69.6 25,704 16.68 9.24 3 0.240 100.00 5.00 0.3600 1.0000 1 24.2 28,941 18.78 9.96 119.6 34,104 22.13 11.30 #2 1 0.170 50.00 33.00 0.4500 1.0000 1 32.6 123,303 80.03 43.77 E 19.9 4,182 0.07 0.05 #3 1 0.240 100.00 5.00 0.0820 1.0000 1 4.3 S,816 3.77 2.05 2 0.170 100.00 2.00 0.4500 1.0000 1 53.1 11,190 7.26 4.02 3 0.240 100.00 5.00 0.0820 1.0000 1 16.1 7,066 4.55 2.44 71 90.8 10,039 5.18 2.42 Subwatershed Time of Concentration Details; Stru SWS Land Flow Condition Slope(%) Vert. Dist. Horiz. Dist. Velocity Time(hrs) # # (R) (ft) (fps) #1 1 S.Nearly bare and unfilled,and 50.00 24.00 48.00 7.070 0.001 alluvial valley fans #1 1 Time of Concentration: 0.001 Filename:KellerSandMine25yr.so4 Printed 05-30-2023 i SEDCAD 4 for Windows (:nnvrinhf'Iawt_7fnin Pamaia i Crhurah 14 Stru SWS Vert.Dist. Horiz.Dist. Velocity # # Land Flow Condition Slope(%) (ft) (ft) (fps) Time(hrs) #1 2 5.Nearly bare and unfilled,and 2.46 16.00 650.00 1.560 0.115 alluvial valley fans #1 2 Time of Concentration: 0.115 #1 3 3.Short grass pasture 5.32 33.00 620.00 1.840 0.093 #1 3 Time of Concentration: 0.093 #2 1 5.Nearly bare and untilled,and 5.33 32.00 600.00 2.300 0.072 alluvial valley fans #2 1 Time of Concentration: 0.001 #3 1 3.Short grass pasture 5.67 36.00 635.00 1.900 0.092 #3 1 Time of Concentration: 0.092 #3 2 5.Nearly bare and untilled,and 2.00 12.00 600.00 1.410 0.118 alluvial valley fans #3 2 Time of Concentration: 0.118 #3 3 2.Minimum tillage cultivation 4.72 30.00 635.00 1.080 0.163 #3 3 Time of Concentration: 0.163 su�bwatershed Muskingum Routing Details: Stru SWS Land Flow Condition Slope(%) Vert.Dist. Horiz. Dist. Velocity Time(hrs) # # (ft) (ft) (fps) #1 1 5.Nearly bare and untilled,and 2.55 14.00 550.00 1.590 0.096 alluvial valley fans #1. 1 Muskingum K: 0.096 #1 3 S.Nearly bare and unfilled,and 32.73 18.00 55.00 5.720 0.002 alluvial valley fans 5.Nearly bare and unfilled,and 2.40 12.00 500.00 1.540 0.090 alluvial valley fans #1 3 Muskingum K: 0.092 #2 1 5.Nearly bare and untilled,and 2.33 14.00 600.00 1.520 0.109 alluvial valley fans #2 1 Muskingum K: 0.123 #3 1 S.Nearly bare and untilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans S.Nearly bare and untitled,and 5.88 30.00 510.00 2.420 0.058 alluvial valley fans #3 1 Muskingum K: 0.060 #3 3 5.Nearly bare and unfilled,and 32.00 16.00 50.00 5.650 0.002 alluvial valley fans 5.Nearly bare and untilled,and 2.55 13.00 510.00 1.590 0.089 alluvial valley fans #3 3 Muskingum K: 0.091 Filename:KellerSandMine25yr.sc4 Printed 05-30-2023 4 0 SEDCAD 4.0 (`nnrrinht'1 QQA_7f19(1 Pnmolo I Crh+unh 1 D-1 Diversion Ditch Material: Coarse gravel noncolloidal Trapezoidal Channel Left Right Freeboard Freeboard Freeboard Limiting Bottom Width(ft) Sideslo a Sideslo a Slope Mannin 's n Depth(ft) of Depth Mult.x Velocit y Ratio Ratio (VxD) (fps) 20.00 3.0:1 3.0:1 2.0 0.0250 0.50 1 6.0 w/o Freeboard w/Freeboard Design Discharge: 75.00 cfs Depth: 0.60 ft 1.10 ft Top Width: 23.63 ft 26.63 ft Velocity: 5.68 fps X-Section Area: 13.19 sq ft Hydraulic Radius: 0.554 ft Froude Number: 1.34 SEDCAD Utility Run Printed 05-30-2023